COMPLIANCE REPORT

October 2016 – March 2017

M/s Believers Church Thiruvalla, Pathanamthitta District, Kerala.

Page 2: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 2

COMPLIANCE REPORT

TO

THE CONDITIONS

OF

ENVIRONMENT CLEARANCE ORDER

(No.142/SEIAA/KL/2743/2013)

FOR THE PERIOD OF

October 2016 - March 2017

PREPARED FOR

Believers Church, St. Thomas Nagar, Kuttapuzha P O, Tiruvalla, Pathanamthitta District, Kerala – 680 105

PREPARED BY

ENVIRONMENTAL ENGINEERS & COUNSULTANTS PVT. LTD. A1- 198, Janak Puri New Delhi – 110 058, India

Page 3: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 3

Index

Sl. No. Particulars Page No.

1. Introduction 05

2. Glimpse of the project 06

3. Compliance Report – Specific conditions – Part A 08

4. Compliance Report – General conditions – Part B 11

5. Plates 24

6. Annexure 29

7. Soft copy (in CD) of the compliance report 42

LIST OF TABLES

Sl. No. Particulars Page No.

1. Glimpse of the project 06

2. Details of Rain Water harvesting tanks 12

3. Environmental Monitoring Cell (EMC) 13

4.. Details of the vegetation existing along the road side 13

5. Details of STP 15

6. Details of colour coded bins 16

7. Corporate Social Responsibility (CSR) performed 17

8. Details of the vegetation existing in the project site 18

9. Details of statutory approvals 20

10. Details of advertisement published in news papers 22

Page 4: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 4

LIST OF PLATES

Plate No. Particulars Page No.

1. Photograph of paddy field 25

2. Photograph of the pond 25

3. Photograph of Avenue trees 26

4. Photograph of sewage Treatment Plan 26

5. Photograph of Green belt in the project site 27

6. Photograph of colour coded bins 27

7. Photograph of designated place for waste collection 28

8. Photograph of Metallic board 28

LIST OF ANNEXURES

Annexure No. Particulars Page No.

1. Copy of NOC from Fire and rescue services 30

2. Copy of consent to Operate 31

3. Copy of building permit 32

4. Copy of Approval for transformer 33

5. Copy of occupancy Certificate 34

6. Copy of Environmental Clearance Order 35

7. Copy of advertisement in News papers 36

8. Copy of monitoring result of Air 37

9. Copy of monitoring result of drinking water 38

10. Copy of monitoring result of sound 40

11. Affidavit 41

Page 5: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 5

INTRODUCTION

M/s Believers Church is a hospital project situated at Survey Nos. 96/1,96/13,

102/6, 102/9,95/4, 236/1 and others at Kuttapuzha village, Thiruvalla Municipality,

Thiruvalla Taluk, Pathanamthitta District, Kerala. The construction project was accorded

Environmental Clearance for 56,919.45 sq.Mtr of build up area on 14-08-2014 vide order

No.142/SEIAA/KL/2743/2013 by State Environment Impact Assessment Authority, Kerala.

The half yearly compl iance report needs to be submitted as part of

general condition No.16 of Environmental Clearance order by the project

proponent. The compl iance report of second half to conditions of the

Environmental Clearance for the period of October 2016 – March 2017 is

being submitted.

Page 6: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 6

GLIMPSE OF THE PROJECT

1 Type of Project Construction - Hospital Project 2 Name of the project M/s Believers Church Address for correspondence Believers Church Hospital,

St. Thomas Nagar, Kuttapuzha P O, Tiruvalla, Pathanamthitta District, Kerala – 680 105

3 Website and E mail ID of company

www.bcmch.org [email protected]

4 Name, Phone Number & e - mail id of responsible persons

1. Jacob Pothen, 0469-2630654 [email protected]

2. Arun Babu 9495998445 [email protected]

5 Salient Features:

a) Of the project

The project involves construction 7 building

blocks for proposed hospital (500 beds). The

hospital building is with ground floor + 4 floors.

The total water requirement is 352.25 KLD and

the source will be Roof Rainwater water,

Ground water, Recycled water from STP and a

large pond located at about 500 meter from the

project site. The quantity of waste water

generated from the project activity will be about

281.80 KLD which will be treated in the STP.

The capacity of STP for hospital is 300 KLD

and for medical College Hospital is 300KLD..

The treated water will be recycled back and

utilized for gardening, flushing and chiller unit

etc. The estimated solid waste generation will

be 815 Kg/day which is segregate and collect

separately as bio degradable and Non – bio

degradable waste as per MSW Rules 2000.

Non bio degradable is sold to local vendors and

Page 7: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 7

b) Of the Environmental Management Plan

has set up a biogas plant for bio degradable

waste. The maximum height of the building is

20.35 Meters. The cost of the project is 176.64

crores

a) Acoustic enclosures with DG sets

b) Establishment of STP

c) Bio gas Plant

d) Rain water harvesting

e) Green belt development

f) Energy Conservation measures

g) Solid waste disposal

h) Hazardous waste disposal

i) Bio medical waste disposal

j) Environment Monitoring Cell

6 Break of the project area Plot Area 8.1917 hectors. Built – Up Area 64,481,490 sq.m.

7 Status of construction:

Date of commencement

Date of Completion

15th Dec 2014 September 2016

Current status of the Project

The proposed hospital project has 7 building blocks, comprises of teaching hospital,

Medical College building, mortuary block, hostel block, Kitchen and dining building,

services block. The whole work of the hospital has completed. At present, the hospital

has been running and providing modern health services to the public.

Page 8: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 8

COMPLIANCE REPORT

SPECIFIC CONDITIONS

Page 9: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 9

SPECIFIC CONDITIONS

01 The stream diversion should be regularized in the revenue records and certificate produced.

Complied

As per the direction of Kerala State Environment Impact Assessment Authority (SEIAA),

Kerala, the project proponent has got approval, vide order no. C4-15525/2003 dated 20-

08-2003 from District Collector, Pathanamthitta to re-align the drain.

02 The extent of Bhoosthithi vazhi should also be regularized in the revenue records

Complied

The Bhooshthithi Vazhi (path way) was used by the public to reach their houses 20

years ago. At present the houses are under the ownership of Believers Church so the

pathway became under-used.

03 A buffer distance of 5 meter has to be provided on either side of the internal stream and the land may be provided with riparian vegetation

Complied

.

A stream (thodu) is flowing inside the project site. To preserve the stream and its aquatic

life, the project proponent has planted various saplings in the buffer zone area. The

riparian vegetation can provide not only an aesthetic value to the stream but to improve

the quality of water too. The stream is periodically cleaned by the project proponent for

its uninterrupted flow.

04 Tertiary sandstones exposed should not be isolated or covered with non – permeable material

Complied

During the time of field visit of State Expert Appraisal Committee, (SEAC) Kerala spotted

tertiary sandstones in the applied area. To conserve it, the project proponent did not

extent its construction work or stockyard where the tertiary sandstones were spotted not

only that did not cover the tertiary sandstones exposed in the site with any non –

permeable materials. The area remains untouched.

05 Paddy fields in possession of the proponent must be used for paddy cultivation and should not be reclaimed.

Noted

Page 10: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 10

The project proponent is having nearly 50 acres of paddy land in possession near to the

hospital building. The paddy field will not be reclaimed.. The photograph of the paddy fields

is provided in Plate No.1

Page 11: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 11

COMPLIANCE REPORT

GENERAL CONDITIONS

Page 12: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 12

GENERAL CONDITIONS

01 Rain Water Harvesting capacity should be installed as per the prevailing provisions of KMBR / KPBR, unless otherwise specified elsewhere.

complied

Compliance:

As part of rain water harvesting, the project has constructed six Rain Water Harvesting

Tanks in the project site. The total capacity of the water tanks are 2050 KL. The project

has 4,500 sq.m roof top areas for harvesting roof run off to the Rain water harvesting

tank. This water will be used for domestic purposes. The details of Rain water harvesting

tanks are provided in Table No.1. The hospital has also developed a large pond in 7

acres of land as rain water harvesting Pond. The photograph of the pond is attached as

Plate No.2.

TABLE NO.1 – DETAILS OF RAIN WATER HARVESTING TANKS

Sl.No. Rain water harvesting Tank Capacity

01 Tank No. I & II 250KLD x 2 = 500KLD

02 Tank No. III & IV 500KLD X 2 =1,000KLD

03 Tank No. V 450KLD

04 Tank No. VI 100KLD

Total 2,050 KLD

02 Environment Monitoring Cell (EMC) as agreed under the affidavit

filed by the proponent should be formed and made functional. complied

Compliance:

The project proponent has constituted an Environmental Monitoring Cell (EMC)

with Rev. Thomas George as head of the monitoring cell, who is also the director of

general administration of hospital. The EMC meeting has been convening regularly to

evaluate and monitor the execution of the conditions stipulated in the Environmental

Clearance (EC) order. The details of the monitoring cell is given in Table No.2. We

Page 13: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 13

have engaged the services of a MoEF accredited consultant for all environmental

matters including the preparation of six monthly compliance reports.

TABLE No. 2 ENVIRONMENTAL MONITORING CELL (EMC)

Sl. No. Post Name

1. Head of the monitoring cell : Rev.Thomas George

3. Environmental Officer in charge : Mini Sara Thomas

4. Environmental Officer for health & safety : Ajith Kuruvilla

5. Accredited Environment Consultant

: Environmental Engineers and Consultants Pvt. Ltd., New Delhi

03 Suitable avenue trees should be planted along either side of the tarred road and open parking areas, if any, inclusive of approach road and internal roads.

Complied

Compliance:

The avenue trees can reduce air and noise pollution during the time of plying of

vehicle, the project has planted various species as avenue trees at either side of the

road. The vehicles are parking on the shades of trees planted at parking areas. This will

help to enrich vegetation and biodiversity in the site. The photograph of trees planted at

parking area is given in Plate No.3. The details of saplings planted along the road side

are given below in Table No.3.

TABLE No.3 DETAILS OF THE SAPLINGS PLANTED ALONG THE ROAD SIDE

Sl. No. Scientific Name Common Name Family Habit

01 Anacardium occidentale Cashew

Anacardiaceae

Tree

02 Elaeocarpus ganitrus Rudraksham

Elaeocarpaceae

Tree

03 Mimusops elengi Elanji

Sapotaceae

Tree

04 Syzygium cumini Njaval

Myrtaceae Tree

05 Azadirachta indica Neem

Meliaceae

Tree

Page 14: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 14

06 Ficus religiosa Arayal

Moraceae

Tree

07 Couroupita guianensis Nagamalli

Lecythidaceae

Tree

08 Calophyllum inophyllum Punna Calophyllaceae Tree

09 Spathodea campanulata Spathodea

Bignoniaceae

Tree

10 Pinus muricata Bishop pine tree

Pinaceae

Tree

04 The project shall incorporate devices for solar energy generation and utilization to the maximum possible extent with the possibility of contributing the same to the National grid in future

Complied

.

Compliance:

As part of energy conservation, the project is intending to generate and utilize

renewable energy. Solar panels are installed in the project site. There are four solar

water heaters with the capacity of 200 litters. This solar water heater will reduce energy

consumption from conventional sources.

05 Safety measures should be implemented as per the Fire and Safety regulations

Complied

Compliance:

The safety part is one of the highly priority area of the project proponent therefore as

per the guidelines and norms of Fire and Rescue services of Govt. of Kerala, the project

has implemented all possible safety measures for the safety of patients and employees.

The project has got NOC from the department for the same. A copy of NOC from Fire

and Rescue Department is provided in Annexure No.1. The details of executed safety

measures are follows:

Fire escape staircase

Fire lifts

Portable Fire fighting equipments

Water tank with the capacity of 125KLD

Emergency and escape lighting

Fire assembly points

Page 15: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 15

Travel distance to the emergency exit is below 30 meters

06 STP should be installed and made functional as per KSPCB guidelines including that for solid Waste Management.

Complied

Sewage Treatment Plant (STP)

As part of environmental sustainability, the project has installed two Sewage

Treatment Plants (STPs) in the project site for the recycling of used water. One STP with

the capacity of 300 KLD has installed for hospital and second one with the capacity of

300KLD is for Medical College. The two STPs are working properly and the treated water

is used for chilling units as make up water, flushing and horticulture. The supplier of STP

is Green Method Engineering (P) Ltd, ATC Building, Moolepadam Nagar Road, HMTJn,

Kalamassery P.O, Kochi, Kerala. The photograph of the STP is provided in Plate No.4.

The details of existing STP is mentioned in Table No.4

TABLE NO. 4 - DETAILS OF STP

Sl.No STP Capacity Avg. volume of

used water/day

Reuse of treated

water

01 STP at Hospital site 300

KL/day

260KL/day 250KL for Chilling

unit

10KL for

horticulture

02 STP at Medical

college site

300

KL/day

60KL/day 60KL for flushing

Total 600

KL/Day

320KL/day 320KL/day

Solid Waste Management

The collection, segregation, treatment and disposal is in accordance with the Municipal

Solid Waste (Management & Handling) Rules, 2016.

For the sustainable disposal of Municipal Solid Waste to be generated from the hospital,

the following measures are proposed and made functional:-

Page 16: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 16

Segregation of Municipal Solid Waste (MSW)

The segregation of Municipal Solid Waste to Bio- Degradable and Non – Degradable is

achieved by providing colour coded bins in the hospital (Green colored bins for Bio

Degradable waste and Blue colored for the Non – Bio degradable waste.). The

photograph of colour coded bins are provided in Plate No. 6. The project proponent has

provided designated area to store the generated waste, the photograph of the designated

place is attached as Plate no.7

Bio- Degradable Municipal Solid Waste

Bio gas plant is installed within the complex for the disposal of bio – degradable

Municipal Solid Waste. Even though biogas plant is there in the project site, the project

proponent is using all the food waste to piggery farm.

Bio Medical Waste

The bio medical waste is an inevitable waste from the hospital. This has been out-

sourced with the help of IMAGE (Indian Medical Association Goes Eco Friendly), an

agency authorized by Kerala Pollution Control Board (KSPCB). The hospital has placed

yellow, Red, white and black colour bins in every wards to collect the bio medical waste

generated from the hospital as per Bio-Medical Waste Management Rules, 2016. The

colour codes as per the said Rules are mentioned below in the Table No. 5

TABLE NO.5 – COLOUR CODED BINS FOR VARIOUS TYPE OF WASTES

Green Blue Yellow Red White Black

Food waste General waste Paper, plastic etc

Post operative body parts Placenta Cotton waste Face mask, cap

Syringes IV set Gloves Urine Bag Dialysis Kit

Broken Glass Ampoules, slides Needles

Solid chemicals Incineration Ash Discarded medicines

Page 17: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 17

07 The recommendation specified in the Companies Act, 2013 should be observed for Corporate Social Responsibility (CSR).

Complied

Compliance:

AS part of CSR (Corporate Social Responsibility), the project proponent spent

amount in the area of health care. The details of the Health care activities performed

from October 2015 to March 2016 are mentioned below in the table. The major activity

under CSR is discount and concession in treatment. The whole beneficiaries are from

economically back ward families. The Table No. 6 shows the activities under Corporate

Social Responsibility of the Project Proponent.

TABLE NO. 6. ACTIVITIES UNDER CSR

08 The proponent should plant trees at least 5 times of the loss that has occurred while clearing the land for the project.

Complied

Compliance:

SL. NO.

ACTIVITY BENEFICIARY (NUMBER AND

CATEGORY)

PLACE PERIOD AMOUNT (in Rs.)

01 Discount given to

patients for

treatment

380 BPL and other

category patient

Thiruvalla Oct– March 2017

18,96,814

02 Medical Camp

conducted in

Cardiology, Ortho

and Oncology

1500Adults Pandalam, Mulakazha, Chenganoor, Chenganacherry,Adoor, Vallamkulam, etc.

Oct – March 2017

20,000

03 Dialysis

(concession of Rs.300

to all patients for

dialysis)

Kidney patients -

9531 nos

Thiruvalla Oct – March 2017

9531X 300= 28,59,300/-

Total 11,411 patients 6 months 47,76,114

Page 18: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 18

The project proponent has planted many tree saplings, shrubs, climbers, herbs in

the project area as a compensation of loss of trees while the project is clearing the land

for construction. The number of trees existing in the project site was less than 60 before

the construction. As part of its landscape plan the project has planted trees more than

the requirement. The project proponent is planting maximum number of tree saplings in

the project site. The photographs of the vegetation is provided in Plate No. 5. The details

of various planted saplings in the project area are provided in the table given below in

Table No. 7

Table No.7. Details of saplings planted in the project area

Sl. No. Scientific Name Common Name Family Habit

01. Anacardium occidentale Cashew

Anacardiaceae

Tree

02. Jasminum officinale Jasmine Oleaceae Shrub

03. Elaeocarpus ganitrus Rudraksham

Elaeocarpaceae

Tree

04. Bougainvillea spectabilis Bougainvillea

Nyctaginaceae

Shrub

05. Mimusops elengi Elanji

Sapotaceae

Tree

06. Syzygium cumini Njaval

Myrtaceae Tree

07. Campanula persicifolia Bell flower

Campanulaceae

Shrub

08. Azadirachta indica Neem

Meliaceae

Tree

09. Allamanda cathartica Allamanda

Apocynaceae

Shrub

10. Ficus religiosa Arayal

Moraceae

Tree

11. Lilium candidum Lilly

Liliaceae

Shrub

12. Couroupita guianensis Nagamalli

Lecythidaceae

Tree

13. Tagetes erecta, Marigold

Asteraceae

Shrub

14. Calophyllum inophyllum Punna Calophyllaceae Tree

15. Rosa multiflora Rose ROSACEAE Shrub

Page 19: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 19

16. Spathodea campanulata Spathodea

Bignoniaceae

Tree

17. Pinus muricata Bishop pine tree

Pinaceae

Tree

18. Hibiscus mutabilis Hibiscus Malvaceae Srub

19. Ficus carica Fig

Moraceae

Tree

20. Nyctanthes arbor-tristis Parijatham

Oleaceae

Tree

21. Cassia fistula Kanikonna

Fabaceae

Tree

22. Lannea coromandelica Uthi Anacardiaceae Tree

23. Magnolia nilagirica Chempakam Magnoliaceae Tree

24. Pterocarpus dalbergioides

Roxb

Mahogany Fabaceae Tree

25. Mangifera indica Mango

Anacardiaceae

Tree

09 Consent from Kerala Pollution Control Board under water and Air act(s) should have been obtained before initiating activity

Complied

Compliance:

The project has obtained “Consent for Establishment” from KSPCB under Water

and Air Act(s) before initiating the construction of the project. The project proponent has

obtained “Consent to Operate” from KSPCB for its operational phase. The copy of latest

certificate of “Consent to Operate” from Kerala State Pollution Control Board is provided

in Annexure No.2.

10 All other statutory clearances should have been obtained, as applicable, by project proponents from the respective competent authorities including that for blasting and storage of explosives.

Complied

Compliance:

To enhance safety and promote environment sustainability, the project proponent

is being scrupulously followed all guidelines and directions of Government. The project

proponent has obtained approvals from all applicable respective statutory authorities.

Page 20: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 20

The important approvals are provided as Annexure Nos.1,2,3,4,5,&6. The details of

approvals are mentioned in Table No.8.

TABLE NO.8 - LIST OF NECESSARY APPROVALS

Annexure. No.

Name of the

Statutory

Clearances/

permission

Name of the

Issuing

authority

Approval Number

& Date

Expiry date if any

01 NOC Fire and Rescue

Services Dept.,

Govt. of Kerala

No.B1-1431/15

Dated. 30-03-2015

02 Consent to

Operate

Kerala State

Pollution Control

Board

PCB/HO/PTA/ICO/

01/2015

Dated – 28-01-

2015

30-04-2017

03 Building permit Thiruvalla

Municiapality

BP 315/12.13

Dated 22-04-2015

21-04-2018

04 Installation of

Transformer and

DG Sets

Chief Electrical

Inspector to

Govt. of Kerala

B1-

10465/2013/CEI

Dated 31/10/2014

05 Occupancy

Certificate

Thiruvalla

Municipality

BP 315/12-13

Dated 22 -4 -2015

06 Environmental

Clearance

State Environmental Impact Assessment Authority (SEIAA), Kerala

142/SEIAA/KL/274

3/2013 Dated

14/08/2014

31-07-2019

11 In the case of any change(s) in the scope of the project, the project would require a fresh appraisal by this Authority.

Noted

Compliance:

In case of any change(s) in the scope of the project, the proponent will apply for

fresh appraisal to get the Environmental Clearance.

12 The Authority reserves the right to add additional safe guard measures subsequently, if found necessary, and to take action including revoking of the environment clearance under the provisions of the Environmental (Protection) Act 1986, to ensure

Noted

Page 21: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 21

effective implementation of the suggested safeguard measures in a time bound and satisfactory manner.

Compliance:

To enhance safety and sustainability of environment, the project will add additional

safe guard measures subsequently if the authority found necessary.

13 The stipulations by Statutory Authorities under different Acts and Notifications should be complied with, including the provisions of Water (Prevention and Control of Pollution) Act, 1974, the Air (Prevention and Control of Pollution) Act 1981, The Environment (Protection) Act, 1986, the public liability (Insurance) Act, 1991 and EIA notification, 2006.

Complied

Compliance:

The stipulated orders and directions under different act and notification including

EIA notification will be scrupulously followed. A brief list of various Acts and notifications

which are followed by the proponent is given below

1. The Environment Protection Act,1986

2. The Water (Prevention and Control of Pollution) Act, 1974

3. The Air (Prevention and Control of Pollution) Act, 1981

4. The Public Liability (Insurance) Act,1991

5. The Solid Waste Management Rules, 2016

6. The Bio Medical Waste Management Rules, 2016

7. The Construction and Demolition Waste Management Rules, 2016

8. The Hazardous and Other Wastes (Management and Transboundary

Movement ) Rules, 2016

9. The E – waste (Management) Rules, 2016

10. The Plastic Waste Management Rules, 2016

11. Kerala Municipality Building Rules, 1999 as amended up to 2013

12. The Companies Act, 2013.

14 The project proponent should advertise in at least two local news papers widely circulated in the region, one which (both advertisement and the newspaper) shall be in the vernacular language informing that the project has been accorded Environmental Clearance and copies of clearance letters are available with the Department of Environment and Climate Change, Govt. of Kerala and may also be seen on the website

Complied

Page 22: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 22

of the Authority at www.seiaakerala.org. The advertisement should be made within 10 days from the date of receipt of the Clearance letter and the copy of the same signed in all pages should be forwarded to the office of this authority as confirmation.

Compliance:

An advertisement in two local daily newspapers (English and Malayalam)

regarding Environmental Clearance accorded to the quarry project was given within the

stipulated period and the copy of the same was submitted at SEIAA Kerala. The copy of

the advertisement given in two local newspapers is provided at Annexure No.7.

TABLE NO.9. DETAILS OF ADVERTISEMENT IN NEWS PAPER

Sl. No. News paper Language Date of edition

1 Janmabhoomi Malayalam 25/10/2014

2 Deccan Chronicle English 25/10/2014

15 A copy of the clearance letter shall be sent by the proponent to concerned Gram/District Panchayath / Municipality / Corporation / Urban Local Body and also to the Local NGO, if any from whom suggestions / representations, if any were received while processing the proposal. The Environmental Clearance shall also be put on the website of the company by the proponent.

Complied

Compliance:

A copy of the Environment Clearance letter was submitted to the Panchayat

Office. The project proponent did not receive any suggestions / representation from

anywhere while the processing the proposal therefore did not give the copy of clearance

latter to anyone.

16 The proponent shall submit six monthly reports on the status of compliance of the stipulated EC conditions including results of monitored data (both in hard copies as well as by e-mail) and upload the status of compliance of the stipulated EC conditions including results of monitored data on their website and shall update the same periodically. It shall simultaneously be sent to the respective Regional Office of MoEF, Govt. of India and also the Directorate of Environment and Climate Change, Govt. of

Complied

Page 23: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 23

Kerala.

Compliance:

The compliance report is being submitted to the Directorate of Environment and

Climate Change, Govt. of Kerala and the Regional Office of MoEF&CC, Govt. of India

with the results of monitored of air, water and sound both in hard copy as well as mail.

The result of monitored data is provided in Annexure No. 8, 9 &10.

17 The details of Environmental Clearance should be prominently displayed in a metallic board of 3 ft x 3ft with green background and yellow letters of Times New Roman font of size of not less than 40.

Complied

Compliance:

The detail of the Environmental Clearance is displayed in the project site as

prescribed by the State Environmental Impact Assessment Authority at hospital

premises. The photograph of the project is attached as Plate No. 8.

18 The proponent should provide notarized affidavit (indicating the number and date of Environmental Clearance proceedings) that all the conditions stipulated in the EC shall be scrupulously followed.

Complied

Compliance:

An assurance in the form of affidavit was already submitted to SEIAA Kerala. The

copy of the same is attached at Annexure No.11.

Page 24: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 24

PLATES

Page 25: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 25

Plate No.1

Paddy field near to the Hospital

Plate No.2

Rain water storage Pond

Page 26: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 26

Plate No.3

Avenue Tress along the internal road

Plate No.3

Sewage Treatment Plant

Page 27: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 27

Plate No.4

Vegetation in the project site

Plate No.6

Coloured bins to collect wastes

Page 28: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 28

Plate No.7

Designated area to store the wastes

Plate No.8

Display board

Page 29: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 29

ANNEXURES

Page 30: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 30

Annexure No.1

Copy of NOC from Fire

Page 31: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 31

Annexure No.2

Copy of Consent to Operate

Page 32: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 32

Annexure No.3

Copy of Building Permit

Page 33: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 33

Annexure No.4

Copy of approval for Transformer

Page 34: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 34

Annexure No.5

Copy of Occupancy Certificate

Page 35: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 35

Annexure No.6

Copy of EC order

Page 36: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 36

Annexure No.7

Copy of Advertisement in news papers

Page 37: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 37

Annexure No.8

Copy of Monitoring Result of Air

Page 38: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 38

Annexure No.9

Page 39: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 39

Monitoring results of Drinking water

Page 40: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 40

Annexure No.10

Copy of Monitoring result of Sound

Page 41: Compliance Report M/s Believers Church...2017/08/17  · Compliance Report – General conditions – Part B 11 5. Plates 24 6. Annexure 29 7. Soft copy (in CD) of the compliance report

Compliance Report M/s Believers Church

October 2016 – March 2017 Page 41

Annexure No.11

Copy of Affidavit