PROFILE

KCC Buildcon Pvt. Ltd. (FORMERLY KUNDU CONSTRUCTION CO.)

(GOVT. CONTRACTOR) An ISO 9001:2008 Certified

Civil CONSTRUCTION COMPANY

Company’s Registered Office BU-5, IInd Floor, S.F.S. Flats, Outer Ring Road,

Pitampura, Delhi- 110034. Ph: 011-47581001 Email: [email protected],

Web Add: www.kccbuildcon.co.in Corporate Office:

Block - C, Unit No. - 501, 5th Floor, Nirvana Courtyard, Nirvana Country, Sector - 50,

Gurgaon – 122018 (HARYANA) Ph./Fax. 0124-4087524/5

Branch Office: 119, Sector - 14, Rohtak (Haryana)-124001,

Ph: 01262-279545/325077

M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)

3

BRIEF PROFILE

1. Name of the Company : KCC Buildcon Private Limited (Formerly Kundu Construction Co.)

2. Address (Regd. Office) : BU-5, IInd Floor, S.F.S. Flats, Outer Ring

Road, Pitampura, Delhi -110034.

3. Corporate Office : # 501, Block - C, 5th Floor, Nirvana Courtyard, Nirvana Country, Sec - 50, Gurgaon 122018

4. Branch office : 119, Sector – 14, Rohtak, (Hr) – 124001

5. Constitution : Private Limited Company under Company act 1956.

6. Date of Incorporation : The Business was run under the Partnership since 01.04.1999. Running Business of the Firm has been taken over by M/s. KCC Buildcon (P) Ltd. Ongoing concern basis w. e. f. 01.04.2010.

7. Line of Activity : CIVIL CONSTRUCTION CONTRACTORS (ROADS/highways, Bridges and BUILDINGS)

8. Key Management : Consisting following Directors:

1. Sh. Balraj Kundu, CMD 2. Sh. ShivRaj Kundu, Director 3. Sh. Vijay Kundu, Director

M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)

4

INDEX 1. Chairmen’s message

2. Our Aims

3. Introduction

4. DIRECTORS, Office Address, PAN Etc.

5. Registration with department

6. Annual Turnover

7. Organizational Chart

8. ISO Certificate

9. List of Plant and Equipment

10. Project successfully completed

11. Ongoing Project

12. Technical Staff

13. Site pictures

M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)

5

M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)

6

OUR AIMS To enhance Customers satisfaction through

delivery of Quality Service.

To complete the Projects within stipulated Time Frame.

To do Right thing every time.

To quote most competitive and economical Rates.

To become a leader in the field of civil construction.

M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)

7

Introduction M/S. KCC BUILDCON PRIVATE LIMITED IS A PRIVATE LIMITED COMPANY INCOPRPORATED WITH THE ROC (DELHI & HARYANA) IN the YEAR 2009 WITH THE OBJECT TO TAKE OVER THE RUNNING BUSINESS OF M/S. KUNDU CONSTRCUTION CO., A PARTNERSHIP FIRM ESTABLISHMENT IN THE YEAR 1999 AND THE BUSINESS WAS CARRIED UNDER THE PARTNERSHIP TILL 31.03.2010 ,THEREAFTER THE BUSINESS WAS TAKEN OVER BY THE PRIVATE LIMITED COMPANY M/S. KCC BUILDCON (P) LTD AND ALL THE ASSETS AND LIABILITIES OF THE ERSTWHILE PARTNERSHIP FIRM ON BASIS OF AUDITED BALANCE SHEET AS AT 31.03.2010 W.E.F 01.04.2010 ALL THE PARTNERS OF THE FIRM ARE THE DIRECTORS OF THE COMPANY. “Quality, integrity and Honesty set KCC, apart from any other Commercial road contraction company. We understand the importance of each and every Road/Highways project, from small tenement renovations to multi-Crores projects. We give all clients personalized attention that every project requires. KCC looks forward to working with them till completion of their Dream Destination. Not only do we have a past that we can be proud of but, we also hold dear to our hearts, the future hopes and aspirations of professionals who guide this company. We have people and resources to lead this company to a bright future. We have reached thus far owing to hard-work, dedication and determination of the team that drives this organization. We have earned the trust and respect of our clients and we are confident, that our company will grow from strength to strength in our endeavor to make this Company into one that delivers value and satisfaction to our growing base of valued clients.

M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)

8

We are well reputed name in Road construction in Delhi & Haryana, we specialize in the field of: - • Earth work. • All type of Pavements, • Concrete and Bituminous Roads, • Mass Excavation and • Site Development We are well equipped with a complete range of latest construction equipment and machines required in the field of construction.

M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)

9

Directors Sh. Balraj Kundu

SH. ShivRaj Kundu

SH. Vijay Kundu

Head Office Location Flat No. BU-5, II Floor, SFS Flats, Outer Ring Road, Pitampura, Delhi-

110034, Ph: 011-47581001

Corporate Office Location Block - C, Unit No. - 501, 5th Floor, Nirvana Courtyard, Nirvana Country,

Sector - 50, Gurgaon – 122018 (HARYANA) Ph./Fax. 0124-4087524/5

Branch Offices Location Haryana (Rohtak) 119, Sector-14, Rohtak, Haryana-124001 Telephone:-

01262 279545/325077

Madhya Pradesh (Bhopal) 65, Railway Housing Society, 12 No. Stop E-8,

Arera Colony, Bhopal(MP)-462016

West Bengal(Kolkata) Durga Tower, Lichubagan, Mouzu-Kalipur, P.O.-

Grolgacha Dankuni, Hooghly, Kolkata(WB)-712708

Chandigarh Flat No. 614, Sector – 49A, IAS/IPS Society, Chandigarh-

160047

Web Page www.kccbuildcon.co.in

Email IDs [email protected], [email protected],

[email protected], [email protected],

[email protected]

PAN NO. AADCK8357N

Name of Bankers Bank of Baroda, ICICI Bank Limited, YES BANK, Punjab National

Bank, HDFC Bank, DENA BANK, Corporation Bank

Registration with Departments (CLASS-I) CPWD, New Delhi, MES (Military Engineering Services) & Flood Control

Department

M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)

10

Incorporation Certificate

M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)

11

PAN of COMPANY

M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)

12

Audited Annual Financial Data Years Turnover (F.Y.) (INR Rs. Crores)

2009-10 149.38 2010-11 235.44 2011-12 202.49 2012-13 447.80 2013-14 500.74

2014-15 496.93

AUDITED NET WORTH:-

Financial year 2014-15 = Rs. 104.38 Crores

Projected Turnover of F.Y. 2015-16

<Rs.750.00 Crores

M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)

13

Organization chart

M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)

14

List of Major Plant & Machinery S

No. Particulars of Equipment

No. of

Units Manufacturer

1 TIPPER/DUMPER 170 TATA/AMW

2 TRANSIT MIXTURE 13 SCHWING STETTER

3 EXCAVATOR 16 HYUNDAI/VOLVO/KOMATSU/KOBALCO

4 TRAILER 4 TATA PRIMA/ASHOK LEYLAND

5 JCB 10 JCB INDIA PVT LTD

6 SOIL COMPACTOR 19 DYNAPAC/ESCOURT/VOLVO/HAMM

7 ROLLER 14 DYNAPAC/VOLVO/HAMM/WIRTGEN

8 WHEEL LOADER 17 HINDUSTAN, LIUGONG

9 WATER TANKER 14 TATA MOTORS/MAHINDRA

10 HYDRA ESCORT 4 HYDRA ESCORT

11 CONCRETE MIXURE 2 AJAX FIORI

12 KERB LAYING MACHINE 2 APOLLO

13 CRUSHING PLANT 5 METSO, BHP

14 DRUM TYPE HOT MIX PLANT 8 EVEREST

15 BATCH TYPE HOT MIX PLANT 4 APOLLO/LINHOFF/ROADY ROAD

EQUIPMENT

16 RMC PLANT 10 APOLLO/SCHWING SETTER/AKONA

17 MOBILE CRUSHER 2 TEREX/METSO

18 WET MIX PLANT 4 EVEREST ROAD EQUIPMENTS

19 POWER SCREEN(SCREENING) 2 POWER SCREEN TEREX

S

No. Particulars of Equipment

No. of

Units Manufacturer

M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)

15

20. PAVER 9 METER 3 WRITGEN VOGELE

21 PAVER 5.5 METER 5 APOLLO/EVEREST ROAD EUIPMETS

23 PNEUMATIC TYRE TOLLER 4 VOLVO INDIA PVT LTD

24 GRADER 12 CATERPILLAR/LIUGONG/KOMATSU

25 MILLING MACHINE 1 WIRTGEN INDIA PVT LTD

27 LIGHTING TOWER 4 ASKA SAFETY DEVICES

28 D.G SET 17 SUDHIR/JAKSON/LEYLAND/CATERPILL

AR

29 WEIGHBRIDGE 5 WEIGHTEX SCALES

30 TOWER CRANE 2 ESCORT/ACE

31 TRACTOR 8 MAHINDRA/EICHER/ESCORT

32 AIR COMPRESSOR 7 EVEREST ROAD EQUIPMENTS

33 OTHER MACHINERY 62

ESCORT/VOLVO/IR/KOMATSU/APOLLO/

CAT/WRITGEN/SHWING

STETTER/MAHINDRA/JCB/ACE etc.

WE HAVE SUFFICIENT ASSOCIATE ARRANGEMENTS FOR TAKING EXTRA PLANT & MACHINERY LIKE HOT MIX PLANTS (BATCH/DRUM TYPE), PAVERS, SLIP FORM PAVER, FIXED FORM PAVERS, DUMPERS, MILLING MACHINE, TRANSIT MIXERS, GRADERS, ROAD ROLLERS, JCB, VIBRATORY ROLLERS, EXCAVATORS, GENERATOR SETS, AIR COMPRESSORS WITH JACK HAMMER, SHUTTERING PLATES ETC. ON LEASE/RENT BASIS FOR SMOOTH OPERATION & FAST PROGRESS OF PROJECT AS AND WHEN REQUIRED.

M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)

16

List of Major Work Completed Sl.

No. Description of Work State Employer

Completion

Cost (INR

Crores)

1

Development of Lateri - Anandpur -

Bhagwantpur, Tyonda (NH-86) - Ganjbasoda,

Itkhedi - Raslakhedi, Kurawar - Iklera - Talen

& Ankhia - Barkheda - Dongargaon Road

Major District Roads on BOT (Annuity) basis

under Package - V

Madhya

Pradesh

MPRDC, 45-A,

Arera Hills,

Bhopal - 0755-

2765196

156.83

2

Construction of Balance Work of 8-Laning

from KM 16.500 to KM 29.300 of NH-1 in

the State of Delhi

Delhi

National Highways

Authority of India,

G 5&6, Sector-10,

Dwarka, New

Delhi - 110 075

129.72

3

Widening & Reconstruction of Package-6,

Pachor-Chhapikheda-Jirapur-Machalpur-

Soyat Road under MPSRP-III (ADB Loan

No. IND-2736)

Madhya

Pradesh

MPRDC, 45-A,

Arera Hills,

Bhopal - 0755-

2765196

116.03

4

Development of, Sijhata-Hinoti-Malgaon-

Khamariya-Ater, Poudi-Maharajpur-

Parasmaniya & Mangawar-Bekunthpur Major

District Road under Package-X on BOT

(Annuity) basis

Madhya

Pradesh

MPRDC, 45-A,

Arera Hills,

Bhopal - 0755-

2765196

100.00

5

Resurfacing of Main Runway, Dispersal and

SGA Conversion at Air Force Station

Jaisalmer

Rajasthan

Garrison Engineer

(P) (AF), Military

Engineer Services,

Air Force Station,

Jaisalmer- 345001

92.77

6

Improvemcnt of Jhajjar Dhaur Beri road,

Bahadurgarh Beri Kalanaur road, Dighal Beri

Jahazgarh road in Jhajjar District (Package

No. HSRDC/NCT/C10/2008)

Haryana

HSRDC, Opposite

T.B. Hospital, In

the Campus of

Superintending

Engineer, P.W.D.

B&R, Br. Rohtak

83.89

M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)

17

Sl.

No. Description of Work State Employer

Completion

Cost (INR

Crores)

7

Strengthening and widening of main carriage

way and improvement of footpath i/c central

verge, construction of RCC box drain on

Road No. 3 from Mangolpuri to Auchandi

border).

NCT

Delhi

Executive Engineer

BPD, PWD, M-

341, (GNCTD),

Old Court

Building,

Kashmere Gate,

Delhi-110006

81.33

8

Construction of 75 Mtr & 60 Mtr wide master

road between sector-81 to 95 and outer road

Gurgaon.

Haryana

ExecutiveEngineer,

Haryana Urban

Development

Authority,

Division-III,

Gurgaon

(HARYANA)

62.38

9

Construction of Four lanning of Jhajjar Badli

road from Km 0.00 to 18.250 in Jhajjar

District (Under CRF Scheme)

Haryana

Superintending

Engineer, PWD

B&R Br., Jhajjar

Circle, Jhajjar

(Haryana)

54.01

10

Strengthening and widening of main

carriage way and improvement of footpath,

i/c central verge, construction of RCC box

drain from GT Karnal Road NH-1 to

Auchandi Border via Bawana

NCT

Delhi

Executive Engineer

BPD, PWD, M-

341, (GNCTD),

Old Court

Building,

Kashmere Gate,

Delhi-110006

51.13

11

Widening & Strengthening along with

reconstruction Cement Concrete Pavement in

KM 28.200 to 58.600 & 62.500 to 67.000

(SH-22) (Sec. Jhajjar to Kosli) of

Bahadurgarh-Jhajjar-Subna-Kosli Road (Job

No. CRF/HR/2007-68)

Haryana

Executive

Engineer, Provicial

Division, PWD

B&R Br., Jhajjar

(HR)

43.60

12

Balance Work of Improvement of Four

lanning of various roads in Rewari Town &

Construction of new roads in Rewari district

Haryana

The Managing

Director, HSRDC,

Bay No.13-14,

Sec.2,Panchkula

43.03

M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)

18

13

Construction of Sector Dividing Road of Sec-

29, 31 & 32Sec-27&28. Construction of

Kheri Shad By Pass from RD 63.700 to

65.500. Widening of NH-71A from RD 1.100

to 3.300 & 5.500 to 7.100.

Haryana

Executive

Engineer, HUDA,

Division No. 1,

Rohtak (HR)

35.33

14 Construction of Roads in Phase - II at Growth

Centre, Bawal Haryana

HSIIDC, Industrial

Growth Centre,

Bawal, Distt.

Rewari (HR)

25.36

15

Construction of Badli Bypass KM 0.000 to

5.681 and Improvement of 2 KM existing

Bahadurgarh Badli Chandu Border road in

NCR area in Jhajjar Distt.

Haryana

Executive

Engineer, HSRDC,

Bay No. 13-14,

Sector-2,

Punchkula

24.61

16

Widening & Strengthening in KM 94.350 to

113.800 of Murthal-Sonepat-Kharkhode-

Sampla-Jhajjar-Dadri Road (SH-20) in

Bhiwani Distt. (Job No. CRF-HR-2007-72)

Haryana

Executive

Engineer, Provicial

Division, PWD

B&R Br., Ch.

Dadri (HR)

20.21

M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)

19

List of Major Work-in-Hand

Sr.No

. Name of Project/Work

Value of contract

as per Agreement

/LOA

Anticipated date

of completion

1

Development of Access Controlled Kundli-

Manesar-Palwal Expressway section

(Manesar RD 83.320 k.m to Palwal RD

135.650 K.M (Balance Work) on Item Rate

mode. (401.50*75/100) =

401.50 24.01.16

2

trengthening and Widening to 2 lane/2-lane

with paved shoulder configuration of

Chanditala-Seakhala-Champadanga

(Section of) SH15) in West-Bengal Km Ch

0.00 to KmCh 36.20 Length=36.20 Km

(Approx) (District – Hugli )

155.35 21.07.16

3

Strengthening and Widening to 2 lane/2-

lane with paved shoulder configuration of

Saptagram-Triveni-Kalna-Katwa Road

(Section of SH-6) in West-Bengal Km 0.00

Ch to Km 34.00 Ch but excluding Km

Ch2.515 to Km Ch3.415 Length = 33Km

(Approx)(District –Hugli)

151.56 31.12.15

4

Maksudanganj Najeerabad (MDR-06-03) &

Najeerabad Maksudangarh (MDR-23-08),

Berasia Najeerabad (MDR-23-06) and

Vidisha Berasia (MDR-23-10) & Vidisha

Berasia (MDR-27-01)

143.29 31.12.16

5

Construction of Manwar-Mangod

(Bandheri) (Balance Work) and Sardarpur-

Rajgarh-Bagh (Balance Work) Road.

111.44 31.12.15

M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)

20

6

Construction of internal roads, providing

and laying of water supply, tertiary network

system, sewerage, storm water and

electrification and all other works

contingent thereto for sector 27 & 28 and

construction of circulation road for Sector

3,4 & 5 of Pinjore Kalka Urban Complex

including 3 year mtc. & defect liability

period free of cost for civil work and one

year mtc. & defect liability period free of

cost for electrical works).

104.79 22.07.16

7

Construction of 200 feet wide road from

aerocity/airport road junction to kharar

banur (PR-9), S.A.S Nagar

92.51 30.04.16

8.

Construction of 65 mtr., 60 mtr & 45 mtr.

wide master road between Sector- 30/37,

31/37, 32/36, 33/35, 34/35, 35/36, 32/33,

4/32 ,26/26A, 26A/34, 34/33, 27/33 &

26/33, U/E, Sonipat.

70.08 31.01.16

9. Upgradation of Dighal Sampla road via

Behrana Kultana Road in Jhajjar District.

40.36 31.12.15

10.

Upgradation of Beri Dubaldhan Majra

Bigowa upto Jhajjar Dadri road in Jhajjar

District.

33.33 31.12.15

11.

Development of Infrastructure facilities i.e.

Roads, Storm Water Drainage System,

Water Supply Distribution System, Waste

water Conveyance system & development

of water works at Transport Hub at IMT

Manesar

33.07 31.12.15

M/s KCC Buildcon (P) Ltd. (Formerly Kundu Construction Co.)