13
Company Profile Personnel Projects 2016

Company Profile Personnel Projects - Eureka Landscapes · Company Profile Personnel Projects 2016. From the outset, we establish a partnership with our client to understand ... and

  • Upload
    others

  • View
    13

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Company Profile Personnel Projects - Eureka Landscapes · Company Profile Personnel Projects 2016. From the outset, we establish a partnership with our client to understand ... and

Company Prof ilePersonnelProjects

2016

Page 2: Company Profile Personnel Projects - Eureka Landscapes · Company Profile Personnel Projects 2016. From the outset, we establish a partnership with our client to understand ... and

From the outset, we establish a partnership with our client to understand their design – not just the brief and the drawings, but their vision, their enthusiasm, their ethos and their creativity. This grasp of the overall project provides a sound basis for a well-planned and well-executed project from start until completion.

Communication, collaboration and teamwork are vital to our successful delivery. A Eureka Landscapes director manages each of our major projects, the workflow is maximised, potential problems are identified early and solved with minimum interruption to the project. Sound decisions based on the best of project outcome are able to be made instantly.

Our highly trained employees bring extensive knowledge and experience in all areas of landscaping. Over the many years of working together, they are able to slot into teams as required: versatility that helps us complete eachproject as smoothly as possible.

Membership of Landscape QLD, QMBA, HIA and UDIA attests to our commitment to maintaining our accreditation, professional development, expertise and staying up to date.

Whatever the challenge before us, we know we have the experience, versatility and expertise to turn your design into reality.

From estimating, planning and project management, through all the stages of construction and maintenance, the Eureka Landscape team’s skills, capabilities and experience lead to an outstanding outcome.

With more than thirty years’ experience across a wide range of projects, we’re proud of our record in specialist construction services (like golf course surrounds, wetlands and vertical landscapes), rehabilitation and revegetation, public infrastructure and residential developments.

A strong factor in our success is our people: some have been with us for many years. Our training programs allow them to build their skills and to contribute to our reputation as an industry leader.

A Better PartnerEureka Landscapes

to turn your design into realityA BETTER PARTNER

because of our range of services and abilitiesA BETTER PARTNER

Page 3: Company Profile Personnel Projects - Eureka Landscapes · Company Profile Personnel Projects 2016. From the outset, we establish a partnership with our client to understand ... and

Knowing that reliable tools, equipment and machinery are essential to our workmanship, we own, service and maintain all the equipment needed to complete each task.

Experienced project managers and foremen schedule the availability of equipment, thus avoiding costly delays in maintaining the workflow of projects.

To comply with our Workplace Health & Safety policy, all operators of our equipment must have the relevant OHS ticket.

From start to finish of each project, Eureka Landscapes is there to help turn your design into reality.

Our clients comment upon our workmanship, our attention to detail and our collaborative approach. They tell us they value having one designated person on each site with whom they can consult.

Our status as a preferred contractor and ‘one-stop shop’ attests to our reputation, while the majority of our projectscomes from long-term repeat work.

When you’re looking for a partner with a comprehensive range of services and abilities, who has a reliable fleet ofmachinery and equipment, who values safety and `responsible management of the environment —phone us on 07 3350 8300 to find out how we can become your better partner to turn your design into reality.

A Better PartnerEureka Landscapes

because we have our own f leet of equipment and machineryA BETTER PARTNER

because that’s what our clients tell usA BETTER PARTNER

Page 4: Company Profile Personnel Projects - Eureka Landscapes · Company Profile Personnel Projects 2016. From the outset, we establish a partnership with our client to understand ... and

Directors

Jason joined Eureka as their accountant 20 years ago, within 10 years he had become owner and director.

Jason has helped Eureka Landscapes to grow to it’s current 100+ employees and become an industry leader. This has been acknowledged with his inclusion in the Landscape QLD Hall of Fame and AILA QLD’s Award to his commitment to partnering with the Landscape Architects Association.

QualificationsBachelor of Business, UCQ Graduate Diploma in Advanced Accountancy, QUTAdvanced Diploma in HorticultureMaster Landscape ProfessionalCertificate IV in WHS

Key ProjectsBrightwater Estate – StocklandBells Reach Estate - StocklandBrentwood Estate - Investa

Jason started with Eureka Landscapes as a labourer straight out of high school in 1988. From there he continued to climb the ranks to foreman to estimator and now is a partner in the business.

Jason’s hands-on knowledge provides a practical insight into the effects of planned changes upon staff & operations throughout the organisation.

QualificationsCertificate IV in HorticultureCertificate III in Carpentry

Key ProjectsYarrabilba Estate - Lend LeaseSpringfield Lakes – Lend LeaseNorth Lakes – Stockland

Key Personnel

JASON MCGARRY

DirectorJASON HANDY

Managing Director

Page 5: Company Profile Personnel Projects - Eureka Landscapes · Company Profile Personnel Projects 2016. From the outset, we establish a partnership with our client to understand ... and

Management

QualificationsAdvanced Diploma in HorticultureBachelor of Arts, UQCertificate IV WHSEnviro Development ProfessionalMember of Australian Institute of Horticulture

Key ProjectsGainsborough Green - MirvacWaterfront Place - Mirvac

QualificationsMasters of Project ManagementBachelor of Design (Landscape Architecture) – HonoursCertificate IV in HorticultureCertificate IV in WHS

Key ProjectsSprinfield Lakes - Lend LeaseSouthbank Parklands - CPTSTennyson Park - MirvacOceanside - StocklandGold Coast Light Rail - Mac Dow

QualificationsBachelor of Applied Science Built Environment (Landscape Architecture and Town Planning), Certificate IV in Landscape Horticulture

Key ProjectsBells Reach - StocklandBrightwater - StocklandOceanside - StocklandCreekwood - AV Jennings

QualificationsAdv Diploma of Civil EngineeringCertificate II in HorticultureCertificate IV in WHS

Key ProjectsOrmeau Ridge - StocklandCoolum Sports Complex - ShadforthsHeathwood Logistics Park - Shadforths Civil

Key Personnel

Project Manager - EstimatorJOHN WHITE

Project Manager - EstimatorSHAUN LIVESEY

Project Manager - EstimatorPAUL HEAD

Project Manager - EstimatorLIONEL DESMOND

Page 6: Company Profile Personnel Projects - Eureka Landscapes · Company Profile Personnel Projects 2016. From the outset, we establish a partnership with our client to understand ... and

Management

Bachelor in Occupational Health and SafetyDiploma in Occupational Health and Safety - Fire Safety AdvisorDiploma in Environmental Management - Lead Auditor

Certificate IV Training and Assessment - Drug and Alcohol TestingTraffic Management Level 3 and 4 General Safety InductionAdvanced First Aid

Studying Graduate Diploma In Occupational H&SDiploma in Occupational H&SNebosh International General Certificate in Occupational H&SCert IV in Occupational H&S

Certificate III in Landscape Construction Drug and Alchol testing Traffic Management Level 2Electrical Testing and Tagging First Aid

Grad Certificate in Business - HRCert IV in Occupational H&SCert IV in Training and Workplace AssessmentMediator – Justice and Attorney Certified Professional AHRI

Certificate III HorticultureCertificate IV in WHSCertificate IV Business ManagementCertificate III Civil Plant Operations

Bachelor of CommerceDiploma in Advanced AccountingMember of CPA AustraliaCertified Justice of the Peace

Key Personnel

HSEQ ManagerSTEVE FITZPATRICK

HSEQ AdvisorROBERT WHITESIDE

HR ManagerMARY ASTON

Maintenance ManagerDEAN SCHMIDTCHEN

F inance ManagerBEN PARLETT

Page 7: Company Profile Personnel Projects - Eureka Landscapes · Company Profile Personnel Projects 2016. From the outset, we establish a partnership with our client to understand ... and

Foreman

QualificationsCertificate III in HorticultureSkid Steer LicenseSenior First Aid

Key ProjectsYarrabilba - Lend LeaseNorth Lakes - StocklandSouthbank Parklands - CPTS

QualificationsCertificate IV in HorticultureCertificate IV in WHS

Key ProjectsGainsborough Greens - MirvacSpringfiled Lakes - Lend LeaseOrmeau Ridge - Stockland

Qualifications Advanced Diploma of Horticulture Certified Landscape ProfessionalBSA Site Supervisors LicenseCourse In General Safety Induction

Key ProjectsNorth Lakes - StocklandYarrabilba - Lend LeaseRoma Water Play - MRC

QualificationsCertificate III Civil Constructions Plant Operations

Key ProjectsCoolum Sports Complex - ShadforthsBrightwater - StocklandBells Reach - Stockland

QualificationsCertificate III in HorticultureCertificate IV in WHS

Key ProjectsOceanside - StocklandBirtinya Peninsula - StocklandCreekwood - AV Jennings

QualificationsBSA Supervisors LicenseCertificate IV in WHS

Key ProjectsOceanside - StocklandNorth Lakes - StocklandKookaburra Park - BCC

Key Personnel

ForemanHEATH PYATT

ForemanMARK GUMBLEY

ForemanDALE DARVILL

ForemanJOHN ROBERTSON

ForemanBEN FORD

ForemanBRAD HARVEY

Page 8: Company Profile Personnel Projects - Eureka Landscapes · Company Profile Personnel Projects 2016. From the outset, we establish a partnership with our client to understand ... and

Planned Communities

Birtinya Peninsula is adjacent to the Birtinya Island development at Oceanside and will remain as one of the primary residential communities within this greater development. At Birtinya Peninsula we completed the neighbourhood park, seven stages of streetscaping with linking parks and waterfront explorative parkland, as well as extended the network of access paths that now include access for personal water activities within the local waterways. The neighbourhood park is a prime example of our ability to deliver a high-intensity park with many exclusive components. This park includes open lawns, feature gardens, interactive natural play zones, playground equipment, an all-abilities amenities block, customised shelters, picnic and BBQ facilities with an open air amphitheatre. The park showcases our team’s passion for quality landscape finishes and the desire to deliver superior facilities to local communities

The Bells Reach Parks were varied in their construction approach as they were to target particular age groups. The latest addition has been the Adventure Park with many challenging and exciting elements. This park sets the benchmark in adventure play by providing challenging activities for all ages. Due to this park being the only kind of its nature in the region it had to be constructed to the highest quality to ensure continued safety and rigour for all to enjoy. This adventure park is located in a beautifully vibrant setting with large ex ground palms, surrounding ‘old school’ additional play elements, natural environments that generate free play, low maintenance gardens and large open break-out lawn areas.

The ultimate in contemporary living, with extensive green open spaces. Located between Brisbane and the Gold Coast, the community is nestled around the Gainsborough Greens Golf Course and has extensive green open spaces. 65% of Gainsborough Greens is dedicated to extensive open space, parks, conservation areas and the golf course.

Key Projects

StocklandBIRTINYA

StocklandBELLS REACH

MirvacGAINSBOROUGH GREENS

Page 9: Company Profile Personnel Projects - Eureka Landscapes · Company Profile Personnel Projects 2016. From the outset, we establish a partnership with our client to understand ... and

Planned Communities

Eureka Landscapes have been involved with Yarrabilba from day 1. We are currently entering our fourth year on site having completed Precinct 1 (includes Darlington Parkland, 3 smaller parks, 6 staged streetscapes, a sales village and significant entry works); Precinct 2 (various large staged streetscapes, various extensive linear parklands and upgrades to the display village and sales office) and Precinct 3 (streetscapes, linear parkland and neighbourhood parks).Yarrabilba provides a very stable platform for ongoing growth and development within our construction and management teams. Working in a collaborative manner with all contractors and consultants involved we are able to constantly deliver high quality outcomes within the budget and program constraints.

At North Lakes, Eureka Landscapes have enjoyed delivering all of the landscapes and parks to the ever growing and ever changing community. Throughout our 12 year journey we have established a great relationship with the local and broader community. We have accommodated not only the Stockland Development requirements but also the smallcommunity requests. We are extremely proud that the parks that we havecontinued to deliver at North Lakes are standing up to the demands. We have been continued to developed a highly skilled workforce as this project has provided all of the challenging situations any landscape contractorcould expect.

Springfield Lakes is another landmark project development site that Eureka Landscapes pride ourselves on. We have formed a strong long term relationship with Lend Lease. This relationship has formed from our ability to work cooperatively as a team with all contractors, consultants and the Ipswich City Council. We have delivered many custom and bespoke landmark elements in the parks that we have delivered in andaround the Springfield Lakes region. The Promenade Falls was a reticulated water body with not only custom off form concrete weirs but also ones of natural stone. This required additional hydraulic engineering tomaintain even volumes over the individual wall sections. A feature water body that has had no issues since opening many years ago. Other key park areas delivered include the Discovery Park, Grande Park and LakesEntrance.

Key Projects

Lend LeaseYARRABILBA

StocklandNORTH LAKES

Lend LeaseSPRINGFIELD LAKES

Page 10: Company Profile Personnel Projects - Eureka Landscapes · Company Profile Personnel Projects 2016. From the outset, we establish a partnership with our client to understand ... and

Infrastructure & Education

The ACU Banyo campus include the complete revitalisation of the Community Court with a historically sensitive approach, the comprehensive revitalisation of the St. Francis Courtyard and the construction of the new Journey Works access route.The works included the thorough demolition of all works, re-profiling and installation of a selection of premium pedestrian pavement treatments sensitive to the Chapel and historic data for the project site; new feature gardens with rare roses, custom furniture, a vehicular access pavement through the courtyard and up-lighting to the Chapel.The St. Francis Courtyard works included the installation of a formal courtyard complete with various pavement finishes, access paths, stairs, feature gardens and a pair of unique Blackbutt timber shade trellis structures.

The Anglican Church Grammar School’s Junior School Playground proved to be a very complex arrangement of surface treatments and seating elements. A large component of demolition works was initially required prior to commencement of the new courtyard. Due to access requirements and the design of the playground, this project has to be completed in stages working from the top back of the area, outwards. The area coprises of a series of terraced platforms, extensive seating walls of varying surface finishes, large shaded concrete areas, many stair and ramp access options as well as a lower level play area. A highlight of the site is the aerial play equipment which is situated at the top of the slope with a commanding view of the entire area.

Mainly underground, the 6.7km toll road connects the Clem 7 Tunnel, Inner City Bypass and local road networks. Airport Link is the first major motorway linking the Brisbane city to the northern suburbs and airport precinct, avoiding up to 18 sets of lights. Design and construction of the projects followed a comprehensive Environmental Management Plan,incorporating appropriate environmental management and protection practices. During construction, our project team was committed to protecting the existing environment and managing environmental impacts. Through innovative urban design, the project enhanced the surrounding environment with the creation of significant areas of new landscape.

Key Projects

Australian Catholic UniversityAUSTRALIAN CATHOLIC UNIVERSITY

Anglican Church Grammar SchoolANGLICAN CHURCH GRAMMAR COURTYARD

Thies John HollandAIRPORT LINK

Page 11: Company Profile Personnel Projects - Eureka Landscapes · Company Profile Personnel Projects 2016. From the outset, we establish a partnership with our client to understand ... and

Public

Working extremely closely with the design team post-contract award we were able work collectively in design workshops to value-engineer custom elements in the project to find efficiencies for additional scope options.The works included: significant earthworks and level changes; curved, formed and poured in-situ concrete walls and stairs, cobble, unit and concrete pavements; premium softfall rubber in custom pattern; customised timber and steel balustrade; detailed drainage works; lighting and electrical works; a unique suite of furniture; irrigated and planted garden beds; profiled lawn area; and, of course, the pink, sprawling sky tower and slide system with associated playground elements.

Located on the site of a former coal fired power station this 2.9 hectare north facing site on the Brisbane River at Tennyson is a contemporary all abilities district park. The park covers the environmental, social and cultural aspects of the past and future cultures. A project heavily based on sustainable initiatives and usability. This project has all of the prerequisites required to showcase a landscape contractors construction abilities.

A super park for all ages. The super park at Darlington Parklands comprises of various play areas targeted at different age groups, a water play area similar to Darlington Quarter in Sydney, a markets area, large open break out lawns, picnic facilities and natural walks along natural waterway corridors. This super park has been part of the Precinct 1development at Yarrabilba which also included 3 other smaller parks, 6 staged streetscapes, a sales village and suburb entry works.

Key Projects

City Parklands Transistion ServicesRIVERSIDE GREEN PLAYGROUND

MirvacKEN FLETCHER PARK

Lend LeaseDARLINGTON PARKLANDS

Page 12: Company Profile Personnel Projects - Eureka Landscapes · Company Profile Personnel Projects 2016. From the outset, we establish a partnership with our client to understand ... and

Certif ication

Safety is the number one concern for the entire Eureka Landscapes team. It starts from the moment our employees leave home in the morning until they return home in the evening. We consider that safety affects everyone impacted by our work – our employees, sub-contractors, site visiting staff and the public – where they come into contact with our activity and work site.

As a show of our dedication to creating and maintaining a safe working environment we are certified in the following: AS/NZS 4801:2001 Occupational health and safety management systems.

At Eureka Landscapes we pride ourselves on our ability to construct landscapes to the highest standard within the industry. With over 100 construction excellence awards we believe that we are able to provide reliable outcomes based on a consistent track record of delivery.

Our construction processes will include a series of opportunities to evaluate the works, these include regular site meetings, site inspections and hold points set out in the scope of works or as per our quality management plan. Quality of workmanship is assessed, and the highest standards will be upheld throughout project lifecycles.

As a show of our dedication to construction quality we are certified in the following: AS/NZS ISO 9001:2008 Quality management systems.

Eureka Landscapes acknowledge the combined dedication to provide a clean and suitable working environment with as little impact on the surrounding environment as possible. We actively participate in best practice initiatives to carry out our works. During the construction processes we are constantly seeking improvements and any new adoption processes. At the forefront of our daily prestart meetings we are engaging the site employees to ensure that our image on behalf of our clients is clearly demonstrating best practice and professional workmanship.

As a show of our dedication to creating and maintaining a clean and safe environment we are certified in the following: AS/NZS ISO14001:2004 Environmental management systems.

This shows our commitment to construction excellence, through strong relationships and by providing unsurpassed quality construction outcomes.

Management System

HEALTH AND SAFETY

QUALITY

ENVIRONMENT

Page 13: Company Profile Personnel Projects - Eureka Landscapes · Company Profile Personnel Projects 2016. From the outset, we establish a partnership with our client to understand ... and

Year : 2015Body : Landscape Queensland IndAward : Commercial FourProject : Bells Reach Arbour ParkResult : Winner

Year : 2015Body : Landscape Queensland IndAward : Million Dollar PlusProject : Stoneleigh Park, Logan ReserveResult : Winner

Year : 2014Body : Landscape Queensland IndAward : Best Landscape Feature CommercialProject : Darlington Parklands, YarrabilbaResult : Winner

Year : 2014Body : Landscape Queensland IndAward : Million Dollar PlusProject : Darlington Parklands, YarrabilbaResult : Highly Commended

Year : 2013Body : Landscape Queensland IndAward : QLD Landscape Construction of the YearProject : Ken Fletcher Park, TennysonResult : Winner

Year : 2013Body : Landscape Queensland IndAward : Million Dollar PlusProject : Ken Fletcher Park, TennysonResult : Winner

Year : 2013Body : Landscape Queensland IndAward : Best Landscapes Feature Commerical Project : Bells Reach Adventure Park, Bells ReachResult : Winner

Year : 2013 Body : Landscape Queensland IndAward : Commercial 4Project : Anglican Church Grammar SchoolResult : Winner

Year : 2013 Body : Landscape Queensland IndAward : Environmental Value CommendationProject : Gainsborough Greens Precinct 6, PimpamaResult : Winner

Year : 2011Body : Landscape Queensland IndAward : QLD Landscape Construction of the YearProject : Gainsborough Green ParkResult : Winner

Year : 2011Body : Landscape Queensland IndAward : Million Dollar PlusProject : Brightwater Boulevard, Mountain CreekResult : Winner

Year : 2011Body : Landscape Queensland IndAward : Commercial IV Category Project : Gainsborough Green ParkResult : Winner

A short list of our most recent awards

Associated Businesses

Awards & Group of Comapnies

Soak It is a professional water truck business that uses state of the art equipment and drivers that are trained horticulturists to provide the best outcome for a vareity of landscapes.

www.soakit.com.au07 3350 8399

Evolve Environmental Solutions specialise in Weed Management, planting, seed collection/production, implementation of vegetation plans, mulching, bioretention basin repairs/maintenance.

www.evolveenvironmental.com.au07 3350 8388

Industry