Page 1: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Compliance Report For

Group Housing Colony village Wazirpur and Mewka

Sector-92, Gurgaon (Haryana)

Submitted By

GROUP HOUSING COLONY

M/s Ramprastha Sare Realty Pvt. Ltd. C-10, C-Block market, Vasant Vihar,

New Delhi-110057

December 2014

Page 2: Compliance Report Submitted By GROUP HOUSING COLONY M/s

TABLE OF CONTENT

S. No Description Compliance of Specific and General Conditions

LIST OF ANNEXURES

Annexure Description

Annexure-I Environment Clearance Letter

Annexure-II CTE from HSPCB

Annexure-III Photographs showing First Aid Room

Annexure-IV Photographs showing hutments and mobile toilets

Annexure-V Photographs showing Fresh water Tanker

Annexure-VI Photographs showing stockpiles of excavated soil

Annexure-VII Photographs showing storage of Cement Bags Annexure-VIII Environmental monitoring report

Annexure-IX Photographs showing DG sets Annexure-X

Photographs showing Fly ash bricks and ready mix concrete

Annexure-XI Photograph showing RWH Pit

Annexure-XII Forest NOC Annexure-XIII Fire NOC

Annexure-XIV Electricity Permission from DHBVN

Annexure-XV Approved Site Layout

Annexure-XVI Undertaking for No use of Groundwater

Annexure-XVII Bills of External development charges to HUDA

Annexure-XVIII Approved Fire Layout

Annexure-XIX AAI NOC

Annexure-XX Affidavit

Annexure-XXI Receiving of NBWL

Annexure-XXII Copy of Receiving of June’2014

Page 3: Compliance Report Submitted By GROUP HOUSING COLONY M/s

LIST OF TABLES

Tables Description Page No Table-1 Schedule of AAQM 01

Table-2 Monitoring Result of SO2 at location AQ1 01 Table-3 Monitoring Result of NO2 at location AQ1 02 Table-4 Monitoring Result of PM10 at location AQ1 03

Table-5 Monitoring Result of PM2.5 at location AQ1 03 Table-6 Monitoring Result of CO at location AQ1 04 Table-7 Schedule of Noise Monitoring 05 Table-8 Daytime Noise Monitoring Results 06 Table-9 Night time Noise Monitoring Results 07 Table-10 Schedule of Ground Water sample collection 07 Table-11 Ground Water monitoring Results 08 Table-12 Soil Monitoring Results 10 Table-13 D.G. stack monitoring results

10

Table-14 D.G. noise monitoring results

11

LIST OF FIGURES

Figure Nos. Description Page No

Figure-1 SO2 concentrations at AQ1 01

Figure-2 NO2 concentrations at AQ1 02

Figure-3 PM10 concentrations at AQ1 03

Figure-4 PM2.5 concentrations at AQ1 04

Figure-5 CO concentrations at AQ1 05

Figure-6 Day time Noise monitoring results at Location AN1

06

Figure-7 Night Time Noise monitoring results at Location AN1 07

Page 4: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at village-Wazirpur and Mewka, sector-92, Gurgaon, Haryana.

Page 1 of 17

“COMPLIANCE REPORT” General and Specific Conditions as per the Environment Clearance Letter No. SEIAA/HR/2014/935 dated: 11/07/2014 (Annexure-I)

S. No. Conditions Compliance PART – A SPECIFIC CONDITIONS A. Construction Phase

1

“Consent To Establish” shall be obtained from Haryana State Pollution Control Board under air and water act and a copy shall b e submitted to the SEIAA, Haryana before the sta rt of any construction work at site.

Consent To Establish from HSPCB vide letter No. HSPCB/Consent/:2821214GUSOCTE916879 dated: 20/08/2014 is attached as Annexure-II.

2

A first aid room will be provided in the project both during construction and operation of the project.

First aid facility has being p rovided on the s ite and it will be provided during the operational phase of the project. The ph otographs showing first aid room is attached as Annexure-III.

3

Adequate drinking water and sanitary facilities should be provided for construction workers at the site. Provision should be made for mobile toilets. Open defecation is strictly prohibited. The safe disposal of waste water and solid wastes g enerated during the construction phase should be ensured.

All the necessary infrastructural facilitieslike drinking water, sanitary facility had been provided to the construction workers. Photographs showing hutments and mobile toilets are attached as Annexure-IV. Fresh water has been provided to the workers Photographs showing fresh water tank er is attached as Annexure-V.

4

All the topsoil excavated during construction activities should be stored for use in horticulture/landscape development within the project site.

All excavated top soil excavated has been stored and will used in horticulture/landscape development. Photographs showing stockpiles of excavated soil is attached as Annexure-VI.

5

The project propo nent shall ensure that the building material required during construction phase is properly stored within the project area and disposal of const ruction waste should not create any adverse effect in the neighboring communities and sho uld be disposed of afte r taking n ecessary precautions for general h ealth and safety aspects of people, on ly in approved sites w ith the approval of

Building material is being stored in covered rooms to p revent the adverse effects in the neighboring communities and the photographs showing storage of cement bags are attached as Annexure-VII.

Page 5: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at village-Wazirpur and Mewka, sector-92, Gurgaon, Haryana.

Page 2 of 17

competent Authority.

6

Construction spoils, including bituminous material and o ther hazardous materials, must not be allowed to c ontaminate watercourses and the dump sites for such materials must be secured s o that they should not leach int o the ground water and any Hazardous waste generated during the construction phase, should be disposed as per applica ble rules and norms with necessary approval of the Haryana State Pollution Control Board

Construction spoils has been stored in adedicated area surrounded by boundaries to avoid contamination to nearby environment. Impervious lining on floor of storag e area prevented contamination. Ground water monitoring is being carried out on regular to check the quality of ground water. No contamination of ground water has been observed. Environmental monitoring report has been attached as Annexure-VIII.

7

The diesel generator set to be used during construction phase should be of ultra-low sulphur diesel ty pe and should conform to Environment (Protection) Rules prescribed for air and noise emissions standards.

Ultra-Low sulphur Diesel is being used as fuel for the DG sets.

Environmental monitoring report has beenattached as Annexure-VIII.

8

The Diesel required for operat ing DG set shall be stored in underground tanks and if required, clearance from chief controller of Explosive sh all be taken.

During the construction phase, only 500-600 ltrs. diesel is required, which is being p urchased on daily basis. Permission from Chief Controller of explosives shall be obtained if the s tored capacity of diesel at the site exceeds 1000 liters. The total amount of diesel stored at the site does not exceed 1000 l itres, thus there is no requirement of clea rances from chief controller of explosives for storage of diesel as per Petroleum Act 1934, Chapter-1, Section 7. During the operational phase, if storage of diesel will exceeds 2.5 K L, clearance would be tak en from chief controller of explosives.

9

Ambient noise lev el should conform to residential standards both during day and night. Incre mental pollution loads on th e ambient air and noi se quality should be closely monitored during construction phase. Adequate measures should be taken to reduce ambient air and noise lev el during construction phase, so as to conform to the stipulated standards.

Mitigation measures like dust suppression through water sprinkling, covering of the trucks carrying construction material with Tarpaulin cover, DG sets being used are with acoustic enclosures, use of low sulphur diesel as fuel for DG sets etc were some of the measures taken during the construction phase to conform to the air and noise standards prescribed by CPCB. Photographs showing D G sets in acoustic enclosures is attached as Annexure-IX. Cement is being stored in the separate room. Photographs showing cement room is attached

Page 6: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at village-Wazirpur and Mewka, sector-92, Gurgaon, Haryana.

Page 3 of 17

as Annexure-VII.

Ambient Air and A mbient Noise monitoring reports is attached as Annexure-VIII.

10

Fly ash should be used as building material in the construction as per the provision of Fly Ash Notification of September, 1999 and amended as on 27th August, 2003.

Construction materials in the form of rea dy mix concrete consisting of Fly ash is being used for construction propose. Photographs showing Fly ash bricks and ready mix concrete is attached as Annexure-X.

11.

Storm water control and its reuse as per CGWB and BIS standards for various applications should be ensured.

Most of the storm water produced on site isbeing harvested for ground water recharge as per the CGWB norms. Rain Water Harvesting is being carried out at the project site as per the sanctioned drawings. The photograph showing RWH pit has been attached as Annexure-XI.

12.

Water demand during const ruction should be reduced by use of pre-mixed concrete, curing agents and other best practices referred.

Ready Mix Concrete along with curing agents is being used at the site for the construction work to reduce the water requirement for the construction purposes. Photographs showing Fly ash bricks and ready mix concrete is attached as Annexure-X.

13

In view of the several constraints in water supply augmentation in the region and sustainability of w ater resources, the dev eloper will submit the NOC from CGWA s pecifying water extraction quantities and assurance from HUDA/ utility provider indicating source of water supply and quan tity of water with details of intended use of water – potable and non-potable. Assurance is required for both con struction and operation stages separately. It shall be submitted to the SEIAA and RO, MoEF Chandigarh, before the start of construction

During the construction phase, treated water is being used from HSIIDC.

During operational phase, water will be provided by the HUDA and it will be submitted in the operational phase of the project

14.

Roof should meet prescriptive requirements as per Energy Conservation Building Code by using appropriate thermal insulation material

Roof would meet prescriptive requirements as per Energy Conservation Building Code by using appropriate thermal insulation material to fulfill requirement

15.

Opaque wall should meet prescriptive requirements as per Energy Conservation Building Code which is proposed to be mandatory for all conditioned spaces while it is

Opaque w a l l w o u l d meet p r e s c r i p t i v e requirements as per Energy Conservation Building Code.

Page 7: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at village-Wazirpur and Mewka, sector-92, Gurgaon, Haryana.

Page 4 of 17

desirable for non-air- conditioned spaces by use of appropriate thermal insulation material to fulfi ll requirement

16.

The approval of th e competent authority shall be obtained for structural safety of the building due to earthquake, adequacy of firefighting equipments, etc. as per Nation al Building Code including protection measures from lightening etc. If any Forest Conservation Act shall be taken from Competent Authority.

The building will be designed as per the National Building Code’2005. Forest NOC from DFO, vide Letter No.1349.G dated: 28/09/2012 and vide Letter No.2873-G dated: 25/11/2013 has been attached as Annexure-XII.

17.

Overexploited ground water and impending severe shortage of w ater supply in the region requires the developer to redraw the water and energy conservation plan. Developer shall reduce t he overall footprint of the proposed development. Project proponent shall incorporate water efficiency/ savings measures as w ell as water reuse/ recycling within 3 month and before start of construction to the SEIAA, Haryana and RO, MoEF, GOI, Chandigarh

No ground water is being used for construction activities. Treated water from HSIIDC is being used for construction activities. During operational phase, water will be provided by the HU DA and if groun d water w ill abstracted during the operational phase, permission will be taken from Central Ground Water Authority. Provision of Ra in water harvesting pits for ground water recharge is provided and implemented. The photograph showing RWH pit has been attached as Annexure-XI.

18.

The project proponent as stated in the proposal shall construct 49 rain water harvesting pits for recharging the ground water within the project premises. RWH pits shall be designed to make provisions for silting chamber and removal of floa ting matter before entering harvesting pit. Maintenance budget and persons responsible for Maintenance must be provided. Care shall also be taken that contaminated water do not enter any RWH pit.

49 Pits will be c onstructed for recharging the ground water. In the existing part, RWH pits are being constructed and the photograph showing RWH pit has been attached as Annexure-XI.

19.

The project proponent shall provide for adequate fire safety measure and equipments as required by Haryana Fire Service Act, 2009 and instructions issued by the local Authority Directorate of fire from time to time. Further the project proponent shall take necessary permission regarding fire safety scheme/NOC form competent Authority as required.

The Fire Fighting system has been designed considering the following codes, manual and guidelines; Standard codes:

1. National Building Code of India (NBC); 2. As per require ment of fire officer/local fire approving authorities; and 3. As per Indi an Standard Code for Fire

Page 8: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at village-Wazirpur and Mewka, sector-92, Gurgaon, Haryana.

Page 5 of 17

Protection (IS Codes) No Objection Certificate (Partly) from the Fire Safety Point of view for tower F01 and C01 Vide Letter No. DFS/FA/2014/87/42785 dated: 03/09/2014 is attached as Annexure-XIII.

20

The project proponent shall obtain assurance from the DH BVN for supply of 19694 KVA of power supply before the start of construction. In no case project will be operational solely on generators without any power supply from any external power utility.

Currently, construction is i n progress and full load of 19694 KVA is not required. Sancti on of 500 KW with CD 500 KVA Memo No: 2405 dated:09/05/2012 has been granted by DHBVN and permission letter is attached as Annexure-XIV.

21

Detail calculation of po wer load and ultimate power load of the proj ect shall be subm itted to DHBVN under intimation to SEIAA H aryana before the start of construction. Provisions shall be made for electri cal infrastructure in the project area.

Detail calculation of power load has been submitted to DHBVN and it will be submitted to SEIAA, Haryana in due course of time.

22

The project proponent shall not raise any construction in th e natural land depression/Nallah/ water course and shall ensure that the natural follow from the Nallah/water course is not obstructed.

No construction is being carried out the natural land depression/Nallah/ water course and no Nallah/water course is obstructed by the construction activities.

23

The project proponent shall keep the plinth level of the bu ilding blocks sufficiently above the level of the approach road to the project as p er prescribed by laws. Levels of the other areas in the projects shall also be kept suitably so as to avoid flooding.

The plinth level of the building blocks ar e sufficiently above the level of the approach road. Levels of th e other areas in the projects would also be kept suitably so as to avoid flooding. Construction of all building blocks will be as per approved site layout and it is attached as Annexure-XV.

24

Construction shall be carried out so that density of po pulation does not exceed norms approved by Director General Town and Country Department Haryana.

Construction will be carried out as per the approved site layout by DTCP and it is attached as Annexure-XV.

25

The project proponent shall submit an affidavit with the declaration that ground water will not be used for construction and only treated water should be used for construction.

No ground water is being abstracted for construction purposes. Treated water from HSIIDC is being used at site for construction activities. Undertaking in this regards is attached as Annexure-XVI.

26 The project proponent sha ll not cut any existing tree and project

The Project site was vacant land and devoid of trees at the time start of construction. Hence, this

Page 9: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at village-Wazirpur and Mewka, sector-92, Gurgaon, Haryana.

Page 6 of 17

landscaping plan should be modified to include those trees in green area.

point is not applicable.

27

The project proponent shall provide 3 meter high barricade around the project area, dust screen for ev ery floor above the ground, proper sprinkling and covering of stored material to restrict dust and air pollution during construction.

The barricading is being provided around the construction site and construction material is being stored in cover ed rooms. Photographs showing cement room is attached as Annexure-VII. Manual water sprinkling is being carried out on site to suppress the dust.

28

The project pr oponent shall construct a sedimentation basin in the lower level of the proj ect site to trap pollutant and other wastes during rains.

It would be taken care to construct a sedimentation basin in the lower level of the project site to trap pollutant and other wastes during rains.

29

The project proponent shall provide proper Rasta of proper width and proper strength for each project before the start of construction.

Proper rasta of proper width has being provided at construction site.

30

The project propo nent shall ensure that U- value of the glass is less than 3.177 and m aximum solar heat gain co-efficient is 0.25 for vertical fenestration.

It would be taken care that U- value of the glass is less than 3.177 and maximum solar heat gain co-efficient is 0.25 f or vertical fenestration as per ECBC,2007.

31

The project proponent shall adequately control construction dusts like silica du st, non-silica dust, wood dust, Such dust shall not spread outside project premises. Project proponent shall provide respiratory protective equipment to all construction workers.

Water sprinkling is being done on the s ite to suppress the dust and personal protectiv e equipments such as mask, ear muffs etc. has been provided to the construction labours.

32

The project proponent shall develop complete civic infrastructure of the group housing co lony including internal roads, green belt development, sewerage line, Rain water recharge a rrangements, storm water drainage system, solid waste management site and provision for treatment of biodegradable waste, STP, water supply line, dual plumbing line, electric supply lines etc. and shall offer possession of the units /flats thereafter.

The development will be done as p er the approved site lay out by DTCP. All the civic infrastructure including internal roads, green belt development, sewerage line, Rain water recharge arrangements, storm water drainage system, solid waste management site and provision for treatment of biodegradable waste, STP, water supply line, dual plumbing line, electric supply lines etc. will be provided.

33 The project proponent shall provide one refuse area t ill 24 meter, one till 39 meter and one after every 15 meter

Refuse area for emergency situation will be provided as per the National Building Code and it will not convert in th e habitable space or not

Page 10: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at village-Wazirpur and Mewka, sector-92, Gurgaon, Haryana.

Page 7 of 17

as per National building code. The project proponent shall not convert any refuse area in the habitable space and it should not b e sold out/commercialized.

be sold out.

34

The project proponent shall provide fire control room and fire officer for building above 30 meter as per National Building Code.

It would be taken care to provide the fire control room and fire officer for building above 30 meter as per National Building Code.

35

The project Proponent shall obtain permission of mines and g eology Department for excavation of soil before the start of construction

The project Proponent would obtain per mission of mines and geology Department for excavation of soil.

36

The project proponent shall seek specific prior approval from concerned local Authority/HUDA regarding provision of storm drainage and sewerage system including their integration with external services of HUDA / Local authorities beside other required services before taking up any construction activity.

We are submitting the external development charges to HUDA and bills are attached as Annexure-XVII.

37

The site for solid waste management plant be earmarked on the layout plan and the detailed project for setting up the solid waste management plant shall be submitted to the authority within one month.

Approved Site Layout is attached as Annexure-XV.

38

The project proponent shall submit the copy of fire safety plan duly approved by fire depar tment before the start of construction.

The Approved Fire Layout is attached as Annexure-XVIII.

39

The project proponent shall discharge excess of trea ted waste water/storm water in th e public drainage system and shall seek permission of HUDA before the start of construction.

Treated water will b e reused and recycle for horticulture, flushing and cooling p urposes and will try to achieve zero water discharge. For the integration of external services, we are submitting the external development charges to HUDA and bills are attached as Annexure-XVII.

40 The project proponent shall m aintain the distance between STP and water supply line.

The distance between STP and fresh wat er supply will be maintained.

41 The project propo nent shall ensure that the stack height is 6 meter more than the highest tower.

Stack height will be kept 6 meters above the highest tower as per the norms of CPCB.

42 The project propo nent shall ensure that structural stability to withstand

Project has been designed according to si te specific structural stability norms as per Part –IV

Page 11: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at village-Wazirpur and Mewka, sector-92, Gurgaon, Haryana.

Page 8 of 17

earthquake of magnitude 8.5 on Richter scale.

(Fire and Life Safety) of NBC’2005.

43

The project proponent shall provid e helipad facility as required under NBC norms and shall seek per mission of helipad from AAI accordingly.

Helipad facility will be provided t o the tower having the building more than 60 mtrs. As per NBC norms and H eight clearance from Airport Authority of India Vide Letter No. AAI/NOC/2009/322/1232-1236 dated: 02.08.2012 is attached as Annexure-XIX.

44

The project propo nent shall ensure that no construction activity is undertaken either on surface or below or above s urface of revenue rasta passing through the project area.

It will be ensured that no construction activity is undertaken either on surface or below or above surface of revenu e rasta passing through the project area. We had already submitted an Affidavit to SEIAA, Haryana that we will not cross services line across the re venue rasta falling within our project site. Copy of an Affidavit is attached as Annexure-XX.

45

The project proponent shall indicate the width and t he length of revenue rasta passing through the project area on sign board and sh all display the same at both the ends o f revenue rasta stretch, for awareness of public. Sign board shall also display the message that this is public rasta/road and any citizen can use it. Th ere shall not be any gate with or with out guards on revenue rasta further project proponent shall not encroach revenue rasta and shall not cross internal road over revenue rasta.

It will be ensured that no construction activity is undertaken either on surface or below or above surface of revenu e rasta passing through the project area. We had already submitted an Affidavit to SEIAA, Haryana that we will not cross services line across the re venue rasta falling within our project site. Copy of an Affidavit is attached as Annexure-XX.

46

The PP shall provide water supply for EWS houses by calculating water requirement @5 persons instead of @2 people.

We had considered EWS houses by calculating water requirement @5 persons and already submitted our calculations to SEIAA, Haryana.

47

The PP shall submit NOC from DWLW stating tha t project area does not fall in the E co-sensitive Zone around Sultanpur National Park notified by MoEF GOI before start of construction.

We had submitted an application to the Deputy Inspector General of Forests, MoEF for the NBWL clearance. Receiving copy of the same is attached as Annexure-XXI.

48

The PP sha ll provide approach to others property and shall not construct or provide a ny services i n basement also below others land.

It will be ensured that no construction or any other services will be done by us in others lands.

OPERATIONAL PHASE a. “Consent to Operate” shall be Consent to Operate will be obtained from

Page 12: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at village-Wazirpur and Mewka, sector-92, Gurgaon, Haryana.

Page 9 of 17

obtained from Haryana State Pollution Control Board under Air and Wa ter Act and a copy shall be submitted to the SEIAA, Haryana

Haryana State Pollution Control Board under Air and Water A ct with intimation to SEIAA , Haryana.

b.

The Sewage Treatment Plant (STP) shall be installed for th e treatment of the sewage to prescri bed including odor and treatment effluent shall be recycled. The installation of S TP should be certified by an independent expert and a report in this regard should be submitted to the SEIAA , Haryana before the project is commissioned for operation. Tertiary treatment of waste water is mandatory. Discharge of tre ated sewage shall conform to the norms and standards of HSPCB, Panchkula project proponent shall implement such STP Technology which does not required filter backwash.

The Sewage Treatment Plant (STP) will be installed for the treatment of the sewage. After treatment, treated water will be reused and recycle on the site for flushing, horticulture, DG cooling. The installation of STP would be certified by an independent expert and a report in this regard would be submitted to the SEIAA, Haryana before the project is commissioned for operation.

c.

Separation of the grey and black water should be done by use of dual plumbing line. Treatm ent of 100 % grey water by decentralized treatment should be done ensuring that the re-circulate water should have BOD level less than 10mg/ liter. And the recycled water will be used for fl ushing, gardening and DG set cooling etc. to achieve zero exit discharge.

Provision of the dual plumbing will be provided. The Sewage Treatment Plant (STP) will be installed for the treatment of the sewage. After treatment, treated water will be reused and recycle on the site for flushing, horticulture, DG cooling.

d. For disinfection the treated wastewater ultra-violet radiation of ozoniza tion process should be used.

For disinfection the treated wastewater ultra-violet radiation of ozonization pro cess will be used.

e

Diesel power generating sets proposed as source of back po wer for lifts, common area illumination and for domestic use should be of enclosed type and conform to rules made under the Environment (Protection) Act, 1986. The location of the DG sets should be in the open as promised by project proponent w ith appropriate stack heights above th e highest roof level of th e project as per the CPCB norms. The diesel used for the DG sets shall be ultra-low sulphur contents diesel (35 pp m Sulphur) instead of low Sulphur diesel.

Diesel power generating sets proposed as source of back power for lifts, common area illumination and for dom estic use would be o f enclosed type and conform to rules made under the Environment (Protection) Act, 1986. The DG sets are kept in t he open area with appropriate stack heights above the highest roof level of the project as per the CPCB norms. The diesel used for the DG sets is low Sulphur diesel.

Page 13: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at village-Wazirpur and Mewka, sector-92, Gurgaon, Haryana.

Page 10 of 17

f

Ambient Noise level should be controlled to ensure that the do es not exceed the prescribed standards both within and at th e boundary of the Proposed Residential group housing Complex.

It will be ensured that noise level will not exceed the prescribed standards both within and at the boundary of the Proposed Residential group housing Complex.

g

The project proponent as stated in the proposal should maintain at least 35.56% as green cover area for tree plantation especially all around the periphery of the project and on the road sides preferably with loca l species which can provided protection against noise and suspended particulates matter, the open spa ces inside the project should be preferably landscaped and covered with Vegetation/grass, herbs & shrubs. Only locally available plant species shall be used.

As committed, landscape area will be provided 35.56% of total plot area as green cover area for tree plantation especially all around the periphery of the project and on the road sid es preferably with local species which can provided protection against noise and su spended particulates matter.

h

The project proponent shall strive to minimize water in irrigation of landscape minimizing grass a rea, using native variety, xeriscaping and mulching, utilizing efficient irrigation system, scheduling irrigation only after checking evapo transpiration data.

Adaptive local species as pe r CPCB guide lines are preferred for landscaping to reduce water requirement for landscaping. Treated water from the STP will be explored for the meeting the landscape water requirement. Drip irrigat ion & water sprinkling system will be used for watering lawns and other green area in operational phase. Plants with similar water requirements are grouped on co mmon zones to match precipitation heads and emitters, use of low-angle sprinklers for lawn areas as a measure to reduce water requirement for landscaping.

i.

Rain water harvesting for roof run- off and surface run-off, as per plan submitted should be im plemented. Before recharging the surface run off, pre-treatment through sedimentation tanks must be done to re move suspended matter, oil and grea se. The bore will for rainwater recharging shall be kept at least 5 mts, above the highest ground water table. Care shall be taken that contaminated water do not enter any RWH pit. The pro ject proponent shall avoid Rain water harvesting of first 10 minutes of rain fall. Roof top of the building shall be without any toxic material or whi ch

Rain water harvesting for roof run-off and surface run-off, as pl an submitted will be implemented. Before recharging the run-off, pre-treatment will be don e to rem ove suspended matter, oil, grease and other soluble components. The bore-well for rainwater recharging should be kept at least 5 meters, above the highest ground water table as per CGWB norms.

Page 14: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at village-Wazirpur and Mewka, sector-92, Gurgaon, Haryana.

Page 11 of 17

can contaminate rain water. Wire mess and filters should be used wherever required.

j.

The ground water level and its quality should monitor regularly in consolation with Central Ground Water Authority.

The ground water is being monitored and monitoring reports are attached as Annexure-VIII.

k

A report on the en ergy conservation measure conforming to energy conversation norms finalized by Bureau of En ergy Efficiency should be prepared incorporating details about building materials & Technology, R & U factors etc and submitted to the SEIAA, Ha ryana in three months time.

An audit Report on implemented Energy conservation measures incorporating details about building materials and technology, R & U factors etc. as per ECBC 2007 shall b e submitted to your esteemed office as and when project become operational.

l

Energy conversation measure like installation of LED for lighting the areas outside the building should be integral part of the project design and should be in pla ce before project commission. Use of solar pan els must be adapted to the maximum energy conservation.

Energy conversation measure like installation of LED for lighting the areas outside the build ing would be integral part of the project design and will be in place before project commission. Use of solar panels must be adapted to the maximum energy conservation.

m

The project proponent shall use zero ozone depleting potential material in insulation, refrigeration, air- conditioning and adhesive; project proponent shall also p rovide Halon free fire suppression system

The project proponent would use zero ozon e depleting potential material in insulation, refrigeration, air- conditioning and adhesive.

n

The solid wast e generated should be properly collected and segregated as per the requirem ent of the MSW Rules, 2000 and as amended from time to time. The bio-degradable waste should be treated by appropriate technology at the site ear-marked with in the project area and dry/insert solid waste should be dispose d off to the approved sites for l and filling after recovering recyclable material.

The project is in construction phase, waste generated is mainly construction waste like broken bricks, waste plaster which is being used to raise the refilling and raising the site level, Empty cement bags will be used for the road construction, excavated soil is being stockpiled and is used for refilling. The solid waste generated will be disposed off as per the MSW Rules, 2000.

o

The provision of the solar water heating system shall be as p er norms specified by HAREDA and shall be made operational in each building block.

The provision of the solar water heating system will be as per norms specified by HAREDA and will be made operational in each building block.

p The traffic plan and the parking plan proposed by the project proponent

Parking will be provided as per the approved parking plan.

Page 15: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at village-Wazirpur and Mewka, sector-92, Gurgaon, Haryana.

Page 12 of 17

should be adhered to meticulously with further scope of additional parking for future require ment. There should be n o traffic congestion near the entry and exit points from the roads adjoining the proposed project site. Parking should be fully internalized and no public space should be used.

Parking will be fully internalized to avoi d traffic congestion near exit and entry points from adjoining road. No public space will be utilized.

q

The project shall be operational only when HUDA / local authority will provides domestic water supply system in the area.

During the operational phase, water requirement will be met through HUDA and permission will be submitted in the operational phase of project.

r

Operation and maintenance of S TP, Solid waste management and electrical infrastructure, pollution control measure shall be ensured even after the completion of project.

Operation and maintenance of STP, Solid waste management and electrical infrastructure, pollution control measure would be ensured even after the completion of project.

s

Different type of wastes sho uld be disposed off as per provisi ons of municipal solid waste, biomedical waste, hazardous waste, e-waste, batteries & plas tic rules made under Environmental Protection Act, 1986, Particularly E-waste and battery waste shall be disposed of as per existing E-waste Management Rules 2011 and Batteries Management Rules 2001, The project proponent should maintain a collection centre for E-waste and it should be di sposed of to only registered and authorized dismantler / recycler.

This condition will be strictly complied.

t

Standards for discharge of environmental pollutants as enshrined in various schedules of rules 3 of Environmental Protection Rules 1986 shall be strictly complied with.

This condition will be strictly complied.

u Water supply shall be metered among different users of utilities.

Water meters would be prov ided in the operational phase of the project.

v

The project propo nent shall ensure that the stack height of DG sets is as per the CPCB guide lines and also ensure that the emission standards of noise and air are within the CP CB prescribed limits. Noise and Emission level of DG sets greater than 800KVA shall be as per CPCB l atest standards

It will be ensured that stack height of DG sets is as per the CPCB guide lines and also ensure that the emission standards of noise and air are within the CPCB prescribed limits.

Page 16: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at village-Wazirpur and Mewka, sector-92, Gurgaon, Haryana.

Page 13 of 17

for high capacity DG Sets.

w

All electric supply exceeding 100amp, 3 phases s hall maintain the power factor between 0.98 lag to 1 at the point of connection.

It would be ensured that all electric supply exceeding 100amp, 3 phases would be maintained the power factor between 0.98 lag to 1 at the point of connection.

x

The project proponent shall not use fresh water for HVAC and DG cooling. Air based HVAC system should be adopted and only treated water shall be used by project proponent for cooling, if it is all needed. The project proponent shall also use evaporative cooling technology and double stage cooling system for HVAC in order to reduce water consumption. Further temperature, relative humidity during summer and winter seasons should be kept at optional level, Variable speed drive, best Co-efficient of Performance(cop), as w ell as optimal integrated point load value and minimum outside fresh air supply may be resorted for conservation of power and water . Coil type cooling DG Sets shall be used for sa ving cooling water consumption for water cooled DG Sets.

This condition will be complied during th e operational phase of the project as and when required and submitted to your esteemed office.

y

The project propo nent shall ensure that the transformer is constructed with high q uality grain oriented, low- loss silicon steel and virgin electrolyte grade copper. The project propon ent shall obtain manufacture’s certificate also for that.

This condition will be complied during th e operational phase of the project as and when required and submitted to your esteemed office.

Z

The project propo nent shall ensure that exit velocity from stack should be sufficiently high. S tack shall be designed in such a way that there is no stack down–wash under any meteorological conditions

Stack would be as per the CPCB norms. It would be 6 mtrs. High than the highest tower or 30 mtrs. Above the ground level.

aa

The project proponent shall provide water sprinkling system in the project area to suppress the dust in addition to the already suggested mitigation measures in the Air chapter of EMP.

Manual water sprinkling is being carried out on site to suppress the dust and it will be c ontinue during the operational phase of the project.

ab The project propo nent shall ensure proper air-ventilation and light system

This condition will be complied during th e operational phase of the project as and when

Page 17: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at village-Wazirpur and Mewka, sector-92, Gurgaon, Haryana.

Page 14 of 17

in the basements area for comfortable living of human being and shall ensure that number of air changes per hour/(ACH) in basem ent never falls below 15. In case of emergency capacity for increasing ACH to the extent of 30 must be provided by the project proponent.

required and submitted to your esteemed office

ac

The project propo nent shall ensure drinking/ domestic water supply as per prescribed standards till treated water supply is made available by HUDA.

This condition would be complied.

PART-B GENERAL CONDITIONS

(i)

The project proponent shall ensure the commitments made in Form-1, Form-1A, EIA/EMP and other docu ments submitted to the SEIAA for the protection of environment and proposed environmental safeguards are complied with in letter and spirit. In case of contradiction between tw o or more documents on any point, the most environmentally friendly commitment on t he point shall be taken as commitment by project proponent.

This condition will be strictly complied.

(ii)

The project proponent also sub mit Six monthly reports on the status of compliance of the stipulated EC conditions including results of monitored data (both in hard copies as well as by email) to the Northern Regional office of MoEF, the respective zonal office of CPCB,HSPCB and SEIAA Haryana.

The six mo nthly compliance reports are regularly submitted to Northern Regional of fice of MoEF, and the respective zonal office of HSPCB Haryana. The copy of receiving of June’2014 are attached as Annexure-XXII.

(iii)

STP outlet after stabilization and stack emission shall be monitored monthly. Other environmental parameters and green belt shall be monitored on quarterly basis. After every 3 months, the project proponent shall cond uct environmental audit and shall take corrective measure, if required without delay.

This condition will be complied during th e operational phase of the project as and when required and submitted to your esteemed office

(iv)

The SEIAA, Haryana reserves the right to add additional safeguard measures subsequently, if found necessary, Environmental Clearance

Agreed for the condition.

Page 18: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at village-Wazirpur and Mewka, sector-92, Gurgaon, Haryana.

Page 15 of 17

granted will be revoked if it is f ound the false information has been g iven for getting approval of this project. SEIAA reserves the right to revoke the clearance if conditions stipulated are not implemented to the satisfaction of SEIAA/MoEF.

(v) The project proponent shall not violate any judicial orders/pronouncements issued by any court/Tribunal.

We will not viola te any judicial orders/pronouncements issued by any court/Tribunal.

(vi)

All other statutory clearance such as the approvals for storage of diesel from Chief Controller of Explosive, Fire Department, Civil Aviation Department, Forest Conservation Act , 1980 and Wi ldlife (Protection) Act, 1972,Forest Act 1927, PLPA, 1900 etc. shall be obtained, as applicable by project proponent from the respective authorities prior to construction of the project

Forest NOC from DFO, vide Letter No.1349.G dated: 28/09/2012 and vide Letter No.2873-G dated: 25/11/2013 has been attached as Annexure-XII.

Height clearance from Airport Authority of India Vide Letter No. AAI/NOC/2009/322/1232-1236 dated: 02.08.2012 is attached as Annexure-XIX.

No Objection Certificate (Partly) from the Fire Safety Point of vie w for t ower F01 and C01 Vide Letter No. DFS/FA/2014/87/42785 dated: 03/09/2014 is attached as Annexure-XIII.

(vii)

The project proponent should inform the public that th e project has been accorded Environment Clearance by the SEIAA and copies of the clearance letter are available with the state pollution control bo ard & SEIAA. This should be advertised within 7 days from the date of issue of the clearance letter at l east in two local newspapers that are widely circulated in the region and copy of the same should be forw arded to SEIAA Haryana. A copy of Environmental Clearance conditions shall also be p ut on project proponent’s web site for public awareness.

This condition will be complied.

(viii)

Under the provision of Environment (Protection) Act, 1986, legal action shall be initiated against the project proponent if it was found that

Agreed.

Page 19: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at village-Wazirpur and Mewka, sector-92, Gurgaon, Haryana.

Page 16 of 17

construction of the project has been started before obtaining prior Environmental Clearance.

(ix)

Any appeal against the this Environmental Clearance shall lie with the National Green Tribunal, if preferred, within a period of 30 days as prescribed under secti on 16 of the National Green Tribunal Act,2010.

Agreed.

(x)

The PP shall pu t in place Corporate Environment Policy as mentioned in MoEF, GoI office Memorandum No. J-1103/41/2006-IA.II (I) dated 26.04.2012 within 3 months period. Latest Corporate Environmental Policy should be submitted to SEIAA within 3 months of iss uance of th is letter.

This condition would be complied.

(xi)

The fund ear-marked for environment protection measures should be kept in separate account and should not be diverted for other purposes and year wise expenditure shall be reported to the SEIAA/RO MoEF GOI under rules prescribed for En vironment audit.

This condition will be complied and as when required and submitted to your esteemed office.

(xii)

The project proponent shall ensure the compliance of Forest Department, Haryana Notification no. S.O.121/PA2/1900/S.4/97 dated 28.11.1997

Forest NOC from DFO, vide Letter No.1349.G dated: 28/09/2012 and vide Letter No.2873-G dated: 25/11/2013 has been attached as Annexure-XII.

(xiii)

The project propo nent shall ensure that no vehicle during construction/operation phase enter the project premises without valid “Pollution under Control” certificate from competent authority.

This condition is being complied on the project site.

(xiv)

The project pr oponent is responsible for compliance of a ll conditions in Environmental Clearance letter and project proponent cannot abso lve himself / herself for the responsibility by shifting it to any contractor engaged by project proponent.

Agreed.

(xv)

The project proponent shall seek fresh environmental clearance if at an y stage there is change in the planning of the proposed project.

Agreed.

Page 20: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at village-Wazirpur and Mewka, sector-92, Gurgaon, Haryana.

Page 17 of 17

(xvi)

Besides the developer/ applicant, the responsibility to ensure the compliance of Environmental Safeguards/ conditions imposed in the Environmental clearance letter shall also lie on the licensee/licensees in whose name/names the license/CLU has been granted by the town & country planning department Haryana.

Agreed.

(xvii)

The proponent shall upload the status of compliance of the stipulated EC conditions, including results of t he monitored data on their website and shall update the same periodically. It shall simultaneously be sent to the regional office of MoEF, the respective Zonal office of CPCB and the SPCB. The criteria pollutant levels namely PM2.5, PM10, SOX, NOX, Ozone, Lead, CO, Benzene, Ammonia, Benzopyrine, arsenic and Nickel. (Ambient levels as well as stack emissions) or critical sectoral parameters, indicated for the project shall be monitored and displayed at a convenient location near the main gate of the company in the public domain.

We are submitting the six monthly compliance reports along with the monitoring reports to the Northern Regional office of MoEF, and th e respective zonal office of HSPCB Haryana.

(xviii)

The environmental statement for each financial year ending 31st March in Form-V as is mandated to be by the project proponent to the H SPCB panchkula as prescribed under the Environmental (Protection) Rules, 1986, as amended subsequently, shall also be put on the w ebsite of the company along with the status of compliance of the EC conditions and shall also be sent to the respective regional offices of MoEF by email

This condition would be co mplied in the operational phase of the project.

(xix)

The project proponent shall conduct environment audit at every three months interval and th ereafter corrected measures shall be taken without any delay. Details of environmental audit and corrective measures shall be submitted in the monitoring report.

This condition would be co mplied in the operational phase of the project.

Page 21: Compliance Report Submitted By GROUP HOUSING COLONY M/s
Page 22: Compliance Report Submitted By GROUP HOUSING COLONY M/s
Page 23: Compliance Report Submitted By GROUP HOUSING COLONY M/s
Page 24: Compliance Report Submitted By GROUP HOUSING COLONY M/s
Page 25: Compliance Report Submitted By GROUP HOUSING COLONY M/s
Page 26: Compliance Report Submitted By GROUP HOUSING COLONY M/s
Page 27: Compliance Report Submitted By GROUP HOUSING COLONY M/s
Page 28: Compliance Report Submitted By GROUP HOUSING COLONY M/s
Page 29: Compliance Report Submitted By GROUP HOUSING COLONY M/s
Page 30: Compliance Report Submitted By GROUP HOUSING COLONY M/s
Page 31: Compliance Report Submitted By GROUP HOUSING COLONY M/s
Page 32: Compliance Report Submitted By GROUP HOUSING COLONY M/s
Page 33: Compliance Report Submitted By GROUP HOUSING COLONY M/s

HARYANA STATE POLLUTION CONTROL BOARDC-11, SECTOR-6, PANCHKULA

Website – www.hspcb.gov.in E-Mail - [email protected]

Telephone No. – 0172-2577870-73______________________

To M/s : Ramprastha Sare Reallty Pvt. Ltd.

Duet House, Plot No. 46, Udyog Vihar Phase -4 Gurgaon(Haryana)

GURGAON

122015

Sub. : Issue of Consent to Establish from pollution angle .

Please refer to your Consent to Establish application received in this office on the subject noted

above.Under the Authority of the Haryana State Pollution Control Board vide its agenda Item No. 47.8

dated 28.04.83 sanction to the issue of “Consent to Establish” with respect to pollution control of Water

and Air is hereby accorded to the unit Ramprastha Sare Reallty Pvt. Ltd., for manufacturing of Group

housing project with the following terms and conditions:-

No. HSPCB/Consent/ : 2821214GUSOCTE916879 Dated:20/08/2014

1. The industry has declared that the quantity of effluent shall be 1180 KL/Day i.e0KL/Day for Trade Effluent, 0 KL/Day for Cooling, 1180 KL/Day for Domestic and thesame should not exceed .

2. The above “Consent to Establish” is valid for 24 months from the date of its issue to beextended for another one year at the discretion of the Board or till the time the unit starts itstrial production whichever is earlier. The unit will have to set up the plant and obtainconsent during this period.

3. The officer/official of the Board shall have the right to access and inspection of theindustry in connection with the various processes and the treatment facilities beingprovided simultaneously with the construction of building/machinery. The effluent shouldconform the effluent standards as applicable

4. That necessary arrangement shall be made by the industry for the control of Air Pollutionbefore commissioning the plant. The emitted pollutants will meet the emission and otherstandards as laid/will be prescribed by the Board from time to time.

5. The applicant will obtain consent under section 25/26 of the Water (Prevention & Controlof Pollution) Act, 1974 and under section 21/22 of the Air (Prevention & Control ofPollution) Act,1981 as amended to-date-even before starting trial production

6. The above Consent to Establish is further subject to the conditions that the unit complieswith all the laws/rules/decisions and competent directions of the Board/Government and itsfunctionaries in all respects before commissioning of the operation and during its actualworking strictly.

7. No in-process or post-process objectionable emission or the effluent will be allowed, if thescheme furnished by the unit turns out to be defective in any actual experience

8. The Electricity Department will give only temporary connection and permanent connectionto the unit will be given after verifying the consent granted by the Board, both under WaterAct and Air Act.

9. Unit will raise the stack height of DG Set/Boiler as per Board’s norms.

10. Unit will maintain proper logbook of Water meter/sub meter before/after commissioning.

Page 34: Compliance Report Submitted By GROUP HOUSING COLONY M/s

11. That in the case of an industry or any other process the activity is located in an areaapproved and that in case the activity is sited in an residential or institutional orcommercial or agricultural area, the necessary permission for siting such industry andprocess in an residential or institutional or commercial or agricultural area or controlledarea under Town and Country Planning laws CLU or Municipal laws has to be obtainedfrom the competent Authority in law permitting this deviation and be submitted in originalwith the request for consent to operate.

12. That there is no discharge directly or indirectly from the unit or the process into anyinterstate river or Yamuna River or River Ghaggar.

13. That the industry or the unit concerned is not sited within any prohibited distancesaccording to the Environmental Laws and Rules, Notification, Orders and Policies ofCentral Pollution control Board and Haryana State Pollution Control Board.

14. That of the unit is discharging its sewage or trade effluent into the public sewer meant toreceive trade effluent from industries etc. then the permission of the Competent Authorityowing and operating such public sewer giving permission letter to his unit shall besubmitted at time of consent to operate.

15. That if at any time, there is adverse report from any adjoining neighbor or any otheraggrieved party or Municipal Committee or Zila Parishad or any other public body againstthe unit’s pollution; the Consent to Establish so granted shall be revoked.

16. That all the financial dues required under the rules and policies of the Boardhave been deposited in full by the unit for this Consent to Establish.

17. In case of change of name from previous Consent to Establish granted, fresh Consent toEstablish fee shall be levied.

18. Industry should adopt water conservation measures to ensure minimum consumption ofwater in their Process. Ground water based proposals of new industries should getclearance from Central Ground Water Authority for scientific development of previousresource.

19. That the unit will take all other clearances from concerned agencies, whenever required.

20. That the unit will not change its process without the prior permission of the Board.

21. That the Consent to Establish so granted will be invalid, if the unit falls in Aravali Area ornon conforming area.

22. That the unit will comply with the Hazardous Waste Management Rules and will alsomake the non-leachate pit for storage of Hazardous waste and will undertake not to disposeoff the same except for pit in their own premises or with the authorized disposal authority.

23. That the unit will submit an undertaking that it will comply with all the specific andgeneral conditions as imposed in the above Consent to Establish within 30 days failingwhich Consent to Establish will be revoked.

24. That unit will obtain EIA from MoEF, if required at any stage.

25. In case of unit does not comply with the above conditions within the stipulated period,Consent to Establish will be revoked.

Specific Conditions

Other Conditions :

Page 35: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Senior Environmental Engineer II, HQ

For and on be'half of chairman

Haryana State Pollution Control Board

---It is system generated certificate no signature is required---

1.The unit will take trial consent to operate before the occupation of the project.2.The unit will install the project only on the land for which Town and Country PlanningDepartment has given licenece.3.The unit will comply all the terms and conditions of the Environmental Clearance granted bythe SEIAA, Haryana.4.Unit will obtain prior NOC/Permission from central Ground Water Authority in case underground water resource is used.5.The unit will achieve Zero effluent Discharge as proposed by unit.6.The NOC is valid only for such land within this project which is under ownership of projectproponent and for which report regarding Aravali area has been issued by DC, Gurgaon.7.The unit will install adequate acoustic enclosures/chambers on their DG SETS with properstack height as per prescribed norms to meet the prescribed standards under EP Rules, 1986.8.The unit will install the adequate sewage treatment plant to meet the standards prescribedunder EP Rules 1986.9.The NOC will become invalid in case the project is found violating the provisions ofnotification no. S.O.191(E) dt. 27.01.2010 issued by MoEF Government of India regarding Eco-sensitive Zone of Sultanpur National park.

Page 36: Compliance Report Submitted By GROUP HOUSING COLONY M/s

First Aidd Room Fac

 

cility

Annexur

 

 

re-III

Page 37: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Phottographs shhowing Labo

Labo

our Hutmen

 

ur Hutmen

 

nts & Mobi

nts

ile Toilets Annexur

 

 

re-IV

Page 38: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Phottographs shhowing Labo

Mo

our Hutmen

 

 

bile Toilets

nts & Mobiile Toilets Annexur

 

 

re-IV

Page 39: Compliance Report Submitted By GROUP HOUSING COLONY M/s

 

Photoggraphs showwing Fresh water Tankker Annexu

 

 

ure-V

Page 40: Compliance Report Submitted By GROUP HOUSING COLONY M/s

PPhotographhs showing SStockpiles o

 

of Excavatedd Soil Annexur

 

 

re-VI

Page 41: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Storage

of Cement B

 

Bags

Annexure

 

 

e-VII

Page 42: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at Village – Wazirpur and Mewka, Sector 92, Gurgaon, Haryana.

Page 1 of 11

Environmental Monitoring Report

1. Ambient Air Quality Monitoring

Ambient air quality monitoring was done at one location for two day within the site premises (project area near office). The details of monitoring schedule is given in Table-1

Table 1: Schedule of Ambient Air Quality Monitoring

Day of sampling

Duration of sampling (hours)

Date Sample collected on

Location From To Near Office

Area Day 1 24 31/10/2014 01/11/2014 01/11/2014 AQ1 Day 2 24 01/11/2014 02/11/2014 02/11/2014 AQ1

Sulphur Dioxide (SO2)

Monitoring results of SO2 are given in Table-2 and graphical representation is given in Figure-1

Table 2: Monitoring results for SO2 at location AQ1

Pollutant Day Result (mg/m³) AAQ Limit (As per CPCB)

(mg/m3)

Time Weighted Average

AQ1

Sulphur Dioxide (SO₂) μg/m³

Day 1 17 80 24 hours Day 2 14 80 24 hours

Figure 1: SO2 concentrations at AQ1

0102030405060708090

SO₂ i

n μg

/m³ →

Days of Monitoring→

SO₂ Monitoring Graph

AAQ Limit(As perCPCB)

Day 1

Day 2

Page 43: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at Village – Wazirpur and Mewka, Sector 92, Gurgaon, Haryana.

Page 2 of 11

The concentration of SO2 was observed to be below limit as prescribed by Central Pollution Control Board (CPCB). Nitrogen Dioxide (NO2)

Monitoring results of NO₂ is given in Table-3 and graphical representation is given in Figure-2

Table 3: Monitoring results for NO2 at location AQ1

Pollutant Day Result (mg/m³) AAQ Limit (As per CPCB)

(mg/m3)

Time Weighted Average

AQ1

Nitrogen Dioxide (NO₂), μg/m³

Day 1 17.67 80 24 hours Day 2 36 80 24 hours

Figure 2: NO2 concentrations at AQ1

The concentration of NO2 was below the limits as prescribed by CPCB. Particulate Matter PM10: Monitoring results of PM10 is given in Table-4 and graphical representation is given in Figure-3

0

10

20

30

40

50

60

70

80

90

NO

₂ in

μg/

m³ →

Days of Monitoring →

NO₂ Monitoring Graph

AAQ Limit(As perCPCB)

Day 1

Day 2

Page 44: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at Village – Wazirpur and Mewka, Sector 92, Gurgaon, Haryana.

Page 3 of 11

Table 4: Monitoring results for PM10 at location AQ1

Pollutant Day Result (mg/m³) AAQ Limit (As per CPCB)

(mg/m3)

Time Weighted Average AQ1

Particulate Matter(Size Less than 10μm) or PM₁₀ μg/m³

Day 1 86 100 24 hours Day 2 82 100 24 hours

Figure 3: PM10 concentrations at AQ1

The concentration of PM10 was within the limit as prescribed by CPCB.

PM2.5:

Monitoring results of PM2.5 is given in Table-5 and graphical representation is given in Figure-4

Table 5: Monitoring results for PM2.5 at location AQ1

Pollutant Day Result (mg/m³) AAQ Limit(As per CPCB)

(mg/m3)

Time Weighted Average AQ1

Particulate Matter(Size Less than 2.5μm) or PM₂.₅ μg/m³

Day 1 52 60 24 hours Day 2 50 60 24 hours

0

20

40

60

80

100

120

PM₁₀

in

μg/

m³ →

Days of Monitoring →

PM₁₀ Monitoring Graph

AAQ Limit(As perCPCB)

Day 1

Day 2

Page 45: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at Village – Wazirpur and Mewka, Sector 92, Gurgaon, Haryana.

Page 4 of 11

Figure 4: PM2.5 concentrations at AQ1

The concentration of PM2.5 was within the limit as prescribed by CPCB.

Carbon Monoxide (CO)

Monitoring results of CO is given in Table-6 and graphical representation is given in Figure-5

Table 6: Monitoring results for CO at location AQ1

Pollutant Day Result (mg/m³) AAQ Limit(As per CPCB)

(mg/m3)

Time Weighted Average

AQ1

Carbon Monoxide (mg/m3)

Day 1 BDL (0.1) 2 24 hours Day 2 BDL (0.1) 2 24 hours

0

10

20

30

40

50

60

70

80

PM₂.₅

in μ

g/m

³ →

Days of Monitoring →

PM₂.₅ Monitoring Graph

AAQ Limit(As perCPCB)

Day 1

Day 2

Page 46: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at Village – Wazirpur and Mewka, Sector 92, Gurgaon, Haryana.

Page 5 of 11

Figure 5: CO concentrations at AQ1

The concentration of CO was within the limit as prescribed by CPCB.

2. Noise Monitoring

Noise monitoring was done at two days one location within the site premises. The details of monitoring are given in Table-7

Table 7: Schedule of Noise Monitoring

Day of sampling

Duration of sampling (hours)

Date Sample collected on

Location

From To Near main gate area

Day 1 24 31/10/2014 1/11/2014 1/11/2014 AQ1 Day 2 24 1/11/2014 2/11/2014 2/11/2014 AQ1

Near Main Gate Area (Location AN1) Monitoring was done for 24 hours. The results for day time & night time observations are discussed below. Monitoring results for day and Night time were within the prescribed limit as recommended by CPCB. Day Time Monitoring results of daytime is given in Table-8 and graphical representation is given in Figure-6

0

0.4

0.8

1.2

1.6

2

PM₂.₅

in m

g/m

³ →

Days of Monitoring →

CO Monitoring Graph

AAQ Limit(As perCPCB)

Day 1

Day 2

Page 47: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at Village – Wazirpur and Mewka, Sector 92, Gurgaon, Haryana.

Page 6 of 11

Table 8: Day Time monitoring results

Location (Near main gate area)

Day Result dB(A) Permissible Limit dB(A)

Commercial Area (as per CPCB)

Day Time (6.00 AM to 10.00 PM)

(AQ1) Day 1 56.4 65 (AQ1) Day 2 58.6 65

Figure 6: Day time Noise monitoring results at Location (AQ1)

05

1015202530354045505560657075808590

Noi

se L

evel

in D

b(A)

Days of Monitoring →

Day Time Ambient Noise Level

Day1

Day2

Permissible Limit dB(A)Commerial Area (as perCPCB)

Page 48: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at Village – Wazirpur and Mewka, Sector 92, Gurgaon, Haryana.

Page 7 of 11

Night Time

Monitoring results of night time is given in Table-9 and graphical representation is given in Figure-7

Table 9: Night Time monitoring results

Location (Near main gate

area) Day

Result dB(A) Permissible Limit dB(A) Commercial Area

(as per CPCB) Night Time (10:00 PM

to 6:00 AM) (AQ1) Day 1 48.7 55 (AQ1) Day 2 45.4 55

Figure 7: Night time Noise monitoring results at location (AQ1)

3. Ground water monitoring Schedule for Ground water monitoring is given in Table 10.

Table 10: Schedule for ground water sample collection

05

1015202530354045505560

Noi

se L

evel

in D

b(A)

Days of Monitoring →

Night Time Ambient Noise Level

Day 1

Day2

Permissible LimitdB(A) CommerialArea (as per CPCB)

Day of sampling Sample collected on Location

Day 1 31/10/2014 Near-by project area

Page 49: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at Village – Wazirpur and Mewka, Sector 92, Gurgaon, Haryana.

Page 8 of 11

Ground water monitoring results for locations near by project area is given in Table 11

Table 11: Ground water monitoring results at location near by project area

S.No. Substance or Characteristic

Result Requirement (Acceptable Limit)

Permissible Limit in the absence of Alternate source

Refer to part of IS 3025

1 Colour, ( Hazen units, Max )

Less than 5 5 15 Part 4

2 Odour Agreeable Agreeable Agreeable Part 5 3 Turbidity ( NTU,

Max) 0.2 5 10 Part 10

4 pH Value 7.91 6.5 to 8.5 No Relaxation Part 11 5 Total Hardness (as

CaCo3) mg/l, Max 142 200 600 Part 21

6 Total Dissolved solids mg/l, Max

569 500 2000 Part 16

7 Chlorides (as Cl) mg/l, Max

89 250 1000 Part 32

8 Iron (As Fe) mg/l, Max

0.23 0.3 No Relaxation Part 53

9 Residual free chlorine mg/l, Min

BDL(0.01) 0.2 1 Part 26

10 Calcium (as Ca) mg/l, Max

27 75 200 Part 40

11 Copper (as Cu) mg/l, Max

BDL(0.01) 0.05 1.5 Part 42

12 Manganese (as Mn) mg/l, Max

BDL(0.1) 0.1 0.3 Part 59

13 Sulfate (as SO4) mg/l, Max

63 200 400 Part 24

14 Nitrate (as NO3) mg/l, Max

BDL(0.1) 45 No Relaxation Part 34

15 Fluoride (as F) mg/l, Max

0.26 1 1.5 Part 60

16 Phenolic Compounds (as C

6H5OH) mg/l, Max

BDL(0.001) 0.001 0.002 Part 43

17 Selenium (as Se) mg/l, Max

BDL(0.01) 0.01 No Relaxation Part 56

Page 50: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at Village – Wazirpur and Mewka, Sector 92, Gurgaon, Haryana.

Page 9 of 11

18 Zinc (as Zn) mg/l, Max

BDL(0.1) 5 15 Part 49

19 Magnesium (as Mg) mg/l, Max

78 30 100 Part 46

20 Anionic detergents (as MBAS) mg/l, Max

BDL(0.1) 0.2 1 Annex K of IS 13428

21 Mineral Oil mg/l, Max

BDL(0.1) 0.5 No Relaxation Part 39

22 Total Alkalinity as Calcium Carbonate mg/l, Max

260 200 600 Part 23

23 Aluminium (as Al) mg/l, Max

BDL(0.01) 0.03 0.2 Part 55

24 Boron (as B) mg/l, Max

BDL(0.1) 0.5 1 Part 57

25 Mercury (as Hg) mg/l, Max

BDL(0.001) 0.001 No Relaxation Part 48

26 Cadmium (as Cd ) mg/l, Max

BDL(0.001) 0.003 No Relaxation Part 41

27 Total Arsenic (as As ) mg/l, Max

BDL(0.01) 0.01 0.05 Part 37

28 Cyanide (as CN) mg/l, Max

BDL(0.01) 0.05 No Relaxation Part 27

29 Lead (as Pb) mg/l, Max

BDL(0.01) 0.01 No Relaxation Part 47

30 E.coli Absent Shall not be detectable in any 100 ml sample IS:5401:Part 2 31 Total Colifom

Bacteria Nil Shall not be detectable in any 100 ml sample IS:5887:Part 1

Water was found to be slightly alkaline. All the other parameters were found to be below prescribed limits of IS 10500:2012

Page 51: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at Village – Wazirpur and Mewka, Sector 92, Gurgaon, Haryana.

Page 10 of 11

4. Soil Monitoring Soil Monitoring results are given in Table 12

Table 12: Soil Monitoring Results

Parameters Unit Results Colour Yellowish Brown Conductivity(20% slurry) µmhos/cm 113 Moisture % 1.2 Texture Sandy Clay Loam pH(20% Slurry) 7.28 Chlorides( as Cl) mg/Kg 48 Potassium as K mg/Kg 241 Nitrogen as N mg/Kg 988 Phosphorus as P mg/Kg 27.3 Organic matter % 1.7 Water holding capacity % 30.2 Carbonate mg/kg NIL Bi- carbonate mg/kg 200 Bulk Density gm/cm3 1.45

5. Diesel Generator Stack Monitoring Results Stack of 1 nos D.G. sets were monitored on 31/10/2014 at the site. The results are furnished in Table-13 below

Table 13: D.G. stack monitoring results

D.G. Set Number

Capacity (KVA)

Particulate Matter (PM)

Sulphur Di Oxide (SO₂)

Oxides of Nitrogen (Nox)

Carbon Mono Oxide (CO)

Total Hydrocarbons

g/kw-hr g/kw-hr g/kw-hr g/kw-hr g/kw-hr D.G set-I 500 0.13 0.07 0.12 0.188 0.032

( up to 250 kW) 0.3 … 9.2 3.5 1.3

Method references IS 11255

(part1):1999 IS 11255

(part2):1999 IS 11255

(part7):2005 13270:1999 APHA

Page 52: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Proposed Expansion of Group Housing Colony at Village – Wazirpur and Mewka, Sector 92, Gurgaon, Haryana.

Page 11 of 11

6. Diesel Generator Noise Monitoring Results

Stack of 1 no’s D.G. noise were monitored on 31/10/2014 at the site. The results are furnished in Table-14 below

Table 14: D.G. Noise monitoring results

S.No. Monitoring Area Parameters Result (dB)

72.8

1 Noise DG-1 (500 KVA) Noise

Permissible Limit - CPCB 75

Page 53: Compliance Report Submitted By GROUP HOUSING COLONY M/s

IN KAMAL ENVIRO & FOOD LAB PVT. LTD./+\ (Complete Test House for Testlng of Environment, Drugs & Pharmaceuticals & Food Samples)

ffi (AN tso eool-2008 cERnFtED coMpANy)\!r/ Plot No,254, Sector6, t.M.T. Manesar, Distt. Gurgaon-122Osl,Telefax : 01244119624 E-mait : [email protected]

Sample Name- Ambient Air euality Report No. KEFL/ENVT/M021L1.401,M/S Ramprastha Sare Reatty pvt. Ltd. Receipt Datio2./LL/2}14Village- Mewka and Wazirpur, Sector-92, Report Date :Og/1,L/20L4Gurgaon (HR)

SamplingTeam: Mr. Rajesh Kumar Sample protocol: KEFL/e1/Z4

Description : Ambient Air quality monitoring was carried out by us on 0L/1L /201,4ro 02/1_1./201.4.

Name of ClientLocation of sampling pointSampling starting atSampling completed atTotal time of sampling (minutes)Flow rate of sampling (m3/minutes)Total volume of air-sampled (m3)Am bient temperature (oC)

PARAMETERS

Particulate Matter (pMz.s)

Particulate Matter (pMro)Sulphur Dioxide as SO2

Nitrogen Dioxide as NO2

Carbon monoxide as CO

Lead (as Pb)Benzene (as C6,H6)

Ammonia (as NH3)

BenzopyrenesNickel (as Ni)Ozone as 03Arsenic( as As)

M/S Ramprastha Sare Realty pvt. Ltd.Near Office Area.11.:00 AM (01/10 /201.4)1L:00 AM (02/L1,/20L4)1,430

1,.41.

20L6.327

RESULT PERMISSIBLE LIMITS(As Per The Gazette of tndia part-tl

UNIT

(pslm')(pelm')(pslr')(pglm')(mglm')(pslm')(pelm')(pelm')(nglm')(nglm')(pslm')(nglm')

Date L6llt/2OO9)

60

100

BO

80

2.0

1.05

400L

20

1806

5082

14

36BDL(0.1)

BDL(0.1)

BDL(0.1)

BDL(0.1)

BDL(1.0)

BDL(1.0)31

BDL(1.0)

:.*/./.ll:::!Al|/:a;:::;it))il4n>ry.a!.::::;?,.:/,N.W

Sample Collected By Us / Not Collected By Us

Authorized Signatory

NOte : 1. The result listed refer only to the tested samples and applicable parameter. Endorsement of products is neither inferred not imptied2. Total liability of this laboratory is limited to the invoice amount onty.3. This report is not be reproduced wholly or in part and cannot be used as an evidence in the Court of Law and should not be used in

any advertising media without special permission in writing.4. Samples consumed in testing.

Registered Office : 834/1, K-Block, Mahipalpur, New Delhi-l'10037 Tel. : +91-11-26788114-5 Fax : +91-11-26781200

Page 54: Compliance Report Submitted By GROUP HOUSING COLONY M/s

KAMAL ENVIRO & FOOD LAB PVT. LTD.(Complete Test House for Testing of Environment, Drugs & Pharmaceuticals & Food Samples)

(AN rSO 9001-2008 CERTTFTED COMPANY)

Plot No.254, Sector6, l.M.T. Manesar, Distl. Gurgaon-lzzO5A, Telefax : 01244119624 E-mail : [email protected]

Sample Name- Ambient Air QualityM/S Ramprastha Sare Realty Pvt. Ltd.

Village- Mewka and Wazirpur, Sector-g2,Gurgaon (HR)

Sampling Tearn: Mr. Rajesh Kumar

Report No. KEFL/ENVT/MO1 111403

Recei pt D at:O1, / 11, / 20L4Report Date :08/1,1./2014

Sample Protocol: KEFLIQP /24

Description : Ambient Air quality monitoring was carried out by us on 31/10 /2Ot4To 01,/11,/201,4.

Name of ClientLocation of sampling pointSampling starting atSampling completed atTotdl time of sampling (minutes)Flow rate of sampling (m3/minutes)Total volume of air-sampled (m3)Ambient temperatu re (oC)

PARAMETERS

Particulate Matter (PMz.s)

Particulate Matter (PMro)

Sulphur Dioxide as SOz

Nitrogen Dioxide as NO2

Carbon monoxide as CO

Lead (as Pb)

Benzene (as C6,H6)

Ammonia (as NH3)

BenzopyrenesNickel (as Ni)

Ozone as 03

Arsenic( as As)

M/S Ramprastha Sare Realty Pvt. Ltd.Near Office Area.10:45 AM (31/10 /201.4)10:45 AM (01/11/201.4)

PERMISSIBLE LIMITS(As Per The Gazette of lndia Part-ll

Date L6/LI/20091

60100

80802.01.05

4001_

20

1806

UNIT

(uelm')(Lrelm')(uelm')(pslm')(mglm')(trs/m')(pglm')(pslm')(nelm3)(nglm')(pglm')(nelm')

1420L.28

7817.627

RESULT

52

86

17

1,.767

BDL(0.1)

BDL(0.1)

BDL(0.1)

BDL(0.1)

BDL(1.0)

BDL(1.0)

33

BDL(1.0)

Sample Collected By Us / wot Collected By Us

Authorized Signatory

NOte : 1. The result listed refer only to the tested samples and applicable parameter. Endorsement of products is neither inferred not implied2. Total liability of this laboratory is limited to the invoice amount only.3. This report is not be reproduced wholly or in part and cannot be used as an evidence in the Court of Law and should not be used in

any advertising media without special permission in writing.4. Samples consumed in testing.

Registered Office : 834/1, K-Block, Mahipalpur, New Delhi-110037 Tel. : +91-11-26288114-5 Fax : +91.11-2678,1200

Page 55: Compliance Report Submitted By GROUP HOUSING COLONY M/s

IN KAMAL ENVIRO & FOOD LAB PVT. I.TD.,A (Complete Test House for Testing of Environment, Drugs & Pharmaceuticals & Food Samples)

ffi (AN rso 9001-2008 cERTFTED coMpANy)\E!r/ Plot No.254, S6ctor6, l.M.Tl Manesar, Distt, Gurgaon-122Oi1,Telefax: 01244119624 E-mail : [email protected]

Sample Name- Ambient Noise LevelM/S Ramprastha Sare Realty pvt. Ltd.Village- Mewka and Wazirpur, Sector_92,Gurgaon (HR)

Report No. KEFL/ENVT/M0I1 114a4Receipt Date: OL/ 1.L/ 201,4

ReportDate :OB/tt/201,4

Description: Ambient noise monitoring was carried out by us from 3L/1,0/2014 To 0U1,1,/2014& following average leq.dB(A) values were observed.

Parameters Time Result PermissibleAs per EPA-I(Commercial

Ambient Noise Level

( Near Main Gate Area )

Day Time. 6:00 AM TO 10:00 pM

Night Time 10:00 PM TO 6:00 AM

56.4 dB(A)

48.7 dB(A)

65 dB(A)

55 anle;

Sampfe Collected By Us / Not Collected By Us

Authorized Signatory

! 1. The result listed refer only to the tested samples and applicable parameter. Endorsement of products is neither inferred not implied2. Total liabilig of this laboratory is limited to the invoice amount only.3. This report is not be reproduced wholly or in part and cannot be used as an evidence in the Court of Law and should not be used in

any advertising media without special permission in writing.4. Samples consumed in testing.

Registered Office: 834/1, K-Block, Mahipalpur, New Delhi.110037 Tel, : +91-11-267gg114-5Fax: +91-11.26781200

Page 56: Compliance Report Submitted By GROUP HOUSING COLONY M/s

IN KAMAL ENVIRo & FOoD LAB PVT. LTD.d'\ (Complete Test House for Testing of Environment, Drugs & Pharmaceuticais & Food Samples)

W (AN lso 9001'2008 cERTIFIED coMPANY)\qlr/ PIot No.254, Sector-6, LM.T. Manesar, Distt. Gurgaon-122A50, Telefax: 01244119624 E-mail : [email protected]

Sample Name- Ambient Noise LevelM/S Ramprastha Sare Realty Pvt. Ltd.

Village- Mewka and Wazirpur, Sector-92,Gurgaon (FlR)

Report No. KEFL/ENVT/MO21 1.L4A2

Recei pt Date:)Z/ LL/ 20L4ReportDate :08/11./201a

Description: Ambient noise monitoring was carried out by us from ot/1,1,/zoL4 To 02/L1,/20L4& following average leq.dB(A)values were observed.

Parameters Time asResult Permissible LAs per EPA-I(Commercial

Ambient Noise Level

( Near Main Gate Area )

Day Time 6:00 AM TO 10:00 PM

Night Time 10:00 PM TO 6:00 AM

s8.6 dB(A)

4s.4 dB(A)

65 anla;

55 dB(A)

r3i:.:..aaawt \:.;;ii!q///: )::?,.t " . -9:l): :l:9 t_Y-!=':,{, 1 .!:j 1:*: d B"y

Y :

Authorized Signatory

: 1. The result listed refer only to the tested samples and applicable parameter. Endorsement of products is neither inferred not implied?. Iglrt liability of this laboratory is limited to the invoice amount onty.3. This report is not be reproduced wholly or in part and cannot be used as an evidence in the Court of Law and should not be used in. any advertising media without special permission in writing.4. Samples consumed in testing.

Registered Office ; 83411, K-Block, Mahipalpur, New Delhi-110037 Tel. : +91-11-267gg114-5 Fax : +91-11-26781200

Page 57: Compliance Report Submitted By GROUP HOUSING COLONY M/s

ilN KAMAL ENVIRO & FOOD LAB PVT. LTD./A (Complete Test House for Testing of Environment, Drugs & Pharmaceuticals & Food Samples)

ffi (AN tso 9001-2008 cERnFtED coMpANy)\W Plot No. 254, sector6, l.M.T. Manesar, Distt. Gurgaon- 122 osl,Telefax : 01244119624 E-mail : [email protected]

Sample Name- Ground WaterM/S Ramprastha Sare Realty Pvt. Ltd.

Village- Mewka and Wazirpur, Sector-92,Gurgaon (HR)

Sampling Team: Mr. Rajesh Kumar

Report No. KEFL/ENVT/M31101403Receipt Date:31/1-0 /ZOt+Report Date :06/11,/2014

Sample Qty.: 2 Ltrs.

Sample Protocol: KEFLI QP /23

ReferenceDESCR!PTIONS.NO. Parameters Results

Less than 5

Agreeable7,97o.2s69

BDL(0.01)

BDL(0.1)BDL(0.1)11

89

BDL(0.01)

o.26BDL(0.01)o.2378

BDL(0.01)BDL(0.1)

BDL(0.1)

BDL(0.001)

BDL(0.01)

63

260t42BDL(0.1)

BDL(0.001)

BDL(0.01)

BDL(0.01)

BDL(0.001)BDL(0.0(x)1)

BDL(0.01)BDL(0.01)

Absent

NIL

: lS 10500-20: One Ground water sample was collected by us on 3l/tO/20L4

Requirement Permissible(Acceptable LimitsLimit)

(ORGANOLEPTIC AND PHYSICAL}

1 Color (Hazen)

2. Odour3. pH

5

Agreeable6.5 to 8.55

s00

0.03o.20.575

2s00.051.00.20.3300.10.5450.0010.012002002005

0.0030.05

0.010.0010.0001

15

AgreeableNo relaxation10

2ooo

o.21.0

1.020010001.5

1.51

No relaxation1000.3No relaxationNo relaxation0.002No relaxation400600

60015

No relaxationNo relaxation

No relaxationNo relaxationNo relaxation

Method of test, RefPart of IS 3025

Part 4Part 5

Part 11

Part 10

Part 16

Part 55

5.

6.

1.

2.

3.

4,

5.

6.

7.

8.

9.

10.

11.

12.13.

t4.15.

16.

17.18.

19.

L

2

3

4

5

6

7

l.

Turbidity(NTU)Total Dissolved Solids (mg/l)(General Parameters)Aluminum (as Al) mg/lAnionic Detergents (as MBAS) mg/lBoron (as B) mgllCalcium (as Ca) mg/lChlorides (as Cl) mgllCopper (as Cu) mg/lFluorides (as F) mgllFree Residual Chlorine (mg/l)lron (as Fe) mg/lMagnesium (as Mg) mgllManganese (as Mn) mg/lMineral Oil mg/lNitrate( as NO3) mg/lPhenolic Compounds (as CsHsOH) mg/lSelenium (as Se) mg/lSulphate (as SOq)mgllTotal Alkalinity (as CaCO3) mgllTotal Hardness (as CaCO3) mg,/lZinc (as Zn) mgll(Parameters Concernins Toxic Substances)Cadmimum (as Cd) mgllCyanide (as CN) mgillLead (as Pb) mc/lMercury (as Hg) mgllPolynuclear Aromatic Hydrocarbon( as PAH) mg/lTotal Arsenic (as As) mg/lTotal Chromimum (as Cr)mgllBacteriolosical QualitvE-Coli

2. Total Colifom Ba€teria

0.01 0.050.05 No relaxation

RequirementShall not be detectable in any 100 mlsampleShall not be detectable in any 100 mlsample

Annex K of lS 134Part 57Part 40Part 32Part 42Part 60Part 26

Part 53Part 46Part 59Part 39

Part 34Part 43Part 56Part 24Part 23

PaftZLPart 49

Part 4LParl 27

Paft 47Part 48APHA 6440

Part 37Part.52

lS :5401:Part-2

lS:5887:Part-1

Sampte Collected By Us / ltet+elie+ea+y+s

1.2.J.

4.

The result listed refer only to the tested samples and applicable parameter. Endorsement ofTotal liability of this laboratory is limited to the invoice amount only.This report is not be reproduced wholly or in part and cannot be used as an evidence in the Court of Law and should not be used inany advertising media without special permission in writing.Samples consumed in testing.

Registered Office : 834/1, K-Block, Mahipalpur, New Delhi-110037 Tel. : +91-11-26788114-5 Fax : +91-11-267g1200

Page 58: Compliance Report Submitted By GROUP HOUSING COLONY M/s

ilN KAMAL ENVIRO & FOOD LAB PVT. LTD.,ft\ (Complete Test House for Testing of Environment, Drugs & Pharmaceuticals & Food Samples)

kffiffi (AN tso s001-2008 cERflFtED CoMpANy)\W Plot No. 254, Sector-6, I.M.T. Manesar, Disft. Gurgaon- 122 osa,Telefax : afi441'tg624E-mail : [email protected]

Sample Name- Soil SampleM/S Ramprastha Sare Realty pvt. Ltd.Village- Mewka and Wazirpur, Sector-92,Gurgaon (HR)

SamplingTeam: Mr. Rajesh Kumar

Report No. KEFL/ENVT/M3 11 0L404Receipt Date:3 1/10 /201.4

Report Date :06/1,1/201,4

Sample Qty.: 2 kg.

DESCRIPTION: one Soil sa*p@ 3U1012014.

ST. No. PARAMETERES RESULTS

I Colour yellowish Brown2 Texture Sandy Clay Loam

3 pH(20% Sluny) 7.Zg4 Conductivity (20% Slutry) 1135 Bulk Density 1.45

6 Moisture 1.27 Chlorides (as Cl) 4g8 Organic Matter I.79 Water Holding Capaciry 30.210 Potassium as K 241

1 1 Phosphorus as P 27.312 Nitrogen as N 9gg13 Carbonate (as CO3 ) Xn14 Bi-Carbonate (as HCO3 ) ZOO

d...:.:i.N//@t, !..:.::\|.:w1,'!.: ]::

Sample Collected By Us / Not Collected By Us

:pmhos/cm

gm/cm"

%

mg/kg

%

%

mglKg

mg/kg

mg/kg

mg/kg

mg/kg

Authorized Signatory

: 1' The result listed refer only to the tested samples and applicable parameter. Endorsement of products is neither inferred not implied?. Igl"t liability of this laboratory is limited to the invoice amount onty.3. This report is not be reproduced wholty or in part and cannot be used as an evidence in the Court of Law and should not be used in_ any advertising media without special permission in writing.4. Samples consumed in testing.

Registered Office:834/1, K-Block, Mahipalpur, New Dethi-110037 Tel. : +91-11-267gg114-5Fax:+91_11-26781200

Page 59: Compliance Report Submitted By GROUP HOUSING COLONY M/s

KAMAL ENVIRO & FOOD !.AM PWY- ilTM"(Complete Test House for Testing of Environment, Drugs & Pharmaceuticals & Food Samplesi

(AN rSO 9001.2008 CERT|F|ED COMPANY)

Plot No. 254, Sector6, l.M.T. Manesar, Distt. Gurgaon-lzz 05A, Telefax : 01244119624 E-mait : kamaienv!rolahs@gmai!.com

Sample Name- Noise LevelM/S Ramprastha Sare Realty pvt. Ltd.Village- Mewka and Wazirpur, Sector-92,Gurgaon (HR)

Report No. KEFL/ENVT/M3 1101406Receipt Date :3 L/10 /201,4

Report Date :06/1,1/20L4

DESCRIPTION: Noise Monitoring of D.G set ( 500 KVA)was carried out on 3l/10/2014 &following average Leq. dB(A) value was observed.

Subject Time Duration Results Requirements(As Per Gazette Notification

G.S.R.371(E),Da ted L7 / 0s / 2002 |

7s dB(A)Outside the D.G. Room 72:OO PM To 12:30 pM 72.8 dB(A)

Sample Collected By Us / Not Collected By Us

Authorized Signatory

! 1. The result listed refer only to the tested samples and applicable parameter. Endorsement of products is neither inferred not implied2. Total liability of this laboratory is limited to the invoice amount only.3' This report is not be reproduced wholly or in part and cannot be used as an evidence in the Court of Law and should not be used in- any advertising media without special permission in writing.4. Samples consumed in testing.

Registered Office: 834/1, K-Block, Mahipalpur, New Delhi-110037 Tel. ; +91-11-26788114-5 Fax : +91-1tr-267g1200

Page 60: Compliance Report Submitted By GROUP HOUSING COLONY M/s

IN KAMAL ENVIRO & FOOD LAB PVT. LTD./+\ (Compleie Test House for Testlng of Environment, Drugs & Pharmaceuticals & Food Samples)

ffi (AN tso 9001-2008 cERrtFtED coMpANy)\Xr/ Plot No.254, Sector6, l.M.T. Manesar, Dlstt. Gurgaon-1lz050, Telefax: 01244119624 E-mail ; [email protected]

Sample Name- Stack EmissionM/S Ramprastha Sare Realty pvt. Ltd.Village- Mewka and Wazirpur, Sector-92,Gurgaon (HR)

SamplingTeam: Mr. Rajesh Kumar

Report No. KEFL/ENVT/M3 1101405Recei pt Dat:31/ 1,0 / 201.4

ReportDate :08/11,/2014

Sample Protocol: KEFL/ QP /24

Description: one stack Emission sample was collected by us on 3L/10/20L4Name of Client M/S Ramprastha Sare Realty pvt. LtdName of plant & Section D.G Section

Emission Source Monitored D.G Set-t (5OO KVA)

Type of Fuel

Stack ldentification

Normal Operating Schedule (Hrs/day)

Locatiori of sampllng point

Type of Chimney (ACC/Metal)

Stack Height (Meters)

From Roof Level

From Ground Level

From source of Emission

Diameter of stack (cm)

Sampling Duration (minutes)

Parameters MonitoredPurpose of Monitoring

Products Manufactured

Recovery of Material (if any)

General Sensory observations

Fugitive Emissions (if any)

Control measures (if any)

Stack Temperature (oC)

Ambient Temperature(oC)

Stack Velocity (m/second)

Quantity of Emission (Nm3/Hr)

Parameters

Particulate Matter pM

Sulphur Dioxide as SO2

Oxides of Nitrogen as NOx

Carbon Monoxide as COTotal Hydro Carbons as Methane

Sample Collected By Us / Not Collected By Us

Diesel

Stack To D.G Set-r ( 5OO KVA)

As per Requirements

Not As Per Standard (Top of Chimney)

Metal

2L.94

30.48

30

PM, SO2, NOx, CO, THC

To Assess Pollution

Construction work

Nil

Normal

Nil

Nil

295

27

13.39

7844.O

Results permissible limit(gmlkw-hr) (As per EpA 1986 for

D.G Set up to 800KVA

0.130.0700.1200.1880.032

0.3(gmlkw-hr)

9.2(gmlkw-hr)

3.5(gmlkw-hr)

1.3(gmlkw-hr)

Protocol

1S11255:Part1:L9851S11255:Part2:1955IS 11255 : PartT :2005lS 5182 Part 10 : 1999APHA

The result listed refer only to the tested samples and applicable parameter. Endorsement ofTotal liability of this laboratory is limited to the invoice amount only.This report is not be reproduced wholly or in part and cannot be used as an evidence in the Court of Law and should not be used inany advertising media without special permission in writing.

4. Samples consumed in testing.

Registered Office : 834/1, K-Block, Mahipalpur, New Delhi-110037 Tel. : +91-11-26788114-5 Fax i +91-11-267ffi20}

Page 61: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Photograph

Acoust

Sta

h showing D

tic Enclosur

 

ack Height

DG Sets

res

Annexur

 

 

re-IX

Page 62: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Phootographs shhowing Utili

Fly

ization of F

ash Bricks

 

Flyash brick

ks and RMC

Annexure

C

 

 

e-X

Page 63: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Phootographs shhowing Utili

ization of F

 

 

Flyash brick

ks and RMC

Annexure

C

 

 

e-X

Page 64: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Photograpph showing RRWH Pit Annexure-XI

 

Page 65: Compliance Report Submitted By GROUP HOUSING COLONY M/s
Page 66: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Fr',sm: H14." fi,6-ng*m*tall'Gf.',Ford,sfs,oGurgaon, Haryana,

"':'-al{:r-

,ffiftrGxltre '

- +.

,Bated::,

Bated

,s.if6"I '*la ea.iegar.dl ,g p.l altttl*.#s.-fb [.la+'q, r,s. hnd Apptied gy lff& Reriig.rrl*th*::s*amReallty Pvf, Ltd. land4ocidted atVjllqge- Wazirpur'& fi[6*Tka, Disllic*-Gurg6on.

fetter no, Nil dated 08,08.29f8 made a lBquqt in connection with rland frreasuring E.adii Acre*;hdVlng Rect tto, B't

,KlllHl;:-.sls.o $I3 min, ,*fii ,Sffi; tyrrlt *uzt,i$, i&,: *.?, 65i if ,m':.aM farfi foc*eC *f vi$ag . *r,*mr+"Bn*imeaHuring 0.7 Acrea having fte<*, No, I Killa No, 8I*, land lifcated at village llitwka District Ourgad.:{Total lartd meaeuring 7.043:Ac-r6s) Affiticant made *i,cpf-oposal gg use ttlt$ land fur group Houqilg Purprlge. tncontinuation olreport submised$y *FO, Gurgaoli vlOe loter.no, fooo+ cateu rr.tt.zOli i is rn"O$:*eart'ttaf

dl As per'uecords:*nailaHlb'.,aboire ,,se{itf *t:Ed i$l ,aot,pai*: df ,${ffified Regerir-ed. F,q#*t, P.=r,o,teded.,F.oJkr}l.unde-f' In'dian f'u"iestAix, 19?F oreny area.plosed {tnder ssotiot!+ a 5 o.f,,Fr'rn}eb nd Ff*Eervatioa,,A4;lS.0o.

6) t * 9p ng. [hat byJhe N,q]fiq&n N{, s.&8 ti$ dated {th Jlirr**ar.}. 20JS., art,ft*venu,e,Estatre of Ggrgnon *s nolified u/b 4 of FLPA 19'00 and S.O.8'tiF*"z1s00lS.aE0.l2 dated lg*i Spcsmber,2012-u/s B of PL-PA 190O; The flrea i*rfrovsesdrnot recoicledas forhst in,thb Gwemment record'b$t{btting ofanytree is:,stticly..,'pt*rhib,ltdd ti it'tt#perfi&Skin .f irli$i6nBl.F.ofp fi*iisg'*r,,Guf$Aon., '

q) lf approach :is required frot'*f. Prete&ed forest by.,!hg l$br ageney, th$ clearardc€/regulaiiiHion unde{ ForestGonservatiori Act 1980 w,t"ll bs;,Equixff#: Witmfit$rioi desunce frffii For€st Dep€rtment, the use sflForestland#or approed*r.road.is stricts fohibitg fms',nampfnpttia S+re neat'ity pvf iii whosp land'ii tocatgd atvflegejW,e t*t*r& iilH,vrk$ pistrict GulHeS,n mU.p*ffibft,+leamns*,ns,aeiijn+irlB r.rnder Foradi Conservathn

NU,' ffi,,,g--t$ r m#

dI ns 'per the recolds aypilable with lhe Forest Departm€fit, Guryaon, thq. area does not fall ln iSISas whEl+.p[antathns weresai$ed by theForest Depa*inent under Aravblli project

'$l lsl other statl$bry olenran. -.-.-.-.Ri mffidated.l4lS*r:tke,,ffiiiiffirqbts{,,ftqt$dii t&Be,asiptri,t tp$]$ffi

ililinislry of Enviroanrbnt and roieits, Gr$Emmehi riflndia;,dated ofdS-tegdror any ottiei*Revoidershaltlbpiobtsirried aS apBlicahle;,ffi,the iX?6jic*[#f e, dlauthorities.

B, tj,e project pftiponent will not vtol.aite arly fiidlciatOrdertdipctiq6iibeupd by the Hon'ble &lpremerUourU Higfl:.Oourb.:

;* :fft ,t

*ffi, .,,} ,{

:I, :} ##,,,

sl

hf' It ehall b* tbs res.po.nsibili$ oJ user a$nffip",plffi#l{i i#t-:i1ec{*tiisii .#aalq $ $rttl**iCI_irs.q6futldrluus

:ffiete: lffi,: {,r,,},,ig.,*n

'Ftags,r, G-,uguonYEndst,,,hls-

A'emBLYi$:fsiirir4fded#- '-&1." Cqniewatorq$tsorts€ts, South'Gircle, Gingaon for Kirid iniomtation,2t D.G, T.cjP,Ayojana Bhauran, $eg.{fl- linaghffifilerg, Chandtgarf}Tsr kind infonnaiion3. Fy, Oommissionsr, Guqgaon for kind,fiifonyration4, Gri{rd Eile.

f;:,, tl .H"_*,ffi

,Elf. Bons.Bwat$r $f .f'urs,stiGurgaon,

Page 67: Compliance Report Submitted By GROUP HOUSING COLONY M/s
Page 68: Compliance Report Submitted By GROUP HOUSING COLONY M/s
Page 69: Compliance Report Submitted By GROUP HOUSING COLONY M/s
Page 70: Compliance Report Submitted By GROUP HOUSING COLONY M/s
Page 71: Compliance Report Submitted By GROUP HOUSING COLONY M/s
Page 72: Compliance Report Submitted By GROUP HOUSING COLONY M/s

Ramprastha Sare Realty. pvt. ttdC-10 C Blok Market Vasant Vihar New Delhi_110057Date:

UNDERTAKING

This is to inform you that, we IWs. Ramprastha Sare Realty Pvt. Ltd, Gurgaon are developing the

Group Housing Colony at village Wazirpur and Mewka,Sector-92,Gurgaon.Hari6a.po, this, weundertake that we are not using and extracting the ground water for any construction activities.

s@a Sare Realty Pvt. Ltd

(Authorized Signatory)

Page 73: Compliance Report Submitted By GROUP HOUSING COLONY M/s
Page 74: Compliance Report Submitted By GROUP HOUSING COLONY M/s
Page 75: Compliance Report Submitted By GROUP HOUSING COLONY M/s
Page 76: Compliance Report Submitted By GROUP HOUSING COLONY M/s
Page 77: Compliance Report Submitted By GROUP HOUSING COLONY M/s
Page 78: Compliance Report Submitted By GROUP HOUSING COLONY M/s

.J

AAliNoc/200st32u /"ai * _/4_iE

To,Maj. Gen, Satish SahipatC/O M/S Ramprastha Sare Reatty (p) LtdCrecent parc, Sector_92Gurgaon

BY FEGD./SPEED POST(Revised Height)

02.082D12

r! "r{

t

rai. ir.[ ii b Z iit \l lL-v iiJ'.e

tI

Datel :

Sir,Please refer to your retter rro.Nirdate.d Nlr on the subjdct mentioned above.

l-(RAill LAL )G^ENERAL MANAq ER (ATM) N Rcppv to'- I ;-r?34ffi iir#S$;.llljrrllllflilTll:j:;.*i Bhawan, sardariuns Airpon.N Deihii RIi ;?i,:,^A-1:d^" 9

o ntp r"{,'s;.iol_ ia,' e ur.s, oo

, . :lL5i::.:l1: gm=r, DIAL, r.r",,1ilaoJ. rrrJ*#i,,iJlili,"-,,:JiI B,y;iJ*""*111_"*,#::nx1lf "ill.1i{11ili#orl,'bh,*uo sardarjung Airport, N.D.jung Airport, N.D. i-3, Opp.ATS Cornpleir, tCl

SUBJECT._ NO OBJECTTON CERT.IF|CArE _ t

This office has no objection to the conitruction of the prRgaltv Pvt Lirnited herein after referr,erl t^ ."'+n^ ^^^ri^^-.,-1 -r

'i,

I

II

I

Airport, New Deihi- 37,

.i i,'j :irjaii;tr$, r..ir; r.i lyfro tig, -{$ i}.-..-1l1.10 {}37 .: l$ 4ir : ?4 .r}.r-:,jic :-r.i',i ;{.i.,i:.t_:;". t.,;i.ih ,;i ,,;:i*ig,,::!., c',lrn*^ n";: ;;; tCI*32 .i isr tr* ;ti,:,"lil.? rl-:ri rrli -r-il'rva j,/i,,

Page 79: Compliance Report Submitted By GROUP HOUSING COLONY M/s

$gf{ ],|-ffT LJTTAR PRADESHdE

*B

Ee

AFFIDAVIT

38AC 433922

Ltd., R/o C-10, C-Blockf, $apt. T.N. Singh, Authorized Signatory M/s Ramprastha Sare Reality Pvt'

rvrlrtet, Vasant Vihar, New Delhi-110057 do solemnly affirm and declare that:

E

(i)F We will not cross services lines across revenue rasta falling within our project area'

,i i t,;l/ : )i ;, r Sf i s fafu*Br. .,,."1:.lii,iC; i{*|a,.,,t :',J.: ;iiijrih Bl,rJi"i *JnUAl

? 7 ji;r; ilIffi,

Page 80: Compliance Report Submitted By GROUP HOUSING COLONY M/s
Page 81: Compliance Report Submitted By GROUP HOUSING COLONY M/s

c-10, C-BLOCK MAIU(ET. VASANT VIHAR. NEW DELHI-1 I 0057

ha Sare Real Pvt. Ltd.

Datez26l4l20l4To,The Director,Northern Regional Office (MoEF),

Bays No. 24 -25.

Sector- 31-A,Dakshin Marg,Chandigarh- 160030

Subject: Submission of six monthly Complianc.-l:potr-}r.the GrooP.H:"ttlg. foj::t..Ramprastha Sare Township" located at Village Wazirpur and Mewka, Sdctor 92,

Distt. Gurgaon, HarYana. i

Ref EC Letter Number: SEIAA/HR/I0301 Dated: l0l5l20l0

Respected Sir,

This is with reference to the above mentioned subject. We are submitting six molthly

compliance Report of June, 2014 for Group Housing project "Ramprastha Sare Township"

located at Village Wazirpur and Mewka, Sector 92, Distt. Gurgaon, Haryata, along with the

necessary annexure for your kind perusal'

We understand that thd above is in line with requirement of Ministry of Environment & Forest'

(Authorized S i gnatorY)

Enclosure: Compliance Report; Soft copy of Report in C'D

copy to: Haryana state Pollution Control Board, c-11 Sec:6, Panchkula,Haryana

ri.+,1 '

..f.'}G.

t.

Page 82: Compliance Report Submitted By GROUP HOUSING COLONY M/s

rastha Sare Real Pvt. Ltd.C.10" C.BI.,OCK MATU(ET. VASANT VTITAR. NEW NNLNI.

1r0057

Date:NHE

"Yl,rW,14To,

The Director,Northern Regional Office (MoEF),Bays No. 24 -25,

Sector- 31-A,Dakshin M*g,Chandigarh-l 60030

Distt. Gurgaon, HarYana.

Ref EC Letter Number: SEIAA/FIR/10301

ewil*::

Subject: Submission 'of six monthly Cornpliance Report for the Group Housing project

"Ramprastha Sare Township" located at Village Wazirpui and Mewka, Sector 92,

Dated: 101512010

Respected Sir,

This is with reference to the above mentioned subject. We are submitting six monthly

Compliance Report of June, 2014 for Group Housing project ooRamprastha Sare Township"

located at Village Wazirpur and Mewka, Sector 92, Distt. Gurgaon, Haryana, along with the

necessary annexure for youq kind perusal

We understand that the above is in line with requirement of Ministry of Environment & Forest.

M/s Ranfnrastha Sare Realty Pvt. Ltd.

Authorized Signatory)

Enclosure: compliance Report; Soft copy ofReport in C.D 0 \ "o_