Upload
kneepack-hush
View
214
Download
0
Embed Size (px)
Citation preview
7/25/2019 com_res_9635.pdf
1/28
REPUBLIC O
TI-IE PHILIPPIN S
COMM ISSION O N ELECTIONS
Int ran iuros , Man i la
. y
CONTINUITY PLAN FOR
T I i E
CONDUCT
OF
TH BRILILANTES, Sixto, Jr S. ~hairnyan
AUTOMATED ELECTION TAGLE, Luceri ito N. comhsikioner
SYSTEM IN CONNECTION YUSOPH
Eliss
R
Comn iks~oner
WITH THE MAY 13
2013
I.IM,
Chr ist ian Robert S.
Col-ni ~sioner
N TION L ND LOCAL
PADACA
Mar ia Gracia Cielo M.
Comqissioner
ELECTIONS
\
I--
t
prOMU1gate,j
:
F e b ~ r i ~ '2 2 ?
f
3535
RESOLUTION NO.
WHEREAS,
Section
9 of
Republic Act No.
9369,
created a new Section
11,
providing for the Functions
of
the ~e cl in ic al valuation Committee (TEC), as follows:
'
5EC 11 Fmctioni- of the 72chnical Fvaluation Committee. - The Conlrnlttee
shall certiw, through an estab/ished nternational cerlification entity to be chosen by the
Cotnnilssion fro111 the
recommendations
of the Advisory Council, not later than three
months before the date of the electoral exercises, categorically stating that the A
including itr hardware and soffware CrJrnponenk, is operating properly, secure/ : and
accurately, in accordance with the provisions of th is Act base@ anlong others, 017 the
following documented reslllts :
6. The developnienf, prov3 ioning , and opwatlonalization o f
a
c o n t h ~ ~ l t ylan
to cover risks t the A 55 t all points In the process such that a failure of
elections, whether at ~ , in g , ounting or consolidation, nray be avoided
WHEREAS, to enable the
TEC
to issue the requi red certification, the Project
Control Group of t he Project Management Office (PMO) for the 2013 Automated
Election System
(AES)
prepared a Continuity Plan for the May 13,
2013
blational
nd
Local Elections;
4 -
7/25/2019 com_res_9635.pdf
2/28
WHEREAS
the Continuity Plan prepared by the PMO contains a list of
contingency measures, and the policles for activation of such, tha t shall be
put:
in place
to ensure the continuous operation of the
AES
and avoid a failure of elections, whether
at voting, counting or consolidation of election results;
NOW
TI-IEREFORE pursuant to the powers vested i n
t
by 'th e Constitution, the
Omnibus Election Code, Republic ct No. 9369, and other electlon laws, the
Commission
RESOLVED
as
t
hereby RESOLVES to approve and adopt the Continuity
f'lan for the May 13, 2013 Automated National and Local Elections, attached herein as
Annex A , subject to the Cornrnission's power and autl ior ity to adopt, in exceptional
cases, additional procedures in the voting, counting, consolidation, transmission,
storage, custody, distiribution and retrieval of accountable forms and paraphernalia Lo
fulfill it s Constitutlonai mandate to ensure free, orderly, honest, peaceful
nd
credible
elections.
Commissioner
Commissioner Commissioner
7/25/2019 com_res_9635.pdf
3/28
CONTIN UITY PLAN
M A Y
13
2093 N A TIO N A L A N D LOC AL ELE TIONS
Discussed elow
re the Contii~gency
Procerlrrres to be arlopteif as
supplement t o the Gerreral .Trlstr~ c ti u r~ sor t he Board o f Election Inspectors
BEI)
on the Voting, Counting, g r ~ d Transntission o f Resulb, and i f the
Canvassing o f Election Reslr1t.s by th Board of Canvassers [BOC), i17
connection wjth the
May
13 201.3 Nations/ and Local Elections
:
Definition of Terms
1.
COMELEC Comrnission on Elecflons;
I
2 . SERVICE PROVIDER The company or entity who will be awarded the contract for
the provision of National F,upport Center services for the election;
.
3.
NSC
he
National Scrpport Center-, where all contingencies nationwide are
reported, addressed sn d resolved, manned by the PMO Technology Group from
COMELEC, the National Support Center Officers, and the National Suppo~TCenter
Technicians and Coorillnators;
4. NSCO Nat ional Support Center Officer, responsible for coordinating wit11 the
various CCS Technicians asslgned to the canvassing boards nationwide, and the
PCOS Supervisors assigned to clustered precincts, and shall address and resolve all
.possible contingencies;
5.
CCS Consolidation Canvassing System, also known as the Rest-Time Election
Information System (REIS), comprising the system and service to be used by the
National Board of. Canvassers (NB,OC), Provir~cialBoard of Canvassers (PBOC),
Distr ict Board of Canvassers (DBOC), City Board of Canvassers (CBOC) and the
Municipal Board of Canvassers (MBOC);
6.
CCST CCS Technician, assigned to every board of canvassers nationwide, and
.
shall coordinate wi th the NSCO to address- possible contingencies
as may
be
reported and authorlzed by the board to which helshe is assign ;
7. PC05
--
Precinct Count Optical Scan;
7/25/2019 com_res_9635.pdf
4/28
1)
Technical Si~pport
to address and monitor
therein. He/She shall also be responsible to
8. PCOS Supervisor Off
shall report to th e
NSC 0
on problems or iss i~es
9. DepEd Supervisor
supervlse a polling ce
of Election Inspectors
Election Officer of thl?
resolved at the precinc:t
cer assigned. to moni tor a number of clustered precincts and
from time to time, and coordinate with PCOS Technicians
:hat need t o be resolved at the precinct level;
offlcer from' the Department o f Educatlon appointed to
iter. He/she shall directly supervise and monitor the Board .
BEIs) and the P OS machines, make regular reports to the
status and possible problems or issues that need to be
levc l;
7/25/2019 com_res_9635.pdf
5/28
Organizational Structure of t he National Support enter
For the purpose of implementing this Contingency Plan the following
Organizational Structure s hereby adopted:
CONTINGENCY PLAN ORGANIZATIONAL CHART
PROJECT MANAGEMENT
PMO PROJECT DIRECTOR-
COMELEC
NATIONAL SUPPORT
CENTER NSC)
NATIONAL COMMAND
CENTER NCC)
I
NATIONAL SUPPORT CENTER
OFFICERS
- NSCO) COMELEC
I
NSC TECHNICIANSISUPPORT
PERSONNEL
DEPED SUPERVISOR
0
1 5
r
PCOS SUPERVISOR
BOARD OF ELECTION
1
INSPECTORS BEI) PCOS TECHNICIAN PCOST)
CONSOLIDATION
CANVASSING
SYSTEM
TECHNICIAN
CCST)
PROVINCIAL ELECTION
SUPERVISOR PES)
OFFICERS EO)
J
PBOCIDBOCI
MBOCICBOC
CITYIMUNICIPAL ELECTION
7/25/2019 com_res_9635.pdf
6/28
Contingency procedures applicable to the National CCS Service
The procedures to ,b e observed i n the event the
following
contingencies arise
during the conduct of the elections on ay 13,
2 1
n the National
S
service
are as
follows:
A
The Data Storage is not available and there is Database
Service Interruption
i
The
IT
Capable member of the
BOC
shall notify the NS of the
System failure;
ii
The
NS
shall notify the
P O
Director of the system failure and
iii
iv
v
vi
vii
viii
IX
ask fo r aslc fo r an authorization;
The Comelec ~ M Ot -ojectDirector shall issue the authorization
and the
P O
Technology Group representative shall supervise
the execution of the recovery procedures;
The Security specialist Technician shall block Firewall access to
the server from the external network:
The Database specialist Techniclan shall shut down the database
service in, the node. He then checks the integrity and
status o f the database back-up i n the standby server;
I f the back-up data files are corrupted or the status is incorrect,
the Database Specialist Techniclan shall check for the
contingency procedures for the back-up center;
I f the back-up data files are correct, t he Database Specialist
Technician shall restore the database wi th the back-up files, and
shall star t the database service in the secondary node, and then
execute the scripts for primary database transition;
The Database Specialist Technician shall check the log system
messages in th e database server and application servers;
The Database ~~ecla i ls technician shall notify the
P O
Technology Group representative and the
NS
that the system
has been recovered;.
x
The NSC shall notify the PMO Project Director and ask for
authorization for firewall activation, and thereafter, declare the
end o f the Recovery process;
7/25/2019 com_res_9635.pdf
7/28
xi
The Security Specialist Technician shall open the firewall access
to the server from the external network.
8
There is
Server
~ a r d w a r e ai lure and Database Service
Interruption
i.
The IT Capable member of the BOC shall notify the NS of the
System failure;
ii.
The
NSC
shall notify the PMO Director of the system failure and
ask for a n authorization;
iii.
The Comelec PMO Project Director shall issue the authorization
and the PMO Technology Group representative-shall supervise
the execution of the recovery procedures;
iv
The Security 6peciali st ~ec hn icl an hall block the firewal l access
to the server from the external network;
v
The Database
Specialist
Technician shall shut down the
database service in the primary node and check the integrity
and status of the database files in the storage;
vi I f the storage files are corrupted or the status is incorrect, the
Database Specialist Technician shall check for the contingency
pro cedures for t he Back-up Center;
vii
I f
the storage data files are correct, th e Database Specialist
Techntciah shall mount the storage device, and star t the
database service in the secondary node, and execute the scripts
for the primary database transition;
viii
The Database Specialist Technician shall check the log system
messages in the database server and application servers;
ix
The Database Specialist Technician shall notify the Technology
Group representative and the NS that the system has been
recovered;
x The NSC shall notify the PMO Project Director and ask for
authorizat ion to activate the firewall, and thereafter, declare the
end of t he recovery process;
xi
The Security Specialist Technician shall open the firewall access
to the server from the external network.
7/25/2019 com_res_9635.pdf
8/28
C
There is Server Hardware Failure and Real-Time Election
Informat ion System
REIS)
Listener Service Interruption:
i
ii.
iii.
iv.
v.
vi.
vii.
viii.
ix.
X.
xi.
The
T
Capable member of the BOC shall notify the NSC of the
System failure;
T ~ ~ N s chall notify the PMO Director o f the system failure and
ask for an authorization;
The Comelec PMO Project Director shall issue the authorization
and the PMO Technology Group representative shall supervise
the exe ci~ tion f th e recovery procedures;
The Security Specialist Technician shall block the firewall access
to the server from the external network;
The Database Specialist Technician shall shut down the Primary
R IS Server
ih
the phmary node;
The Database Specialist Technician shall shut down the Primary
REIS Listener Server in the first node and check the status of
the secondary server;
I f the secondary server failed, the Database Specialist
Technician shall check for the contingency procedures for the
Back-Up Center;
I f the secondary server is working properly, the Database
Specialist Technician shall check the application status in the
secondary node, and execute the scripts for primary REIS
listener transition and check the log system messages in the
R IS listener server;
Th e Database Specialist Technician shall notif y th e Technology
Group Head and the NSC tha t the system has been recovered;
The NSC shall notify the PMO Project Director and ask for
authorization to activate the firewall, and thereafter, declare the
end o f the recovery process;
The Security Specialist Technician shall open the flrewall access
to the server from the external network;
There is Server Hardware Failure and REIS Service
Interruption:
7/25/2019 com_res_9635.pdf
9/28
i
11
iii
Iv.
v.
vi.
vii.
viii.
ix.
X.
xi.
i
ii
The
T
Capable member of the BOC shall notify the NSC of the
System failure;
The NSC shall notl fy the
PMO
Director of the system failure and
ask for an authorization;
The Comelec PMO Project Director shall issue the authorization
and the PMO Tecnnology Group representative shall supervise
the execution of the recovery procedures;
The Security Specialist Technician shall block the flrewali access
to the server from the external networl
7/25/2019 com_res_9635.pdf
10/28
iii
The Comelec PMO Project Director shall issue the authorization
and the PMO Technology Group representative shall supervise
the execution o f t he recovery procedures;
iv
The Electricity Technician shall power on th generator set and
check the status o f the generator set;
v. The Electric ity Teahnician shall change the power connection
for the external source to the generator set and check the
status of the UPS System;
vi.
The Electricity Technician shall continually check the status of
the external electricity source and when it Is up/on for at least
thirty (30) minutes, and the UPS system is charged; he must
change back the power connectlon to the external source;
vii.
The Technology Group representative shall noti fy the NS of the
l
end of the Recovery process.
F
There
is
Power
Supply
Interr i~pt ion Blaclcout) and the
Central Server Servlce is Interrupted:
i
The Electricity Technlclans shall notify the
NS
of the Power
Supply failure, and ask for authorlzatlon;
ii
The
NSC
shall notify the PMO Director of the Power Supply
failure and ask for an authorization;
111
The Comelec PMO Project Director shall issue the authorization
and the PMO Technology Group representatlve shall supervise
the execution of the recovery procedures;
iv.
The Central Server Center Technicians shall check the status of
REIS listener queues and latest transactions;
v.
The Back-Up Center Techniclan shall check the status of the
servers:
Check Status of the Database, based on the latest
transaction from the Regional Center.
Check application servers status (Applications and
System logs).
Check network connection status: network reachability
wi th the routers and firewall in the Region.
7/25/2019 com_res_9635.pdf
11/28
vi I f the status of the systems is correct, then the Back-Up Center
Technician shall:
Change the database mode from stand-by to Primary
and check databa se services
Start-up REIS and REIS listener services, and check
application Iqg messages.
Ask for authorization from the COMELEC Technology
Manager.
vfi
The Technology Group representative shall authorize and
supervise the activatlon of the back-up Center Firewall;
viii
The Back-Up Center Technician shall open the Back-Up Center
Firewall, allowing the incoming transmissions and check for
incoming trarkmisslbns in the REIS listener logs;
ix
The Technology Group representative shall finalize the recovery
procedures.
G
There is Networlc Access Fa il i~re nd National Service is
interrupted
i
The Technical Support shall notify the NSC p f the network
failure;
ii
The
NS
shall notify the PMO Director of the network failure
and
ask for an authorization;
iii
The Comelec PMO Project Director shall issue the authorization
and the PMO Technology Group representative shall supervise
the execution of the recovery procedures;
iv
The Network Specialist shall check the connections with the
back-up provider, the network access wi th all the locations and
check the interfaces status;
v
The Network Specialist. shall disable the cory-tection with the
Primary Network provider, and activate the back-up network
provider;
vi
The Network Specialist shall check for incoming connection
from the different locations, then call the primary network
provider support center, and together, check the status of the
Network;
.
7/25/2019 com_res_9635.pdf
12/28
vii When the primary network provider is ready the Network
Specialist shall ask for authorization;
vlli
The Technology Group representative shall give the
authorization for t he change;
ix. The Network Specialist shall disable the connection with the
back-up network provider and activate the primary network
provider;
x The Technology Group representative shall finalize the recovery
procedures.
H
Critical Weather/High Temperature Conditions and there
is
National Se wi ce Interruption:
i The Electricity Technicians shall notify the NSC of the air-
conditioning failure;
ii.
The NSC shall notify the PMO Director of the air-conditioning
failure and ask for an authorization;
i i i
The Comelec PMO Project Director shall Issue the authorlzatlon
and the PMO Technology Group representative shall supervise
the execution of the recovery procedures;
iv
The Technical Support shall shut down all servers In the Data
center except for the ES sewers;
v.
The Electricity Technlclan shall start the FAN systems In the
Data center and watch the temperature level;
vi. Once the air-condit lonlng system has been recovered the
recovery process ends.
I. Fire Flooding and Earthquake Occur and the re s Central
Serv ice Interruption:
i.
The Technical Support must leave the building and if possible
move t o the back-up Center;
ii.
The NSC shall notify the PMO Project Director for an
authorization to use the recovery plan;
7/25/2019 com_res_9635.pdf
13/28
iii
After authorization is given by the PMO Project Director, the
Technical Support must check the status of the REIS listener
queues and latest transactions;
iv
The
Back
up center technician must check the status of the
servers:
. Check status ,of the database, based on the latest
transaction from the central center.
Check application servers status (applications and system
logs).
Check network connection status: network reachability with
the routers and flrewall In the Region.
v
I f he status of the system Is correct, then the Back Up Center.
Technician must change the database mode from stand-by to
primary and check databases services. He must start-up the
R IS and R IS listener services, and check application log
messages;
vi The Back-Up Center Techniclan must ask for authorizatlon from
the PMO Project Director through the
NSC
to actlvate the back-
up center Firewail;
vii
After authorization is given, the technician must open the back-
up center firewail, allowing incoming transmisslons, and check
for Incoming transmlssions in the REIS Listener logs;
vili
The Technology Group representative shall finalize the Recovery
Procedures
7/25/2019 com_res_9635.pdf
14/28
Contingency
Procedures
pplicable to the
Board
of
Canvassers
.
The procedures to be observed in the event the following contingencies arise
during the conduct of the elections a t the PBOC/DBOC/CBOC/MBOC on May 13,
2010,
are as follows:
A. T he re is Hard Disk Failure and there is
DATABASE/REIS/REIS Listener Service Int erru pti on, t li e
System wi ll freeze, and. no furth er operation can be performed
on t he System, or CCS Graphical Inte rf ac e is no t responding,
or d oes no t start, or shows a blank screen indicating-an error
boot, or does no t turn-on:
. .
I
i The PBOC/DBOC/CBOC/MBOC shall Inform the T Capable
member o f the board of the failure;
ii
The ITCapabl e member of the board shall report the failure to
the NSC indicating the name of the server and the location;
iii
The NSC shall upon authority of the PBOC/DBOC/CBOC/MBOC
ask the l Capable member of the board to repeat the turn-off
and turn-on procedure;
iv. f the problem persists the NSC shall arrange for the delivery of
the replacement CCS to the affected PBOC/DBOC/CBOC/MBOC;
v.
The TCapable member of the board shall:
Tu rn of f the defective CCS.
Remove the removable memory from the defective CCS.
Store the defective CCS in its original packing.
Place the replacement CCS
in
the designated location.
When the replacement CCS arrives the CCST must install
the removable memory in to the replacement CCS
Connect the replacement CCS to the power main and turn i t
on.
Call the NSC and update them on the status o f the CCS.
6 There Is Power Supply Interr uptio n (Brownout/Blackout)
and Provincial District City Municipal
Canvass Service is
interrupted:
7/25/2019 com_res_9635.pdf
15/28
1 The PBOC/DBOC/CBOC/MBOC together with the T capable
member, shall check the status of the generator set, its gasoline
level and cable connections;
ii
The PBOC/DBOC/CBOC/MBOC shall start t he generator set, and
check the activity indlcator in the generator set;
iii
The PBOC/DBOC/CBOC/MBOC shall authorize the T capable
member to unplug the CGS power cables from the external
electric source, and to plug the cable n the
ene er tor
set
outlet; ..
iv
The Tcapable member shall call the NSC informing them of the
status o f the systems;
v
The NSC shall record the new status for the location;
vi. The lT capade m edber shall continually check the status of the
external electricity source;
vii.
Upon the return o f external electricity source lasting more than
one hour, the
T
capable member must request authorization
from the PBOC/DBOC/CBOC/MBOC to switch over to the
external electricity source;
viii.
The PBOC/DBOC/CBOC/MBOC shall authorize the switch back to
external electricity source;
ix.
The
T
capable member shall unplug the CCS UPS power cable
from the generator set and connect
t
to the external power
source;
x.
PBOC/DBOC/CBOC/MBOC shall authorize the switch back to the
external electricity source;
xi.
The T capable member shall unplug the CCS UPS power cable
from the generator set and connect
t
to the external power
source;
xii.
The T capable member shall call the NSCO indicating the new
status of the location;
xiii. NSC shall record the new status, and thereafter, end the
recovery plan for the center.
C.
There is Wide Area Network WAN) Access Failitre and the
Provincial/District/City/Municipal
Canvass Service is
Interrupted
7/25/2019 com_res_9635.pdf
16/28
i
ii
...
111
IV.
V.
vl.
vii.
viii.
The PBOC/DBOC/CBOC/MBOC shall in form the T capable
member
of
the inability of the CCS to send/receive;
The PBOC/DBOC/CBOC/MBOC shall authorize the l capable
member to:
Check the ;tatus of the network device;
Unplug and plug back the network device, and test the
connection;
I f the CCS still cannot connect, the IT capable member
must use the alternative network devices s) if available
and re-test the connection;
The I T capable member shall call the NSCO indicating the
statug of the1 system i f the CCS still cannot connect.
The NSC shall record the new status for the location and checlc
th e networlc status with t he network providers;
The NSC shall call the network technlcians in order to supply
back-up network devices if necessary;
The PBOC/DBOC/CBOC/MBOC shall authorlze the Network
Technician to plug the back-up network device Into the CCS,
and test t he connection;
fhe CCS is able to connect to the network, then no further
action is needed. I f not, the Network Technician, w ith
authorizat ion from t he PBOC/DBOC/CBOC/MBOC, must check
the network device and network availability with the provider;
Once the connection Is ready, the Networlc Technician must call
the NS indicating the status o f th e system;
f
the Connection still cannot be established, the Networlc
Technician must inform the PBOC/DBOC/CBOC/MBOC;
ix
The PBOC/DBOC/CBOC/MBOC must inform the Commission and
request for further Instructions;
x.
The NSC f informed by the lT capable member of the networic
connection recovery, records the new status for t he location.
D. There
i s
a Catastrophe: Fire Flood earthquake anti
others and the
Provinciai/Dictrict/City/Municipal
Canvass Service is interrupted:
7/25/2019 com_res_9635.pdf
17/28
i The Canvassing Center security must instruct all personnel to
evacuate the provincial/municipaI center;
ii
The PBOC/DBOC/CBOC/MBOC shall secure all election materials
and equipment;
iii The PBOC/DBOC/CBOC/MBOC shall check with the Regional
Election Director/ Provincial Election Supervisor for fur ther
instructions;
iv.
The T capable member shall check all the networlc devices and
servers.
I f
any of the equipment is missing he shall call the
NSC and inform about the missing equipment. For the
replacement procedure he shall check the corresponding
recovery procedure.
v The Regions1 Election Director/ Provincial Election Supervisor
shall issue order on what action to
be
un de r taken for the
Provlncial/District/City/Municipal Canvassing Center
E
T h e r e
is
Sabotage equipment recovery and other s imi lar
circumstances an d t l ie
Provincial District City Municipal
Canvass
Service is interr i rpted
i I f the Ca nv as si ng Center is safe t h e
PBOC/DBOC/CBOC/MBOC Security Personnel shall direct
the
M D i s t r i c t C i t y M u n i c i p a l
p smd to
s w
in the Center and
continue with the proceedings;
ii I f the Center is no t safe t h e PBOC/DBOC/CBOC/MBOC
S ecur i t y P e rsonne l sha l l g
i
v e o r d.e r t o leave the
provinclal district city mun icipal
center and to stop all
proceedings.
The
PBOC/DBOC/CBOC/MBOC Security Personnel
shall secure ail election materials and equipment in the
custody of the PBOC/DBOC/CBOC/MBOC;
iii
The IT capable member shall check a l l the network devices
and servers.
I f any of the equipment is missing the CCST shall
call the NSC and Inform them about the missing equipment.
For the replacement procedure he shall check the
corresponding recovery procedure.
7/25/2019 com_res_9635.pdf
18/28
Contingency procedures applicable
to
th
PCOS
System
The procedures to be observed in the event the following contingencies arise
during the conduct of the elections on May 13, 2010 in the precinct level involving the
PCOS System, are as follows:
A
The BE1 P I N s is unavailable:
i
The BE1 Shall inform the Technical Support personnel;
ii The Technlcal Support personnel shall inform the PCOS
Supervisor
iii
The PCOS Supervisor shall inform the NSC;
iv
The NSC shajl advise the PCOS Supervisor to provide the PINS o
the BEIs;
v
The Technlcal Support personnel shall provide the PINs to the
BEI;
vi
The PCOS Is now ready to resume the votlng process;
vii
The Technlcal Support personnel shall call the PCOS Supervisor,
who in turn shall call the NSC and Inform them about the
avallabiiity of the PINs.
6
Tiiere is a Ballot Jam
i
I f the ballot is visible, the
BEI IT
capable shall pull out gently
the ballot;
ii
I f the ballot Is not visible, the BE1 shall ca llupon the Technical
~u~po; t .~ersonne lho will remove the PC05 from the ballot. box,
and retrleve the ballot causlng the jam;
...
111 The BE1 chairman, after the
P OS
has been cleared of the
ball ot jam, shall re feed the ballot t o th e PCOS. If the ballot
is rejected because
t
has been already counted, the BE1
chairman shall direct the Technical Support personnel to
remove the PCOS from the ballot box, and shall deposit the
said ballot inside the ballot box without passing through the
PCOS. However, If the ballo t was rejected for other causes
7/25/2019 com_res_9635.pdf
19/28
(e.g, invalid, ambiguous, mlsread), the BE1 shall follow the
provisions as stated in the Revised General Instructions for
BEIs for rejected ballots;
lv.
I n cases when the ballot jam Is caused
by
the improper stacking
of the'-ballot box, and there is a need to open the ballot box in
,order t o make rom for additional ballots, the chairman of the
BEI, in the presence of watchers, shall open the ballot box, press
the ballots in order'to make room for additional ballots, and
thereafter, close the ballot box.
C There is a prl nte r Jam:
i
Under the direct supervision of the BEI, the Technical Support
personnel shdil ope printer door an d remove the jam by gently
pulling the paper back toward the paper roll;
ii
The.Technica1 Support personnel shall reload the paper, once the
jam has been removed.
D
There is a Power Supply Interruption (Battery):
i
he NSC, upon advlse of the PCOS Supervisor or Tecllnical
Support personnel, must undertake measures to locate ,and
deliver a replacement battery;
i i
For the Battery Replacement, ubder the direct supervision of the
BEI, the Technical Support personnel shall:
Disconnect the battery, if available.
Connect new battery
Connect the inverter to the external source (if applicable .
Turn t he PCOS on.
E.
The PCOS operation is interrupted during voting, as when
th
Display Screen is unresponsive, or there is a Hardware failure or
damage, and other similar .circumstances: ,
i
The Technical 'support personnel'shall call the PCOS Supervisor, who
7/25/2019 com_res_9635.pdf
20/28
shall in turn inform the
NSC
ii The
NSC
shall ask the Technical Support personnel under BE
supervision to turn-of f and then turn-on the PCOS and follow other
general troubleshooting instructions;
iii
I f the problem persists the NSC shal l arrange for delivery of
replacement PCDS;
iv
I f the NSCO confirms that a replacement contlngency PCOS shall be
arriving the BE1 shall:
Turn-off the defective PCOS;
Remove the PCOS from the ballot box;
Open the ballot box retrieve the ballots if any count
ballotls place tpem in an envelope seal and record
in the Minutes;
Put the sealed envelope containing the counted
ballots If any In the ballot box close and lock the
ballot box;
Upon authority of the Electlon Offlcer continue
voting depositing the ballots in the ballot box without
passing through the PCOS;
Once the replacement contingency PCOS arrives the
BE1 Chairman shall open the ballot box retrieve the
envelope containing the counted ballots i f any;
Retrieve the uncounted ballots;
Take out the counted ballots inside the envelope and
return them inside the ballot box;
Place the uncounted ballots inside the envelope and
seal
It
Put the sealed envelope contalning the uncounted
ballots if any in the ballot box;
Close and lock the ballot box;
Break the seal of the Poll Worker Memory Card
compartment of the defective PCOS;
Remove the Main Memory Card of the defective
PCOS;
7/25/2019 com_res_9635.pdf
21/28
Open the Poll Worker M emory Card Compa rtment of
th e re plac em ent PCOS;
Inse r t t he main memory card taken f ro m the
defe tive
PCOS
Close the Pol l Worker compartment of the
replacement RCOS;
Open the Adminis t rator Memory Card compartment
o f t h e defect ive PCOS;
Remove the back-up memory card of the defect lve
PCOS;
Open the Adminis t rator Memory Card compartment
o f t he replacem ent PCOS;
Ret r ieve the back-up memory card Ins ta l led in t he
repiace ment
PCOS
I nse r t t he back-up memory card taken f rom the
defe ctive PCOS to th e rep lacem ent PCOS;
Close the Admlnis t rator compartment of the
rep lace me nt PCOS;
Th e Chai rman o f th e BE1 shall ret r ieve th e envelope
contain ing the uncounted bal lots f rom the bal lot box;
Insta l l th e replacement PCOS on th e b al lot box;
Plug the replacement PCOS to the electr lcal out let
using the powe r cable;
Plug the bat tery t o th e replacement PCOS;
The PCOS shal l then perform the inl t ial izat lon
process;
The Chairman shal l feed the uncounted bal lots one
a t a t ime into th e replacement PCOS;
F ~ l l o whe General Ins t ruc t ions u p to the end;
After al l th e procedures have been followed, reinsert
the or ig inal back-up memory of the replacement
contingency PCOS;
The Technical Support personnel shall call the NSC,
through the PCOS Supervisor, and inform them about
the replacement.
7/25/2019 com_res_9635.pdf
22/28
I f
the voting is over, and there is still no contingency
PCOS, as confirmed by the NSCO, the BE1 shall use
the PCOS of the next or nearby precinct, following
the procedure as enumerated in the next Item.
v I f he NSC confirms that there is an available replacement PCOS, but the
time to wait for the replacement Is more than the time needed to wait to
be able to use the PCOS of the next or nearest precinct:
T h e NSC, through the PCOS Supervisor, shall arrange the
transfer of a
PCOS
from
the
nexthearby polling precinct to
be used as the replacement PCOS;
After the said PCOS from the next/nearby precinct has
finished all its activities, t shall be retrieved and
delivered
by
the Technical Support personnel to the precinct with the
defective PCOS;
The BE1 and the Technical Support personnel shall undertake
to follow the applicable steps as enumerated in the
preceding Item, and follow the General Instructions up to
the end;
ARer all th e procedures have been followed, reinsert the
original back-up memory of the replacement PCOS, and
return It to i ts original polling placefcenter;
.
The Technical Support personnel shall call the NSC through
the PCOS Supervisor, and Inform them about the
replacement.
vi I f here is no available replacement, as confirmed by the NSC, or there is
no available PCOS from the nearest precinct/pol ling center, as confirmed
by the NSC, and there are still uncounted ballots:
The BEI, af ter following the preceding steps on continuing
with the voting with the ballots not passing through the
PCOS, shall ask for authority from the Election Officer to
transfer the ballot box containing the ballots to the
7/25/2019 com_res_9635.pdf
23/28
MunicipalICity Canvassing Center with the contingency
PCOS;
Upon closing of the polls and with the corresponding
authori ty from the Election Officer the BE1 shall together
wi th the watchers transport the ballot box containing the
ballots and thetma1n memory card of its PCOS to the
Municipal/City Canvassing Center that has the available
Contlngency PCOS;
The BE members then shall open the ballot box and feed
the uncounted ballots one at a time in the Contlngency
PCOS
Close the polls and follow the General Instructions up to the
end.
F The P OSwas
unable to
the
Elect lon Returns:
i The Technical Support personnel through the PCOS Supervisor shall
inform the NSC who shall instruct the Technical Support personnel the
general t roubleshooting procedures;
ii
I f the problem persist the NSC shall undertake to:
Arrange for the dellvery of replacement PCOS
if
available; or
I f no replacement PCOS Is available direct the Technical Support
personnel to Inform the BE to take the removable maln memory
to the Identifled nearest precinct/polling center or to their
respective Munlclpal/City canvassing center as the case may be;
iii
Once the replacement PCOS is avallable the Teclinical Support personnel
shall perform the following under
BE
supervlslon:
Turn o ff the defective PCOS.
Remove both CF
cards
from the defective PCOS
Store the defective
PCOS
in its origlnal packing.
Install t he replacement PCOS
Install both
F
cards in to the replacement PCOS.
Ensure that a roll of paper is installed.
Connect the replacement PCOS to the battery and external
21
7/25/2019 com_res_9635.pdf
24/28
electricity source.
Perform P OS startup procedure.
Follow the General Instructions to the end.
The Technical Support personnel shall call the NSC
and
inform
them about the replacement.
iv
I f the PCOS of a nearby precinct shall be used for the printing of the
election results the Technical Support personnel shall under the
supervision of the BEI:
The NSC through the PCOS Supervisor shall ariange the
transfer of a PCOS from the nextlnearby polling precinct to be
used as the replacement PCOS;
After the said PCOS from the nextlnearby precinct has finished
all Its activities
t
shall be retrieved and delivered by the
Technical Support personnel to the precinct with the defective
PCOS;
The BE1 and the Technical Support personnel shall undertake t o
follow the applicable steps enumerated as when using a
replacement PCOS and follow the General Instructions up to
the end;
After all the procedures have been followed reinser t the orlglnal
back-up memory of th e replacement PCOS and return
t
to Its
original polling placelcenter;
The Technical Support. personnel shall call the NSC through the
PCOS Supervisor and inform them about the replacement.
vii I f there is no available replacement P OS from nearest precinct/polling
center as confirmed by the NSCO:
The BE1 shall together with the watchers transport the main
memory card of the defective PCOS to the Municipal/Cih/
canvassing center that has the available Contingency PCOS;
Follow the General Instructions to the end using the
Contingency PCOS.
7/25/2019 com_res_9635.pdf
25/28
.
The Technical Support personnel shall inform the NSC, through
the PCOS Supervisor, of the use of the Contingency PCOS.
G
The
ain
Mem ory card, o r iButt on Keys, is/are defective/lost/stolen
destroyed:
I .
The BE1 shall inform the Technical Support personnel and the
DepEd Supervisor, who shall the inform the Election Officer
concerned;
ii The Technical Support personnel shall inform the NSC and await
further Instructions; ..
iii
The BEI af t - eceil ing authority from the Election Officer, shall
proceed with the voting, depositing the ballots into the ballot box
without passing through the PCOS;
iv
After voting and closing of the polls and there Is still no
replacement IButton or Main Memory Card, the Election Officer
shall direct the BE1 to deliver, together wlth the watchers present,
the ballot box containing the ballots to the Municipal/City
Treasurer for safekeeping;
v
The Electlon Officer shall send out the notlce of the date, time
and place of reconvening of the BEIs for the purpose of the
automated counting to all concerned parties.
I. There is a WA N (Wide Area Network:) access failu re:
i The' Technical Support personnel, under BE1 supervision, shal l repeat
the turn-off and turn- on procedure a n d
t o check. the network link
indicator;
ii I f the p;oblem persists, the Technical Support personnel, through the
PCOS Supervisor, shall inforrr, the NSC, who shall:
Arrange for the delivery of replacement modem and BGAN
device, i f available; or
Dlrect the Technical Support personnel to inform the BE1 to
7/25/2019 com_res_9635.pdf
26/28
take the
movable
main memory to the identified nearest
precinct/polllng center, or t o thei r respective. Municipal/City
canvasslng center, as the case may be;
iii
I f the replacement modem and BGAN device is available, the
Technical Support ~ersonrlel,under the supervision of the BEI,
shall:
Connect replacement modem and BGAN device to PCOS.
Retransmit the information.
iv
I f the PCOS of a nearby precinct shall be used for the
transmission of results, t il e BE1 shail, in the presence of watchers:
After printing the remaining election returns and other
reports, turn-off the PCOS;
Eject the removable maln memory from the PCOS, place
it
inside the envelope for such purpose, and write therein NOT
TRANSMTTTED ;
Bring the removable maln memory to the Identified nearby
polling precinct using the
P OS
therein to transmlt the
lnformatlon;
, Glve.the removable 'main memory to the Technical Support
personnel;
Technical Support personnel shall ensure that the PCOS of the
nearby precinct has finished all activlties involving the PCOS;
The Technical Support personnel shail remove the main
memory and back-up memory of the PCOS from the nearby
preclnct;
The Technical Support personnel shall plug tile maln memory
of the defective PCOS in to rthe Poll Worker slot of the PCOS of
the nearby precinct;
Transmlt the results uslny the PCOS of the nearby precinct;
After the results have been successfully transmitted, the BE1
shall remove the main memory card, place it in the envelope
and write therein TRANSMITTED ;
The Technical Support personnel shall return the original main
memory and back-up memory of the replacement PCOS;
7/25/2019 com_res_9635.pdf
27/28
I f l e results still cannot be transmitted, the ~ech ni ca l upport
personnel shall inform the
NSCO,
through the
PC0 5
Supervisor, and await further Instructions.
v.
I f there is no alternative transmission available in the polling center or
nearby poll ing c;nter, the
BE
shall proceed to their respective
MBOC/CBOC. I n this case, the
BE1
shall:
Complete the printing o f the
thirty 30)
copies of the Election
Return
(ER),
and other reports, and follow the General
Instructions to the end;
Once all the activities are completed, the BE1 shall retrieve
the Main Memory Card of the PCOS, place
t
in
a sealed
envelope, write therein the words "NOT TRANSMTTTED"
and, accompanied by the watchers present, deliver the
same to the RCG (Reception and Custody Group) of the
BOC of the city/munlcipality concerned, where the
consoildatlon of the c~ntransmltted esults shall be done.
I
Tliere is a Catastrophe: Fire flood earthquake and
tli PCOS
Service is interrupted:
i The BEI, upon advise of the Polling Place Security Personnel, or when
danger is apparent, shall Instruct all p ol li ng ce nt er personnel to
evacuate the polling center;
ii The BE1 shall secure all election
materials
and equipment;
iii The BE1 shall inform the Election Officer and await further instructions;
iv.
he
Election Officer shall instruct the BE1 on further action/s to take.
3
There is a sabotage robbery other similar circi~mstances:~
i
I f the polling place is safe, t h e BE1 sh a l l direct the polling place
personnel to stay i n the center and contlnue with the proceedings;
ii.
I f t h e p ol l i ng c e n t e r i s n o t ~ a f e ~ t h eE1 shal l orderthestop toal l
all proceedings and to leave the polling place;
iii The BE1 shall secure all election materials and equipment;
7/25/2019 com_res_9635.pdf
28/28
iv The Technical Support personnel shall check all the network devices, the
PCOS, and peripherals. I f any of the
equipment
Is missing, h6 shall
call the
NSC
and inform them about the missing equipment, if any,
and the reasons therefor. For the replacement procedure, check the
corresponding recovery procedure.
I n all cases, all contingency measures and procedures undertaken y the BOCs
and the BEIs shall
be
supervised and/or authorized, noted in the Mlnutes, and In the
presence of watchers, i f any.
The contin gency measures herein set forth shall also e adopted, as far as