Concrete Airport Pavement Workshop Right Choice, Right Now ACPA – SE Chapter Hilton Atlanta Airport November 8, 2012 W. Charles Greer, Jr., P.E. – AMEC Subash Reddy Kuchikulla – MME James Drinkard, P.E. – ATL

Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

Concrete Airport Pavement WorkshopRight Choice, Right Now

ACPA – SE ChapterHilton Atlanta Airport

November 8, 2012

W. Charles Greer, Jr., P.E. – AMECSubash Reddy Kuchikulla – MME

James Drinkard, P.E. – ATL

Page 2: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

Pavement Management System

ACKNOWLEDGEMENTS

CITY OF ATLANTA DEPARTMENT OF AVIATION STAFF

MR. MAX WALKER – DEPARTMENT OF AVIATION

MR. FRANK HAYES – ~40 YEARS IN NUMEROUS CAPACITIES

OTHERS TOO NUMEROUS TO LIST

Sustainable Concrete Pavement

Page 3: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

ATL – World’s Busiest Airport

In 2011

Passengers 92 million

Aircraft Operations 923,000

Concrete Pavement 1000+ acres

Replacement Value $2 billion

Enough concrete to pave a 10,000 ft runway --- Every year for 30 years

Page 4: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

ATL – World’s Busiest Airport

24

20

33

23

0

5

10

15

20

25

30

35

<10 11…20 21…30 >30

% O

F TO

TAL

AIR

SID

E PA

VEM

ENT

PAVEMENT AGE IN 2010 (YEARS)

PAVEMENT AGE --- % OF TOTAL IN 2010

Page 5: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

Reasonable spread of pavement area among the age groups.

Why is Pavement Management important ----

Fast forward 5 years!!!

ATL – World’s Busiest Airport

Page 6: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

ATL – World’s Busiest Airport

2420

33

2320

1511

54

0

10

20

30

40

50

60

<10 11…20 21…30 >30

% O

F TO

TAL

AIR

SID

E PA

VEM

ENT

PAVEMENT AGE (YEARS)

PAVEMENT AGE --- % OF TOTAL IN 2010 & 2015

%..2010 %..2015

WHAT A DIFFERENCE 5 YEARS CAN MAKE!!!!!!

15 – 10,000’ Runways

Page 7: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

Runway 8R-26L

How did the Pavement Management Program start?

…….Slowly at first…….

Page 8: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

ATL – World’s Busiest AirportRunway 8R-26L

Replaced in 1969

40 Day Wonder

In 1984

15 Years old (20 year design life)

20 Years of traffic

Surface cracks – cracked longitudinal joints

Replace it before accustomed to 4 runways

Page 9: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

Runway 8R-26L

ATL Management Agreed To:

Investigate/Evaluate

Need for replacement

1984 Study

FWD (relatively new)

Petrographic examination of concrete cores

Strength and modulus lab testing of pavement samples

Remaining Life Assessment

Page 10: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

Runway 8R-26L

FWD - 1984Falling Weight Deflectometer

Force = 25,000 lbs.Load Plate = 12” diameterSurface deflection across several feet

Deflection basin – pavement surfaceDeflection across joints

HWD - 2001Heavy Weight Deflectometer

Force = 60,000 lbs.Load Plate = 18” diameter

Page 11: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

Runway 8R-26L

Petrographic Examination – Cores

Stereo-optical microscope10x to 60x

Nature of cracksReactions - paste/aggregateSecondary deposits in voids and cracks

Page 12: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

Runway 8R-26L

Strength – Modulus Testing of Pavement Samples

Concrete coresCement treated baseSoil cement

Compressive strengthModulus of elasticitySplit tensile strength

Page 13: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

Runway 8R-26L

1984 Findings

Surface cracks 3” - 5” deep

Good structural capacity

Slight evidence of ASR

• alkali-silica reactivity• translucent rims around aggregate edges• little disruption of paste-aggregate bond

Page 14: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

Runway 8R-26L1984 Recommendations

Expect 5 more years of service

Replace 10-15 slabs

• Actual = portions of 2 of 800

Repair longitudinal joints

Seal cracks (<1/4” wide)

Seal all joints

Repeat program in 3 years --- Genesis of Pavement Management System

Page 15: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

Pavement Management System1984 Program Repeated

1987 // 1990 // 1994 // 1997 // 2001 // 2004 // 2007 // 2010 // 2013?

New techniques added with time

Pavement Condition IndexResilient Modulus of SubgradeLaser ProfilometerHigh-Speed Digital Video ImagingDistress Surveys with GPS & GISLong Term Photo LibrarySEM & XRD AnalysesSpecial Field Investigations

Page 16: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

Pavement Management SystemPavement Condition Index (PCI) – 1990

Corps of Engineers – 1970’s

Quantify defects – extent & severity• Spalls• Cracks• Patches• Joint Sealant

Process to a single value – 0 to 100

Pavement Condition Index – PCI

Best = 100Worst = 0

Page 17: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

Pavement Management SystemPavement Condition Index (PCI) – 1990

Develop performance history curves

Predict timing of future critical conditions

ACTUAL & PROJECTED PCI VS. TIMERW-8R (KEEL - CD LINE)

0102030405060708090

100

1965 1970 1975 1980 1985 1990 1995 2000 2005 2010 2015 2020 2025

YEAR

PCI

8R-CD-act 8R-CD-proj

MAJOR REHAB FOR KEELNEEDED BY 2010

Page 18: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

Pavement Management SystemResilient Modulus Testing – 1990

Rebound Stiffness ModulusVarious Confining Pressures

Utilized for Mechanistic DesignsModel Physical Pavement System

Page 19: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

Pavement Management SystemLaser Profilometer & Roughness / Ride Quality – 1994

Rolling cart with light sensitive cells

Fixed laser source

Roll cart longitudinally along pavement

Record elevation every 1 foot

Develop profile

Analyze aircraft response

Develop Pavement Smoothness Index (PSI)

Laser source Cart

Page 20: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

Pavement Management SystemLaser Profilometer & Roughness / Ride Quality – 1994

8R-26L Smoothness Performance

0

10

20

30

40

50

60

70

80

90

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

5500

6000

6500

7000

7500

8000

8500

9000

9500

1000

0

Distance, ft. (west-east)

PSI

8R-2004R&L8R-2001R&L

SOME DROP IN SMOOTHNESS FROM 2001 TO 2004

ENDS NOT SHOWN DUE TO LITTLE OR NO EFFECT2001 WAS CENTERLINE ONLY2004 INCLUDES CENTERLINE AND WHEELPATHS

Page 21: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

Pavement Management SystemHigh-Speed Digital Video Imaging – 2001

Van at night – 40 to 60 mph

12-to 13 wide path

Cover entire surface

Capture hairline cracks

Historical record

Page 22: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

Pavement Management SystemHigh-Speed Digital Video Imaging – 2001

Historical record – project on wall – like walking the pavement

2001

2004

2004

2007

Page 23: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

Pavement Management SystemLong Term Photo Library – 1984 Forward

Photos of key conditions over many years

Puts better perspective on when to replace

1990 2004

Page 24: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

Pavement Management SystemAnnual Crack Surveys with GPS and GIS - 1995

Surveyor on foot with GPS PoleDistress – sound pavement surface with steel dowel barGeneral limits with GPS – so can find it againPhoto and location --- input into GIS system

Page 25: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

Pavement Management System

Scanning Electron Microscope (SEM)Energy Dispersive X-rays (XRD)

Detailed nature of cracksChemical make-up of deposits

Page 26: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

Pavement Management SystemSpecial Investigations and Testing

Taxiway with unusual corner breaks (only 7 years old)Corner of one slab visually deflected under gear of DC-8Suspected curling of slabs (16 inches thick)Cut 26-inch diameter core

Page 27: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

Pavement Management SystemSpecial Investigations and Testing

Curling confirmedNote void between bottom of slab and top of cement treated base

Page 28: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

Pavement Management SystemSpecial Investigations and Testing

Slice core in sections 4-inch thickX-ray to see dowel and dowel socket conditionVoid above dowel on one side and below dowel on other side of joint

Page 29: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

Pavement Management SystemSummary

PCIcondition

HWDdeflection

PSIsmoothness

Page 30: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

Pavement Management SystemSummary

Not an exact science – pavement failure is like beauty

It is in the eye of the beholder/user

ATL – system development over 28 years

Institutional knowledge retrievable in a database

Asset worth $2 billion

Sustainable Concrete Pavement

Page 31: Concrete Airport Pavement Workshop Right Choice, Right Now ...€¦ · ATL – World’s Busiest Airport In 2011 ¾Passengers 92 million ¾Aircraft Operations 923,000 ¾Concrete Pavement

Pavement Management System

Summary

LIFE OF 2 RUNWAYS NEARLY DOUBLED TO ~40 YEARS

VALUE -- CONSERVATIVELY ESTIMATED > $100 MILLION

–Good News – Concrete lasts a long time.

Sustainable Concrete Pavement