COMPANY PROFILE
VISION
• To be a world class construction &
infrastructure enterprise
harmoniously integrating
business goals with health, safety
& environment practices.
MISSION • To encourage innovation, upgradation
of knowledge, latest technologies in
the filed of engineering & construction.
• To deliver maximum value to all
our stakeholders.
CONSERVE INFRATECH PVT LTD
(Division of Allcargo Logistics Ltd)
THE AVVASHYA HOUSE
CST ROAD KALINA
SANTACRUZ EAST
MUMBAI - 400 098
PHONE : 022-66798100
ABOUT THE GROUP
Conserve Infratech Pvt Ltd (CIPL) was founded in 2011, as Construction company based at Mumbai catering to
construction needs of Avvashya group.
Executed projects in diversified sector such as ware housing, CFS, industrials, real estate, infra development, interior etc.
At present we have worked in Maharashtra, West Bengal, Tamilnadu, Karnataka, Haryana & Gujarat.
Dedicated professionally qualified work force.
Using state of art construction technologies for excellent results.
Reliable & professional construction company with commitment to quality, health, safety & environmental policies.
CIPL is ISO:9001 complaint & professionally managed construction company with employment policies & system
radiating form a single principle “We construct to save”
CIPL, has the technical competence & skilled manpower to handle any Project in the field of Civil Engineering including
execution of projects on Turnkey Basis( Design & Build)
Conserve Infratech Pvt. Ltd. is the Engineering and Construction division of Avvashya Group.
Conserve has not only supervised and executed many in-house projects like construction of state of-the-art Container
Freight Stations (CFS), Warehouse, Inland Depots, Railway Sidings, Real Estate Development Projects, Interior Works,
Exterior and Facade Works, etc. but also in line to undertake integrated turn key projects, positioning the company as
“One-Stop Construction company”
Design & Build is a single point solution that offers a single source of responsibility and accountability which reduces the compulsory
involvement of the stakeholders during design and construction to coordinate or arbitrate between separate contract for resolving budget
and schedule conflicts.
Few benefits of “Design & Build”:
• Increased time and cost efficiency
• Enhanced communication
• Guaranteed quality
• Guaranteed cost
• Guaranteed schedule completion
Options in “Design & Build “contract system:
• Lump sum contract with fixed cost and fixed time lines
• Item rate contract
• Cost plus contract: it’s a system in which client has to pay a certain percentage which is mutually agreed upon, to the “Design & Build”
contractor over the actual executed project cost by the various vendors under the Design & Build contractor. It’s a very transparent and
simple system in which every vendor and its cost finalized in consultation with the client.
ADVANTAGES OF DESIGN & BUILD
Warehouse CFS
CFS
Contract Logistics
CFS / WAREHOUSE / ICD
PROJECTS COMPLETED
CONTAINER FREIGHT STATIONS /
WAREHOUSE / ICD
Indian Fine Blanks Limited (IFB - Goa)
Transindia Logistic Park Pvt Ltd ( JNPT)
Caterpillar - Hosur
Container Corporation of India Ltd (Concor - Dadri Phase-II )
Transindia Logistic Park Pvt Ltd ( Phase II – Yard Extension)
Snapdeal
Transindia Logistic Park Pvt Ltd – New Warehouse
Transindia Logistic Park Pvt Ltd – New Warehouse
Indian Fine Blanks Limited (IFB – Goa – Phase II )
Allcargo Logistics Ltd – CFS
PROJECTS: CASE STUDY
PROJECTS: CASE STUDY
Case Study : Kolkata
* The project is spread over 18 acres of which phase 1 comprises of 11 acres which is developed.
There were multiple challenges
a. Local issues
b. Non availability of construction material
c. Poor soil conditions
d. Time constraint.
Non availability of construction material
* All the local materials are to be bought only through the local syndicates and also we need to pay ransom money through
certain areas.
* Despite material being available at lower rates still we could not procure from those sources, there was complete
monopoly.
* Initially our design was with GSB, the pricing was almost doubled by the local syndicates.
* Eventually we had to modify our design to 10mm metal which was easily available and economical too.
Soil Condition
* The soil test conducted indicates the very poor nature of soil , SBC (Soil bearing capacity) was found very less.
CBR value was 1.2 hence recommendation for band drain for yard area by soil consultant for the entire plot.
* As seen from the borehole logs in geotechnical report, soft to medium stiff marine clay soils were encountered within 14m
of existing ground surface. Consolidation settlement under weight of 4 stack high container and pavement loads will
result in excessive settlement on the order of 300 to 400mm, which is higher than permissible. Hence, Installation of
band drain/Prefabricated Vertical Drains (PVDs) and temporary preload are recommended :
PROJECTS: CASE STUDY
Case Study : Kolkata
• The water table was also was very shallow approximately 1.0m, considering that most of the yard development works
being conducted during the rainy seasons all these had a great impact on timelines. Lot of dewatering pumps were installed to keep the site
working.
• Initial design suggested for Band drain to be drilled throughout the plot which was very slow that means the entire plot needed 80000 no’s
band drain and also loading/unloading with suitable fill material for the entire plot. (5 cycle of 2 months for completion of 1st Phase)
• The Band drain however was done for critical structures like Warehouse, Canteen and Weigh Bridge. Hence the decision to change design to
geo-textile/geo cell/geo grid was taken to speed up the entire activity.
• The above design is vetted by IIT Bombay.
• This design change helped in saving of Rs4.25 Cr with enhanced quality.
• An additional saving of 3.25 Cr for elimination of band drain.
• The average settlement in the currently executed sections is around 140mm over a period of 6 years as against 400mm for the previous one.
• The loading material was effectively and efficiently used to fill the pockets of geo cell.
Yard section
Time constraints
Despite our initial time lost due to all the above mentioned reasons our end date was still the same and
we have achieved it.
Had our initial design with band drain would have been implemented the project would have been pushed to September 2017.
We started the work in the 1st week of October 2016 and completed the project (phase-I)by 2nd week of March 2017.
ARCHITECTURAL
Allcargo Logistics Ltd – The Avvashya House
Avvashya Learning Center
Aamby Valley
Comptech Solutions Pvt Ltd – Gurgaon
Planet SKS
Pirkon School
INTERIOR PROJECT
The Avvashya House Upgradation
The Avvashya House - 3rd Floor Interiors
Transindia Logistics Park Pvt Ltd - CFS
Transindia Logistic Park Pvt Ltd ( JNPT) – EDI
The Avvashya House - 4th Floor Interiors
Kalina Guest House
Comptech Solution Pvt Ltd – Gurgaon HCL Office
Meridien Tradeplace Pvt Ltd
The Avvashya House – Fourth Floor Expansion
Caterpillar Facility - Hosur
Kohinoor Office Interior Fitment
The Avvashya House 2nd Floor - ACCI – Interior Fitment
Avvashya Learning Center
Avvashya Learning Center
Allcargo Logistics Ltd – CFS
CREATING A SUSTAINABLE ENVIRONMENT
SUSTAINABLE DEVELOPMENT
We have installed Solar Panels of more than 1MW at our
various projects.
We have replaced traditional lighting system with LEDs at
several projects.
Rain water harvesting at facilities saves water to the tune
of thousands of kiloliter.
We strongly believe in creating a sustainable environment
for both business and communities.
CREATING A SUSTAINABLE ENVIRONMENT
Solar - Chennai Solar - Mundra
Solar - Jnpt
Chennai CFS JNPT I
Mundra CFS JNPT II
LED Lighting Images during night time at CFS’
SERVICES OFFERED: LCL
Completed Project
Year Project Name Description Of Work Project
Cost
2012
Indian Fine Blanks Limited (IFB - Goa) Warehouse with 5000 sqm 7 Cr
Caterpillar - Hosur 11500 sqm ware house,Yard work & Ancillary
building 12.5 Cr
Transindia Logistic Park Pvt Ltd ( JNPT) 23000 sqm G+2 RCC warehouse,Yard & Ancillary
Building 78.2 Cr
The Avvashya House – Building Façade/Ext development /MEP 9.75 Cr
The Avvashya house - 3rd floor Interior work for office area 1.9 Cr
Comptech Solutions Pvt Ltd - Gurgaon Interior work for office area/Façade/lift etc 2.8 Cr
Kohinoor City Interior work 1.3 Cr
2013
Allcargo Logistics Ltd - JNPT-I EDI EDI office work 1.36 Cr
Indian Fine Blanks Limited
(IFB – Goa – Phase II A) Yard work ,Ramp work,Ancillary Building 2.7 Cr
Container Corporation of India Ltd
(Concor - Dadri Phase-I )
5250 sqm ware house,Yard work & Ancillary
building of 1750 sqm & Yard 7 Cr
The Avvashya house - 4th floor Interiors Interior work for office area 0.95Cr
Pirkon School G+1 Seven class room Building -Civil work 0.3 Cr
SERVICES OFFERED: LCL
Completed Project
Year Project Name Description Of Work Project Cost
2014 Avvashya Training centre Total civil as well interior work 7 Cr
Kalina Guest House Interior work 1.1 Cr
2015
Transindia phase-II Yard work 4.8 Cr
Snapdeal Racking & conveyor work 3.4 Cr
HCL office- Gurgaon Interior work 0.2 Cr
Avvashya house -
4th Floor Expansion Interior work for office area 0.71 Cr
2016
All cargo Logistics Ltd - Annex 15000 sqm Ware house G+1,25000 sqm Yard, Ancillary
building 30.3 Cr.
Indian Fine Blanks Limited
(IFB – Goa – Phase II B) Trimix flooring & UG Tank work 0.9 Cr
Avvashya House -Upgradation Main Entarance,Terrace-Dinning Hall & Training centre 5.05 Cr
Aamby Valley Bungalow Renovation interior work as well as site development work 15 Cr.
2017
Kolkata Phase-I 3700 sqm ware House,600 sqm Office & 700 sqm other
ancillary Building 41Cr
Aamby Valley Bungalow Renovation interior work as well as site development work 15 Cr.
Kohinoor office Interior work 0.42 Cr
Avvashya House 2nd floor Interior work for office area 1.6 Cr
SERVICES OFFERED: LCL
Year Project Name Description Of Work Plot Area Project
Cost
1 Cargill India Pvt Ltd.Pune
60,000 sft ware house ,5000 sft yard ,
Ancillary building of 1050 sqm,MEP &
Infra work
15000 sqm 17 Cr
2 TransIndia ,Uran 1,40,000 sft ware house ,Infra & MEP
work 20000 sqm 18 Cr
3 Cargill - Kandla
100000 sqft of warehouse, rail
connectivity,
yard development, oil tank farm
14 Acres 50 Cr.
4 Kolkata Phase II ( Yard development work) 10 Cr.
Upcoming Design & Build Projects.
SERVICES OFFERED: LCL
INDUSTRY CERTIFICATIONS
SERVICES OFFERED: LCL
OUR ASSURANCE ON SAFETY AND QUALITY
REGOGNITIONS
AWARD : Outstanding Company in Logistics
Infrastructure & Constructions
PROJECT : JNPT- II CFS For Speedy, Quality &
Innovative Methodology for the Project
EVENT : 3rd EPC World Awards 2012 held at New
Delhi on 15th December ‘12
REGOGNITIONS
QUALITY / SAFETY/
HEALTH & ENVIRONMENT
Quality, Health, safety & Environmental (QHSE) Policy.
Quality is a key driver at CIPL, and at the heart of working .
A system approach to construction management perfected over last 5 years, the use of modern equipment, teams of highly skilled & experience workmen,
superior material, quality tools & constant supervision throughout ensures superior & consistent quality in all CIPL projects.
CPIL strives to exceed client expectations by providing quality through their collective commitment to excellence and assuring dependability with
experienced and motivated human resources and state-of-art machinery & equipment. Senior site supervisors for all processes, elaborate documentation
&reporting, in-organizational quality audits, scheduled management visits and periodical review ensures quality workmanship & finishing.
CIPL help their clients with optimal solutions to their satisfaction taking Into account their needs and resources.
CIPL provide An in –house lab having with all modern equipment & testing for regular testing & for testing of steel we generally prefer external ISO
certified labs only.
Inspection test plan (ITP) is religiously follow for each & every activity .
Quality Policy
•CIPL has built its image on the strong foundation of “Quality” construction.
•We are an ISO 9001:2008 company for quality management system (QMS).
•Adopt best technique & practices in the industry.
•Dedicated Quality Engineer at site for quality control.
•Quality lab at each site for quality checks & material testing.
•* We strive to achieve total customer satisfaction by delivering quality product.
•* Committed continual improvement in all fields of our business
Safety
At CIPL, safety is a primary ingredient to work ethic and its commitment to Zero accident extends to every aspect of a project from planning to
completion. We strongly believe that every accident is preventable and this philosophy is embedded into every project we execute through a
combination of technical field procedures & on-going training programs.
Environment
CIPL is committed to environmental excellence and to harmonizing development with the environment and understand that each of their project
whether Industrial, Institutional or Residential can affect people, animal, plants and land. Its goal is always to protect the environment during
construction and to build in safeguard that will keep protecting it even after completion.
Health Safety & environmental (HSE) policy.
* Our aim is to minimize the damage to the environment in which we operate along with health and safety of our staff, workers,
subcontractor’s & everyone involved.
* All personal protective Equipment (PPES) are provided to workers.
* Safety drill by the safety officer on a regular basis .
* Safety helmets, safety shoes, Goggles, jacket’s, safety belts, etc are compulsory at sites.
* Regular safety Audit.
* Providing of Fire extinguisher at important points during execution.
* Daily Tool box meeting to inculcate the culture of safe working to all.
Environmental Awareness:
Using FLY ASH in concrete
Rain water Harvesting for water management
Use of skylights in Warehouse / Admin Atriums ensures artificial lights are not required during the day time
Use of turbo vents which run without electricity
Use of electronic ballast / CFL luminaries with reflectors ensures less electric consumptions Installation of Capacitor Bank for
Electrical Supply.
Use of Sensor urinals and DUAL flush valves for toilets ensures optimum utilization of water Auto Sensors for OH Tanks
Film on Glasses to reduce solar radiation
Kept Green zone in every unusable area.
Solar panels on Warehouse Top,
Installation of Hydraulic Hoist which consumes 50% electricity as compared to other type of Hoist Solid waste Management.
The firm is ISO 9001:2008 certified. (Enclosed find certified attached herewith)
SERVICES OFFERED: LCL