IRSC 2012 - London
I- A Very Challenging Line to OperateA. Environmental Features
B. Specific Installations1. Bellegarde remote control centre
2. Catenary switching device
3. Catenary power supply feeder
II- Providing Human Factors SupportA. Lot 11. Bellegarde remote control centre
2. Catenary switching device
B. Lot 2
IRSC 2012 - London
A- Environmental Features
Several curves of radius below 300 m
Risks of runaway
Source: Dossier de sécurité - Rénovation de la ligne du Haut Bugey V3 du 10/11/2011– Annexe 02
IRSC 2012 - London
A- Environmental Features
Difficult climatic conditions :- 120 rainy days per year,
- 65 days of frost,
- 27 days of thunder,
- heavy snow,
- ice formation in tunnels
Large rock walls along platforms
Large number of detectors and
protection nets from rock falls
Risks of wheel-slip, wheel-lock, track shift.
High risks of false alarms due to weather conditions
A- Environmental Features
Numerous and imposing structures :
- 10 tunnels of different lengths,
- 49 railroad bridges,
- 5 viaducts,
Presence along the line of 42 level crossings located in :
- high traffic areas,
- tourist zones,
- areas of difficult track geometry
IRSC 2012 - London
IRSC 2012 - London
A- Environmental Features
Central platforms including one :-located just at the end of a tunnel,
-at a gradient of 22 ‰
-and of a curve of 300 m making access to TGVs difficult,
Boarded track crossings
High passenger number in winter
Numerous tourists during summer
Risk of unauthorized presence on tracks
B- Specific Installations
1. A remote control centre in Bellegarde station
2. A unique type on the French national railway network of catenary switching device from 1500 V dc to 25 kV ac linked to the route in Bellegarde station
3. A rare 25 kV ac catenary power supply feeder to be used in case of emergency
If each of these features taken individually can be easily handled ; once gathered together they lead to real and important operation and maintenance risks including some which are linked to human factors.
IRSC 2012 - London
IRSC 2012 - London
B- Specific Installations 1- Bellegarde Remote Control Centre
Necessity to adapt to a new mode of rail traffic control and to a new technology
IRSC 2012 - London
B- Specific Installations 1- Bellegarde Remote Control Centre
Source: translated from Dossier de sécurité - Rénovation de la ligne du Haut Bugey V3 du 10/11/2011– Annexe 29
An inadequate adaptation of staff to new technologies could lead to incorrect application of procedures in case of disruption, to immobilization of trains and to the presence of passengers on tracks.
IRSC 2012 - London
B- Specific Installations 2- Catenary Switching Device
Linked to the routeRemote controlled by Bellegarde remote control centre
Voltage monitored by a programmable controllerCondition the clearing of the controlled protecting signal
Source: translated from Dossier de sécurité - Rénovation de la ligne du Haut Bugey V3 du 10/11/2011
IRSC 2012 - London
to Bourg en Bresse
To Geneva
Source: inspired from http://www.ligneduhautbugey.fr/
Area25000 V ac
Area25000 V ac
Area1500 V dc
Area1500 V dc
Switchingarea
Switchingarea
IRSC 2012 - London
B- Specific Installations 2- Catenary Switching Device
Control / command incidents at the remote control centre could lead to : command and control failures for the route to Haut Bugey prolonged immobilization of trains before station platforms passengers on tracks train running on sight and power trip stress for remote control centre staff
Requires : training to the particular characteristics of the installation ability to work with many people from different disciplines and remote
Communications dysfunctions in rail traffic control predominate in the majority of incidents.
Bellegarde TC SSR
Verbaly ask the SSR if voltage indication corresponding to the
established route is displayed on his terminal
Verify voltage indication on his terminal
Voltage indication is not displayed
SSR to BellegardeTC: voltage indication« TK …(1500 ou 25000)
displayed on my terminal »
Voltage indication is displayed
Inform Bellegarde TCby numbered
message
After having verified all other conditions for clearing the signal, authorises the passing of the stop signal under the usual regulatory
conditions.
Receive numbered message from SSR
Verbally inform Bellgarde traffic controllerReceive verbal information from SSR
After setting a route, the signal does not clear and the corresponding voltage indication (« KT 1500 » or « KT 25000 ») is not displayed
Source: translated from Dossier de sécurité - Rénovation de la ligne du Haut Bugey – Annexe 29
B- Specific Installations 3- Catenary Power Supply Feeder
To be used only in emergencies cases
Of delicate use in case of accidents on the catenary intervention of maintenance staff
Presents serious electrical hazards
Requires the acquisition of essential job skills
IRSC 2012 - London
B- Specific Installations
Operation of the renovated line is complicated
train traffic controller in charge of the remote control center,
operators, maintenance staff, central substation staff drivers ...
Risks of incidents derive from technical components organizational and human
factors
IRSC 2012 - London
IM decided to launch a dedicated study based on human factors
Lot 1 Control risks associated with
the catenary switching device and catenary power supply feeder
By working in collaboration with staff at the design stage
To ensure that they had identified and understood all risks of dysfunctions and their corresponding procedures
Lot 2 Assessing the robustness of
Bellegarde remote control centre’s planned organization
By identifying in literature and at similar sites, elements that could contribute to the reflection on the organization of Bellegarde remote control centre
IRSC 2012 - London
II- Providing Human Factors Support
Actions Study behaviour of a
single or multiple unit vehicle in case of accidental immobilisation under the catenary switching device
Study how staff would deal with programmable controller malfunctions
Decisions Write a special operating procedure for
the management of train distress scenarii under the catenary switching section,
Include relevant data in driver training, Produce documents on the conditions of
intervention on the catenary switching device for maintenance staff
Incorporate simulation exercises in staff training
Check the consistency of the documents Monitor the operation of the catenary
switching device / care about feedbacks
IRSC 2012 - London
A- Lot 11. Catenary Switching Device
Actions
Clarify the synchronisation of maintainers local interventions and the repowering of the feeder to rescue a train on the line
Decisions
Organizing knowledge sharing on the basis of catenary power supply feeder instructions
Organizing exercises to test its use in conditions close to real operations.
IRSC 2012 - London
A- Lot 11. Catenary Switching Device
IRSC 2012 - London
Issues
B- Lot 2Assessing the robustness of Bellegarde remote control
center planned organization
B- Lot 2Assessing the robustness of Bellegarde remote control
centre planned organization
Attention particularly paid on :
Operation of novel installations Clarity and readability of
procedures, Documents accessibility Procedure consistency Remote control center
ergonomics
Alarm management, tools and installations
maintenance Competency profile Training Management Workload Team composition
IRSC 2012 - London
Actions
Identify in literature and in the field, elements that could contribute to the reflection on the organization of Bellegarde remote control centre.
Decisions
Adapt Bellegarde traffic controllers’ training to their specific situation,
Organize meetings between train traffic controllers and players with whom they will have to work,
Regularly ensure rotation between the old and the new control centre,
Adapt the ergonomics of Bellegarde remote control centre.
IRSC 2012 - London
B- Lot 2Assessing the robustness of Bellegarde remote control
centre planned organization
IRSC 2012 - London
Conclusion
Since 2010 no accident related to :
-specific installations
-new technologies
-communications dysfunctions