    CONTINUITY PLAN FOR

    T I i E

    CONDUCT

    OF

    TH BRILILANTES, Sixto, Jr S. ~hairnyan

    AUTOMATED ELECTION TAGLE, Luceri ito N. comhsikioner

    SYSTEM IN CONNECTION YUSOPH

    Eliss

    R

    Comn iks~oner

    WITH THE MAY 13

    2013

    I.IM,

    Chr ist ian Robert S.

    Col-ni ~sioner

    N TION L ND LOCAL

    PADACA

    Mar ia Gracia Cielo M.

    Comqissioner

    ELECTIONS

    \

    I--

    t

    prOMU1gate,j

    :

    F e b ~ r i ~ '2 2 ?

    f

    3535

    RESOLUTION NO.

    WHEREAS,

    Section

    9 of

    Republic Act No.

    9369,

    created a new Section

    11,

    providing for the Functions

    of

    the ~e cl in ic al valuation Committee (TEC), as follows:

    '

    5EC 11 Fmctioni- of the 72chnical Fvaluation Committee. - The Conlrnlttee

    shall certiw, through an estab/ished nternational cerlification entity to be chosen by the

    Cotnnilssion fro111 the

    recommendations

    of the Advisory Council, not later than three

    months before the date of the electoral exercises, categorically stating that the A

    including itr hardware and soffware CrJrnponenk, is operating properly, secure/ : and

    accurately, in accordance with the provisions of th is Act base@ anlong others, 017 the

    following documented reslllts :

    6. The developnienf, prov3 ioning , and opwatlonalization o f

    a

    c o n t h ~ ~ l t ylan

    to cover risks t the A 55 t all points In the process such that a failure of

    elections, whether at ~ , in g , ounting or consolidation, nray be avoided

    WHEREAS, to enable the

    TEC

    to issue the requi red certification, the Project

    Control Group of t he Project Management Office (PMO) for the 2013 Automated

    Election System

    (AES)

    prepared a Continuity Plan for the May 13,

    2013

    blational

    nd

    Local Elections;

    4 -

  • 7/25/2019 com_res_9635.pdf

    2/28

    WHEREAS

    the Continuity Plan prepared by the PMO contains a list of

    contingency measures, and the policles for activation of such, tha t shall be

    put:

    in place

    to ensure the continuous operation of the

    AES

    and avoid a failure of elections, whether

    at voting, counting or consolidation of election results;

    NOW

    TI-IEREFORE pursuant to the powers vested i n

    t

    by 'th e Constitution, the

    Omnibus Election Code, Republic ct No. 9369, and other electlon laws, the

    Commission

    RESOLVED

    as

    t

    hereby RESOLVES to approve and adopt the Continuity

    f'lan for the May 13, 2013 Automated National and Local Elections, attached herein as

    Annex A , subject to the Cornrnission's power and autl ior ity to adopt, in exceptional

    cases, additional procedures in the voting, counting, consolidation, transmission,

    storage, custody, distiribution and retrieval of accountable forms and paraphernalia Lo

    fulfill it s Constitutlonai mandate to ensure free, orderly, honest, peaceful

    nd

    credible

    elections.

    Commissioner

    Commissioner Commissioner

  • 7/25/2019 com_res_9635.pdf

    3/28

    CONTIN UITY PLAN

    M A Y

    13

    2093 N A TIO N A L A N D LOC AL ELE TIONS

    Discussed elow

    re the Contii~gency

    Procerlrrres to be arlopteif as

    supplement t o the Gerreral .Trlstr~ c ti u r~ sor t he Board o f Election Inspectors

    BEI)

    on the Voting, Counting, g r ~ d Transntission o f Resulb, and i f the

    Canvassing o f Election Reslr1t.s by th Board of Canvassers [BOC), i17

    connection wjth the

    May

    13 201.3 Nations/ and Local Elections

    :

    Definition of Terms

    1.

    COMELEC Comrnission on Elecflons;

    I

    2 . SERVICE PROVIDER The company or entity who will be awarded the contract for

    the provision of National F,upport Center services for the election;

    .

    3.

    NSC

    he

    National Scrpport Center-, where all contingencies nationwide are

    reported, addressed sn d resolved, manned by the PMO Technology Group from

    COMELEC, the National Support Center Officers, and the National Suppo~TCenter

    Technicians and Coorillnators;

    4. NSCO Nat ional Support Center Officer, responsible for coordinating wit11 the

    various CCS Technicians asslgned to the canvassing boards nationwide, and the

    PCOS Supervisors assigned to clustered precincts, and shall address and resolve all

    .possible contingencies;

    5.

    CCS Consolidation Canvassing System, also known as the Rest-Time Election

    Information System (REIS), comprising the system and service to be used by the

    National Board of. Canvassers (NB,OC), Provir~cialBoard of Canvassers (PBOC),

    Distr ict Board of Canvassers (DBOC), City Board of Canvassers (CBOC) and the

    Municipal Board of Canvassers (MBOC);

    6.

    CCST CCS Technician, assigned to every board of canvassers nationwide, and

    .

    shall coordinate wi th the NSCO to address- possible contingencies

    as may

    be

    reported and authorlzed by the board to which helshe is assign ;

    7. PC05

    --

    Precinct Count Optical Scan;

  • 7/25/2019 com_res_9635.pdf

    4/28

    1)

    Technical Si~pport

    to address and monitor

    therein. He/She shall also be responsible to

    8. PCOS Supervisor Off

    shall report to th e

    NSC 0

    on problems or iss i~es

    9. DepEd Supervisor

    supervlse a polling ce

    of Election Inspectors

    Election Officer of thl?

    resolved at the precinc:t

    cer assigned. to moni tor a number of clustered precincts and

    from time to time, and coordinate with PCOS Technicians

    :hat need t o be resolved at the precinct level;

    offlcer from' the Department o f Educatlon appointed to

    iter. He/she shall directly supervise and monitor the Board .

    BEIs) and the P OS machines, make regular reports to the

    status and possible problems or issues that need to be

    levc l;

  • 7/25/2019 com_res_9635.pdf

    5/28

    Organizational Structure of t he National Support enter

    For the purpose of implementing this Contingency Plan the following

    Organizational Structure s hereby adopted:

    CONTINGENCY PLAN ORGANIZATIONAL CHART

    PROJECT MANAGEMENT

    PMO PROJECT DIRECTOR-

    COMELEC

    NATIONAL SUPPORT

    CENTER NSC)

    NATIONAL COMMAND

    CENTER NCC)

    I

    NATIONAL SUPPORT CENTER

    OFFICERS

    - NSCO) COMELEC

    I

    NSC TECHNICIANSISUPPORT

    PERSONNEL

    DEPED SUPERVISOR

    0

    1 5

    r

    PCOS SUPERVISOR

    BOARD OF ELECTION

    1

    INSPECTORS BEI) PCOS TECHNICIAN PCOST)

    CONSOLIDATION

    CANVASSING

    SYSTEM

    TECHNICIAN

    CCST)

    PROVINCIAL ELECTION

    SUPERVISOR PES)

    OFFICERS EO)

    J

    PBOCIDBOCI

    MBOCICBOC

    CITYIMUNICIPAL ELECTION

  • 7/25/2019 com_res_9635.pdf

    6/28

    Contingency procedures applicable to the National CCS Service

    The procedures to ,b e observed i n the event the

    following

    contingencies arise

    during the conduct of the elections on ay 13,

    2 1

    n the National

    S

    service

    are as

    follows:

    A

    The Data Storage is not available and there is Database

    Service Interruption

    i

    The

    IT

    Capable member of the

    BOC

    shall notify the NS of the

    System failure;

    ii

    The

    NS

    shall notify the

    P O

    Director of the system failure and

    iii

    iv

    v

    vi

    vii

    viii

    IX

    ask fo r aslc fo r an authorization;

    The Comelec ~ M Ot -ojectDirector shall issue the authorization

    and the

    P O

    Technology Group representative shall supervise

    the execution of the recovery procedures;

    The Security specialist Technician shall block Firewall access to

    the server from the external network:

    The Database specialist Techniclan shall shut down the database

    service in, the node. He then checks the integrity and

    status o f the database back-up i n the standby server;

    I f the back-up data files are corrupted or the status is incorrect,

    the Database Specialist Techniclan shall check for the

    contingency procedures for the back-up center;

    I f the back-up data files are correct, t he Database Specialist

    Technician shall restore the database wi th the back-up files, and

    shall star t the database service in the secondary node, and then

    execute the scripts for primary database transition;

    The Database Specialist Technician shall check the log system

    messages in th e database server and application servers;

    The Database ~~ecla i ls technician shall notify the

    P O

    Technology Group representative and the

    NS

    that the system

    has been recovered;.

    x

    The NSC shall notify the PMO Project Director and ask for

    authorization for firewall activation, and thereafter, declare the

    end o f the Recovery process;

  • 7/25/2019 com_res_9635.pdf

    7/28

    xi

    The Security Specialist Technician shall open the firewall access

    to the server from the external network.

    8

    There is

    Server

    ~ a r d w a r e ai lure and Database Service

    Interruption

    i.

    The IT Capable member of the BOC shall notify the NS of the

    System failure;

    ii.

    The

    NSC

    shall notify the PMO Director of the system failure and

    ask for a n authorization;

    iii.

    The Comelec PMO Project Director shall issue the authorization

    and the PMO Technology Group representative-shall supervise

    the execution of the recovery procedures;

    iv

    The Security 6peciali st ~ec hn icl an hall block the firewal l access

    to the server from the external network;

    v

    The Database

    Specialist

    Technician shall shut down the

    database service in the primary node and check the integrity

    and status of the database files in the storage;

    vi I f the storage files are corrupted or the status is incorrect, the

    Database Specialist Technician shall check for the contingency

    pro cedures for t he Back-up Center;

    vii

    I f

    the storage data files are correct, th e Database Specialist

    Techntciah shall mount the storage device, and star t the

    database service in the secondary node, and execute the scripts

    for the primary database transition;

    viii

    The Database Specialist Technician shall check the log system

    messages in the database server and application servers;

    ix

    The Database Specialist Technician shall notify the Technology

    Group representative and the NS that the system has been

    recovered;

    x The NSC shall notify the PMO Project Director and ask for

    authorizat ion to activate the firewall, and thereafter, declare the

    end of t he recovery process;

    xi

    The Security Specialist Technician shall open the firewall access

    to the server from the external network.

  • 7/25/2019 com_res_9635.pdf

    8/28

    C

    There is Server Hardware Failure and Real-Time Election

    Informat ion System

    REIS)

    Listener Service Interruption:

    i

    ii.

    iii.

    iv.

    v.

    vi.

    vii.

    viii.

    ix.

    X.

    xi.

    The

    T

    Capable member of the BOC shall notify the NSC of the

    System failure;

    T ~ ~ N s chall notify the PMO Director o f the system failure and

    ask for an authorization;

    The Comelec PMO Project Director shall issue the authorization

    and the PMO Technology Group representative shall supervise

    the exe ci~ tion f th e recovery procedures;

    The Security Specialist Technician shall block the firewall access

    to the server from the external network;

    The Database Specialist Technician shall shut down the Primary

    R IS Server

    ih

    the phmary node;

    The Database Specialist Technician shall shut down the Primary

    REIS Listener Server in the first node and check the status of

    the secondary server;

    I f the secondary server failed, the Database Specialist

    Technician shall check for the contingency procedures for the

    Back-Up Center;

    I f the secondary server is working properly, the Database

    Specialist Technician shall check the application status in the

    secondary node, and execute the scripts for primary REIS

    listener transition and check the log system messages in the

    R IS listener server;

    Th e Database Specialist Technician shall notif y th e Technology

    Group Head and the NSC tha t the system has been recovered;

    The NSC shall notify the PMO Project Director and ask for

    authorization to activate the firewall, and thereafter, declare the

    end o f the recovery process;

    The Security Specialist Technician shall open the flrewall access

    to the server from the external network;

    There is Server Hardware Failure and REIS Service

    Interruption:

  • 7/25/2019 com_res_9635.pdf

    9/28

    i

    11

    iii

    Iv.

    v.

    vi.

    vii.

    viii.

    ix.

    X.

    xi.

    i

    ii

    The

    T

    Capable member of the BOC shall notify the NSC of the

    System failure;

    The NSC shall notl fy the

    PMO

    Director of the system failure and

    ask for an authorization;

    The Comelec PMO Project Director shall issue the authorization

    and the PMO Tecnnology Group representative shall supervise

    the execution of the recovery procedures;

    The Security Specialist Technician shall block the flrewali access

    to the server from the external networl

  • 7/25/2019 com_res_9635.pdf

    10/28

    iii

    The Comelec PMO Project Director shall issue the authorization

    and the PMO Technology Group representative shall supervise

    the execution o f t he recovery procedures;

    iv

    The Electricity Technician shall power on th generator set and

    check the status o f the generator set;

    v. The Electric ity Teahnician shall change the power connection

    for the external source to the generator set and check the

    status of the UPS System;

    vi.

    The Electricity Technician shall continually check the status of

    the external electricity source and when it Is up/on for at least

    thirty (30) minutes, and the UPS system is charged; he must

    change back the power connectlon to the external source;

    vii.

    The Technology Group representative shall noti fy the NS of the

    l

    end of the Recovery process.

    F

    There

    is

    Power

    Supply

    Interr i~pt ion Blaclcout) and the

    Central Server Servlce is Interrupted:

    i

    The Electricity Technlclans shall notify the

    NS

    of the Power

    Supply failure, and ask for authorlzatlon;

    ii

    The

    NSC

    shall notify the PMO Director of the Power Supply

    failure and ask for an authorization;

    111

    The Comelec PMO Project Director shall issue the authorization

    and the PMO Technology Group representatlve shall supervise

    the execution of the recovery procedures;

    iv.

    The Central Server Center Technicians shall check the status of

    REIS listener queues and latest transactions;

    v.

    The Back-Up Center Techniclan shall check the status of the

    servers:

    Check Status of the Database, based on the latest

    transaction from the Regional Center.

    Check application servers status (Applications and

    System logs).

    Check network connection status: network reachability

    wi th the routers and firewall in the Region.

  • 7/25/2019 com_res_9635.pdf

    11/28

    vi I f the status of the systems is correct, then the Back-Up Center

    Technician shall:

    Change the database mode from stand-by to Primary

    and check databa se services

    Start-up REIS and REIS listener services, and check

    application Iqg messages.

    Ask for authorization from the COMELEC Technology

    Manager.

    vfi

    The Technology Group representative shall authorize and

    supervise the activatlon of the back-up Center Firewall;

    viii

    The Back-Up Center Technician shall open the Back-Up Center

    Firewall, allowing the incoming transmissions and check for

    incoming trarkmisslbns in the REIS listener logs;

    ix

    The Technology Group representative shall finalize the recovery

    procedures.

    G

    There is Networlc Access Fa il i~re nd National Service is

    interrupted

    i

    The Technical Support shall notify the NSC p f the network

    failure;

    ii

    The

    NS

    shall notify the PMO Director of the network failure

    and

    ask for an authorization;

    iii

    The Comelec PMO Project Director shall issue the authorization

    and the PMO Technology Group representative shall supervise

    the execution of the recovery procedures;

    iv

    The Network Specialist shall check the connections with the

    back-up provider, the network access wi th all the locations and

    check the interfaces status;

    v

    The Network Specialist. shall disable the cory-tection with the

    Primary Network provider, and activate the back-up network

    provider;

    vi

    The Network Specialist shall check for incoming connection

    from the different locations, then call the primary network

    provider support center, and together, check the status of the

    Network;

    .

  • 7/25/2019 com_res_9635.pdf

    12/28

    vii When the primary network provider is ready the Network

    Specialist shall ask for authorization;

    vlli

    The Technology Group representative shall give the

    authorization for t he change;

    ix. The Network Specialist shall disable the connection with the

    back-up network provider and activate the primary network

    provider;

    x The Technology Group representative shall finalize the recovery

    procedures.

    H

    Critical Weather/High Temperature Conditions and there

    is

    National Se wi ce Interruption:

    i The Electricity Technicians shall notify the NSC of the air-

    conditioning failure;

    ii.

    The NSC shall notify the PMO Director of the air-conditioning

    failure and ask for an authorization;

    i i i

    The Comelec PMO Project Director shall Issue the authorlzatlon

    and the PMO Technology Group representative shall supervise

    the execution of the recovery procedures;

    iv

    The Technical Support shall shut down all servers In the Data

    center except for the ES sewers;

    v.

    The Electricity Technlclan shall start the FAN systems In the

    Data center and watch the temperature level;

    vi. Once the air-condit lonlng system has been recovered the

    recovery process ends.

    I. Fire Flooding and Earthquake Occur and the re s Central

    Serv ice Interruption:

    i.

    The Technical Support must leave the building and if possible

    move t o the back-up Center;

    ii.

    The NSC shall notify the PMO Project Director for an

    authorization to use the recovery plan;

  • 7/25/2019 com_res_9635.pdf

    13/28

    iii

    After authorization is given by the PMO Project Director, the

    Technical Support must check the status of the REIS listener

    queues and latest transactions;

    iv

    The

    Back

    up center technician must check the status of the

    servers:

    . Check status ,of the database, based on the latest

    transaction from the central center.

    Check application servers status (applications and system

    logs).

    Check network connection status: network reachability with

    the routers and flrewall In the Region.

    v

    I f he status of the system Is correct, then the Back Up Center.

    Technician must change the database mode from stand-by to

    primary and check databases services. He must start-up the

    R IS and R IS listener services, and check application log

    messages;

    vi The Back-Up Center Techniclan must ask for authorizatlon from

    the PMO Project Director through the

    NSC

    to actlvate the back-

    up center Firewail;

    vii

    After authorization is given, the technician must open the back-

    up center firewail, allowing incoming transmisslons, and check

    for Incoming transmlssions in the REIS Listener logs;

    vili

    The Technology Group representative shall finalize the Recovery

    Procedures

  • 7/25/2019 com_res_9635.pdf

    14/28

    Contingency

    Procedures

    pplicable to the

    Board

    of

    Canvassers

    .

    The procedures to be observed in the event the following contingencies arise

    during the conduct of the elections a t the PBOC/DBOC/CBOC/MBOC on May 13,

    2010,

    are as follows:

    A. T he re is Hard Disk Failure and there is

    DATABASE/REIS/REIS Listener Service Int erru pti on, t li e

    System wi ll freeze, and. no furth er operation can be performed

    on t he System, or CCS Graphical Inte rf ac e is no t responding,

    or d oes no t start, or shows a blank screen indicating-an error

    boot, or does no t turn-on:

    . .

    I

    i The PBOC/DBOC/CBOC/MBOC shall Inform the T Capable

    member o f the board of the failure;

    ii

    The ITCapabl e member of the board shall report the failure to

    the NSC indicating the name of the server and the location;

    iii

    The NSC shall upon authority of the PBOC/DBOC/CBOC/MBOC

    ask the l Capable member of the board to repeat the turn-off

    and turn-on procedure;

    iv. f the problem persists the NSC shall arrange for the delivery of

    the replacement CCS to the affected PBOC/DBOC/CBOC/MBOC;

    v.

    The TCapable member of the board shall:

    Tu rn of f the defective CCS.

    Remove the removable memory from the defective CCS.

    Store the defective CCS in its original packing.

    Place the replacement CCS

    in

    the designated location.

    When the replacement CCS arrives the CCST must install

    the removable memory in to the replacement CCS

    Connect the replacement CCS to the power main and turn i t

    on.

    Call the NSC and update them on the status o f the CCS.

    6 There Is Power Supply Interr uptio n (Brownout/Blackout)

    and Provincial District City Municipal

    Canvass Service is

    interrupted:

  • 7/25/2019 com_res_9635.pdf

    15/28

    1 The PBOC/DBOC/CBOC/MBOC together with the T capable

    member, shall check the status of the generator set, its gasoline

    level and cable connections;

    ii

    The PBOC/DBOC/CBOC/MBOC shall start t he generator set, and

    check the activity indlcator in the generator set;

    iii

    The PBOC/DBOC/CBOC/MBOC shall authorize the T capable

    member to unplug the CGS power cables from the external

    electric source, and to plug the cable n the

    ene er tor

    set

    outlet; ..

    iv

    The Tcapable member shall call the NSC informing them of the

    status o f the systems;

    v

    The NSC shall record the new status for the location;

    vi. The lT capade m edber shall continually check the status of the

    external electricity source;

    vii.

    Upon the return o f external electricity source lasting more than

    one hour, the

    T

    capable member must request authorization

    from the PBOC/DBOC/CBOC/MBOC to switch over to the

    external electricity source;

    viii.

    The PBOC/DBOC/CBOC/MBOC shall authorize the switch back to

    external electricity source;

    ix.

    The

    T

    capable member shall unplug the CCS UPS power cable

    from the generator set and connect

    t

    to the external power

    source;

    x.

    PBOC/DBOC/CBOC/MBOC shall authorize the switch back to the

    external electricity source;

    xi.

    The T capable member shall unplug the CCS UPS power cable

    from the generator set and connect

    t

    to the external power

    source;

    xii.

    The T capable member shall call the NSCO indicating the new

    status of the location;

    xiii. NSC shall record the new status, and thereafter, end the

    recovery plan for the center.

    C.

    There is Wide Area Network WAN) Access Failitre and the

    Provincial/District/City/Municipal

    Canvass Service is

    Interrupted

  • 7/25/2019 com_res_9635.pdf

    16/28

    i

    ii

    ...

    111

    IV.

    V.

    vl.

    vii.

    viii.

    The PBOC/DBOC/CBOC/MBOC shall in form the T capable

    member

    of

    the inability of the CCS to send/receive;

    The PBOC/DBOC/CBOC/MBOC shall authorize the l capable

    member to:

    Check the ;tatus of the network device;

    Unplug and plug back the network device, and test the

    connection;

    I f the CCS still cannot connect, the IT capable member

    must use the alternative network devices s) if available

    and re-test the connection;

    The I T capable member shall call the NSCO indicating the

    statug of the1 system i f the CCS still cannot connect.

    The NSC shall record the new status for the location and checlc

    th e networlc status with t he network providers;

    The NSC shall call the network technlcians in order to supply

    back-up network devices if necessary;

    The PBOC/DBOC/CBOC/MBOC shall authorlze the Network

    Technician to plug the back-up network device Into the CCS,

    and test t he connection;

    fhe CCS is able to connect to the network, then no further

    action is needed. I f not, the Network Technician, w ith

    authorizat ion from t he PBOC/DBOC/CBOC/MBOC, must check

    the network device and network availability with the provider;

    Once the connection Is ready, the Networlc Technician must call

    the NS indicating the status o f th e system;

    f

    the Connection still cannot be established, the Networlc

    Technician must inform the PBOC/DBOC/CBOC/MBOC;

    ix

    The PBOC/DBOC/CBOC/MBOC must inform the Commission and

    request for further Instructions;

    x.

    The NSC f informed by the lT capable member of the networic

    connection recovery, records the new status for t he location.

    D. There

    i s

    a Catastrophe: Fire Flood earthquake anti

    others and the

    Provinciai/Dictrict/City/Municipal

    Canvass Service is interrupted:

  • 7/25/2019 com_res_9635.pdf

    17/28

    i The Canvassing Center security must instruct all personnel to

    evacuate the provincial/municipaI center;

    ii

    The PBOC/DBOC/CBOC/MBOC shall secure all election materials

    and equipment;

    iii The PBOC/DBOC/CBOC/MBOC shall check with the Regional

    Election Director/ Provincial Election Supervisor for fur ther

    instructions;

    iv.

    The T capable member shall check all the networlc devices and

    servers.

    I f

    any of the equipment is missing he shall call the

    NSC and inform about the missing equipment. For the

    replacement procedure he shall check the corresponding

    recovery procedure.

    v The Regions1 Election Director/ Provincial Election Supervisor

    shall issue order on what action to

    be

    un de r taken for the

    Provlncial/District/City/Municipal Canvassing Center

    E

    T h e r e

    is

    Sabotage equipment recovery and other s imi lar

    circumstances an d t l ie

    Provincial District City Municipal

    Canvass

    Service is interr i rpted

    i I f the Ca nv as si ng Center is safe t h e

    PBOC/DBOC/CBOC/MBOC Security Personnel shall direct

    the

    M D i s t r i c t C i t y M u n i c i p a l

    p smd to

    s w

    in the Center and

    continue with the proceedings;

    ii I f the Center is no t safe t h e PBOC/DBOC/CBOC/MBOC

    S ecur i t y P e rsonne l sha l l g

    i

    v e o r d.e r t o leave the

    provinclal district city mun icipal

    center and to stop all

    proceedings.

    The

    PBOC/DBOC/CBOC/MBOC Security Personnel

    shall secure ail election materials and equipment in the

    custody of the PBOC/DBOC/CBOC/MBOC;

    iii

    The IT capable member shall check a l l the network devices

    and servers.

    I f any of the equipment is missing the CCST shall

    call the NSC and Inform them about the missing equipment.

    For the replacement procedure he shall check the

    corresponding recovery procedure.

  • 7/25/2019 com_res_9635.pdf

    18/28

    Contingency procedures applicable

    to

    th

    PCOS

    System

    The procedures to be observed in the event the following contingencies arise

    during the conduct of the elections on May 13, 2010 in the precinct level involving the

    PCOS System, are as follows:

    A

    The BE1 P I N s is unavailable:

    i

    The BE1 Shall inform the Technical Support personnel;

    ii The Technlcal Support personnel shall inform the PCOS

    Supervisor

    iii

    The PCOS Supervisor shall inform the NSC;

    iv

    The NSC shajl advise the PCOS Supervisor to provide the PINS o

    the BEIs;

    v

    The Technlcal Support personnel shall provide the PINs to the

    BEI;

    vi

    The PCOS Is now ready to resume the votlng process;

    vii

    The Technlcal Support personnel shall call the PCOS Supervisor,

    who in turn shall call the NSC and Inform them about the

    avallabiiity of the PINs.

    6

    Tiiere is a Ballot Jam

    i

    I f the ballot is visible, the

    BEI IT

    capable shall pull out gently

    the ballot;

    ii

    I f the ballot Is not visible, the BE1 shall ca llupon the Technical

    ~u~po; t .~ersonne lho will remove the PC05 from the ballot. box,

    and retrleve the ballot causlng the jam;

    ...

    111 The BE1 chairman, after the

    P OS

    has been cleared of the

    ball ot jam, shall re feed the ballot t o th e PCOS. If the ballot

    is rejected because

    t

    has been already counted, the BE1

    chairman shall direct the Technical Support personnel to

    remove the PCOS from the ballot box, and shall deposit the

    said ballot inside the ballot box without passing through the

    PCOS. However, If the ballo t was rejected for other causes

  • 7/25/2019 com_res_9635.pdf

    19/28

    (e.g, invalid, ambiguous, mlsread), the BE1 shall follow the

    provisions as stated in the Revised General Instructions for

    BEIs for rejected ballots;

    lv.

    I n cases when the ballot jam Is caused

    by

    the improper stacking

    of the'-ballot box, and there is a need to open the ballot box in

    ,order t o make rom for additional ballots, the chairman of the

    BEI, in the presence of watchers, shall open the ballot box, press

    the ballots in order'to make room for additional ballots, and

    thereafter, close the ballot box.

    C There is a prl nte r Jam:

    i

    Under the direct supervision of the BEI, the Technical Support

    personnel shdil ope printer door an d remove the jam by gently

    pulling the paper back toward the paper roll;

    ii

    The.Technica1 Support personnel shall reload the paper, once the

    jam has been removed.

    D

    There is a Power Supply Interruption (Battery):

    i

    he NSC, upon advlse of the PCOS Supervisor or Tecllnical

    Support personnel, must undertake measures to locate ,and

    deliver a replacement battery;

    i i

    For the Battery Replacement, ubder the direct supervision of the

    BEI, the Technical Support personnel shall:

    Disconnect the battery, if available.

    Connect new battery

    Connect the inverter to the external source (if applicable .

    Turn t he PCOS on.

    E.

    The PCOS operation is interrupted during voting, as when

    th

    Display Screen is unresponsive, or there is a Hardware failure or

    damage, and other similar .circumstances: ,

    i

    The Technical 'support personnel'shall call the PCOS Supervisor, who

  • 7/25/2019 com_res_9635.pdf

    20/28

    shall in turn inform the

    NSC

    ii The

    NSC

    shall ask the Technical Support personnel under BE

    supervision to turn-of f and then turn-on the PCOS and follow other

    general troubleshooting instructions;

    iii

    I f the problem persists the NSC shal l arrange for delivery of

    replacement PCDS;

    iv

    I f the NSCO confirms that a replacement contlngency PCOS shall be

    arriving the BE1 shall:

    Turn-off the defective PCOS;

    Remove the PCOS from the ballot box;

    Open the ballot box retrieve the ballots if any count

    ballotls place tpem in an envelope seal and record

    in the Minutes;

    Put the sealed envelope containing the counted

    ballots If any In the ballot box close and lock the

    ballot box;

    Upon authority of the Electlon Offlcer continue

    voting depositing the ballots in the ballot box without

    passing through the PCOS;

    Once the replacement contingency PCOS arrives the

    BE1 Chairman shall open the ballot box retrieve the

    envelope containing the counted ballots i f any;

    Retrieve the uncounted ballots;

    Take out the counted ballots inside the envelope and

    return them inside the ballot box;

    Place the uncounted ballots inside the envelope and

    seal

    It

    Put the sealed envelope contalning the uncounted

    ballots if any in the ballot box;

    Close and lock the ballot box;

    Break the seal of the Poll Worker Memory Card

    compartment of the defective PCOS;

    Remove the Main Memory Card of the defective

    PCOS;

  • 7/25/2019 com_res_9635.pdf

    21/28

    Open the Poll Worker M emory Card Compa rtment of

    th e re plac em ent PCOS;

    Inse r t t he main memory card taken f ro m the

    defe tive

    PCOS

    Close the Pol l Worker compartment of the

    replacement RCOS;

    Open the Adminis t rator Memory Card compartment

    o f t h e defect ive PCOS;

    Remove the back-up memory card of the defect lve

    PCOS;

    Open the Adminis t rator Memory Card compartment

    o f t he replacem ent PCOS;

    Ret r ieve the back-up memory card Ins ta l led in t he

    repiace ment

    PCOS

    I nse r t t he back-up memory card taken f rom the

    defe ctive PCOS to th e rep lacem ent PCOS;

    Close the Admlnis t rator compartment of the

    rep lace me nt PCOS;

    Th e Chai rman o f th e BE1 shall ret r ieve th e envelope

    contain ing the uncounted bal lots f rom the bal lot box;

    Insta l l th e replacement PCOS on th e b al lot box;

    Plug the replacement PCOS to the electr lcal out let

    using the powe r cable;

    Plug the bat tery t o th e replacement PCOS;

    The PCOS shal l then perform the inl t ial izat lon

    process;

    The Chairman shal l feed the uncounted bal lots one

    a t a t ime into th e replacement PCOS;

    F ~ l l o whe General Ins t ruc t ions u p to the end;

    After al l th e procedures have been followed, reinsert

    the or ig inal back-up memory of the replacement

    contingency PCOS;

    The Technical Support personnel shall call the NSC,

    through the PCOS Supervisor, and inform them about

    the replacement.

  • 7/25/2019 com_res_9635.pdf

    22/28

    I f

    the voting is over, and there is still no contingency

    PCOS, as confirmed by the NSCO, the BE1 shall use

    the PCOS of the next or nearby precinct, following

    the procedure as enumerated in the next Item.

    v I f he NSC confirms that there is an available replacement PCOS, but the

    time to wait for the replacement Is more than the time needed to wait to

    be able to use the PCOS of the next or nearest precinct:

    T h e NSC, through the PCOS Supervisor, shall arrange the

    transfer of a

    PCOS

    from

    the

    nexthearby polling precinct to

    be used as the replacement PCOS;

    After the said PCOS from the next/nearby precinct has

    finished all its activities, t shall be retrieved and

    delivered

    by

    the Technical Support personnel to the precinct with the

    defective PCOS;

    The BE1 and the Technical Support personnel shall undertake

    to follow the applicable steps as enumerated in the

    preceding Item, and follow the General Instructions up to

    the end;

    ARer all th e procedures have been followed, reinsert the

    original back-up memory of the replacement PCOS, and

    return It to i ts original polling placefcenter;

    .

    The Technical Support personnel shall call the NSC through

    the PCOS Supervisor, and Inform them about the

    replacement.

    vi I f here is no available replacement, as confirmed by the NSC, or there is

    no available PCOS from the nearest precinct/pol ling center, as confirmed

    by the NSC, and there are still uncounted ballots:

    The BEI, af ter following the preceding steps on continuing

    with the voting with the ballots not passing through the

    PCOS, shall ask for authority from the Election Officer to

    transfer the ballot box containing the ballots to the

  • 7/25/2019 com_res_9635.pdf

    23/28

    MunicipalICity Canvassing Center with the contingency

    PCOS;

    Upon closing of the polls and with the corresponding

    authori ty from the Election Officer the BE1 shall together

    wi th the watchers transport the ballot box containing the

    ballots and thetma1n memory card of its PCOS to the

    Municipal/City Canvassing Center that has the available

    Contlngency PCOS;

    The BE members then shall open the ballot box and feed

    the uncounted ballots one at a time in the Contlngency

    PCOS

    Close the polls and follow the General Instructions up to the

    end.

    F The P OSwas

    unable to

    print

    the

    Elect lon Returns:

    i The Technical Support personnel through the PCOS Supervisor shall

    inform the NSC who shall instruct the Technical Support personnel the

    general t roubleshooting procedures;

    ii

    I f the problem persist the NSC shall undertake to:

    Arrange for the dellvery of replacement PCOS

    if

    available; or

    I f no replacement PCOS Is available direct the Technical Support

    personnel to Inform the BE to take the removable maln memory

    to the Identifled nearest precinct/polling center or to their

    respective Munlclpal/City canvassing center as the case may be;

    iii

    Once the replacement PCOS is avallable the Teclinical Support personnel

    shall perform the following under

    BE

    supervlslon:

    Turn o ff the defective PCOS.

    Remove both CF

    cards

    from the defective PCOS

    Store the defective

    PCOS

    in its origlnal packing.

    Install t he replacement PCOS

    Install both

    F

    cards in to the replacement PCOS.

    Ensure that a roll of paper is installed.

    Connect the replacement PCOS to the battery and external

    21

  • 7/25/2019 com_res_9635.pdf

    24/28

    electricity source.

    Perform P OS startup procedure.

    Follow the General Instructions to the end.

    The Technical Support personnel shall call the NSC

    and

    inform

    them about the replacement.

    iv

    I f the PCOS of a nearby precinct shall be used for the printing of the

    election results the Technical Support personnel shall under the

    supervision of the BEI:

    The NSC through the PCOS Supervisor shall ariange the

    transfer of a PCOS from the nextlnearby polling precinct to be

    used as the replacement PCOS;

    After the said PCOS from the nextlnearby precinct has finished

    all Its activities

    t

    shall be retrieved and delivered by the

    Technical Support personnel to the precinct with the defective

    PCOS;

    The BE1 and the Technical Support personnel shall undertake t o

    follow the applicable steps enumerated as when using a

    replacement PCOS and follow the General Instructions up to

    the end;

    After all the procedures have been followed reinser t the orlglnal

    back-up memory of th e replacement PCOS and return

    t

    to Its

    original polling placelcenter;

    The Technical Support. personnel shall call the NSC through the

    PCOS Supervisor and inform them about the replacement.

    vii I f there is no available replacement P OS from nearest precinct/polling

    center as confirmed by the NSCO:

    The BE1 shall together with the watchers transport the main

    memory card of the defective PCOS to the Municipal/Cih/

    canvassing center that has the available Contingency PCOS;

    Follow the General Instructions to the end using the

    Contingency PCOS.

  • 7/25/2019 com_res_9635.pdf

    25/28

    .

    The Technical Support personnel shall inform the NSC, through

    the PCOS Supervisor, of the use of the Contingency PCOS.

    G

    The

    ain

    Mem ory card, o r iButt on Keys, is/are defective/lost/stolen

    destroyed:

    I .

    The BE1 shall inform the Technical Support personnel and the

    DepEd Supervisor, who shall the inform the Election Officer

    concerned;

    ii The Technical Support personnel shall inform the NSC and await

    further Instructions; ..

    iii

    The BEI af t - eceil ing authority from the Election Officer, shall

    proceed with the voting, depositing the ballots into the ballot box

    without passing through the PCOS;

    iv

    After voting and closing of the polls and there Is still no

    replacement IButton or Main Memory Card, the Election Officer

    shall direct the BE1 to deliver, together wlth the watchers present,

    the ballot box containing the ballots to the Municipal/City

    Treasurer for safekeeping;

    v

    The Electlon Officer shall send out the notlce of the date, time

    and place of reconvening of the BEIs for the purpose of the

    automated counting to all concerned parties.

    I. There is a WA N (Wide Area Network:) access failu re:

    i The' Technical Support personnel, under BE1 supervision, shal l repeat

    the turn-off and turn- on procedure a n d

    t o check. the network link

    indicator;

    ii I f the p;oblem persists, the Technical Support personnel, through the

    PCOS Supervisor, shall inforrr, the NSC, who shall:

    Arrange for the delivery of replacement modem and BGAN

    device, i f available; or

    Dlrect the Technical Support personnel to inform the BE1 to

  • 7/25/2019 com_res_9635.pdf

    26/28

    take the

    movable

    main memory to the identified nearest

    precinct/polllng center, or t o thei r respective. Municipal/City

    canvasslng center, as the case may be;

    iii

    I f the replacement modem and BGAN device is available, the

    Technical Support ~ersonrlel,under the supervision of the BEI,

    shall:

    Connect replacement modem and BGAN device to PCOS.

    Retransmit the information.

    iv

    I f the PCOS of a nearby precinct shall be used for the

    transmission of results, t il e BE1 shail, in the presence of watchers:

    After printing the remaining election returns and other

    reports, turn-off the PCOS;

    Eject the removable maln memory from the PCOS, place

    it

    inside the envelope for such purpose, and write therein NOT

    TRANSMTTTED ;

    Bring the removable maln memory to the Identified nearby

    polling precinct using the

    P OS

    therein to transmlt the

    lnformatlon;

    , Glve.the removable 'main memory to the Technical Support

    personnel;

    Technical Support personnel shall ensure that the PCOS of the

    nearby precinct has finished all activlties involving the PCOS;

    The Technical Support personnel shail remove the main

    memory and back-up memory of the PCOS from the nearby

    preclnct;

    The Technical Support personnel shall plug tile maln memory

    of the defective PCOS in to rthe Poll Worker slot of the PCOS of

    the nearby precinct;

    Transmlt the results uslny the PCOS of the nearby precinct;

    After the results have been successfully transmitted, the BE1

    shall remove the main memory card, place it in the envelope

    and write therein TRANSMITTED ;

    The Technical Support personnel shall return the original main

    memory and back-up memory of the replacement PCOS;

  • 7/25/2019 com_res_9635.pdf

    27/28

    I f l e results still cannot be transmitted, the ~ech ni ca l upport

    personnel shall inform the

    NSCO,

    through the

    PC0 5

    Supervisor, and await further Instructions.

    v.

    I f there is no alternative transmission available in the polling center or

    nearby poll ing c;nter, the

    BE

    shall proceed to their respective

    MBOC/CBOC. I n this case, the

    BE1

    shall:

    Complete the printing o f the

    thirty 30)

    copies of the Election

    Return

    (ER),

    and other reports, and follow the General

    Instructions to the end;

    Once all the activities are completed, the BE1 shall retrieve

    the Main Memory Card of the PCOS, place

    t

    in

    a sealed

    envelope, write therein the words "NOT TRANSMTTTED"

    and, accompanied by the watchers present, deliver the

    same to the RCG (Reception and Custody Group) of the

    BOC of the city/munlcipality concerned, where the

    consoildatlon of the c~ntransmltted esults shall be done.

    I

    Tliere is a Catastrophe: Fire flood earthquake and

    tli PCOS

    Service is interrupted:

    i The BEI, upon advise of the Polling Place Security Personnel, or when

    danger is apparent, shall Instruct all p ol li ng ce nt er personnel to

    evacuate the polling center;

    ii The BE1 shall secure all election

    materials

    and equipment;

    iii The BE1 shall inform the Election Officer and await further instructions;

    iv.

    he

    Election Officer shall instruct the BE1 on further action/s to take.

    3

    There is a sabotage robbery other similar circi~mstances:~

    i

    I f the polling place is safe, t h e BE1 sh a l l direct the polling place

    personnel to stay i n the center and contlnue with the proceedings;

    ii.

    I f t h e p ol l i ng c e n t e r i s n o t ~ a f e ~ t h eE1 shal l orderthestop toal l

    all proceedings and to leave the polling place;

    iii The BE1 shall secure all election materials and equipment;

  • 7/25/2019 com_res_9635.pdf

    28/28

    iv The Technical Support personnel shall check all the network devices, the

    PCOS, and peripherals. I f any of the

    equipment

    Is missing, h6 shall

    call the

    NSC

    and inform them about the missing equipment, if any,

    and the reasons therefor. For the replacement procedure, check the

    corresponding recovery procedure.

    I n all cases, all contingency measures and procedures undertaken y the BOCs

    and the BEIs shall

    be

    supervised and/or authorized, noted in the Mlnutes, and In the

    presence of watchers, i f any.

    The contin gency measures herein set forth shall also e adopted, as far as

    applicable, during the testing and sealing of the PCOS as scheduled before election day.