COMPASS ENERGY TRACK RECORD CLIENT CLIENT'S NAME PROJECT NAME JOB COUNTRY DURATION DESCRIPTION OF PROJECT YEAR SUPPLIED Jack Up Barge JB118 Abu Dhabi 2 Months TLQ Mobilisation Assistance 2015 LNG Easy Pte Ltd --- Singapore / China 7 Months Pre-FEED of FSU & LNG Regas Projects 2015 SAJ SAJ Technical Services (M) Sdn Bhd D18 - Halcyon II Singapore 4 Months Consultancy of Piping Engineer 2015 Bumi Armada Berhad Armada Hibiscus Singapore 1 Month Modification Engineering for Upgrade of Armada Hibiscus Accommodation 2015 Jack Up Barge JB114 Abu Dhabi 2 Months TLQ Mobilisation Assistance 2015 CEC International EP1, EP4 Singapore 2 Weeks Establish Variable load worksheet for EP1 & EP4 2015 MODEC INC FPSO Cidade de Compos dos Goytacazes Singapore 2 Months Consultancy of Structural Designer for Petrobas FPSO Cidade De Campos Dos Goytacazes MV29 Project 2015 LNG Easy Pte Ltd --- Singapore / China 1 month Pre-FEED of FSU & LNG Regas Terminal in China 2015 Page 1 of 13

COMPASS ENERGY TRACK RECORDcompassenergy.com/wp-content/uploads/2015/11/Track-Record.pdf · compass energy track record ... d18 - halcyon ii ... client client's name project name

  • Upload
    vocong

  • View
    220

  • Download
    1

Embed Size (px)

Citation preview

COMPASS ENERGY TRACK RECORD

CLIENT CLIENT'S NAME PROJECT NAME JOB COUNTRY DURATION DESCRIPTION OF PROJECTYEAR

SUPPLIED

Jack Up Barge JB118 Abu Dhabi 2 Months TLQ Mobilisation Assistance 2015

LNG Easy Pte Ltd --- Singapore / China 7 Months Pre-FEED of FSU & LNG Regas Projects 2015

SAJSAJ Technical Services

(M) Sdn BhdD18 - Halcyon II Singapore 4 Months Consultancy of Piping Engineer 2015

Bumi Armada Berhad Armada Hibiscus Singapore 1 MonthModification Engineering for Upgrade of Armada

Hibiscus Accommodation2015

Jack Up Barge JB114 Abu Dhabi 2 Months TLQ Mobilisation Assistance 2015

CEC InternationalEP1,

EP4Singapore 2 Weeks Establish Variable load worksheet for EP1 & EP4 2015

MODEC INC

FPSO Cidade de

Compos dos

Goytacazes

Singapore 2 Months

Consultancy of Structural Designer for Petrobas

FPSO Cidade De Campos Dos Goytacazes MV29

Project

2015

LNG Easy Pte Ltd --- Singapore / China 1 month Pre-FEED of FSU & LNG Regas Terminal in China 2015

Page 1 of 13

COMPASS ENERGY TRACK RECORD

CLIENT CLIENT'S NAME PROJECT NAME JOB COUNTRY DURATION DESCRIPTION OF PROJECTYEAR

SUPPLIED

First E & POML 83 & 85,

OML 71 & 72Singapore 11 Months

Project Management and providing the marine

facilities required to develop and produce the filelds

which cover FPSO for OML 83 and 85 and a MOPU

solution (including a FSO & Tanker Offloading

system) for OML 71 and OML 72

2015

CE ThailandCompass Energy

ThailandEP4 (Ex-Richmond) Singapore 1 Month Design of EP4 Export Pump Skid Storage Platform 2015

CEC International EP3 Singapore 4 MonthsGlobal & Fatigue Analysis for jacking & operating

condition of EP3 (Self-Elevating Platform)2015

GMS GMS Singapore --- Malaysia 3 daysInspection of 2 units Semi-Submersible for Purchase

Option2015

First Reserve

International Limited

Bertam Field block

PM307Singapore 1 Week FPSO Inspection in Singapore Shipyard 2015

Larastia AD6 Malaysia 3 Days Site Inspection of AD6 rig (Self-Elevating Platform) 2015

CEC International EP4 (Ex-Richmond) Singapore 6 WeeksStrength Analysis EP 4 (ex-Richmond-Semi-

Submersible)2014

Jack Up Barge --- Malaysia 6 MonthsProject Management of TLQ Fabrication &

Construction2014

Page 2 of 13

COMPASS ENERGY TRACK RECORD

CLIENT CLIENT'S NAME PROJECT NAME JOB COUNTRY DURATION DESCRIPTION OF PROJECTYEAR

SUPPLIED

Jack Up Barge --- Singapore 2 weeks Review of TLQ Blast Calculation Analysis 2014

Satu Marine CESANO Rig Indonesia 2 weeksRig Condition Survey of CESANO & Budget

Preparation 2014

LEKOIL Limited Lekoil FSO Singapore Ongoing Project Management Consultancy 2014

EMAS AMCPipelay Barge Lewek

ChampionSingapore 3.5 months Engineering on Crane Upgrade for Lewek Champion 2014

Coastal Energy EP 1 Singapore 8 weeks Proposal on Protection Frame for Fuel Gas

Compressor(EP1)2014

EMAS AMCPipelay Barge Lewek

ConstellationSingapore 1 Week

Site Inspection, Supervision & Engineering of Cooling

Water System of Lewek Constellation 2014

Premier Oil Lewek EMAS FPSO Vietnam 4 Months Condition Survey & Reporting for Lewek EMAS FPSO 2014

EMAS AMCPipelay Barge Lewek

ChampionSingapore Ongoing

Design & Engineering Services of Anti Heeling

System for M/V Lewek Champion 2014

Page 3 of 13

COMPASS ENERGY TRACK RECORD

CLIENT CLIENT'S NAME PROJECT NAME JOB COUNTRY DURATION DESCRIPTION OF PROJECTYEAR

SUPPLIED

EMAS AMCPipelay Barge Lewek

ConstellationChina/Singapore 4 weeks Cooling Water System Engineering & Inspection 2014

EMAS AMCPipelay Barge Lewek

ConstellationSingapore 6 months Engineering Assistance for Lewek Constellation 2014

GE Energy E&I Design Singapore CompleteModification and upgrade of Electrical System for

MOPU (EP3 and EP4)2014

EMAS AMCPipelay Barge Lewek

ConstellationSingapore 12 weeks

Structural Analysis & Design of Pipe Reel Cradle

Modification 2014

EMAS AMCPipelay Barge Lewek

ChampionSingapore 2 Months

Additional Basic and Detailed Design for 1000 T

Crane Cooling Water System2014

MODEC INCProject

Commisioning Singapore 12 Months

Map Process Development Commisioning

Compass IT Mobile 2014

BAM International Submersible Barge Singapore 1 Week Design of Submersible Barge 2014

Petrofac Pte Ltd FPSO Opportunity Singapore 2 WeeksProvision of Consultant Services for Refurbishment

of FPSO 2014

Page 4 of 13

COMPASS ENERGY TRACK RECORD

CLIENT CLIENT'S NAME PROJECT NAME JOB COUNTRY DURATION DESCRIPTION OF PROJECTYEAR

SUPPLIED

Muller Dordrecht Steel Barge China 1 Week Independent Condition Survey of Steel Barge 2013

Jack-Up Barge B.V. JB 115, 117, 118 The Netherland 2 MonthsConstruction & Project Consultancy for Various

Upgrades to jack up barges2013

EMAS AMCPipelay Barge Lewek

ConstellationSingapore 12 Months

Consultancy and Engineering Services for The

Modification to Lewek Constellation2013

EMAS AMCPipelay Barge Lewek

ChampionSingapore 12 Months

Engineering and Design for Various Upgrade for

Lewek Champion 2013

Bumi Armada BerhadAccommodation

BargeMalaysia 24 Months

Consultancy of Project Manager for Design and

Construction of an Accommodation Barge2013

Kongsberg Maritime FSO Gagak Rimang Singapore 12 weeks Provision of Turnkey Solution for Dehumidifier

Containers2013

M7 OffshorePetroleo Nautipa

FPSOSingapore 8 weeks Consultancy for Structural Scope on MEG Tank Skid 2013

Rubicon Offshore

International

Rubicon Intrepid

FPSOSingapore 6 Weeks Provision of E&I Consultant for Rubicon 2013

Page 5 of 13

COMPASS ENERGY TRACK RECORD

CLIENT CLIENT'S NAME PROJECT NAME JOB COUNTRY DURATION DESCRIPTION OF PROJECTYEAR

SUPPLIED

M7 OffshorePetroleo Nautipa

FPSOSingapore 8 weeks

Consultancy for Structural Scope on Fuel Gas

Module2013

Compass Energy

ThailandE&I Design Singapore 2 weeks E&I Design for GE Energy 2013

MODEC FPSO MV26 Singapore 4 Months Provision of FPSO MV26 Piping Designer 2013

Bumi Armada Berhad Tuah 303-307 China 8 MonthsProvision of Project Management Team for

Newbuild in Xiamen2013

Jack-Up Barge B.V. Jack-Up Barge JB118 Singapore 2 Months Review & Design of Sea-Fastening of Items onboard

JB1182013

BW Offshore FPSO Espoir Singapore 2 MonthsProvision of Accommodation Engineer for FPSO

Espoir Life Extension2013

CEC International EP4 (Ex-Richmond) Singapore 2 WeeksStructural Modification for New Genset on

Richmond2013

DVB Bank Dalian Developer Singapore 2 months Engineering Study for Dalian Developer 2013

Page 6 of 13

COMPASS ENERGY TRACK RECORD

CLIENT CLIENT'S NAME PROJECT NAME JOB COUNTRY DURATION DESCRIPTION OF PROJECTYEAR

SUPPLIED

BAM International BAM IB909 Singapore 1 WeekProvision of Site Inspector for Maintenance

Programme2013

Seatrans AS EM Leader Singapore 1 Month Conversion for EM Leader 2013

BAM International Crane Barge Singapore 1 Month Engineering Review Consultancy Services 2013

Jack-Up Barge B.V. Jack-Up Barge JB118 Singapore 1 MonthTo provide basic design for additional fuel oil system

for JB 118 DP22012

Premier Oil FPSO LEWEK EMAS Vietnam 1 Month Boiler Failure Assessment 2012

Premier Oil FPSO LEWEK EMAS Vietnam 1 Month Benchmark Survey of FPSO LEWEK EMAS 2012

HA-CE Engineering Crane Barge Singapore 9 months Engineering Design of Crane Barge 2012

CEC International MOPU Singapore 1 MonthStructural Analysis of Deck Extension for Ex-

Richmond2012

Page 7 of 13

COMPASS ENERGY TRACK RECORD

CLIENT CLIENT'S NAME PROJECT NAME JOB COUNTRY DURATION DESCRIPTION OF PROJECTYEAR

SUPPLIED

Keppel Verolme Prime Exerter The Netherland 22 Months Project Consultancy Services 2012

CEC International SKL-C Fixed Platform Singapore 2 weeks Engineering Design for New Piping & Structural

Outfittings on SKL-C2012

CEC International Soraya MOPU Singapore 2 MonthsStructural Design and Analysis for Soraya

Installations in Thailand2012

BAM International Self-Elevating Unit China 2 YearsProject Management Team for Marine Construction

of Jack-Up2012

CEC International

Soraya, Seafox 3,

Seafox 6, SKL-C Fixed

platform

Thailand 2 MonthsSite Verification and Update of GA drawing for

Soraya, SF 3, SF 6, and SKL-C2012

PTSC Asia Pacific Pte Ltd PTSC Lamson FPSO singapore 20 monthsConsultancy of Project Controls Manager for FPSO

Conversion project in Singapore Shipyard2012-2014

CEC International SKL-C Fixed Platform Singapore 5 months

Engineering, Procurement, Construction, Installation

and Commissoning of Portable Power Generation

System for offshore fixed platform in Thailand

2012

BigLift Shipping / HA-CE

Engineering

Heavylift

Transportation

Vessel

Singapore 3 months Conceptual and Basic Engineering Design and

Analysis for Heavylift Transportation Vessel2012

Page 8 of 13

COMPASS ENERGY TRACK RECORD

CLIENT CLIENT'S NAME PROJECT NAME JOB COUNTRY DURATION DESCRIPTION OF PROJECTYEAR

SUPPLIED

CEC International Seafox 6 MOPU Singapore 3 MonthsEngineering Design and Analysis of VSD Platform for

Seafox 6 MOPU 2012

BC Petroleum / Thome

Oil & GasBalai Cluster SFRSC Singapore 12 Months

Engineering Consultancy and Project Management

for Conversion of Early Production Vessel (EPV)2012

STX / HA-CE EngineeringHeavylift Semi-

Submersible VesselSingapore 4 Months

Engineering Design and Analysis of Removable

Buoyancy Casing for Heavylift Semi-Submersible

Transportation Vessel

2012

CEC International Seafox 3 MOPU Singapore 2 MonthsEngineering Design and Analysis of VSD Platform for

Seafox 3 MOPU 2012

Jack-Up Barge B.V. Jack-Up Barge JB118 China 18 Months

Project Management, Construction Supervision and

Engineering Support for Windmill Installation Jack-

Up

2012

Drydocks World NORA L206 Jack-Up Indonesia 1 Month

Technical Inspection and Project Budget Estimation

for Re-activation of NORA L206 Multi-Purpose Jack-

Up

2012

Drydocks World Awassi Indonesia 8 Months

Conversion of Container vessel to Livestock Carrier.

Compass is hired to get a failed project back on track

with Project Management, Site Supervision, Client

Interfacing and Engineering Support

2012

CEC International Soraya MOPU Singapore 2 Months

Engineering Design and FEM Analysis of Crane

Pedestal for installation of Offshore Crane on Soraya

MOPU

2011-2012

Page 9 of 13

COMPASS ENERGY TRACK RECORD

CLIENT CLIENT'S NAME PROJECT NAME JOB COUNTRY DURATION DESCRIPTION OF PROJECTYEAR

SUPPLIED

MODEC / MISCPetronas LNG FSRU

TerminalSingapore 8 Months

Engineering and Construction Consultancy for LNG

FSU Conversion (Malaysia Field)2011-2012

CEC International Seafox 3 MOPU Thailand 4 Months

Project Management, Engineering Design, FEM

Analysis, for Conversion to Mobile Offshore

Production Unit (MOPU)

2011

Petrofac International Berantai FPSO Singapore 6 Months

Engineering and Construction Consultancy, FPSO

Conversion Budget Estimation, Module Fabrication

Site Supervision

2011

Saacke GmbH / PromorPapa Terra P-63

FPSOChina 11 Months

Detailed Engineering, 3D-Modelling, FEM Analysis,

Fatigue Analysis and Construction Supervision of

FPSO topside skids

2011-2012

CEC International Soraya MOPU Singapore 8 Months

Project Management, Detailed Engineering and

Commissioning for Re-Classification, Upgrading and

Modifications on Mobile Offshore Production Unit

(MOPU)

2011

SMIT SMIT Kamara Singapore 2 Months

Engineering Design and FEM Analysis for installation

of HiPAP system on Offshore Support Vessel SMIT

Kamara

2011

AcergyBorealis 5000 Heavy-

lift Crane VesselSingapore 4 Months

Engineering Design and FEM Analysis for sea-

fastening and stowage of PES substructure, ROV

Deck House and Pipe stanchions. Stability studies

and towage plan for sea freight.

2011

KongsbergBW Offshore TSB

FPSOSingapore 8 Months

Engineering Design and Project Management of E-

House for BW Offshore TSB FPSO2010-2011

Page 10 of 13

COMPASS ENERGY TRACK RECORD

CLIENT CLIENT'S NAME PROJECT NAME JOB COUNTRY DURATION DESCRIPTION OF PROJECTYEAR

SUPPLIED

Workfox B.V. Seafox 5 Singapore 24 MonthsProject Management support for construction of

Windmill Installation Jack-Up2010-2012

Jack-Up Barge B.V. Jack-Up Barge JB117 Indonesia 16 Months

Project Management, Construction Management

and Engineering Support for Windmill Installation

Jack-up in Batam, Indonesia

2010-2011

DeepBlue CENDOR FPSO Singapore 3 Months FEED study of marine piping system design 2010

DeepBlue Chevron FSO Singapore 3 Months FEED study of marine piping system design 2010

ASL Shipyard

PetroVietnam

Kamari FSO Metering

Skid

Vietnam 6 MonthsProject Management, Design, Engineering and

Commissioning of a Metering Skid for Kamari FSO2009-2010

MODECPSVM BP Angola

FPSOSingapore 12 Months

Project Management, Design, Modelling and

Engineering of E-House and LER for FPSO to be

operated in Angola

2009-2010

MODECPSVM BP Angola

FPSOSingapore 14 Months

Project Management, Mechanical Handling Study for

FPSO including topsides, machinery space, deck2009-2010

MODECPSVM BP Angola

FPSOSingapore 8 Months

Project Management, Design, Modelling and

Engineering of Flare Tower on FPSO to be operated

in Angola

2009

Page 11 of 13

COMPASS ENERGY TRACK RECORD

CLIENT CLIENT'S NAME PROJECT NAME JOB COUNTRY DURATION DESCRIPTION OF PROJECTYEAR

SUPPLIED

NuCoastal (Thailand)

LimitedSoraya MOPU Singapore 8 Months

Project management, design, engineering,

procurement, for accommodation refurbishment

and classification of Jack up unit

2009

Worskhips Contractors

B.VSeafox 6 MOPU Thailand 3 Months

Project Management, Design, Engineering,

Compliance Review for Conversion to Mobile

Offshore Production Unit (MOPU)

2009

SMIT SMIT Borneo Singapore 1 Month

Review barge SMIT Borneo for entry India.

Necessary certificates and documentation to be

made available to flag state approval.

2009

MODEC Jubilee FPSO Singapore 6 Months Engineering Structural Analysis of Flare Tower 2009

NuCoastal (Thailand)

LimitedSoraya MOPU Singapore 8 Months

Project Management, Design, Engineering,

Procurement, Towage and Installation from cold

stacked condition to production.

2009

PT Arpeni Pratama

Ocean Line Tbk

LPG VLGC

ConsultancyIndonesia 2 Weeks

Feasibility study for increasing cargo capacity of LPG

VLGC tanker2009

Genting Oil & Gas FPSO Consultancy Indonesia 6 Months Evaluation of shipyards for FPSO newbuilding 2007

LGT Shipping Pte. Ltd.Gas Concord LPG-

FSOSingapore 12 Months

Project management, Engineering Structural, Naval

Architecture for the Conversion of LPG VLGC to FSO2006

Gogain Investments Ltd

Soraya MOPU

Upgrade and

Refitting

Indonesia 10 Months

Project management, design, engineering,

procurement and site supervision for upgrade and

refit of Jack-up rig "Soraya" to MOPU

2006

Page 12 of 13

COMPASS ENERGY TRACK RECORD

CLIENT CLIENT'S NAME PROJECT NAME JOB COUNTRY DURATION DESCRIPTION OF PROJECTYEAR

SUPPLIED

PetroChina Jabung

International Ltd

Petrocom Mooring

System ModificationIndonesia 6 Months

Design, Engineering, Procurement and Installation of

modifications to mooring system to allow FSO to

anchor alongside offshore terminal (previously

spread moored)

2005

LGT Shipping Pte. Ltd.

Upgrade and Re-

certification of VLGC

Gas Concord

Singapore 24 MonthsPurchase, Docking, Upgrade and Re-certification of

VLGC followed by Time Charter2004

PetroChina Petrocom FSO Singapore 36 MonthsDesign, Engineering, Procurement and Conversion of

Tanker to Project Management of Conversion of FSO2003