27
Company Profile Park Centra, 1001, 10th Floor, NH-8, Gurgaon - 122002

Company Profile HNBC

Embed Size (px)

DESCRIPTION

profile

Citation preview

Page 1: Company Profile HNBC

Company Profile

Park Centra, 1001, 10th Floor, NH-8, Gurgaon - 122002

Page 2: Company Profile HNBC

Company Profile

1

“Excellence in Comprehensive, Cost Effective

&

Sustainable Solutions”

Page 3: Company Profile HNBC

Company Profile

2

BACKGROUND

HN Company was established in 1997 with an objective to provide complete solution of problems started

from planning to implementation of work. The quality and timely execution of work is top priority of the

company. After passing juvenile stages of establishment, the company extended its scope of work and

area of expertise in various infrastructural works. The horizon of company extended to various fields to

the satisfaction of clients, which is evident from the credentials issued by the clients. During the formation

of the company, various targeted subsidiary units were formed to handle socialized works separately for

better management practices for faster growth. Under the evolutionary changes, the planning and

consultancy umbrella of HN Company, the units were developed as separate companies. With the

evolutionary changes in policy, the planning and consultancy group has been designated as HN

Business Consultants (HNBC) to bear the responsibility of consulting services and eventually expended

with the inclusion of various specialized sectors. The HNBC was formed in 2011 to function as separate

company and registered under Registrar Firm and Society under the companies act, 1956.

The capacity enhancement of HNBC started with objective to provide proper solution of problem in cost

effective manner. The integrated approach with ensured sustainable conservation and management of

natural resources is our prime concern. The input of subject expert having National and International

repute in technological intervention is used to cope up with the environmental and developmental issues

and problems. Our capabilities range from project identification to assessment and to provide sustainable

planning, which provide us distinct recognition in the consultancy sector. Better planning and latest

technologies makes the projects viable as well as beneficial to the target groups. We provide consultancy

services in the following sectors;

Water Resource Conservation

Water And Wastewater Management

Environment And Environmental Safe Guards

Forest And Ecology

Biodiversity Conservation

Nonconventional Energy

Architecture And Heritage Conservation

Advance Technological Intervention For Cost

Effective Solutions

Infrastructure Planning And Design

Wise Use Of Natural Resources Without Destruction

Risk Assessment And Risk Management

Social Environment And Stakeholder’s Concern

IEC And Public Awareness

Sanitation And Health& Hygiene

City Development Plans

Road And Transport

Tourism And Ecotourism

HN Company Established in

1997 having annual turnover of

Rs. 220 Cr (2011-12)

HNBC came into existence in

2011, under the umbrella of HN

Company

Nationally and Internationally

Experienced, Qualified and

Reputed Experts especially in

Water Resources, Environment

and infrastructure

development.

Client Satisfaction and Timely

action is our Motto

Page 4: Company Profile HNBC

Company Profile

3

VISION AND MISSION

HNBC is offshoot of the HN Company and formed with an objective to accomplish the total solution of environmental problems and sustainable perspective planning through its vision and mission

Vision Statement

“HNBC is committed to be solution provider with integrated approach through experienced and qualified expert’s vision. Defining the problem and issues for techno-economically appropriate

solutions”

Mission Statement

HNBC endeavours to be a “one-stop consultancy” delivering, optimal solutions to all your environmental concerns. Our basic goal is to integrate environmental, ecological health and human safety considerations in our company strategy and to capitalize on environment driven opportunities. We vow to provide value driven output through i) value added and cost effective services to the clients, ii) to improve current practices of the industry through green solution for sustainable development, iii) to find out opportunity to work with the communities; and iv) to implement, conscious minded decisions to mitigate any adverse impact on the environment.

OUR STRATEGIES

Our business strategies are to cater the need of the projects to the best satisfaction of the client. Time

and quality assurance of the deliverables and commitment towards work is our priority and we do adhere

with ToR conditions as may agree for. Our strength is qualified and experienced experts input in the

project to provide best planning alternate. We have and to develop our strength as per requirement of

project and complete task in professional manner. The recognition of our work depends on our strong

technical and professional footings to establish our self in the market.

We are efficient of providing specialized services for preparation of Master Plan, conducting Feasibility

Studies in different areas/ issues, preparation of Detailed Project Report (DPRs) with specific details of

design and drawings, cost estimates, institutional and financial framework, operation and maintenance

plan etc; conducting environmental and social impact assessments, impact evaluations of projects,

project planning, project management and monitoring during and post project implementation including

Water Resources, Solid and Hazardous Waste management, sewerage and drainage system, water

supply system, transport planning and development of road & flyovers.

Our strength is our knowledgeable technical staff and experts of various disciplines that involve

engineers, environmental scientists, planners, architects, geologists, public outreach specialists,

economists, policy experts, social scientists, and legal and regulatory analysts. The reference material

requires for current affair for latest technologies and conducive designing of work is part of our

documentation division. Instrumentation in support of investigation is equipped to strengthen the

technical team for firsthand information, besides the secondary data collected and available to us for

given project.

Our Associates provide authentic data and investigation reports by using latest techniques and software

for better planning. The field staff engaged in survey and investigation is technically sound in operation

of equipment’s and well versed to technology. Our association with academic institutions supports in

academic input and upgraded advance techniques. On shore and offshore input for special works are

Page 5: Company Profile HNBC

Company Profile

4

being taken from the individual capacity as well as institutional support to attend complicated issues.

Nevertheless, our approach to the work is team work where experts of the desired disciplines are

involved and work together for the appropriate solution of tackling issues. Computer software is in

support to the analysis of data interpretation and modeling to thrive conclusive options.

OFFICE DETAILS

Office Address / Tel. Nos.

(Head Office – India)

HN Business Consultants

Park Centra, 1001, 10th Floor,

NH-8, Gurgaon – 122002

Tel. nos. 0124 – 4035 113 / 114

Fax no. : 0124 – 4035 115

Email : [email protected]

Delhi Office

(Present Operation)

C-5/8, Ground Floor,

Safdarjang Development Area,

New Delhi-110 016

Telephone: 011-26533690,

E-mail- [email protected]

Contact Details:

[email protected] www.hnbc.co.in

Chairman & Managing Director

HN Business Consultants Email: [email protected] Cell No.: 91 9810788092

Dr. S. M. Misra Executive Director

HOD, Water Resources E-mail : [email protected] Cell No: 91 9873979586

Page 6: Company Profile HNBC

Company Profile

5

ORGANIZATION AND STAFFING

HNBC is subsidiary of HN Company providing environmental consultancy services, water/wastewater

management, infrastructure and technical services through employing experienced professionals, technical

experts and managers, having substantial expertise in the area of infrastructure, environment, health, safety,

and resource management.

Chairman and Managing Director

Executive Director Operations

Director Finance

Vice President

Finance

Director Administration Director Operations

Vice President Admin

Vice President Projects

(Ops)

Vice President Business

Development

Sr. Accts. Officer Asst. Vice

President Admin Project Manager

Office

Secretary

Executive Director

Finance

Executive Director Administration

Accountant

Asst.

Accountant

Administrator

Sr. Manager

Sr. Engineer

Field Staff Asst.

Administrator Asst. Manager Engineer

CAD & Auto

Desk

Manager

HNBC- Organizational Structure

Page 7: Company Profile HNBC

Company Profile

0

Chairman & Managing Director

Executive Drector Technical

Scientist Pool

Limn

olo

gist

2

Enviro

nm

entalsist

7

Bio

techn

olo

gist

Agricu

lture

Scientist

Micro

bio

logi

st

Ecolo

gist

2

Engineering Pool

Civil

Engin

eer

2

Mech

anical

2

Hyd

rolo

gy

2

Ch

emical

1

Structu

ral

2

Transp

ort

1

Enviro

nm

ental

3

GIS Pool

GIS Exp

ert

2

Social Scientist

Pool

Social Scien

tist

2

Tech

nic

al S

tren

gth

Tech

nical Stren

gth

Technical Support Staff (30 No.)

HNBC- Technical Strength

Page 8: Company Profile HNBC

BUSINESS SECTORS

Page 9: Company Profile HNBC

Company Profile

6

BUSINESS SECTORS

HN group of companies are working in diverse fields which include the turn key projects in the field roads and highways, small hydro-electric plants, non-conventional energy, housing and real estate, development of specific economic zone while HNBC is providing consultancy services in different sectors Water, Environment, Energy, Infrastructure, Natural Resource, Social Development and GIS. Important areas of consultancy services being provided by HNBC are as under;

Water Lakes & Wetlands

Rivers

Groundwater Recycling & Reuse

Water Resources Management

Environment Env. Impact Assessment

Env. Management plan

Environmental Audit Solid Waste

Hazardous Waste

Air Quality

Energy Solar Energy

Hydro Power

Energy Efficiency

Energy Audit

Infrastructure

Drinking water

Wastewater

Drainage & Storm water Desalination

CDP

Real Estates & SEZ

Roads & Transport Landscaping

Eco-planning

Rural Development

Natural Resource Land & Soil Management

Sustainable Agricultural Practices

Forests

Silvi-culture

Natural Resource Management

Social Development Information, Education and

Communication (IEC) development

Socio-economic Study

Social Impact Assessment

Rural Development

Training & Capacity Building Institutional Development

and capacity Building

GIS GIS Mapping

Spatial database designing services

GIS Modeling

Data model designing

GIS application consultancy

HN Company

HN Business Consultants Pvt. Ltd.

HN Special Economic Zone HN INFRA

HN infra deals in Execution and Turn Key Projects in following sectors;

Road and Highways, Energy and Hydro-electric

Real estate

Telecommunication

Sewerage and Sanitation Border Fencing

River Protection

HN SEZ deals in the field of Development of Special Economic Zones, Tourism Related Infrastructure, Shopping complexes and Malls.

Page 10: Company Profile HNBC

Company Profile

7

FIELDS OF RELEVANT SPECIALIZED AND AVAILABLE SERVICES

HNBC has excellent consulting capability in various sectors viz. Water Resources

Management, Environment Management, Energy, Infrastructure, Natural Resources

Management, GIS and Social Sectors which comprises all phases from conceptualization

to implementation along with the development of institutional framework and capacity-

building. The wide range of areas covered are:

I- WATER RESOURCE MANAGEMENT

Management of water resources is one of the global challenges in the 21st Century as the demand of this vital resource is increasing day by day on the one hand and its quantity and quality is deteriorating with increasing human pressure on the other hand. Considering the water resources as key element of our life support system, HNBC provides solution in the field of water resource management with its unique and innovative technologies. Our experts in water resource management are undisputed leaders in management of inland waters with an array of experience and expertise in planning and designing the projects for various state and central agencies under NLCP/NRCD and other agencies. We develop management plans for:

Lakes and Wetlands

Reservoirs and Tanks

Rivers

Ground water

Water Resources

Environment Management

Energy

Infrastructure Development

Natural Resources

GIS & Mapping

Social

Page 11: Company Profile HNBC

Company Profile

8

EXPERIENCE OF HNBC SPECIFIC TO THE FIELD OF WATER RESOURCE & WATERSHED MANAGEMENT HNBC having experts, undisputed leaders from different domains having experience and

exposure in the field of water resources management in various part of India for last three

decades. We were involved in planning, designing and execution of projects related to

watershed management, eco-restoration of lakes, wetlands and rivers in collaboration with

State and Central Government and other line departments. The major modules covered

under watershed conservation, Management & Planning are:

Macro & Micro Watershed

Assessment

Watershed Modeling through

SWAT, BASIN & other GIS enabled

Models

Hydrological Assessment

Water Quality Assessment

Ecosystem health Assessment

Water Budgeting & Water Balancing

Sediment Yields

Nutrients Loading & Nutrients

Budgeting

Wise Use of Resources

Planning & Designing sewage & solid

waste management in urban watershed

Catchment Area Treatments

Control over Point & Non-point Pollution

Soil & Moisture Conservation

Abatement of Siltation in inland waters

Stakeholders’ Consultation on uses &

entitlement issues

IEC & Capacity Building

Riparian Rights

Multidimensional Approach- for Watershed Management

II- ENVIRONMENT:

Developmental activities are often associated with varied impacts on the environment. Accelerated pace of infrastructure development and urbanization raised parallel concerns for environmental management and restoration plans. HNBC offers state of the art services in comprehensive solutions related to environmental restoration and management, which include services in following sectors:

Water Quality & Quantity

Ecology & Livelihood

Watershed

Page 12: Company Profile HNBC

Company Profile

9

Environment Impact Assessment

Environment Management plan

Environmental & Industrial Audit

Solid Waste management

Hazardous Waste management

Environmental Modelling

III- ENERGY:

HNBC provides comprehensive services in energy sector including environmental, engineering, and construction solutions associated with energy projects. Our expertise in the field of conventional and non-conventional energy projects allow us to successfully complete the projects including transmission and distribution projects. We specialize in Hydropower, which is one of the most vital sources of energy for an environment friendly future. HNBC offers services and solutions in the following sectors:

Solar Energy

Hydro Power

Energy Efficiency

Energy Audit

Power Saving Devices

IV- INFRASTRUCTURE:

HNBC offers services in the field of infrastructure development with experienced design and architects professionals on board, and create solution-driven, cutting-edge international design. Having strong commitment to sound and sustainable design our practices are techno-economically feasible and environmentally conscientious. HNBC has a vast experience in the design and integration in various sectors of Township, Retail, Hospitality, Healthcare, Commercial and Education with varied and modulated requirements. HNBC has also an excellent track record in all aspects of

road development projects, including planning, feasibility

studies, detailed project preparation, preliminary and

detailed design, construction supervision, project

management, technical advice and audits, operation &

maintenance including studies and project preparation for

private sector participation, under BOT or Annuity or other

feasible system. HNBC has been involved in design of

state of the art for developing roads and highways mainly

in North Eastern States of India.

Page 13: Company Profile HNBC

Company Profile

10

We have reputed and well experienced architects and design professionals on board, and

create solution-driven, cutting-edge international design. Having strong commitment to

sustainable design, and practice a holistic and environmentally conscientious approach. We

have the skills of low housing development, economical advisory, IEC and Community

Mobilization, Capacity Building, Risk Management and Administration activities and hence

we offer sustainable housing to the economy. We offer integrated expertise of the HNBC

and KGD India and together we seek your permission on the appointment of the

Consultancy of the State in order to execute the program and provide technical support to

enable the State of Nagaland to redevelop all existing slums in a holistic and integrated way

and to create new affordable housing stock in a very planned and assimilated manner.

HNBC deals in following sectors of infrastructure development:

Drinking water

Wastewater

Drainage & Storm water

Desalination

CDP & Master Plan

Real Estates & SEZ

Roads & Transport

Landscaping

Eco-planning

V- NATURAL RESOURCES MANAGEMENT:

Management of natural resources is a vital issue as increasing demand on finite natural resources vis-a-vis poor resource management is causing degradation of natural resources. We, at HNBC provide sustainable solutions for natural resources management through the use of multi-disciplinary teams able to take a holistic approach of natural resource management encompassing technical, financial, economic, and social factors. We deal in following sectors of Natural Resource Management:

Land & Soil Management

Sustainable Agricultural Practices

Forestry & Silvi-culture

Natural Resource Management

VI- GIS & MAPPING:

HNBC deals in Geospatial Solutions with turn-key solutions for the Survey works, Remote Sensing & GIS, LIDAR Data Processing & Mapping, and GIS Software Customization. Our vast experience and innovations have allowed us to expand into a new era by offering leading- edge technological services in serving our customers. We offer GIS related services in following fields:

Map digitizing & analysis

Digital elevation models

Spatial & hazard analysis

Classification, spatial & spectral enhancement

Field operation

Page 14: Company Profile HNBC

Company Profile

11

VII- SOCIAL:

Information, Education and Communication play a pivotal role in awareness building,

mobilizing people and promote development participatory through advocacy and by

transferring knowledge, skills and techniques to the people and stakeholders under various

projects. It is also critical for bringing about transparency in implementation of the

programmes at the field level and for promoting the concept of accountability and social

audit. With our experts and experienced team, HNBC offers a wide array of services in social

sector which include academic studies to implementation of projects in the field.

Information, Education and Communication (IEC) development

Socio-economic Study

Social Impact Assessment

Rural Development

Training & Capacity Building

Institutional Development and capacity Building Our Associates for Environmental Monitoring & Engineering Survey:

Environmental Monitoring:

In any environmental project, qualitative and quantitative assessment of various physico-chemical and biological parameters are significant for characterization of ecological health and to assess the changes and alterations caused by unsustainable development processes. Thus, HNBC is taking services of their associates M/S. Analitika Eco Lab Pvt. Ltd., an approved laboratory by Ministry of Environment & Forests (MoEF), GoI, under EPA 1986 offering services in the field of environment monitoring and assessment. This laboratory is well equipped and having wide range of essential instruments such as AAS, GC, Spectro-photometer, HVS and RDS etc. for the characterization and quantification of pollutants generally present in the environment.

Topographical & Engineering Survey:

Our associates GLOBAL SURVEYOR is a recognized and experienced survey company and provide survey data and information as may be required for engineering, and scientific planning. The firm is well equipped with modern and sophisticated equipment, instruments which are necessary for carry our desired field survey. Global Survey has also expertized in costal and specialized for bathymetric survey. Authenticity of data and accuracy in survey and interpretation of data for proper planning is credibility of the Global Survey.

Page 15: Company Profile HNBC

Company Profile

12

SERVICES WE OFFER: HNBC provides consultancy services in various sectors of environment and infrastructure as per demands of the client, which includes management of various sectors namely, Water Resources, Environmental & Natural Resources, Infrastructure Development, Energy, GIS & Mapping along with Social sector. Besides we provide techno-economically feasible technological intervention for total solution of problem as suitable to site and conditions. We deal with the various components under the above sectors as summarized under:

E

Feasibility And Pre-feasibility Reports

Detailed Project Reports

Management Plan

Project Management Consultancy

Design And Construction Supervision

Project And Proposal Appraisal

Technology Advisory Services

Page 16: Company Profile HNBC

Company Profile

13

KEY TECHNICAL STRENGTH

Page 17: Company Profile HNBC

Company Profile

14

KEY TECHNICAL STRENGTH

S.No

Discipline Qualification Experiences Area Of Expertise

1. Principal Water Resource Expert

Ph.D 30 Years Watershed Management

Water Resource Conservation & Management

Sustainable Eco-Technology For Environment Conservation

2. Principal Advisor Ph.D 35 Years Watershed Management

Soil Contamination & Mitigation

Hazardous Waste Management

Environmental Policy & Legislation

3. Urban Sanitation Expert

M.E (Environmental

Engineer)

35 Years Sewerage & Sanitation

4. Hydrological –Geotechnical Expert

M.E (Soil Dynamics)

30+ Years Hydrology & Geo-Technology

5. Urban Planner Masters In Town & Country Planning

25 Years Urban Planning /Landscape Architect

6. Water Supply & Sewage Expert

M.E (Structural Engineer)

35 Years Water Supply & Sewage

7. Senior City Sanitation Expert

Ph.D 35 Years Sewerage & Sewage Treatment

8. Senior Environmental Experts

Ph.D 15 Years Lake & River Conservation

Aquaculture

Bio-Manipulation & Bioremediation

Aeration Of Limnetic Ecosystem

Pollution Prevention

9. Hydro-Geologist Ph.D 15 Years Hydrology & Geology

10. GIS & Remote Sensing Expert

Ph.D 10 Years Gis & Remote Sensing Watershed Planning

11. Senior Biologist Ph.D 15 Years Terrestrial & Aquatic Biodiversity

Page 18: Company Profile HNBC

Company Profile

15

12. Wild Life Expert Ph.D 10 Years Wild Life Conservation

13. Senior Environmentalist

Ph.D 10 Years Environment Conservation Lake Conservation

14. Senior Limno-Chemist

Ph.D 10 Years Limno-Chemistry, Water Quality

15. Financial Expert C.A 15 Years Institutional & Project Finance

16. Social & Institutional Expert

Masters 25 Years IEC & Capacity Building

17. Landfill Design Expert

M.E (Environment)

10 Years Landfill Design Expert

18. Tourism Expert Ph.D 10 Years Tourism & Eco-Tourism

Page 19: Company Profile HNBC

Company Profile

16

DETAIL EXPERIENCE OF HNBC

INCLUDING THAT OF PARENT

COMPANY

Page 20: Company Profile HNBC

17

DETAILED EXPERIENCE OF HNBC INCLUDING THAT OF PARENT COMPANY

S.No. Name of work/project and location, with Work order/LOI No. and Date.

Name/ Address of Clients

Value of Work

(Rs. in Cr)

1 Pollution Abatement Of Rivers Diphu And Dhanseri And Solid Waste Management At Dimapur, Nagaland - Completed And Submitted To MoEF For Financial Assistance

PHED, Govt. of Nagaland

3.22

2 Rejuvenation & Management Of Raj Pukhuri, Dimapur, Nagaland Under NLCP Guidelines - Completed And Submitted To MoEF For Financial Assistance

PHED, Govt. of Nagaland

0.80

3 Rejuvenation & Management Of Padam Pukhuri, Dimapur, Nagaland Under NLCP Guidelines - Completed And Submitted To MoEF For Financial Assistance

PHED, Govt. of Nagaland

0.80

4 Rejuvenation & Management Of Govt. Fisheries Pond, Dimapur, Nagaland Under NLCP Guidelines - Ongoing

PHED, Govt. of Nagaland

0.70

5 Rejuvenation & Management Of Jor Pukhuri, Dimapur, Nagaland Under NLCP Guidelines - Ongoing

PHED, Govt. of Nagaland

0.70

6 Sustainable Conservation And Management Of Diphu River As Per NRCP, MoEF Guidelines - Ongoing

PHED, Govt. of Nagaland

3.50

7 Construction of 100 Bedded Urban Hospital at Chumukedima under Dimapur District. PWD (Housing)

10.56

8

Housing for Urban Poor at Dimapur under ISHDP. PWD (Housing)

26.34

9 Construction of Border Fencing along Indo-Bangladesh Border in Meghalaya State under Phase II, (Jaliakhola to Hengaria, BP No. 1299 to BP No. 1304) - Package No. I.

N.P.C.C Ltd., Shillong

16.13

10 Construction of fencing alongwith Border Road for certain stretches of Meghalaya Sector along Indo-Bangladesh Border (IBB) from Baghmara to Phanda near (BP No. 1158/7S) to near (BP No. 1162/6S) - Package III.

N.P.C.C Ltd., Shillong

7.98

11 Strengthening the existing two lane pavement for the portion from km 235.800 to km 263.000 in the state of Manipur. PWD, Manipur

33.89

12 Pollution abatement of Rivers Dhansiri and Diphu at Dimapur Town. PHE Nagaland

44.60

13 Construction of 24 Nos Type II Qtrs in G+II in 4 blocks and 3 Nos SM Barrack in G+II in 1 Blocks with allied services and development works for Assam Rifles at Shokhuvi (Package XII).

N.P.C.C Ltd., Shillong

1.87

14 Construction of 12 Nos Type II Qtrs in G+II in 2 blocks, 12 Nos Type III Qtrs. In G+II in 2 blocks and 3 Nos SM Barrack in G+II in 1 Blocks with allied services and development works for Assam Rifles at Shokhuvi (Package XIII) Phase II.

N.P.C.C Ltd., Shillong

1.97

15 Construction of Casualty Ward at Dimapur under Referral Hospital

PWD (Housing) Kohima

3.67

16 Construction of Road from NH-39 to Referral Hospital at Dimapur

PWD (Housing) Kohima

2.35

17 Construction of Treatment Block, Dimapur under Referral Hospital Project.

PWD (Housing) Kohima

2.29

18 Contruction of Boundary Wall for Referral Hospital Projects Dimapur

PWD (Housing) Kohima

0.52

19 Airconditioning work for Referral Hospital Project at Dimapur PWD (Housing) Kohima

4.12

20 Construction of 1.5 KV T.E Building (PH-I) and 1 No. Type-II S/Qtrs. at Aghunato, Nagaland.

B.S.N.L Civil Division Dimapur. Nagaland

0.21

Page 21: Company Profile HNBC

18

21 OFC Laying on route Naharlagan-Yupia Section in Arunachal Pradesh.

T.C.I. Ltd. (A Govt. of India

Enterprise)

0.23

22 Construction of OFC Laying on Route Tuensang-Lonkhim-I (Tuensang to 11 Km point towards Longkhim) under Nagaland Telecom District, Dimapur

T.C.I. Ltd. 0.23

23 OFC Laying on Route Mokokchung-Chare-II (19 km point of Mokokchung/ Chare to 22 Km point)

T.C.I. Ltd. 0.08

24 OFC Laying on Route Mokokchung-Chare-II (Mokokchung 11 km point to 19 Km point)

T.C.I. Ltd. 0.17

25 U.G Cable Laying & Associated work; (a) Secondary cable from Nagarjan Cabinet to Pillar 81 & 82, (b) Distribution of Pillar 81 & 82.for OCB Exchange expansion work at Dimapur work at Diampur under GMT. Nagaland

T.C.I. Ltd. 0.07

26 Construction of cable duct 12 ways (11+4 OFC) from T.E to MH-5 and 4 ways from MH-5 to MH-11 to T.E Chumukedima. Nagaland

B.S.N.L, Civil Division, Dimapur

0.51

27 Partition work for office of DET (O.C.B) and ladies Dormitory in T.E Building at Dimapur.

B.S.N.L Civil Division, Dimapur.

0.05

28 Partition and furnishing work for C.G.M’s chamber along with PA and visitors room in T.E Building Dimapur Nagaland.

B.S.N.L Civil Division, Dimapur.

0.02

29 Construction of 8 Nos. Type-III for Assam Rifles at Mokokchung, Nagaland.

N.P.C.C Ltd., Shillong (A Govt. of

India Enterprise)

0.90

30 Construction of OFC laying work on route Wokha Town to Doyang Hydro Project. 25.85 km. PO.

D.G.M (ES & P) I.T.I Ltd. Kolkata.

0.67

31 Construction & Improvement of 7.1km road from Khopanallah to Assam Riffle Pump House Sukhovi ARTC& S, Nagaland

N.P.C.C Ltd. Shillong (A Govt. of India

Enterprise)

1.94

32 Laying OF Cable from Kohima T.E to T.E Phek, Nagaland Part-III

B.S.N.L, Dimapur 1.01

33 Construction of OFC laying work on route Wokha T.E to Mokokchung T.E 82.30 km.

D.G.M (ES & P) I.T.I Ltd. Kolkata.

2.08

34 Construction of Garrage I.B and Type IV Qtrs. at T.E Compound Dimapur.

E.E (C) B.S.N.L Civil Division, Dimapur.

0.28

35 Construction of 8 Nos. Single JCOS Qtrs. for Assam Riffles at Sukhovi.

N.P.C.C Ltd., Shillong.

0.22

36 Construction of 12 Nos. Type-II Qtrs. at Kashiram Basti. N.P.C.C Ltd., Shillong

0.47

37 Construction of 1 No. Single Men Barrack for 4 NCOS and 40 ORS for Assam Riffles at Sukhovi, Nagaland

N.P.C.C Ltd., Shillong

0.33

38 Construction of 2 Nos. S.M. Barrack accommodation for 8 Nos. NCOS and 80 ORS for Assam Riffles at Zunheboto.

N.P.C.C Ltd., Shillong

0.85

39 Construction of 12 Nos. Type-II Qtrs. for Assam Riffles at Zunheboto, Nagaland

N.P.C.C Ltd., Shillong

0.96

40 Construction of 100 bedded Hospital Building Complex for Assam Riffles at Sukhovi.

N.P.C.C Ltd., Shillong

0.95

41 Strengthening & Improvement of Dimapur Halflong Road. Under CRF (Group ‘A’ Road Works) Nagaland

Chief Engineer PWD (R&B) Nagaland,

Kohima.

1.83

42 Construction of protection work from erosion of Dhansiri river (ph-II) at Bridge Point 0-120 mtrs. Left Bank.

Irrigation and Flood Control, Dimapur.

0.33

43 Construction of Cable Duct 6 Ways (4+8) OFC from MH 36 (EX) to MH-48 (INC) in Tenyiphe Village to Sugar Mill colony at Chumukedima. Nagaland.

B.S.N.L, Dimapur 0.47

44 Construction of Cable Duct 6 ways (4+8) OFC from PC48 (EX) to Nuiland road crossing MH.59 (INC) at Chumukedima. Nagaland

B.S.N.L, Dimapur 0.26

Page 22: Company Profile HNBC

19

45 Construction of 1 Nos. S.M Barrack(G+I) for Assam Riffles at Kashiram Basti, Nagaland.

N.P.C.C Ltd., Shillong

0.70

46 Construction of 8 Nos Type-III Qtrs with Allied Services and Development works for Assam Rifles at Jalukie.

N.P.C.C Ltd., Shillong

0.65

47 Supplying Fabrication & Laying P.S over head water tank for 2 Nos. S.M Barrack at Sukhovi.

N.P.C.C Ltd., Shillong

0.04

48 Strengthening & Improvement of Dimapur-Dhansiripar Ganesh Nagar Road. (35 Km), Nagaland

Chief Engineer PWD (R&B) Nagaland,

Kohima

5.39

49 Construction of 24 Nos. S.M. Barrack and 48 Nos. Type-II Qtrs. (G+II) in 8 blocks for Assam Riffles at Zunheboto, Nagaland.

N.P.C.C Ltd., Shillong

9.32

50 Supply of Equipment for Trauma Centre Dimapur. Directorate of Medical Service

Nagaland, Kohima

0.90

51 Construction of Hill Type Building for Accident and Trauma Center at Dimapur Civil Hospital,

Medical Engineering, Govt. of Nagaland

0.37

52 Construction of Hill Type building for Accident and Trauma Center at Mokokchung Civil Hospital,

Medical Engineering, Govt. of Nagaland

0.39

53 Up- gradation of District Civil Hospital at Phek (PMSP) Medical Engineering Division: Govt. of

Nagaland

0.45

54 Construction of 1 Nos. S.M Barrack(G+I) in 1 blocks and 60 Nos. Type-II Qtrs. (G+II) in 1 blocks with Allied Services and Development works for Assam Riffles at Sukhovi, Nagaland.

N.P.C.C Ltd., Shillong

0.33

55 Construction of 30 Nos. S.M Barrack (G+II) in 10 blocks and 60 Nos. Type-II Qtrs.(G+II) in 10 blocks with Allied Services and Development works for Assam Riffles at Sukhovi, Nagaland.

N.P.C.C Ltd., Shillong

10.31

56 Construction of 30 Nos. S.M Barrack (G+II) in 10 blocks and 60 Nos. Type-III Qtrs.(G+II) in 10 blocks for Assam Riffles at Kashiram Basti, Nagaland.

N.P.C.C Ltd., Shillong

11.83

57 Construction of Vertical Extension of newly Constructed Garage, IB & Type IV Qtrs. in T.E compound Dimapur.

E.E (C) B.S.N.L Civil Division, Dimapur.

0.08

58 Under Ground OFC laying work under Nagaland SSA in NE-II Telecom Circle " Zunheboto Exchange to Kilomi Village 46 Km"

ITI Ltd. (Govt. of India Enterprise)

0.78

59 Construction of Road for N.E Agri Expo including construction of Retaining wall Culvert and Steel Gate etc. at 4th Mile Dimapur.

Director Agriculture, Kohima: Nagaland

0.95

60 Construction of Anti- Erosion measure to Protect Mao Colony, Kuki Village and Assam Rifles Transit Camp at Dimapur from flood and erosion of River Dhansiri (s)

Chief Engineer (I & W) Bramaputra

Board Basistha: Guwahati -29,

Assam

1.60

Page 23: Company Profile HNBC

20

COMPANY REGISTRATION &

FINANCIAL DETAILS

Page 24: Company Profile HNBC

21

Page 25: Company Profile HNBC

22

Page 26: Company Profile HNBC

23

Page 27: Company Profile HNBC

24