1
WISCONSIN DEPARTMENT OF TRANSPORTATION PROJECT I.D. 5992-10-02 MEIER ROAD (MILLPOND RD - FEMRITE DR) DANE COUNTY MEIER ROAD EXTENSION CONCEPTUAL INTERSECTION LAYOUTS PUBLIC INVOLVEMENT MEETING APRIL 7, 2016 CONCEPTUAL SIGNALIZED INTERSECTION LAYOUT CONCEPTUAL STOP CONTROL INTERSECTION LAYOUT (2-WAY OR 4-WAY STOP) CONCEPTUAL ROUNDABOUT INTERSECTION LAYOUT 0 100' 200' 50' INTERSECTION ALTERNATIVES SHOWN ARE CONCEPTUAL. ANALYSIS IS ONGOING TO EVALUATE SAFETY, TRAFFIC OPERATIONS, TURN LANES, ACCESS, AND COSTS OF THE THREE ALTERNATIVES. DISCUSSIONS WITH AREA PROPERTY OWNERS AND BUSINESSES WILL BE ONGOING AS THE DESIGN PROGRESSES.

CONCEPTUAL ROUNDABOUT INTERSECTION LAYOUT...conceptual signalized intersection layout conceptual stop control intersection layout (2-way or 4-way stop) conceptual roundabout intersection

  • Upload
    others

  • View
    27

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CONCEPTUAL ROUNDABOUT INTERSECTION LAYOUT...conceptual signalized intersection layout conceptual stop control intersection layout (2-way or 4-way stop) conceptual roundabout intersection

WISCONSIN DEPARTMENT OF TRANSPORTATION

PROJECT I.D. 5992-10-02MEIER ROAD

(MILLPOND RD - FEMRITE DR)DANE COUNTY

MEIER ROAD EXTENSIONCONCEPTUAL INTERSECTION LAYOUTS

PUBLIC INVOLVEMENT MEETINGAPRIL 7, 2016

CONCEPTUAL SIGNALIZED INTERSECTION LAYOUT CONCEPTUAL STOP CONTROL INTERSECTION LAYOUT(2-WAY OR 4-WAY STOP)

CONCEPTUAL ROUNDABOUT INTERSECTION LAYOUT

0 100' 200'50'

INTERSECTION ALTERNATIVES SHOWN ARE CONCEPTUAL.ANALYSIS IS ONGOING TO EVALUATE SAFETY, TRAFFICOPERATIONS, TURN LANES, ACCESS, AND COSTS OF THETHREE ALTERNATIVES. DISCUSSIONS WITH AREAPROPERTY OWNERS AND BUSINESSES WILL BE ONGOINGAS THE DESIGN PROGRESSES.