Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore 26 March 2017 1.0 INTRODUCTION CONCEPTUAL PLAN M/s. Kovai Medical Center and Hospital Limited (KMCH) is a most trusted Multispecialty Hospital in the Southern Indian City of Coimbatore. The relentless service of KMCH in the past 26 years, taken health care to the most modern levels in the region catering to urban and rural population. The hospital is renowned for its state of art medical facilities like Organ transplantation, Oncology care services, Critical Care & Trauma services etc., KMCH will take at most care for improvement of health and well being of the community by providing world class patient care, education and training. 1.1 Background of the project KMCH is located in Kalapatti Village, Coimbatore North Taluk, Coimbatore District. KMCH has already obtained environmental clearance for its existing hospital with total built up area of 48,309.7 Sq.m in a total plot area of 72,843.0 Sq. m and is in operation with 500 beds. The Environmental Clearance issued by SEIAA, Tamilandu vide its Letter No. SEIAA-TN/EC/8(a)/080/F-205/2010 dated 30.03.2010 is enclosed as Annexure - I. 1.2 Summary of Existing Facilities The existing hospital is situated in Kalapatti Village, Coimbatore North Taluk, Coimbatore District. The built up area of the existing project is 48,309.7 Sq.m. The existing hospital is in operation with Hospital block, Canteen, Guest house, etc. The existing hospital is under operation with 500 beds. The KMCH have already obtained the consent form TNPCB, Coimbatore. Copy of the same is enclosed as Annexure – XX. The total water requirement for different purposes is 440 KLD & is sourced from TWAD Board. The total sewage generation of 390 KLD is being treated in a STP of 500 KLD and the treated sewage reused for green belt development, toilet flushing, cooling tower make-up and road washing. The solid waste generation of 1590 kg/day is being treated in the existing campus. About 216 kg/day of bio medical waste is being disposed to the M/s. Tekno Therm Industries, Orattukuppai, Coimbatore.

CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

  • Upload
    lycong

  • View
    274

  • Download
    7

Embed Size (px)

Citation preview

Page 1: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

26 March 2017

1.0 INTRODUCTION

CONCEPTUAL PLAN

M/s. Kovai Medical Center and Hospital Limited (KMCH) is a most trusted

Multispecialty Hospital in the Southern Indian City of Coimbatore. The relentless service

of KMCH in the past 26 years, taken health care to the most modern levels in the region

catering to urban and rural population. The hospital is renowned for its state of art

medical facilities like Organ transplantation, Oncology care services, Critical Care &

Trauma services etc., KMCH will take at most care for improvement of health and well

being of the community by providing world class patient care, education and training.

1.1 Background of the project

KMCH is located in Kalapatti Village, Coimbatore North Taluk, Coimbatore District.

KMCH has already obtained environmental clearance for its existing hospital with total

built up area of 48,309.7 Sq.m in a total plot area of 72,843.0 Sq. m and is in operation

with 500 beds. The Environmental Clearance issued by SEIAA, Tamilandu vide its Letter

No. SEIAA-TN/EC/8(a)/080/F-205/2010 dated 30.03.2010 is enclosed as Annexure - I.

1.2 Summary of Existing Facilities

The existing hospital is situated in Kalapatti Village, Coimbatore North Taluk,

Coimbatore District. The built up area of the existing project is 48,309.7 Sq.m. The

existing hospital is in operation with Hospital block, Canteen, Guest house, etc.

The existing hospital is under operation with 500 beds. The KMCH have already

obtained the consent form TNPCB, Coimbatore. Copy of the same is enclosed as

Annexure – XX.

The total water requirement for different purposes is 440 KLD & is sourced from

TWAD Board. The total sewage generation of 390 KLD is being treated in a STP of

500 KLD and the treated sewage reused for green belt development, toilet flushing,

cooling tower make-up and road washing.

The solid waste generation of 1590 kg/day is being treated in the existing campus.

About 216 kg/day of bio medical waste is being disposed to the M/s. Tekno Therm

Industries, Orattukuppai, Coimbatore.

Page 2: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

27 March 2017

The existing project site is provided with storm water drain all along the boundary

of the site. The roof water from the terrace is collected through down comers

routed to rain water collection tank.

1.3 Project Proposal KMCH propose to expand its hospital activities by constructing additional buildings. The

hospital will be expanded in the additional land of 8,538.5 sq.m along with the existing

land of 72,843.0 sq. m. The total built up area will also be increase from 48,309.7 Sq. m.

to 1,22,886 Sq.m. As the proposed activity constitutes expansion of hospital building

with total built up area more than 20,000 Sq.m., it requires Environmental Clearance

from State Environment Impact Assessment Authority (SEIAA) under sector 8(a) of EIA

Notification 2006 as Category B2.

KMCH has appointed M/s. ABC Techno Labs India Private Limited, Chennai, who is

accredited by National Accreditation Board for Education and Training (NABET),

Quality Council of India (QCI), New Delhi to formulate Environmental Management Plan

during Construction & Operational Phases to mitigate any adverse impacts of the

project on Environment.

The Conceptual Plan describes all the details of the project and its specific activities that

will be considered for investigation of the significant adverse impacts. The report also

provides specific measures that will be put to practice to minimize the impacts on the

Environment.

2.0 DESCRIPTION OF THE PROJECT SITE 2.1 Location The proposed expansion project site is located at S.F. No. 751/1, 3A, 752/2B, 4,

768/2A3, 2B2, 769/4, 5, 6, 8, 9, 10, 11, 770/1 to 11, 12pt, 13, 16, 17, 18 & 771/6,

Kalapatti village, Coimbatore North taluk, Coimbatore district which is located in

Latitude 11002’33.06” N and Longitude 77002’24.85” E. The location of the project site is

shown in Figure - 2.1 and the satellite Image showing the project site is given in Figure

- 2.2.

Page 3: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

28 March 2017

2.2 Environmental Sensitivity of the project site

The proposed expansion project involves construction of additional hospital buildings,

medical college and nursing college buildings. The site is already categorized as Public &

Semi Public use Zone and partially residential use by Coimbatore Local Planning

Authority. The LPA, Coimbatore master plan showing the land use classification of the

project site is enclosed as Annexure - II. The existing land use does not alter as the

proposed project is the expansion of the existing buildings.

Topo map covering 500 m radius from periphery of the project site is enclosed as

Annexure - VI. It indicates that the facilities adjacent to the proposed project site are

mostly public use area, commercial and residential zone. Hence proposed development

/ land use is consistent with the surroundings. Topo map of the project site covering 10

km radius is given in Figure 2.3. The environmental setting of the project site is given in

Table - 2.1.

TABLE - 2.1 ENVIRONMENTAL SETTING OF THE PROJECT SITE

S. No. Particulars Details 1 Latitude 110

2 02’33.06” N

Longitude 770

3 02’24.85” E

Elevation above MSL 405 m 4 Topography Plain 5 Land use classification Public & Semi Public use/ Residential 6 Nearest Roadway Coimbatore – Neelambur Road – Adjacent, S 7 Nearest Railway Station Coimbatore Junction – 10.5 km, SW 8 Nearest airport Coimbatore Airport – 1.5 km, S 9 Nearest town/ city Coimbatore – 10 km, SW

10 Hills/ valleys None within 15 Km radius 11 National parks/ Wildlife

Sanctuaries/Zoos None within 15 Km radius

12 Nearest Water body Noyyal river - 4.5 km, SE Singanallur tank - 5.0 km, SW Muthukoundar puthur lake - 5.4 km, E Sulur lake - 7.5 km, ESE Valam kulam – 7.7 km, SW

13 Reserved/ Protected Forests None within 15 Km radius 14 Seismicity Seismic Zone III as per IS : 1893 15 Defense Installations Sulur Air Base – 13 km, ESE 16 Nearest Sea Port Cochin Port – 150 km, SW

Page 4: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

29 March 2017

FIGURE - 2.1: MAP SHOWING THE LOCATION OF THE PROJECT SITE

PROJECT SITE

Page 5: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

30 March 2017

FIGURE - 2.2: GOOGLE IMAGE OF THE PROJECT SITE

Page 6: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

31 March 2017

FIGURE 2.3: TOPO MAP OF THE PROJECT SITE COVERING 10 KM RADIUS

Page 7: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

32 March 2017

FIGURE - 2.4: LAND USE MAP OF THE PROJECT SITE COVERING 10 KM RADIUS

Page 8: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

33 March 2017

2.3 Site Connectivity

The project site is well connected by road, rail and air ways. The project site is located

adjacent to Avinashi Road (SH) connecting Coimbatore with Erode and further Salem

and Bangalore. The project site is just 1.5 km away from Coimbatore International

Airport which is connected with most of the Indian and also international cities through

airway. The Coimbatore Junction is also situated at a distance of 10.5 km from project

site. The figure showing the local connectivity to the project site in the nearby region is

given in the Figure - 2.4.

FIGURE 2.4 - MAP SHOWING THE SITE CONNECTIVITY OF THE PROJECT SITE

2.4 Topography & Drainage

Topographically, the proposed project area is flat terrain with existing old buildings and

vacant land without much trees and shrubs. The contour map is enclosed as Annexure -

VII. The Drainage map of the project site covering 10 km radius is given in Figures - 2.5.

Project Site

Avinashi Road

Airport

Lotus Eye Hospital

Aravind Eye Hospital

PSG Arts College

Govt. Polytechnic College

Page 9: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

34 March 2017

FIGURE - 2.5: DRAINAGE MAP OF THE PROJECT SITE COVERING 10KM RADIUS

Page 10: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

35 March 2017

3.0 PROJECT DESCRIPTION

3.1. Overview of the project Kovai Medical Centre and Hospital Limited has proposed to expand the hospital

buildings & institution building in their existing campus. They proposed to construct

Cancer block, Nursing College, Lobby & Administrative, Canteen block, Waiting hall &

Medical college buildings. The ownership document for this site is enclosed as

Annexure - III. The size i.e. total built up area of the proposed expansion project is

1,22,886.0 Sq.m. KMCH has obtained Planning Permission for the proposed expansion

project from Directorate of Town and Country Planning

The break up details of the land area is detailed below in Table - 3.1 and the summary

of the built up area statement are given in Table - 3.2. The salient features of the project

are summarized in the Table - 3.3. The Master plan of the project site is enclosed as

Annexure - V.

TABLE - 3.1.1: BREAK UP DETAIL OF PLOT AREA

(DTCP) vide its approval No.

24333/2010/CP dated 23.12.2010. Copy of the DTCP approval layout is enclosed as

Annexure - VIII.

Description Existing Area (Sq.m.)

After Expansion Area (Sq.m.)

Percentage (%)

Plot Building Coverage Area 15250.01 22598.79 27.77

OSR Area 8141.45 8141.45 10.00

Internal Roads & Pathways 8959.14 14362.75 17.65

Open Parking Area 13935.45 18438.96 22.66

Green Belt Area 8103.61 14550.50 17.88

Vacant 18453.34 3289.05 4.04

Total Plot Area 72843.0 81381.50 100.00

Page 11: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

36 March 2017

TABLE - 3.1.2A: SUMMARY OF BUILT-UP AREA OF EXISITNG BUILDINGS All Units are in Sq.m

Building Name Semi Basement

Floor

Ground Floor

First Floor

Second Floor

Third Floor

Fourth Floor

Terrace Floor

Total Built up Area

Hospital Block – A 3365.89 3594.1 3365.9 3365.9 3365.9 3365.89 76.77 17057.61 Existing Canteen -- 1366.2 1366.2 1366.2 -- -- -- 4098.51 Guest House -- 505.67 505.67 -- -- -- -- 1011.34 Existing Toilet -- 42.1 -- -- -- -- -- 42.1 Existing Mortuary -- 27.13 -- -- -- -- -- 27.13 Power House & Generator

-- 552.88 -- -- -- -- -- 552.88

Existing A/C Plant -- 133.2 -- -- -- -- -- 133.2 Existing Prosthetic -- 204.27 -- -- -- -- -- 204.27 Existing Compressor -- 114.59 -- -- -- -- -- 114.59 Existing A.C shed -- 42.65 -- -- -- -- -- 42.65 Linen Services & Toilet -- 238.57 -- -- -- -- -- 238.57 Cancer Block 2231.59 2673.3 2358.6 2344.1 - -- -- 7376.11 Nursing College 1607.99 2155.8 1892.2 1951.6 1966 -- -- 7965.52 Lobby & Administrative 971.93 1094.5 986.31 986.31 - -- -- 3067.12 Canteen Block 1227.14 1336.3 1408.2 - - -- -- 2744.5 Waiting Hall 0 472.4 472.4 - - -- -- 944.8 Nursing Dining 670.45 696.38 696.38 647.96 647.96 -- -- 2688.68

Grand Total Area 10074.99 15250.04 13037.48 12055.89 6951.79 3365.89 76.77 48309.7

Page 12: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

37 March 2017

TABLE - 3.1.2B: SUMMARY OF BUILT UP AREA PROPOSED ADDITIONAL BUILDINGS All Units are in Sq.m

Building Name

Semi Basement

Floor

Ground Floor

First Floor

Second Floor

Third Floor

Fourth Floor

Fifth Floor

Six Floor Terrace Floor

Total Built up Area

Cancer Block -- -- -- -- 2344.14 2344.14 2344.14 -- 244.7 7032.42 Nursing College -- -- -- -- -- 1965.99 1965.99 1965.99 137 5897.97 Lobby & Administrative

23.51 23.51 23.51 23.51 23.51 995.44 995.44 995.44 130.58 3080.36

Canteen Block -- -- -- - 1408.2 1408.18 1471 -- 76.77 4287.36 Waiting Hall -- -- -- 472.4 472.4 472.4 472.4 -- 59.39 1889.6 Medical College Building - A

-- 413.01 413.01 413.01 413.01 -- -- -- 47.96 1652.04

Medical College Building - B

3013.38 3013.38 3013.38 3013.38 3013.38 3013.38 3013.38 3013.38 204.09 21093.66

Medical College Building - C

3898.88 3898.88 3898.88 3898.88 3898.88 3898.88 3898.88 3898.88 267.19 27292.16

Total 6935.77 7348.78 7348.78 7821.18 11573.52 14098.41 14161.23 9873.7 1167.68 72225.57

Page 13: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

38 March 2017

TABLE - 3.1.3: SALIENT FEATURES OF PROPOSED PROJECT

DESCRIPTION DETAILS

EXISTING AFTER EXPANSION

Total Area of Extent 72,843.0 Sq. m 81,381.50 Sq. m

Total Built up area 48,309.7 Sq. m 1,22,886.0 Sq. m

Plot Coverage 15,250.01 Sq.m 22,598.79 Sq. m

FSI 0.66 1.51

Green Belt Area 8,103.61 Sq.m 14,550.50 Sq.m

Total Open Parking Area 1,39,35.45 Sq. m 1,84,38.96 Sq. m

Total Area of Covered Parking 1,858.06 Sq.m 10,539.02 Sq.m

Total Nos. of Car Parking 883 Nos. 1240 Nos.

Water requirement 440 KLD 1248 KLD

Source of water supply TWAD Board TWAD Board

Quantity of wastewater

generation & Treatment Method

390 KLD (Sewage

Treatment Plant)

1113 KLD (Sewage

Treatment Plant)

Power requirement & Source 2000 KVA & TANGEDCO 2850 KVA & TANGEDCO

Solid waste Generation,

Treatment & Management

1. Municipal Solid Waste Bio Degradable – 618

Kg/day (Biogas Plant) Non-Biodegradable –

756 Kg/day (Authorized Recyclers)

2. Bio Medical waste - 216 Kg/day (TNPCB Authorized Recyclers)

3. STP Sludge – 42 Kg/day, Manure for gardening

4. Food waste - 50 Kg/day (Disposed to contractors to use it as food for animals)

5. Oil waste – 150 litres (Disposed to the CPCB

1. Municipal Solid Waste Bio Degradable –

1698 Kg/day (Biogas Plant)

Non-Biodegradable – 2074 Kg/day (Authorized Recyclers)

2. Bio Medical waste – 713 Kg/day (TNPCB Authorized Recyclers)

3. STP Sludge – 160 Kg/day, Manure for gardening

4. Food waste - 150 Kg/day (Bio Gas Plant)

5. Oil waste – 300 litres (Disposed to the CPCB authorized recyclers)

Page 14: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

39 March 2017

3.2 Population Details

The total manpower requirement during the construction phase and the expected

population during the operational phase of the project are given below in Table - 3.4

and Table - 3.5 respectively.

TABLE - 3.1.4: MANPOWER REQUIREMENT DURING CONSTRUCTION PHASE

S. No. Description

1 Approximately 500 persons Inclusive of workmen, Laborers, Supervisors,

Engineers, Architects and Managers

TABLE - 3.1.5: EXPECTED POPULATION DETAILS DURING OPERATIONAL PHASE

S. NO. DESCRIPTION NUMBER OF PERSONS

EXISTING ADDDITIONAL TOTAL

1 In patients 500 1150 1650

2 Out Patients 750 1750 2500

3 Residential employees 750 750 1500

4 Local employees 1550 2450 4000

5 Visitors 850 850 1700

Total 4400 6950 11350

3.3 Project Cost

The estimated project cost of the proposed expansion of the hospital is about Rs. 70

Crores.

authorized recyclers) 6. E – waste – 0.05 TPA

(Disposed to authorized recyclers)

7. Battery Waste – 1 TPA (which will be taken back by the supplier)

6. E – waste – 0.1 TPA (Disposed to authorized recyclers)

7. Battery Waste – 2 TPA (which will be taken back by the supplier)

Page 15: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

40 March 2017

3.4 Construction Materials

Quantity of construction materials required for the proposed construction is given

below in Table 3.6.

TABLE - 3.6: QUANTITY OF CONSTRUCTION MATERIALS REQUIRED

Description Units of Measurement Approx Qty Cement Tons 13,605 Sand Cu ft 932,915 Aggregates Cu ft 544,201 Steel Tons 3,110 Bricks Nos 13,993,732

3.5 Water Requirement

Water requirement during Construction Phase will be about 70 KLD which will be

sourced from outside through tankers by civil contractors.

Total water requirement during operation phase after the expansion will be 1248 KLD.

Out of it, 852 KLD is fresh water and 396 KLD is recycling of treated wastewater. In the

existing activities the fresh water requirement of 300 KLD is sourced from TWAD

Board. After the proposed expansion the additional water quantity of 552 KLD will be

sourced from the same source. Hence no bore well water will be used after the

proposed expansion. The copy of the agreement with TWAD Board for existing water

supply & request letter for additional quantity is enclosed as Annexure – IV. The water

requirement calculations are tabulated in Table – 3.7 A & B and water balance diagram

is presented in Figure – 3.1 A & B.

Page 16: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

41 March 2017

TABLE 3.7A - WATER REQUIREMENT AND WASTEWATER GENERATION CALCULATIONS – EXISTING

S. No. Description Total Occupancy

Water requirement (lpcd)

Water requirement (lpd)

Wastewater Generation (lpd)

Domestic Flushing Domestic Flushing Domestic Flushing 1a In Patients (Domestic) 500 200 150 1,00,000 75,000 80,000 75,000 1b In Patients (Laundry) 500 50 25,000 - 25,000 1c In Patients (Lab & OT) 500 50 25,000 - 25,000 - 2 Out Patients 750 10 5 7,500 3,750 6,000 3,750 3 Residential employees 750 90 45 67,500 33,750 54,000 33,750 4 Local employees 1550 30 15 46,500 23,250 37,200 23,250 5 Canteen 20,000 - 16,000

6 Visitors 850 10 5 8,500 4,250 6,800 4,250 Sub Total 3,00,000 1,40,000 2,50,000 1,40,000

Grand Total 4,40,000 ~ 440 KLD 3,90,00 ~ 390 KLD Note: Water requirement calculated based on CPHEEO manual – eg. Hospital (including laundry) Number of beds > 100 – 450 lpcd (Domestic – 200, Laundry – 50, Operation Theater & Lab – 50 & Flushing – 150 lpcd)

Page 17: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

42 March 2017

TABLE 3.7B – WATER REQUIREMENT AND WASTEWATER GENERATION CALCULATIONS – AFTER EXPANSION

S. No. Description Total Occupancy

Water requirement (lpcd) Water requirement (lpd) Wastewater Generation (lpd)

Domestic Flushing Domestic Flushing Domestic Flushing 1a In Patients (Domestic) 1650 200 150 3,30,000 2,47,500 2,64,000 2,47,500 1b In Patients (Laundry) 1650 50 82,500 - 82,500 1c In Patients (Lab & OT) 1650 50 82,500 - 82,500 - 2 Out Patients 2500 10 5 25,000 12,500 20,000 12,500 3 Residential employees 1500 90 45 1,35,000 67,500 1,08,000 67,500 4 Local employees 4000 30 15 1,20,000 60,000 96,000 60,000 5 Canteen 60,000 - 50,000 5 Visitors 1700 10 5 17,000 8,500 13,600 8,500

Sub Total 8,52,000 3,96,000 7,16,600 3,96,000 Grand Total 12,48,000 ~1248 KLD 11,12,600 ~ 1113 KLD

Page 18: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

43 March 2017

Unit: KLD

FIGURE - 3.1A: WATER BALANCE CHART - EXISTING

Fresh Water Requirement (300)

Domestic (230)

Flushing (140)

Canteen (20)

184

140

16

Sewage Treatment Plant

Lab & OT (25)

Laundry (25)

Neutralization

Disinfection

140

390

Gardening 100

Cooling 50

250

25

25

Road Washing

100

Page 19: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

44 March 2017

Unit: KLD

FIGURE - 3.1B: WATER BALANCE CHART – AFTER EXPANSION

Fresh Water Requirement (852)

Domestic (627)

Flushing (396)

Canteen (60)

502 396

50

Sewage Treatment Plant

Lab & OT (82.5)

Laundry (82.5)

82.5

Neutralization

Disinfection

396

1091

Gardening (80)

UGD Line (515)

717

HVAC (100)

82.5

Page 20: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

45 March 2017

3.6 Wastewater Generation, Treatment & Disposal

During construction phase, domestic wastewater generation of 12 KLD will be treated

in the existing sewage treatment plant.

During operational phase, total wastewater generation of the project is about 1113 KLD

which is proposed to treat through a Sewage Treatment Plant (STP) having capacity of

1200 KLD. The Laundry, Lab & OT water will be neutralized & disinfected initially &

treated in the STP. The treated wastewater of 1091 KLD will be reused for Toilet

Flushing (396 KLD), HVAC make up (100 KLD) and greenbelt development (80 KLD)

within the facility. The excess treated sewage of 515 KLD will be disposed through the

underground sewer of Corporation. Detail about the proposed STP is enclosed as

Annexure - IX.

Preventive measures to avoid leaching of sewage into nearby water courses

There is no water course, lake are exists around the site. Even though, we have

proposed to provide following preventive methods to avoid leaching of treated sewage.

Treated sewage from Sewage Treatment Plant will be conveyed to gardening purpose

through pipelines. All the joints from piping system will be checked periodically and

carrying treated wastewater pipes will be laid in conduits wherever road crossings are

expected. Thus no leaching of treated sewage into nearby water courses shall take place.

Supervisors will be employed for overall operation & maintenance of water supply,

waste water treatment and other utility services.

3.7 Solid Waste Generation, Collection, Transport and Disposal

The quantity of municipal solid waste generation and Solid waste management from the

proposed hospital is estimated and tabulated in Table – 3.8 & Table – 3.9.

Page 21: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

46 March 2017

TABLE - 3.8A: SOLID WASTE GENERATION CALCULATIONS

S. No. DESCRIPTION NO OF PERSONS

WASTE GENERATION

(KG/DAY)

WASTE GENERATED

1 In Patients 1650 1.5 2475 2 Out Patients 2500 0.15 375 3 Employees 4000 0.2 800 4 Resi Employees 1500 0.5 750 5 Visitors 1700 0.05 85

TOTAL 8450 4485 Note: Quantity of per capita per day waste generation - 0.5 kg per capita for residential / 0.2 kg

per capita for non-residential / 0.05 kg per capita per day for visitors

3.7.1 Biomedical Waste Management

As per Bio-Medical Waste (Management and Handling) Rules, 1998 and amendments,

any waste, which is generated during the diagnosis, treatment or immunization of

human beings or animals or in research activities pertaining there to or in the

production of testing of biological and including categories mentioned in schedule 1 of

the Rule, is the bio medical waste. The bio medical waste management starts from the

point of generation. Waste minimization options should be considered and adopted.

After the waste is generated the immediate step is segregation followed by collection,

storage, transportation, treatment and disposal. The path between the two points

(cradle to grave) can be segmented schematically as.

• Identification of areas of waste generation

• Categorization, quantification of waste and minimization

• Segregation, handling and storage

• Treatment, destruction and disposal

The Biomedical waste generated from the proposed project site is 25% of the hospital

waste. The biomedical waste calculation is given below.

Page 22: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

47 March 2017

TABLE - 3.8B: BIOMEDICAL WASTE CALCULATION

S.NO DESCRIPTION NO. OF. PERSONS

WASTE GENERATION (KG/DAY)

WASTE GENERATED

(KG/DAY) 1 Inpatient 1650 1.5 2475 2 Outpatient 2500 0.15 375

TOTAL 2850 Bio-medical waste @ 25% of hospital waste 713

TABLE - 3.8C: CATEGORY WISE BIO MEDICAL WASTE GENERATION DETAILS

WASTE CATEGORY

TYPE OF WASTE QUANTITY (kg/day)

TYPES OF BAGS / CONTAINERS TO

BE USED

DISPOSAL METHOD

Category No. 1 & 2

Human Anatomical waste, Animal waste, Soiled waste

500 Yellow

Disposed to TNPCB

Authorized Biomedical Facilitator

Category No. 3, 5 & 10

Microbiological and biomedical waste, Discarded Medicine and Cytotoxic drugs & Chemical Waste

142 Yellow

Category No. 4, 7 & 8

Waste Sharps, Solid waste, Liquid Waste 71 White

Category 9 Incineration Ash - - Total 713

The Biomedical waste will be collected, stored and disposed to CPCB/TNPCB

Authorized Recyclers and the management of biomedical waste is provided in

Annexure X.

3.7.2 Municipal Solid Waste

The estimated quantity of municipal solid waste generated during Operation Phase will

be 3772 kg/day. The quantity of waste generation is given in Table 3.9.

TABLE - 3.9A MUNICIPAL SOLID WASTE MANAGEMENT

S.NO DESCRIPTION QUANTITY (kg/day)

METHOD OF TREATMENT / DISPOSAL

1 Bio-degradable (45%) 1698 Biogas Plant 2 Non-biodegradable (55%) 2074 Authorized Recyclers 3 STP Sludge 160 Manure for gardening

Page 23: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

48 March 2017

TABLE - 3.9B CANTEEN WASTE MANAGEMENT

S.NO DESCRIPTION QUANTITY (kg/day) METHOD OF TREATMENT / DISPOSAL

1 Food waste 150 Biogas Plant 2 Miscellaneous 10 Authorized Recyclers

• Colour coded dust bin provision is provided for each room / functional area.

• The segregated garbage, Bio-degradable waste and Non-biodegradable waste

collected using different color coded bins will be stored in garbage collection room.

• The bio-degradable wastes are being treated in the existing bio gas in biogas plant.

The inorganic non biodegradable / recyclable waste like plastic, paper, glasses, etc

will be disposed to different type of recyclers.

• Part of the food waste generated from the kitchen / canteen is also being disposed to

bio gas plant.

• Dewatered STP sludge will be used as manure for gardening within the facility.

• Quantity of construction debris during construction phase will be approx. 50 - 100

kg/day which will be sold to appropriate vendors.

• The quantity of total excavated earth material and demolition waste will be

approximately 65,500 Cu.m., which will be used for refilling in the low lying area.

3.8 Rainwater Harvesting & Storm Water Management

A rainwater harvesting system comprises components of various stages - transporting

rainwater through pipes or drains, filtration, and recharging the ground water through

tanks. Percolation pits will be constructed for ground water recharge. Runoff from the

first spell of rain carries a relatively large amount of pollutants from the air and

catchments surface so the system will be provided with a filtration pit consisting of

layers of sand, gravel and pebbles of relevant sizes to remove impurities from the

collected rainwater.

Page 24: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

49 March 2017

3.8.1 Need for Rainwater Harvesting

• Surface water is inadequate to meet the daily demand and we have to depend on

ground water.

• Due to rapid urbanization, infiltration of rain water into the sub-soil has

decreased drastically and recharging of ground water has diminished.

• Rainwater harvesting prevents the flooding of low-lying areas in the site.

3.8.2 Rainwater harvesting in the project site

• The entire site is being designed for an effective and efficient storm water

collection and harvesting system.

• The terrace rain water shall be brought down through RW stacks. Free surface

run off will be planned in the building setbacks and on to saucer drains along

internal roads. The path ways shall be graded to drain into rain water drain

channels in main drive ways/ roads.

• The collected storm water is allowed to percolate to the sub-soil by suitably

designed rainwater harvesting wells & percolation pits. The wells & pits are

designed based on the soils percolation capability.

3.8.3 Rainwater Harvesting Network

Rain water harvesting trenches will be constructed all around the compound wall to

collect rain water. Excess storm water will be allowed to drain into the external storm

drain. The depth of the trench will be 1.5 m and the width will be 1 m. The trench will be

filled with rounded pebble 50 to 75 mm size. The sectional detail of the proposed rain

water recharge pit is provided in Figure 3.2.

The path ways around the harvesting lines will be graded to facilitate drainage into

trenches proposed around the compound. Recharge wells/pits are envisaged along the

path of the storm water drains for rain water recharging & surplus water from the

recharge wells/pits shall be diverted to the storm water drainage network.

The collected storm water will be allowed to percolate to the sub-soil by suitably

designed percolation pits. The pits will be designed based on the soils percolation

Page 25: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

50 March 2017

capability. The subsoil water table is high in these areas and however harvesting pits

with bores will be provided.

Percolation pits of suitable numbers will be provided for recharge of ground water

potential. The quantity of run-off water potential for the proposed construction project

is given below.

Rain Water harvesting will be done through the trench which is provided with the

pebble bed of 1500 mm width & 1000 mm depth all around the building which will be

filled with rounded pebble of size 50 to 70 mm. The path ways will be graded to drain

into rain water drain channels proposed in main drive ways/ roads, so that rain water

from the terrace flow over this pavement and spread into the pebble bed.

FIGURE 3.2 RAIN WATER HARVESTING PIT AND TRENCH DETAILS

Page 26: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

51 March 2017

The details of Rain Water harvesting to be used are given in the below table.

Table 3.9: Rain Water harvesting calculations

Maximum storm runoff using Lloyd Davis Formula

S. No. Description Runoff Co-

efficient (Cr)

Critical Rainfall Intensity (Hourly

Maximum Rainfall in Centimeters) (i)

Catchment area in Hectares (A)

Peak Storm Runoff (m3/hr)

(Qp)

1 Roof Area 0.85 7.4 2.259 1420.91 2 Paved Area 0.75 7.4 3.280 1820.4 3 Unpaved Area 0.15 7.4 2.599 288.48

Total Run-off 8.138 3529.79 Size of RWH Pit 1.2 m dia, 1.5m depth

No. of Pits Provided 45

Qp = 100 Cr i A

where,

Qp = Peak Storm runoff, m3/ hr / Cr = Coefficient of runoff

i = critical rainfall intensity, cm/hr / A = Catchment area contributing to runoff, ha

3.8.4 Storm water Management Plan

Construction Phase:

The surface runoff during the construction phase will be directed into the drains that

would be created temporarily for this purpose. During operation phase of the project, it

is proposed to undertake rainwater harvesting to the extent possible.

Operation Phase:

The site and its surrounding area are sloping towards northwest to southeast direction.

The storm water runoff from the external catchment area is now crossing the site. In

boundary of the site, storm water drains are constructed with 1.0m width x 1.0 depth to

divert the runoff from the catchment area in west & Southwest direction. The drain will

be connected with external drain located in the south east side of the project site. Part of

the runoff water from the west side will be diverted to the storm water drain

constructed in the west side of the project site and further it will also be linked with

external drain for safe disposal.

Page 27: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

52 March 2017

3.9 Power Details The total power requirement of existing campus of 2000 KVA is being sourced from

Tamil Nadu Generation & Distribution Corporation Limited (TANGEDCO). After the

proposed expansion power requirement will increase to 2850 KVA. The DG sets will be

installed to manage the emergency power requirement during the period of power

failure. The details of the DG sets are given in the Table - 3.10.

TABLE - 3.10: DG SET DETAILS

DG Set Capacity Existing Proposed 1500 KVA - 2 Nos 1500 KVA - 1 No 500 - KVA 2 Nos

Diameter of the stack 350 mm 350 mm 200 mm

Height of the stack 15m 15m 10 m 3.10 Fire Fighting System

The design of the Fire Fighting system for a proposed buildings is carried out as per the

guidelines laid out in IS 2190:1992 & National Building Code of India 2005 – Part IV.

The following Fire Fighting System for proposed to provide for the expansion project.

Fire License & Fire NOC for the expansion project is obtained and copy of the same is

enclosed as Annexure - XI.

Fire Extinguishers - Proposed to provide

Hose Reel - Proposed to provide 1 no. for every 1000 sq.mt

Wet Riser - Proposed to provide 1 no. for every 1000 sq.mt

Public address system - Proposed to provide in the entire building

Automatic Sprinkler system - Proposed to provide in the entire building

Manually Operated Electric

Fire Alarm System - Proposed to provide in the entire building

Pumps near ground tank - Proposed to provide 2 electrically driven & 1

diesel hydrant main pump of capacity 2280 &

180 Lpm

Page 28: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

53 March 2017

Terrace Tank - Proposed to provide of 20,000 liters

capacity tank

Underground Tank - Proposed to provide of 1,50,000 liters

capacity tank

Emergency Lights - Proposed to provide in the all floors

Fire Lift - Proposed to provide 1 no. for every 1200 sq.mt

Lightening Arrester - Proposed to provide

Automatic Smoke Ventilation

System - Proposed to provide in the basement floors

AC Duct with Fire Damper - Proposed to provide

3.11 Parking area details

The parking space criteria and area requirement are summarized in the Table - 3.12

below. Parking details are designed as per DTCP guidelines.

TABLE 3.11 DETAILS OF PARKING AREA

Particulates Existing After Expansion

1 car space for every 15 beds 500/15 = 33 Nos 1650/15 = 110 Nos

1 car space for every 100 sq.m

of non-bed area

43252 /100 = 432 Nos 106889 / 100 = 1068 Nos

Open Car Parking Area 13935.45 Sq.m 16934.31 Sq.m

Covered Car Parking Area 4076.66 Sq.m 10539.02 Sq.m

No of Car Parking Required 465 Nos 1178 Nos

No. of Car Parking’s provided 883 Nos 1240 Nos

3.12 Project Schedule

The Bar chart showing the time period for the different construction activities with Bar

chart is attached as Annexure - XII.

Page 29: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

54 March 2017

4.0. ENVIRONMENTAL MANAGEMENT PLAN A detailed environmental management plan to be followed during the construction and

operation phase is presented in Table 4.1 & 4.2.

TABLE - 4.1: ENVIRONMENTAL MANAGEMENT PLAN – CONSTRUCTION PHASE

Discipline Potential Negative Impacts

Probable Source

Mitigative Measures Remarks

Land Environment

Change of land use

Construction of hospital buildings & institutional buildings

Land use of the site is public & semi public / residential use zone.

The proposed land use of the site is consistent with the surroundings

Water Quality

Increase in suspended solids due to soil run-off during heavy precipitation

Loose soil at construction site

During monsoon season run-off from construction site shall be routed to a temporary sedimentation tank for settlement of suspended solids.

---

Air Quality Increase in ambient dust (PM) and NOX

Vehicular movements, excavation and leveling activity

levels

Isolate the construction area with flexible enclosures/ curtains so that the air emissions will not spread in the surroundings. Sprinkling of water in the construction area and unpaved roads. Proper maintenance of vehicles shall be done. Restrict dust-generating activities, such as blasting or top soil removal, to calm wind conditions. Cover heavy vehicles moving offsite. Restrict vehicle speed on construction roads and ensure vehicles use only dedicated construction roads and access points. Visually monitor particulate emissions from diesel vehicles and carryout regular maintenance of equipment.

Construction vehicles will be maintained properly for reducing air pollution levels from vehicle exhausts.

Noise Increase in ambient noise level

Construction equipment

Develop and implement a construction noise management plan.

Equipment shall be kept in good condition to keep the noise

Page 30: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

55 March 2017

Discipline Potential Negative Impacts

Probable Source

Mitigative Measures Remarks

Limit hours of construction where practical. Where blasting occurs, pit shapes and blast campaigns will be designed such that the blast faces are oriented away from noise sensitive receivers.

level within 90- dB(A). Workers shall be provided with necessary protective equipment e.g. earplugs, earmuffs.

Terrestrial Ecology

Clearing of vegetation

Soil enabling activities

Landscaping and extensive plantation shall be done.

Open spaces reserved will be green turfed and appropriate type of plantations will be done.

Socio-economics

Land oustees Land Acquisition

The proposed site is already in possession of the project promoters and free from encumbrances, hence private land acquisition and resultant rehabilitation and resettlement issues are not involved.

--

Solid Waste

Loss of excavated top soil

Excavation The topsoil shall be properly stored and used for leveling in the low-lying area. The construction debris shall be used to level the low lying area

--

Topography & Drainage

No significant change in the existing drainage pattern and topography

Leveling of the site for building construction

The surface run off from the site will be diverted to rainwater harvesting structures to recharge the ground water and the excess water will be disposed in nearest natural drains

Adhering the natural slope for storm water & sewerage drain.

TABLE - 4.2 : ENVIRONMENTAL MANAGEMENT PLAN - OPERATION PHASE

Discipline Potential Negative Impacts

Probable Source

Mitigative Measures Remarks

Water Environment

Depletion of ground water

Usage of ground water for domestic purposes

Ground water should not tap for this project. The water requirement will be met from TWAD Board.

Rain water harvesting pits and trench will be provided.

Page 31: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

56 March 2017

Discipline Potential Negative Impacts

Probable Source

Mitigative Measures Remarks

Air Quality Increase in dust (PM) and gaseous pollutants in ambient air

Vehicular traffic, Stack emissions from DG sets

• Usage of Bharat-III/Euro-III compliant vehicles.

• Usage of low sulphur fuel for transportation and for DG sets.

• Motorable roads in the complex shall be paved to reduce dust emission.

• Ensure operational procedures are adequately implemented and regularly reviewed so as to identify opportunities for continual improvement.

Adequate stack heights shall be provided for the proper dispersion of pollutants from the DG Sets Emissions from DG sets shall be maintain below regulatory standards

Noise Increase in noise levels

Vehicular movement, pump house & DG sets operation

Equipment shall be designed to conform to noise levels prescribed by regulatory agencies

Green belt will also be developed all along the boundary wall for attenuating the noise

Water Quality

Deterioration of quality of receiving water body, if any.

Discharge from various sources

Provide adequate treatment and conditioning facilities so that the treated sewage conforms to the regulatory standards.

Wastewater generated will be treated in STP and treated water will be utilized for landscaping and toilet flushing.

Traffic Increase of vehicle count in existing road

Additional vehicle movement

Improvement of infrastructure, use of modern emission standard vehicles for transportation, provision of the proper parking yard and evaluate impact of traffic density and vehicular emissions.

Proper roads will reduce the dust emissions to a great extent.

Solid waste Impact on human health

Domestic usage

All solid waste will be segregated at source and will be given to authorized agents for recycling / composting.

-

Biomedical Waste

Impact on human health

Lab & Operation Theatres

The various categories of wastes are collected in specific colored containers, stored temporarily and disposed to M/s. Tekno

BMW will not allowed to mix with MSW.

Page 32: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

57 March 2017

Discipline Potential Negative Impacts

Probable Source

Mitigative Measures Remarks

Therm Industries, Orattukuppai, Coimbatore

Demography and Socio-economics

Strain on existing amenities like water sources and sanitation and infrastructure facilities.

Influx of people of proposed project.

All ultra modern work environments shall be provided inside the project site.

The proposed project would generate employment both directly and indirectly. This would enhance overall socio-economic development and quality of life of people.

Terrestrial Ecology

Impact on plant species

Vehicular movement and emissions from stack

It is proposed to develop lawns and green cover. Part of the treated wastewater from domestic uses can be used for greenbelt development

As emissions will be within limits, no active damage to vegetation is expected.

Storm water Control

Impact on water resources

Rain water etc

Provide separate storm water drainage network. Provide rainwater-harvesting pits for percolation of rainwater.

Separate storm water drains will be provided

Fire and Safety

Accidents / disasters related to fire and safety

Domestic firing

Prepare DMP and implement DMP

A well-laid fire fighting system and fire extinguishers will be installed as per fire safety norms. Regular fire safety training and mock drills will also be conducted.

4.1 Energy Conservation Measures Energy Conservation Building Code – 2009

The expansion buildings has been designed in such a way that it complies with the

requirement of building envelope i.e. insulation material and their “R” Values,

Page 33: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

58 March 2017

fenestration “U” factors and Solar Heat Gain Coefficient (SHGC) as per guidelines of

Energy Conservation Building Code – 2009.

Energy Saving Practices

• Building Envelope Design is designed in an energy efficient way

• Use of virgin wood and other building materials with high embodied energy will be

minimized

• Building materials with high recycle content like Fly Ash bricks will be used

• The building materials will be made available regionally within 250 miles radius

from the project site

• Electrical appliances with energy star rating will be installed

• Recycling and reuse of construction debris to minimize virgin materials

• Use of low VOC materials such as paints, adhesives etc…

• Usage of solar water heaters and solar street lights

TABLE 4.3: QUANTIFICATION OF ENERGY SAVINGS

S. No. Description

Power Consumption

Savings in KW

Conventional equipments

power consumption

in KW

Energy Efficient equipments

power consumption

in KW 1 Open parking & inter

driveway 40 Nos x 40 W

FTL x 10 hrs = 16 KW

Solar Street Lights (20 watts) x 40 Nos

x 10 hrs = 0

16

2 Total staircase, lift well & head room

65 Nos x 150 W x 12 hrs = 117 KW

T5 (30 watts) x 65 Nos x 12 hrs = 23

KW

94

3 Corridor Lighting 120 x 100 W x 12 hrs = 144 KW

CFL (60 watts) x 120 Nos x 12 hrs =

86 W

58

4 Total garden light & gate light.

45 Nos Post Top Lattern x 100 W x

10 hrs = 45 KW

CFL (60 watts) x 45 Nos x 10 hrs = 27

KW

18

Total 186

• Energy savings per day – 186 KW

• Energy savings per annum – 67890 KW

Page 34: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

59 March 2017

4.2 Green Belt Development

Green belt is plantation of trees for reducing the pollution as they absorb both gaseous

and particulate pollutant, thus removing them from atmosphere. Green plants form a

surface capable of absorbing air pollutants and forming sinks for pollutants. It balances

the ecological environment, prevents soil erosion, improves the aesthetic value of local

environment and provides possible habitats for birds and animals, thus creating

hospitable nature in urban areas. Greenbelts in and around urban areas have probably

not saved any lives, but they are important nonetheless to the ecological health of any

given region. The various plants and trees in greenbelts serve as organic sponges for

various forms of pollution, and as storehouses of carbon dioxide to help offset global

warming.

Horticulture

While making choice of plant species for cultivation in green belts, weightage has to be

given to the natural factor of bio-climate. It is also presumed that the selected plants will

be grown as per normal horticultural practice.

A standard horticultural practice involves planting of saplings in proper dimensions for

smaller trees and shrubs. The pits are then filled with earth, sand, silt and manure in

pre-determined proportions. The growing plants are cared for the first three years

under favorable conditions of climate and drainage. Hence it is safe to assume that trees

and bushes grown as green belt components in areas under human control will have

overcome the limitations imposed by soil characters to a great extent. Limitations

imposed by climatic conditions on the other hand cannot be overcome and hence will

have to be taken into account while selecting species for plantation in different bio-

climatic conditions.

Plantation along Roadsides

Automobiles may be considered as ground level, mobile sources of pollution of both

types- gaseous as well as particulate. Components of green belts on road sides hence

should be both absorbers of gases as well as of dust particles, including even lead

Page 35: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

60 March 2017

particulates. Choice of plants for roadside plantations may be for containment of

pollution and for formation of a screen between traffic and roadside residences. This

choice of plants should include shrubs of height 1- 1.5 m and tree of 3-5 m height. The

intermixing of trees and shrubs should be such that the foliage area density in vertical is

almost uniform. Since safety of traffic is a major consideration, shrubs in roads will have

to be short enough to be below the eye level of motorists.

Recommended Plants

All tolerant plants are not necessarily good for green belts e.g. Xerophytes with sunken

stomata can withstand pollution by avoidance but are poor absorbers of pollutants due

to low gaseous exchange capacity. Therefore selection of plants is very important in

green belt development for effective removal of suspended particulate matter and for

absorption of gases. The trees in Table - 4.4 are the trees suitable for the soil type in the

study area for green belt development.

• Greenbelt area (Existing) - 8,103.61 Sq.m

• Greenbelt area (After Expansion) – 14550.50 Sq.m

• No of trees required for Greenbelt development after expansion = 582 Nos

• No of existing trees available in Greenbelt area – 280 Nos

• No of additional trees proposed to be planted = 302 Nos

TABLE - 4.4: SUGGESTED PLANTS FOR GREEN BELT DEVELOPMENT

S. No. Botanical Name Common Name No of Tress

1 Azadirachta Indica Vembu 90 2 Pongamia pinnata Pungam 56

3 Saraca asoca Ashoka Tree 48

4 Cassia fistula Golden shower tree 37

5 Albizia lebbeck Vagai 27 6 Moringa Oleifera Moringa Tree 23 7 Prunus Dulcis Almond 21

Page 36: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

61 March 2017

4.3 DISASTER MANAGEMENT PLAN

Disaster is an unexpected event due to sudden failure of the system, external threats,

internal Disturbances, earthquakes, fire and accidents. Following subsection describes

the measures to be undertaken by the project proponent to prevent / minimize risk of

unexpected event.

Preventive Action

Once the likelihood of a disaster is suspected, action has to be initiated to prevent a

failure. Engineers responsible for preventive action should identify sources of repair

equipments, materials, labour and expertise for use during emergency.

Reporting Procedures

The level at which a situation will be termed a disaster shall be specified. This shall

include the stage at which the surveillance requirements should be increased both in

frequency and details. The project incharge should notify the officer for the following

information:

Exit points for the public,

Safety areas in the nearest medical facilities.

Communication System

An efficient communication system is absolutely essential for the success of any disaster

management plan. This has to be worked out in consultation with local authorities.

More often, the entire communication system gets disrupted when a disaster occurs.

The damage areas need to be clearly identified and provided with temporary and full

proof communication system.

Emergency Action Committee

To ensure coordinates action, an Emergency Action Committee should be constituted.

Emergency Action Committee will prepare the evacuation plan and procedures for

implementation based on local needs and facilities available. The plan should include:

Page 37: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

62 March 2017

• Demarcation of the areas to be evacuated with priorities,

• Safe area and shelters,

• Security of property left behind in the evacuated areas,

• Functions and responsibilities of various members, and

• Setting up of joint control action.

All personnel involved in the Emergency Action Plan should be thoroughly familiar with

all the elements of the project area and their responsibilities. The staff at the site should

be trained for problem detection, evaluation and emergency remedial measures.

Individual responsibility to handle the segments in emergency plan must be allotted.

Success of an emergency plan depends on public participation, their response to

warning notifications and timely action. Public has to be educated on the hazards and

key role in disaster mitigation by helping in the rescue operations. It is essential to

communicate by whom and how a declared emergency will be terminated. There should

be proper notification to the public on de-alert signals regarding termination of the

emergency. The notification should be clear so that the evacuees know precisely what to

do when re-entering or approaching the affected areas.

4.4 Environmental Monitoring Plan It is proposed to monitor essential parameters for ambient air quality, ambient noise

quality, ground water quality and waste water quality both during the construction and

operation phases of the project. The frequency of monitoring and method of monitoring

will be conducted as per norms of CPCB. However the monitoring schedule is given in

Table - 4.5.

Page 38: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

63 March 2017

TABLE - 4.5: ENVIRONMENTAL MONITORING SCHEDULE

S. No. Particulars Monitoring Frequency

Duration of Sampling

Important Monitoring Parameters

1 Ambient Air Quality Monitoring

Project site Once in a Month 24 hrs PM10, PM2.5,SO2, NOx

2

& CO

Stack Monitoring

DG Sets Once in a Month 60 min SO2, NOx

3

, PM, CO

Ambient Noise Level

Near DG set Once in a Month 8 hr with 1 hr interval

Noise level in dB(A)

4 Sewage Sample Monitoring

Sewage sample Once in a month Grab sampling pH, TSS & BOD

5 Ground Water Quality Monitoring Ground Water

At project site Once in 3 Months Grab Sampling Parameters specified under IS:10500, 2012

6 Soil Quality

At the project site area

Once in a year Samples were collected from three different

depths

Agricultural potential parameters

4.4.1 Indoor Air Quality Monitoring

The parameters like Temperature, Humidity, PM10, O2, CO, CO2

S. No.

, VOCs, TBC, Yeasts &

Moulds are monitored once in three months in the areas of Lab, Ward, OP area and Scan

Centre. The method of measurement for the above said parameters are given in Table

4.6.

TABLE - 4.6: INDOOR AIR QUALITY MONITORING

Parameters Method of measurement 1. Temperature Thermometer 2. Humidity Hydrometer 3. PM Handy Sampler (Gravimetric method) 10 4. O2, CO, CO Gas Analyzer 2 5. VOCs Photo Ionization Detector 6. TBC Pour plate method (APHA method) 7. Yeasts & Moulds IS 5403, 1999

Page 39: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

64 March 2017

4.5 EMP Budget Provisions The implementation of the pollution control and environmental monitoring and

management programmes is the basis of mitigation of impacts. The environmental

expenditures show commitment of the management on environmental front. The details

of the expenditure on environmental measures are given in Table - 4.7.

TABLE - 4.7: BUDGET FOR ENVIRONMENTAL MANAGEMENT PLAN

S. No. Description Capital Cost (Lakhs)

Recurring Cost per Annum (Lakhs)

1 Wastewater Conveying Systems

& Water Conservation measures

100 10

2 Acoustic & stack for DG sets 10 1.0

3 Energy Conservation Measures 20 2.0

4 Solid Waste Management 25 2.5

5 Green Belt Development 20 2

6 Environmental Monitoring --- 2

7 Environmental Management Cell --- 2.5

Total 175 22

4.6 Environmental Management Cell

Environment Management Cell (EMC) will look after the environment related

matters during the construction and operation phase of the project. EMC will perform

the following assignments.

• Periodic monitoring of emissions and report any abnormalities for

immediate corrective measures.

• Periodic monitoring of ambient air quality, ground and surface water quality.

• Periodic noise monitoring of the building zone and surrounding area.

• Regular monitoring of storm water drains.

• Green belt plantation, maintenance, development of other forms of greenery.

• Regular monitoring of solid wastes quantity and ascertaining avenues for

utilization of solid wastes.

Page 40: CONCEPTUAL PLAN - environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/FormB/TOR/PFR/11032017L... · 1.3 Project Proposal ... Waiting hall & Medical college buildings

Conceptual plan to get Environmental Clearance for the expansion of the hospital buildings by M/s. Kovai Medical Center and Hospital Limited, Coimbatore

65 March 2017

• Development & maintenance of schemes for water conservation.

The Environmental Management Cell (EMC) will take the overall responsibility for

coordination of the actions required for environmental management and mitigation,

and for monitoring the progress of the proposed management plans and actions to be

taken. The organizational set up of the Environmental Management Cell is shown in

Figure 4.1.

FIGURE - 4.1 : ENVIRONMENTAL MANAGEMENT CELL

Environmental Management Cell

Environmental Engineer

Solid Waste Management

Safety & Health Officer

Sewage Treatment Plant

Green Belt Development &

Management

Energy Management

Fire & Electrical safety

Occupational Health & Safety