Concrete Test Section. RPF 8 May 2002. Outline. Objectives Design details Material properties Instrumentation Traffic Construction Conclusion. Objectives. To calibrate cncRisk at the lower end of the traffic spectrum To quantify failure of low-volume concrete pavements. Parties. - PowerPoint PPT Presentation

Citation preview

Page 1: Concrete Test Section

Concrete Test Section Concrete Test Section

RPF

8 May 2002

Page 2: Concrete Test Section

ObjectivesDesign detailsMaterial properties InstrumentationTrafficConstructionConclusion

OutlineOutline

Page 3: Concrete Test Section
Page 4: Concrete Test Section

To calibrate cncRisk at the lower end of the traffic spectrum

To quantify failure of low-volume concrete pavements

ObjectivesObjectives

Page 5: Concrete Test Section

Cement and Concrete InstituteCSIR TransportekUniversity of Pretoria

Alpha Stone and ReadymixBKSRaubex

PartiesParties

Page 6: Concrete Test Section

University of PretoriaSection 1

75 mm SFRC (30 kg/m3) Joint spacing 3 m140 mm Foam concrete subbase In situ

Section 275 mm SFRC (30 kg/m3) Joint spacing 6 & 4 m 125 mm CTS In situ

Design detailsDesign details

Page 7: Concrete Test Section

University of Pretoria (cont)Section 3

75 mm SFRC (30 kg/m3) No joints25 mm ETB125 mm CTS In situ

Design detailsDesign details

Page 8: Concrete Test Section

CSIR TransportekSection 4

50 mm “CRCP”50 mm ETB125 mm CTS In situ

Section 575 mm “CRCP” 25 mm ETB 125 mm CTS In situ

Design detailsDesign details

Page 9: Concrete Test Section

CSIR TransportekSection 6

100 mm “CRCP”125 mm CTS In situ

Design detailsDesign details

Page 10: Concrete Test Section

C&CISection 7

100 mm butt jointed Joint spacing 2 and 3 m125 mm CTS In situ

Section 8100 mm butt jointed Joint spacing 2 and 3 m40 mm continuously graded asphalt 100 mm CTS In situ

Design detailsDesign details

Page 11: Concrete Test Section

C&CISection 9

140 mm jointed Joint spacing 2, 3 and 4 m125 mm gravel In situ

Section 10140 mm butt jointed Joint spacing 2, 3 and 4 m125 gravel In situ

Design detailsDesign details

Page 12: Concrete Test Section

C&CISection 11

140 mm dowel jointed Joint spacing 2, 3 and 4 m Dowels 25 mm @ 300 c/c

125 mm gravel In situ

Design detailsDesign details

Page 13: Concrete Test Section

In situCBR 80Quartzitic gravel A-1-a G5/G6Compaction 97% Mod. AASHTOFWD deflections 1,0 mm

Material PropertiesMaterial Properties

Page 14: Concrete Test Section

SubbaseAs in situCompaction 97% Mod. AASHTOStabilized with 2% CEM I 42.5 (C3)

(Recycler)UCS 2000 kPaFWD deflection 0,9 mm and Stab 0,5 mm

Material PropertiesMaterial Properties

Page 15: Concrete Test Section

ETBSubbase materialStabilized with 1,5% anionic stable grade

60%, 1% cementAsphalt

Continuously graded hot mix with 60/70 pen

12 mm aggregate size

Material PropertiesMaterial Properties

Page 16: Concrete Test Section

ConcreteStrength

fc 22 - 42 MPa

ff 3,7 - 5,6 MPa

Mod E 24 - 33 GPaShrinkage 0,05 - 0,06 %Cement CEM I 42,5/GGBS 80/20

Material PropertiesMaterial Properties

Page 17: Concrete Test Section

LVDT’sCentreSide

ThermocouplesConventionalProgrammable

MDD’sWeather station

InstrumentationInstrumentation

Page 18: Concrete Test Section
Page 19: Concrete Test Section
Page 20: Concrete Test Section
Page 21: Concrete Test Section
Page 22: Concrete Test Section
Page 23: Concrete Test Section
Page 24: Concrete Test Section
Page 25: Concrete Test Section

Readymix concreteCompaction by poker and beamCuring compoundPlastic sheeting

ConstructionConstruction

Page 26: Concrete Test Section
Page 27: Concrete Test Section
Page 28: Concrete Test Section
Page 29: Concrete Test Section
Page 30: Concrete Test Section
Page 31: Concrete Test Section
Page 32: Concrete Test Section
Page 33: Concrete Test Section
Page 34: Concrete Test Section
Page 35: Concrete Test Section
Page 36: Concrete Test Section
Page 37: Concrete Test Section
Page 38: Concrete Test Section
Page 39: Concrete Test Section

Trucks leaving quarryWeighbridge dataNo of axlesApproximately 300 E80’s per dayTo date 14 000 E 80’s

TrafficTraffic

Page 40: Concrete Test Section

Very little distress to dateVertical movement at joints under traffic

but no relative movementRocking of slabs on foam concreteSome corner breaksPlastic shrinkage cracks not affecting

performance

ObservationsObservations

Page 41: Concrete Test Section

Ongoing observationsContinual recording of instruments to

end MayPanel to define failureAnalysis of resultsAvailability of data

FutureFuture

Page 42: Concrete Test Section

Thank you Thank you