Upload
vandung
View
218
Download
1
Embed Size (px)
Citation preview
COMPANY PROFILE | EDITION 2
2018
CONTENT
ABOUT US 03
BUILDING PROJECTS 06
CIVIL PROJECTS 12
PROJECT HISTORY 23
ANNEXURE 27
VISION: To be a leading medium-sized construction company.To aspire to world-class fulfilment in everything we do. To be trusted and respected, and consistently creating value for our stakeholders
through sustainable construction related activities.
MISSION:To deliver a high-quality product with differentiated, superb finishes that satisfy our clients. To improve productivity throughout all operations while still honouring our commitment to quality. We strive to build lifetime relationships with clients and provide employees with challenging but rewarding career development opportunities.
GREETINGSCOMPANY PROFILE | 01
COMPANY PROFILE | 03
Spectrum of work Tyris Construction was formed in 1995 on the back of tenders won to conduct repairs at two Eskom substations. The Company soon fostered an excellent reputation building residential, commercial and retail structures with the introduction of Tyris Realty in 2002 and Tyris Plant Hire in 2007. These three divisions were combined to form the Tyris Group.
Tyris Construction has established a solid reputation for delivering architectural craftsmanship and engineering whilst providing turnkey solutions for clients. Tyris fosters a distinct Company culture and a true sense of family, committed to building
relationships based on trust, integrity and respect.
Our Projects include:
• Large turnkey property development projects;
• Prime residential and commercial development;
• Renovation, restoration and alteration projects;
• Civil construction work for Eskom;
• Sewer, water and storm water reticulation; and
• Bulk earthworks
ABOUT US
CIDB (Construction Industry Development Board)
Tyris Construction has been certified as a Grade 8GB PE & 8CE PE and supports the Board’s continued drive to improve the construction industry in South Africa and enhance value to clients and society.
NHBRC (National Home Builders Registration Council)
Tyris Construction is registered with the NHBRC and is committed to delivering sustainable, quality homes.
BBBEE (Broad Based Black Economic Empowerment)
Tyris Construction is a Level 2 contributor and as a company, we believe that the broad-based nature of empowerment in South Africa presents an effective solution to addressing historic economic and social inequalities and to this end, Tyris Construction complies with the “Employment Equity Act (No 55 of 1998)” and actively participates in the development of the Construction Sector Charter.
SHEQ Management (Broad Based Black Economic Empowerment)
• Tyris is internationally certified for ISO 9001:2008 and OHSAS 18001:2007 by TUV-Rheinland
• The Tyris Environmental Management System (EMS) also conforms to the ISO 14001:2004 and plans are being finalised to obtain a formal certification
COMPANY PROFILE | 05
COMPANY PROFILE | 07
COMPANY PROFILE | 09
The Prinshof Lecture Hall Complex at the
University of Pretoria was awarded to Tyris
Construction based on the reference
provided by Wits University.
Completed in Dec 2015, this four-story building complex of approximately 11 500 m2 comprised of a semi-basement, four 400-seater lecture halls, 66 administration offices interstitial floors for student studying, a student health clinic, cafeteria, gym and external works.
The interesting façade of the building was a monumental task and the first undertaking of its kind in South Africa. The Grata Brise Soleil sunscreen louvres, Carl Stahl Cable system, Mentis Grip Weld gratings and powder coated infused steel plates gave the building a wave effect. Other challenges faced included heavy rains and flooding during basement construction, a steel strike and glass shortages. All which Tyris overcame, with the Project completed on time and within budget to the complete satisfaction of the Client. See Testimonial Annexure
BUILDINGPROJECTS
COMMERCIAL & INDUSTRIAL
UNIVERSITY OF PRETORIACOMMERCIAL & INDUSTRIAL
For a complete list of our projects, please visit www.tyris.co.za/construction
The Evergreen Lifestyle Centre
in Fourways, Johannesburg is a
2000m2 facility and forms part of
an existing Evergreen Retirement
Village. Completed in 2017, the
facility includes 32 intensive care
rooms, dining area, kitchen,
restaurant, indoor swimming pool
and gym.
EVERGREEN LIFESTYLE CENTRERESIDENTIAL BUILDING
PROJECTS
For a complete list of our projects, please visit www.tyris.co.za/construction
COMPANY PROFILE | 11
COMPANY PROFILE | 13
Teamwork and good communication
formed the backbone of this Project. The
warehouse, located in Germiston, was
completed in March 2017 and measures
6,790 m2 with a 370mm steel-fiber
reinforced floor and 800 ton steel structure.
Our reputation and experience led to
successfully being awarded a project by
Amdec Property Development, owners
of Melrose Arch, for the construction of
47 unique retirement units in Broadacres,
Fourways.
ROTEK RMSF WAREHOUSECOMMERCIAL & INDUSTRIAL
EVERGREEN NOORDHOEKRESIDENTIAL
EVERGREEN RETIREMENT VILLAGE
RESIDENTIAL
THE EDGERESIDENTIAL
Located in the town of Noordhoek, Cape
Town, the Evergreen Noordhoek project
shows both Tyris Construction’s expertise
and craftsmanship. Phase 1 handover
of the 3-bedroom homes with double
garages took place in March 2018.
The Edge residential development
in Sunninghill / Barbeque Downs was
completed in March 2018 and features
11 blocks with 130 apartments. This
development was the last project in
the area, with Tyris successfully handing
over a total of 492 units since 2015.
See Testimonial Annexure
BUILDINGPROJECTS
For a complete list of our projects, please visit www.tyris.co.za/construction
COMPANY PROFILE | 15
Completed in 2017, Brickfields
North in Johannesburg CBD is
an affordable housing project
consisting of 164 units. Every
delivery, from bricks to concrete
had to be meticulously planned
for, taking aspects such as traffic
in the CBD and the size of delivery
into account. The project was
delivered on time and within
budget, even when faced with
urban challenges.
BRICKFIELDS NORTHRESIDENTIAL BUILDING
PROJECTS
For a complete list of our projects, please visit www.tyris.co.za/construction
COMPANY PROFILE | 17
Tyris Construction has successfully
completed a range of projects for
Exxaro. The showcased project
entailed the construction of a new
laboratory building facility andthe
expansion and alteration of a
diesel and machine workshop.
Tyris also successfully completed
the construction of Waterberg
Access and Logistics upgrade to
the value of R100million. The work
entailed new building and civil
works including 8500m2 concrete
paving and 500 steel carports.
Exxaro GROOTEGELUK COAL MINE
For a complete list of our projects, please visit www.tyris.co.za/construction
BUILDINGPROJECTS
COMPANY PROFILE | 19
CIVILPROJECTS
PINOTAGE
Eskom appointed Tyris Construction
to expand their existing 400kV yard
and built a new 132kV yard for their
substation in the Western Cape.
The substation has the highest
mechanically built retaining wall
at 12 meters high. The Pinotage
substation required the construction
of a 58,000 m2 platform, 7,000
m3 of concrete works, 170 tons
of structural steel, 1,200 m2 high
barrier security fencing and 1,360m
copper earth mat.
PINOTAGE
Eskom appointed Tyris Construction
to expand their existing 400kV
yard and build a new 132kV
yard for their substation in the
Western Cape. The substation has
the highest mechanically built
retaining wall at 12 meters high.
The Pinotage substation required
the construction of a 58,000 m2
platform, 7,000 m3 of concrete
works, 170 tons of structural steel,
1,200 m2 high barrier security
fencing and 1,360m copper earth
mat. See Testimonial Annexure
ESKOMCIVILS
For a complete list of our projects, please visit www.tyris.co.za/construction
COMPANY PROFILE | 21
CIVILPROJECTS
ESKOMCIVILS
SIMMERPAN
Tyris Construction completed a new
88kV yard substation in Simmerpan,
Germiston. The project included bulk
earthworks for a 60,000 m2 platform,
civil works, structural steelwork, external
yard work and ancillary buildings.
For a complete list of our projects, please visit www.tyris.co.za/construction
COMPANY PROFILE | 23
Project Description Contract Value Client Completion Date
Building Project: Construction of a Hotel and Apartment Development R 89 000 000 Private Investment entity represented by OnSite Solutions 2018-Nov
Building Project: Apartment Development including Earthworks & Basement Construction R 43 000 000,00 Amdec Group 2018-Sep
Building Project: Construction of Residential Units at Evergreen Noordhoek Retirement Village R 38 300 000,00 Amdec Group 2018-Apr
Building Project: Demolition, Refurbishment & new School Building R 13 800 000,00 Africrest Properties 2018-Apr
Civil Project: Installation of Civil and Electrical Services R 12 800 000,00 Private Investment entity represented by OnSite Solutions 2018-Apr
Civil Project: Bulk Earthworks and Civil works for new Residential Development R 3 000 000,00 Africrest Properties 2018-Apr
Civil Project: Civil works at the existing 400kV live yard at the Koeberg Substation, Western Cape. R 9 300 000,00 Eskom Holdings Limited 2017-Nov
Building Project: Construction of new Lifestyle Centre for the Evergreen Retirement Village. R 42 000 000,00 Amdec Group 2017-Oct
Building Project: Construction of 130 Residential Apartments in Sunninghill, Gauteng
R 74 300 000,00 Chevreau Development and Construction 2017-Sep
Building Project: Residential construction of 164 Units. Four storey loft units and parking bays. R 66 000 000,00 Brickfields North Housing 2017-Sep
Building Project: Refurbishment the Reception Area, Commercial Kitchen, Canteen and Offices for Building 44 R 7 000 000,00 C S I R 2017-Aug
Civil Project: Bulk Earthworks and all civil related works for a new 400kV and 132 kV yard in the Western Cape. R 142 000 000,00 Eskom Holdings Limited 2017-Jul
Civil Project:Bulk earthworks and installation of all internal Civil and Electrical infrastructure for new development in Sandton. R 9 700 000,00 Private Investment entity represented by OnSite Solutions 2017-Jul
Building Project: Apartment Development that comprises of 104 Units, clubhouse, gate house and all related site works. R 72 300 000,00 Private Investment entity represented by OnSite Solutions 2017-Jun
Civil Project: Bulk Earthworks and all civil related works for the purpose for a new 400kV and 132 kV yard. R 88 800 000,00 Eskom Holdings Limited 2017-May
Building Project: Construction of the 7000m2 T.G.S. Rotable Spares Warehouse R 120 700 000,00 Eskom Rotek Industries 2017-Apr
Civil and Building Project : Construction of 176 Residential Apartments. The scope also included bulk earthworks and the installation of civil services R 106 000 000,00 Tyris Realty JV Feenstra Group 2016-Dec
Civil Project: Construction of all civil related works at Hydra Substation to accomodate IPP Integration lcoated in DeAar, Northern Cape Province. R 32 000 000,00 Eskom Holdings Limited 2016-Jul
Civil Project: Construction of civil related works for the purpose of upgrading the existing PaulPuts Substation in DeAar, Northern Cape Province. R 20 800 000,00 Eskom Holdings Limited 2016-Jul
PROJECT
HISTORY
For a complete list of our projects, please visit www.tyris.co.za/construction
COMPANY PROFILE | 25
Project Description Contract Value Client Completion Date
Civil Project: Construction of all civil related works at PaulPuts Substation to accomodate IPP Integration lcoated in the Northern Cape Province. R 6 300 000,00 Eskom Holdings Limited 2016-Feb
Civil Project: Bulk Earthworks and civil construction of New 400kV Niewehoop Substation, and alterations at Aries Substation to accommodate new 400kV line going to Niewehoop Substation located in the Eastern Cape Province.
R 125 100 000,00 Eskom Holdings Limited 2016-Feb
Building Project: Construction of 47 new Residential Units that forms part of Phase 3 of the existing Evergreen Broadacres Retirement Village. R 60 000 000,00 Amdec Group 2016-Feb
Building Project: Prinshof Lecture Hall Complex - 11,500 m² building construction, that comprised of a semi-basement, 4 x 400 seat lecture halls and 66 x administration offices.
R 13 800 000,00 University of Pretoria 2018-Apr
Civil Project: Construction of New 400kV Substation that would extend the capacity of the existing Ferrum Substation R 42 000 000,00 Eskom Holdings Limited 2015-Dec
Building Project: Refurbishments, alterations and upgrades to the existing building 2 basement at the CSIR campus located in Pretoria, Gauteng. R 11 600 000,00 C S I R 2015-Sep
Civil Project: Bullk earthworks and installation of all civil services. R 8 700 000,00 Amdec Group 2015-Aug
Civil Project: Civil construction of New Entrance Gate and Associated Services for Exxaro Grootegeluk Coal Mine situated in Lephalale, Limpopo Province. The main purpose is to allow for increased traffic for the supply of coal for Eskom's new Medupi Power Station.
R 122 400 000,00 Exxaro Coal 2015-Jul
Building Project: Construction of 47 new Residential Units that forms part of Phase 3 of the existing Evergreen Broadacres Retirement Village. R 1 400 000,00 Amdec Group 2015-Jun
Civil & Building Project: Turnkey Project entailed all earthworks and civil works for a 7500m2 Warehouse including a 400m2 office component. R 46 000 000,00 City Industrial Property Fund 2015-May
Building Project : The building construction of 186 Residential Apartments. The scope also included bulk earthworks and the installation of civil services R 85 000 000,00 Tyris Realty JV Group5 2015-Apr
Building Project: Alterations project that included the installation of new mezzanine bondeck floor, refurbishment of existing canteen aswell as the reconfiguration of existing Sisulu Street Pedestrian entrance with a new banking hall.
R 37 000 000,00 South African Reserve Bank 2015-Apr
Civil Project: Civil construction and ancillary builldings for the newly proposed Garona Substation, that would allow for IPP integration. R 13 000 000,00 Eskom Holdings Limited 2014-Nov
Civil Project: Civil construction that entailed the alterations to the existing live Dedisa Substation located in PE, Eastern Cape Province R 3 000 000,00 Eskom Holdings Limited 2014-Nov
Civil Project: Civil construction that entailed the alterations to the existing live Grassridge Substation located in the Eastern Cape Province R 7 600 000,00 Eskom Holdings Limited 2014-Nov
Civil Project: Civil construction that entailed the alterations to the existing Garona Substation located in the Northern Cape Province R 1 100 000,00 Eskom Holdings Limited 2014-Nov
Building Project : Construction of a New Canteen and related facilities for Exxaro Grootegeluk Coal Mine situated in Lephalale, Limpopo Province R 12 000 000,00 Exxaro Coal 2014-Oct
Civil Project: Civil construction that entailed the alterations to the existing live Spitskop Substation located in the NorthWest Province R 1 400 000,00 Eskom Holdings Limited 2014-Oct
Civil Project: Installation of a new electric fence Security system and oil dam at Mookodi Substation located in the NorthWest Province. R 600 000,00 Eskom Holdings Limited 2014-Sep
For a complete list of our projects, please visit www.tyris.co.za/construction
COMPANY PROFILE | 27
TESTIMONIAL ANNEXURE
COMPANY PROFILE | 29
Tel: +27 12 450 1600 | Fax: +27 12 450 1800 | [email protected]
Office Suite A102 De Goedehoop Office Park, 121 Sovereign DrR21 Corporate Park, Nellmapius Dr, Irene