14
Comprehensive study and Comprehensive study and technical documentation of technical documentation of development of an development of an International International Airport Wrocław Airport Wrocław January 2009

Comprehensive study and technical documentation of development of an International Airport Wrocław January 2009

Embed Size (px)

Citation preview

Page 1: Comprehensive study and technical documentation of development of an International Airport Wrocław January 2009

Comprehensive study and Comprehensive study and technical documentation of technical documentation of

development of an Internationaldevelopment of an InternationalAirport WrocławAirport Wrocław

January 2009

Page 2: Comprehensive study and technical documentation of development of an International Airport Wrocław January 2009

City locationCity location

Five European capitals are located within 400-km radius of Wroclaw.

Each of twenty-five European capitals can be reached within 2h 30’ by air.

Page 3: Comprehensive study and technical documentation of development of an International Airport Wrocław January 2009

Access to airportAccess to airport

Well-developed road, rail and water transport infrastructure.

Advanced infrastructure investment projects in the city and region.

First Polish city to have joined European motorway network.

Rapid development of Wroclaw airport.

Page 4: Comprehensive study and technical documentation of development of an International Airport Wrocław January 2009

Wrocław airport Wrocław airport 20072007

Page 5: Comprehensive study and technical documentation of development of an International Airport Wrocław January 2009

Development plan of Wrocław airport Development plan of Wrocław airport

1. New terminal, hotel and conference centre, car parks

2. Construction of a new apron

3. Extension of the runway

4. Construction of taxiways

5. Construction of rapid exit ways

6. Construction of deicing areas

7. Completion and hand over of the south apron

77

Page 6: Comprehensive study and technical documentation of development of an International Airport Wrocław January 2009

Development plan of Wrocław airport Development plan of Wrocław airport

EXISTING INFRASTRUCTUREEXISTING INFRASTRUCTURE

PLANNED INVESTMENTSPLANNED INVESTMENTS1 km

Page 7: Comprehensive study and technical documentation of development of an International Airport Wrocław January 2009

Forecast of passengers traffic in 2007-2012 year

Page 8: Comprehensive study and technical documentation of development of an International Airport Wrocław January 2009

Forecast of passengers traffic in 2007-2012 year

Page 9: Comprehensive study and technical documentation of development of an International Airport Wrocław January 2009

Forecast of passengers traffic in 2007-2012 year

Page 10: Comprehensive study and technical documentation of development of an International Airport Wrocław January 2009

Investment projects of Copernicus Investment projects of Copernicus airport Wrocławairport Wrocław

Copernicus Airport Wrocław S.A. is the only airport in the Region capable of operating both domestic and international flights. The completion of airport modernization and development project is to enable faster and safer air connections. Undoubtedly, it will also contribute to the increase in traffic capacity and prepare the airport for steadily-growing passenger traffic.

Page 11: Comprehensive study and technical documentation of development of an International Airport Wrocław January 2009

Investment projects of Copernicus Investment projects of Copernicus airport Wrocławairport Wrocław

The investment project will also help to enhance and streamline the network of connections between the Region, Poland and other EU states. It will prepare the airport for the increase in flight frequency, passenger number and cargo volume. It will also help towards cost reduction and interoperability increase.

Page 12: Comprehensive study and technical documentation of development of an International Airport Wrocław January 2009

Projects of Copernicus airport Projects of Copernicus airport WrocławWrocław

The Project involves drawing up a number of documents and analyses enabling to better prepare the airport for growing passenger and air traffic. The activities necessary for the Project execution are as follows:

Awarding contractors in public procurements and project execution Laying out the master layer map Laying out the GIS map Drawing up the inventory of planes Carrying out the analyses of passengers and operators Drawing up technical documentation of the noise monitoring system

construction Making a dendrological inventory Carrying out geological tests for the entire airport External audit

Page 13: Comprehensive study and technical documentation of development of an International Airport Wrocław January 2009

Costs of planningCosts of planning

Activities 2009 2010 Total eligible cost

DIRECT COST

Project management50 000 30 000 80 000

Laying out the master layer map70 000 70 000

Laying out the GIS map300 000 300 000

Drawing up the inventory of planes1 730 000 1 730 000

Carrying out the analyses of passengers and operators

100 000 100 000

Drawing up technical documentation of the noise monitoring system construction 40 000 40 000

Making a dendrological inventory 30 000 30 000

Carrying out geological tests for the entire airport150 000 150 000

External audit 20 000 20 000

TOTAL ELIGIBLE COST 2170 000 350 000 2 520 000

Page 14: Comprehensive study and technical documentation of development of an International Airport Wrocław January 2009

Thank you fo attentionThank you fo attention

"Wyłączną odpowiedzialność za publikację ponosi jej autor. Unia Europejska nie ponosi odpowiedzialności za wykorzystanie w jakikolwiek sposób informacji zawartych w niniejszej publikacji".