Upload
vannhu
View
223
Download
0
Embed Size (px)
Citation preview
AGENDA• Building Program Update• Construction and Financing
Authorization – Vote• What to expect with construction• Closing Prayer
• Opening Prayer • Agenda Overview /
Quorum Count / Distribute Ballots
• Elder Election - Vote• Senior Pastor Remarks• Elder Appreciation
ELDER NOMINATIONDave DuHadwayDave is a Virginia native (Norfolk), was brought up in a believing home, was active in Young Life while attending and graduating from Lake Braddock Secondary School in 1985. After graduating from the University of Notre Dame in 1989, he served on active duty in the Air Force for 25 years. His family have been members of BCC for six years. Dave has served as the Men's Ministry Leader since 2014. His family has been involved in the Student Ministry, Women's Ministry, and the Worship Arts Ministry since 2010.
Members – please raise your hand for quorum count and hold it up until counted by an ElderMembers – please take one ballot and mark it, fold it and pass it to the aisle
SENIOR PASTOR’S REPORT• Video Venue
• Double the attendance of the Sunday evening service. • Averages 249 worshippers. • 8,703 worshippers since 9/11/2016.• Provides excellent and intimate worship experience. • Room for more worshippers.
SENIOR PASTOR’S REPORT• Construction observations
• Shuttle transportation is pivotal. • Focus on flexibility, understanding and creativity. • Pray for leaders as they lead in uncharted waters.
SENIOR PASTOR’S REPORT • Hope to break ground in Winter of 2017. • Modulars will be removed prior to ground breaking. • Two modulars are being sold to a Korean church. • Modulars currently used for four children’s and adult classes. • Current basement remodel begins June of 2017. • Plan is to build four complete classrooms in this area. • Children will occupy the “new” basement in the Fall of 2017.
SENIOR PASTOR’S REPORT• Adult Generation Sunday morning ministry changes for Fall of
2017.• Educational program to be modified during construction.
• Possible 8 a.m. class & more Wednesday night classes.• Exploring offering seminars on topics of interest during this
time. • Wednesday night classes will continue during this period.
SENIOR PASTOR’S REPORT• Adult Generation Sunday morning ministry changes for Fall of
2017.• Life Groups will be emphasized during construction.
• New leaders needed because of an unusual number of summer moves.
• Some larger groups will need to consider splitting to accommodate more people.
• New worshippers should consider a Quick Connect group.
SENIOR PASTOR’S REPORT • Adult Generation Ministries which will remain unchanged:
• Men’s Base Camp (Tuesday morning & Wednesday night). • Men’s monthly breakfast.• Women’s Breakaway program on Tuesday mornings.• Women’s W.O.W. Wednesday evening program. • Women’s summer Oasis.
SENIOR PASTOR’S REPORT • Next Generation Sunday morning ministry changes for May 28th.
• High School moves from basement to Main Street Square. • 7th & 8th grades combine with 5th & 6th grades in room 202. • 3rd & 4th grades move from Main Street Square to room 201.• This new model will exist during the construction period. • Wednesday & Thursday programming will remain the same.
SENIOR PASTOR’S REPORT • Sermon/Teaching series
• Family Matters Matter (ten parts)• Transgenderism (six parts)
• Six sermons• 2 on logical analysis• 2 on philosophical analysis• 2 on biblical analysis
• Six Friday night sessions on a variety of related topics
SENIOR PASTOR’S REPORT • Sermon/teaching series
• Heading Toward Home (Two-part giving series this Fall) • The book of Romans• Seminar on Islam
SENIOR PASTOR’S REPORT• Men’s Ministry Appreciation:
Dave DuHadwayLeader of Men’s Ministry 2014-2017
SENIOR PASTOR’S REPORT • New Leader of Men’s Ministry: Dallas Shaw
Dallas was raised down the road in Yorktown, Virginia and retired to the area after serving 27 years in the Marine Corps. He is both a George Mason Patriot and a Virginia Tech Hokie. He currently lives in Fairfax City with his bride Jeannette and youngest son Sami (17). His oldest son, Hithem, is 21 and is serving in the Marine Corps at Camp Lejeune, N.C. Dallas chose to follow Christ in 1998 and began attending BCC in 2012.
SENIOR PASTOR’S REPORT • Staffing Updates
• Taking applications for a Women’s Ministry Assistant. • Kim Grindle’s position is now called Student Ministries
Assistant. • Christine Little is the new Kitchen Coordinator.
FGL TIMELINE
Approved Site Plan
We will watch what God does through our
Capital CampaignComplete
Design Build
Capital Campaign (Oct 2014 – Dec 2017)
~3Y
3 Yrs
?
Spring 2015
When FGL giving (and mortgage) make construction affordable, we will complete the design and commence
construction.
Fall2014
FROM NOVEMBER 2014 CONGREGATIONAL MEETING
WE ARE HERE
2 YrsFall2019
WE ARE AT A MILESTONE THANKS TO THESE GIFTED PEOPLE
Master Planning Committee • Jack Law – Chair• Tansy Schindler – Construction
Liaison• Karen Callen• Kirk Hiles• Steffani Mears• Dick Riordan
Capital Campaign Committee• Keye Sabol – Chair• Steve Cantrell• Anthony Galassi• Jim Hassett• Chuck Key• Mike Mears• Randy Navarro
• Lorrie Parker• Erin Sniffin• Julie Steadley• Bob Waltemeyer
• Pam Sanders• Paul Schmidt• Kurt Willstatter
~1150 Seats
6 Classrooms
Bookstore
Prayer Room
ToiletsBaptistry
New BuildingGround Floor
Main Entrance
BASEMENT UNDERNEATH NEW WORSHIP CENTER9600 sq ft useable space
5 Future Classrooms
FutureToilets
Ministry and Utility Storage
PROJECT MILESTONES
Vote on Authorizing Construction & Financing
Remove Modular Classrooms
Break Ground Move into New Building
Construction PermittingComplete Costing / Sign Construction Contract
Renovate Existing Basement
Complete Renovations in the Current Building
2017
2018
2019
Isolate New Parking Lot
(Wisdom and Favor)(Timeliness)
(Safety)(Church Facility Use Plans)
(Willingness to Use Shuttle)(Generosity, Weather, Safety)
(Understanding God’s Will)
AND PRAYER REQUESTS
Patience
Grace
GET IN THE GAME - OVERALL UPDATE
• In hand $5.5M (as of MAY 14, 2017)• Pledge fulfillment $1.5M• Projected
• $0.2M additional unpledged giving• $1.1M in capital investment• $0.1M in other income
• Generosity events $600K
$9M
$0 $1 $2 $3 $4 $5 $6 $7 $8 $9 $10 $11 $12 $13 $14 $15 $16 $17
Received Pledges Outstanding Projected
FINANCING PLAN
Giving status as of May 14, 2017
Construction Loan
BUILDING DESIGN COST GROWTH (15% 0VER 3 YEARS)• Project Cost ~ $15M in 2014 (after shift from Multi-purpose building)• Project Cost < $17.2M in 2017 (99% Confidence)
• Initial Cost Estimates were overly optimistic• Construction materials inflation is main upward driver• Design change time delay (9 months) and scale contributed
Extensive Value Engineering helped control cost growthBudget reductions for furnishings and equipment helped control costs
CONSTRUCTION AND FINANCING - VOTEThe Elder Council proposes:1) Construction, renovation and purchasing be
approved for the overall project design.2) The budget of the overall project will not exceed
$17.2 million. Funded by contributions and debt.3) The debt obligation to complete the overall
project will not exceed $8.5 million.