Comparison of KEPIC/ ASME Nuclear Certification process, and suggestion for improvement
Doosan Heavy Industries & Construction Co., Ltd. QA Team
J.S.Kim
Contents
1. Purpose/ Background
2. Overview of KEPIC/ ASME Certification
3. Certification Process
- Preparation
- Application
- Survey
- Evaluation and Issue of Certification
4. Suggestion for Improvement
1 of 16
1. Purpose/ Background
Certification process for KEPIC and ASME is almost the same, but have some differences
Applicant needs much resources to prepare the demonstration of item and documents/ records
When applicants applies for both of KEPIC and ASME Certificate, demonstration for both of KEPIC and ASME shall be prepared separately though the QA Program and design, fabrication requirements are almost the same
There were some argument of the acceptability of the prepared item and documents/ records compare to the certification scope during the survey
Background
To review and compare the certification process of KEPIC/ ASME Nuclear Certification, and to suggest improvement for effective/ efficient certification for both of Committee and Applicants
Purpose
2 of 16
2. Overview of KEPIC/ ASME Certification
Cert. Scope RemarkMN Class 1, 2, 3, MC and CS components Mechanical ItemsSN Seismic Category I Structures or equipment Structural Items
EN Class 1E equipment Authorized inspection is not requiredHN Safety class air cleaning unit/air conditioning unit and
components
Cert. Scope Remark
N Construction of vessels, pumps, valves, piping systems, storage tanks, core support structures and concrete containments
NPT Fabrication of parts, appurtenances, welded tubular products and piping subassemblies
Corporate Cert. for site installation is issued
NS Fabrication of supports
N3 Construction of transportation containments and storage containments
NV Construction of pressure relief valves NA Field installation and shop assembly of all items Corporate Cert. for site
installation is issuedQSC Manufacture and supply of material
KEPIC has EN/ HN Certificates for instrumentation and control (I&C) or Air conditioning and not applicable for ASME. ASME issues Corporate Certificate of NPT, NA for field installation if the NPT, NA for
component fabrication is acceptable.
ASM
EK
EPIC
3 of 16
Typical Certification Process
All the processes such as application, scheduling, survey, review of survey result, final issue of Certificates are very similar between KEPIC and ASME
However, there are some differences between KEPIC and ASME such as payment of survey fee, survey time table etc.
Com
mitt
eeA
pplic
ants
Preparation of
application
Submittal of application
Review of submittedapplication
Schedule Survey Date
Accept scheduled
dates
Preparation of Survey
Survey
Evaluation of Survey
Result
Issue of Cert.
2. Overview of KEPIC/ ASME Certification
ANIS Pre-Survey
Comparison of Certification Fee- KEPIC : about 40,000 USD for all MN, SN, EN Certificates▶ KEPIC is normally half of the ASME Certification fee
- ASME : about 100,000 USD including 11,000 USD of advance deposit for N, NPT, NS, N3, NA, NPT(corporate)*, NA(Corporate)*
* NPT/ NA(Corporate) : issued to the component manufacturer along with NPT/ NA for site installation 4 of 16
3. Certification Process _ Preparation of application
Review applicable information for the certification program on KEPIC/ ASME website- KEPIC : www.kepic.org/certification- ASME : www.asme.org/shop/certification-accreditation
Applicable scope of work that is required to be certified Obtain required Codes & Standards of KEPIC/ ASME as applicable Agreement with an Authorized Inspection Agency as required Prepare quality manual and procedures Available and not available dates for survey, and the required issue/ renew date
Activities required to do during the preparation stage is the same between KEPIC and ASME as below.
5 of 16
Applicants shall submit the application forms with supplemental forms as below There are some differences between KEPIC and ASME application process
3. Certification Process _ ApplicationA
SME
KEP
IC
Application form with supplemental forms and information are submitted- Applicable certificates and items- Demonstration status for survey- Checklist for each Certificate(for Manufacturer/ Installer, Material, Design etc.)
- Company Information such as employee number etc.
Applicable QA Manual
Supplemental forms and Survey Team Size Questionnaire are submitted through CA Connect- N-Type Cert. Applicants : Form A - QSC Cert. Applicants : Form C- Accreditation/ Certification Agreement
Applicable QA Manual
Same or Similar Differences
All documents are prepared and submitted as hard copy version
After the application, committee evaluate the survey fee and make contract with the applicant
Applicants are submit the application through CA Connect in ASME Website
11,000 USD of advance deposit shall be paid
6 of 16
3. Certification Process _ Application
Application for KEPIC Contract for KEPIC Survey
7 of 16
3. Certification Process _ Application
Application information for ASME
8 of 16
QA Manual and the implementation of QA Program is reviewed during the survey There are some differences between KEPIC and ASME survey process
3. Certification Process _ SurveyA
SME
KEP
IC
Survey Team : Team Leader, members, ANIS/ ANI Survey process
- Manual Review- Entrance Meeting/ Facility Tour- Review of the QA Program implementation▶According to the pre-prepared demonstration▶Issue of CAR and corrective action by
applicant- Team Closed Meeting▶Vote whether the Survey Team will recommend
the issue or renewal of Cert. to Committee- Exit Meeting
Review of Survey Result by applicable Sub-committee
Initial issue or renewal of Certificate
Same or Similar Differences
Entrance Meeting is held on the first day
QA Manual review is performed at the applicant’s facility after the Entrance Meeting
Demonstration for applicable Cert. and item is in detail than ASME (Refer to Doosan Case)
Entrance Meeting is held on the second day
QA Manual review is normally performed in a separated location
Demonstration for upper class item covers the lower class items (Refer to Doosan Case)
Overview of Survey
9 of 16
General requirements for preparation and review of the demonstration between KEPIC and ASME is the same except for some in detail.
Applicants needs much time and resources to prepare demonstration.
3. Certification Process _ SurveyA
SME
KEP
IC
Demonstration of applicable documentation and fabrication shall be prepared for each scope of the Certificate
When there is actual project within 3 years- applicable documents, fabrication records etc. of the project could be the demonstration
- Design demonstration according to the latest edition/ addenda of Code is required
When there is no actual project within 3 years- design, fabrication, inspection/ test, preparationof data report etc. for demonstration item shall be prepared in accordance with latest code edition.
Same or Similar Differences
Separated, detailed demonstration guidance is provided in website
Documentation and fabrication demonstration is required for most of applicable items- demonstration for piping system, storagetank, support, SC/ TC are requiredseparately for vessel manufacturers
Information handbook is provided that includes brief guide for demonstration
Higher class item covers the same or lower class item when the features of the item is similar- Fabrication of Vessel covers fabrication of piping system, storage tank, SC/ TC
Preparation and Review of Demonstration
10 of 16
3. Certification Process _ Survey
Requirements for Preparation of Demonstration for KEPIC
For KEPIC, document and fabrication demonstration is required for most of each items, such as design, procurement, fabrication, inspection/ test, data report etc. although applicant applied for both of Component and Auxiliary items at the same time.
Demonstration for KEPIC and ASME shall be prepared separately though the QA program, material, design, fabrication requirements are almost the same.
Applicable item KEPIC ASME
VesselPumpValveStorage TankPiping SystemCore Support StructureSC/ TC Container
Storage Tank : document demonstration All other items : document
and fabrication demonstration required
When Vessel demonstration is prepared- Demonstration for Storage Tank,
Piping system is covered by Vessel- SC/ TC Container : design document demonstration is required
Tubular Products (with Filler metal)Part and AppurtenancePiping Sub-Assembly
SupportContainer Part, Container Closure Weld
Document demonstration for any one of the three items
Document demonstrationDocument demonstration
Covered by Vessel Demonstration
Document demonstrationCovered by SC/ TC Container
11 of 16
3. Certification Process _ Survey
Comparison of demonstration between KEPIC/ ASME (Doosan Case)
Cert. Scope KEPIC ASME Remark
MN
1·2·3·MC Class Vessel Doc. and Fab. Demonstration SameClass 1 ?2 ?3 Pump Doc. and Fab. Demonstration SameClass 1 ?2 ?3 Piping System Doc. and Fab. Demonstration Not required Covered by Vessel Fab.Class 2 ?3 Storage Tank Doc. Demonstration Not required Covered by Vessel Fab.CS Class Core Support Doc. and Fab. Demonstration Same
SC/ TC Container and parts Doc. and Fab. Demonstration Doc. Demonstration Covered by Vessel Fab.
1·2·3·MC·CS Class Part, Appurtenance1·2·3·MC Tubular Product (Welded Type)1·2·3 Class Piping Sub-Assembly
Doc. and Demonstration(for any one of three items) Not required Covered by Vessel Fab.
1·2·3·MC Class Support Doc. Demonstration SameContainer Part, Container Closure Weld Doc. Demonstration Same Covered by SC/TC Material organization manufacturing and supplying ferrous & nonferrous material Doc. and Fab. Demonstration Same
SNConcrete Containment Structure Doc. and Fab. Demonstration Not required Covered by Vessel Fab.Seismic Category I reinforced steel concrete structure and steel structure Doc. and Fab. Demonstration Not required Covered by Vessel Fab.
Highlighted scope of KEPIC is more required than than ASME though it may be covered by the other items considering the importance and similarity of design, fabrication, inspection/ test for the items.
12 of 16
3. Certification Process _ Survey
Cert. Scope Project Equipment Remark
EN
Class 1E Switchgear SHU#2 RTSS (Reactor Trip Switchgear System) Completed
Class 1E Control Panel SHU#1 RCS (Power Control System) CompletedClass 1E Vital Bus Power Supply System SHU#1 VBPSS (Vital Bus Power Supply
System) Completed
Class 1E Cable, parts SHU#1 CEDM, RSPT Cable Completed
Class Monitoring and Control System SHU #1 RSPT(Read Switch Position Transmitter) Completed
Class 1E System (Control, Alarm, Monitoring etc.) SHU #2 PMCC (POSRV Master Control
Cabinet) On-going
KEPIC has the EN Certificates for I&C items which is not included in ASME Certificates. Document and fabrication demonstration is required for each scope though all the design
and fabrication process for each component or system is almost the same. It is required to be reviewed if the system/ components could cover the similar items as the
I&C components are very similar in design and fabrication
Comparison of demonstration between KEPIC/ ASME (Doosan Case)
13 of 16
3. Certification Process _ Survey
Things to do during the survey team closed meeting, closed meeting, and evaluation of survey result, issue of Certificate process is the same between KEPIC and ASME as below.
Survey TeamClosed Meeting
Held at applicant’s facilities prior to exit meeting
Review the survey result and vote on recommendation for issue or renew of Certification to Committee
Exit Meeting Held at applicant’s facilities with applicant’s management
Findings during the survey and the corrective action result are reviewed
Survey Team’s recommendation to the Committee will be announced
Certification Survey reports are reviewed by the Committee for Certification
Only after the applicant successful demonstration of the adequate and effective implementation of quality program
Certificates are valid for three years, and renewal application shall be submitted at least six months prior to the Certificates expiration date.
14 of 16
4. Suggestion for Improvement
Preparation of Demonstration
To reduce the preparation of documents and fabrication demonstration for KEPIC may be simplified referring to the ASME survey.
Especially piping system, storage tank, SC/TC container, Concrete Containment Structure etc. may be covered by Vessel or other demonstrations.
Demonstration items for EN Certificate may be reviewed and simplified considering the features of I&C component/ system.
If there is any process to check and confirm the acceptability of the prepared demonstration, it will be very helpful for applicants.
To make the preparation and implementation of survey process more effective and efficient, the suggestions below is required to be reviewed for improvement.
Mutual Recognitionbetween KEPIC/
ASME
If KEPIC and ASME have an agreement for recognition of the demonstrated documents and fabrication for each survey, it will be very helpful for applicants.
There should be some advance review for acceptability of the demonstration.
Information sharing and application
Submittal of application through the internet website will be helpful for applicants (refer to the ASME CA Connect)
To provide the summarized information for frequent findings and corrective action, issues during the preparation and survey will be very helpful.
15 of 16
Thank You!!