8
Congestion Management Work Group Update WMS 8-18-10 I Flores, S Reedy—ERCOT M Wagner--PSEG TX

Congestion Management Work Group Update WMS 8-18-10 I Flores, S Reedy—ERCOT M Wagner--PSEG TX

Embed Size (px)

DESCRIPTION

Constraint Competitiveness Test – DME List Key Documents Controlling Entity Declaration Form (03/26/10,.doc, 82.5 KB)Controlling Entity Declaration Form Planning and Market Reports - Roadmap to P.U.C. Rule (09/28/09,.doc, 72 KB)Planning and Market Reports - Roadmap to P.U.C. Rule Resource Controlling Entity (07/28/10,.xls, KB)Resource Controlling Entity

Citation preview

Page 1: Congestion Management Work Group Update WMS 8-18-10 I Flores, S Reedy—ERCOT M Wagner--PSEG TX

Congestion Management Work Group Update

WMS 8-18-10

I Flores, S Reedy—ERCOT

M Wagner--PSEG TX

Page 2: Congestion Management Work Group Update WMS 8-18-10 I Flores, S Reedy—ERCOT M Wagner--PSEG TX

CMWG Met on 7/30/10

• Constraint Competitiveness Test (CCT)– Decision Making Entity (DME) List– List of Competitive Constraints

• CRR Auction Details– Several outstanding issues in ERCOT systems

• No showstoppers

• DA Model

Page 3: Congestion Management Work Group Update WMS 8-18-10 I Flores, S Reedy—ERCOT M Wagner--PSEG TX

Constraint Competitiveness Test – DME List

http://www.ercot.com/gridinfo/sysplan/ Key Documents

Controlling Entity Declaration Form (03/26/10, .doc, 82.5 KB)

Planning and Market Reports - Roadmap to P.U.C. Rule 25.505 (09/28/09, .doc, 72 KB)

Resource Controlling Entity (07/28/10, .xls, 107.5 KB)

Page 4: Congestion Management Work Group Update WMS 8-18-10 I Flores, S Reedy—ERCOT M Wagner--PSEG TX

Constraint Competitiveness Test – DME List

• DME list persists as potential issue for CCT• IMM attended CMWG and noted that DME list potentially

does not reflect common control and decision making for entities

• ERCOT has done one follow up already—another may be desirable

• No insight on whether more concentrated DME list could potentially remove constraints on draft CCT list

• Recommend WMS ask for update from IMM

Page 5: Congestion Management Work Group Update WMS 8-18-10 I Flores, S Reedy—ERCOT M Wagner--PSEG TX

Constraint Competitiveness Test, ctd.• CMWG was to report to WMS in August to

with updated CCT list – Behind schedule– No results from LFC testing yet to determine

whether competitive constraints seem reasonable

Page 6: Congestion Management Work Group Update WMS 8-18-10 I Flores, S Reedy—ERCOT M Wagner--PSEG TX

TAC Must Approve Competitive Constraints

• Protocol Definition “Competitive Constraint”“A contingency and limiting Transmission Element pair that is determined to be competitive by an appropriate TAC subcommittee.”– Requires analysis of nodal cases with congestion on

competitive constraints and same load flow case without competitive offers in there to understand difference CCT is making

– To meet go live schedule, TAC needs to approve this in Sept. Should NATF take this work on to ensure ERCOT involvement?

Page 7: Congestion Management Work Group Update WMS 8-18-10 I Flores, S Reedy—ERCOT M Wagner--PSEG TX

Congestion Revenue Rights Auction• Working but with a couple of bugs

– Outages not transferring smoothly into auction tool--ERCOT has a work around

– Connectivity Nodes (used to transform model from EMS format to CRR format)—a few transformation problems yet to resolve

• ERCOT responded to questions about recent auction results– Results were explainable due to various items—

binding constraints, nonzero impedance between transformers at single location

– BOD anticipated to approve go live prior to WMS meeting

Page 8: Congestion Management Work Group Update WMS 8-18-10 I Flores, S Reedy—ERCOT M Wagner--PSEG TX

Other

• DAM – to date does not include PCAPs, RAPs, SPS– No consistent process (to date) to incorporate

in the DAM– ERCOT is working on the issue