WHAT IS GRANT ESTABLISH?
Under the stipulations of the Water (Prevention & Control of
Contamination) Act, 1974 and the Air (Avoidance & Control of Pollution)
Act, 1981, any procedure, industry or operation or an extension and
addition thereto, which is likely to discharge sewerage or trade effluent
into the environment or likely to discharge any air contamination into
the atmosphere will have to get Grant Establish of the State
Contamination Control Board i.e. Delhi Contamination Control Committee in
case of Delhi. Consent Management Cell of DPCC procedures and issues the
permission under the provisions of Water (P&CP) Act 1974 and Air (P&CP)
Act, 1981 keeping in view the other applicable contamination control
laws/rules.
WHY IS IT IMPORTANT FOR INDUSTRIES TO OBTAIN CONSENT TO ESTABLISH?
Delhi has actually been stated as an Air Contamination Control Location,
under sub area (1) of Area (19) of the Air (Prevention & Control of
contamination) Act vide alert No. GSR 106(E) dated 20-02-1987. This
indicates that no commercial plant (any plant made use of for any
commercial or trade functions) can send out any air toxin (any strong,
liquid or gaseous element consisting of sound) into the atmosphere
without previous consent of the State Pollution Control Board. It also
suggests that no person shall, without the previous authorization of
Delhi Contamination Control Committee develop or run an industrial plant
in Delhi.
WHO IS THE AUTHORIZING AUTHORITY FOR GRANT ESTABLISH?
The Authorization Management Cell developed by State Pollution Control
Board / Committee supplies Consent to Establish.
FUNCTIONS AND ACTIVITIES OF PERMISSION MANAGEMENT CELL
Water (Prevention & Control of Contamination) Act, 1974 and Rules made
there under.
Air (Prevention & Control of Contamination) Act, 1981 and Rules made
there under.
Relevant stipulations of Environment (Security) Act, 1986 and Rules made
there under.
The Hazardous Wastes (Management, Handling and Trans-boundary Movement)
Guidelines, 2008.
The Plastics Waste(Management & Handling)Rules, 2011
The Delhi Degradable Plastic Bag (Manufacture, Sale & Usages) and Trash
(Control) Act, 2000.
S.O. 1533(E), [14/09/2006]-- Environmental Effect Evaluation
Notification-2006
FILES TO BE SUBMITTED FOR CONSENT TO ESTABLISH:.
1. Properly filled in application FORM No. XIII under Water Act.
2. Appropriately filled out application No.
I under Air Act. 3. Permission cost under Water Act and Air Act in the
form of demand draft in favor of"Contamination Control Committee" or
"State (Name) Pollution Control Board".
4. Sworn affidavit in Twenty Rupee stamp paper giving details of capital
investment consisting of land, plant and structure & machinery without
depreciation.
5. Copy of Land sale/lease agreement.
6. Copy of Provisional registration/In principal clearance provided by
District Industries Centre (DIC).
7. Comprehensive job report consisting of the following:.
(a.) List of items to be made.
(b.) List of basic materials to be used (product-wise) & quantity needed
per month.
(c.) List of plant & equipment to be set up.
(d.) Details of Boilers/Thermic Fluid Heaters/DG Sets to be installed and
their capacity, fuel to be made use of and fuel consumption.
(e.) Information of hazardous chemicals, chemical name and its Boiling
Point ("C), Flash Point ("C) and storage ability (Tones) at any given
time.
(f.) Product Security Data Sheet (MSDS) of unsafe chemicals as per
Schedule 9 of the Manufacture, Storage and Import of Hazardous Chemicals
Rules, 1989.
(g.) In-depth production process (product-wise) consisting of chemical
reactions.
(h.) Process Flowchart (product-wise).
(i.) Source of waste generation and its quantity.
(j.) Quality of effluent generation before and after therapy and release
point.
(k.) Details of Effluent Treatment Plant consisting of design, blue print
and treatment procedure.
(l.) Details of solid wastes generation (non-hazardous)-- kind, amount
and technique of collection, storage, treatment and disposal.
(m.) Information of stack and the procedure equipment/machinery to be
attached with it and "Air Contamination Control Develops" to be installed
including blue print.
(n.) Quantity and quality of stack exhaust before and after treatment.
8. Application for details of hazardous waste generation- type, amount,
physical form, chemical composition and technique of collection, storage,
disposal and therapy.
9. Memorandum of Articles Association/Partner Ship Deed (Signed).
10. Authorization letter to sign/receive files.
TIME TAKEN TO OBTAIN CONSENT TO ESTABLISH.
The consent to establish will be granted by DPCC within a duration of
four months after the receipt of the application for authorization.
CONCLUSION.
It is essential for any unit defined above to get consent to establish
prior to setting up the plant. List and information mentioned above are
not detailed and for understanding based sharing of business owners
looking to set up their industrial unit. You can hire our group of
specialists to apply for Consent to Establish if you are looking to set
up your own commercial device. At PDV Group, we are participated in
offering best Intermediary services to our clients to acquire
authorizations for different industries. For even more information, visit
our internet site: http://www.propertydocumentverification.com, you can
compose to us at [email protected] or offer us a call on our helpline
+91 -9911661818 and directly talk with our specialists for any kind of
questions.
consent to establish:
http://www.propertydocumentverification.com/blog/consent-to-establish/