Const. 118 Homework and notesAllen Green [email protected] Date: 4/5/2014
All cost and price rates is according to : “R.P Rempros.com/Remodeling Professional’s/Estimate (Labor Cost, Angie’s List
Proposed Projected Project: (2 car garage) Man cave idea
Projected Contractor: James Cameron of “Man Cave Inc. Co”
Total contract bid: $81,000.00
Start Up Price: $775,000.00
Material Bid Price: $350,000.00
A Two Car Garage (Wood or Vinyl) Permit: $2,500-3,500
A two car garage (28x40) wood $18,716 other $23,118. Possibly looking at 2 weeks most
Electrical: rough in $1,500 (a week) Media entertainment rough in $1,200 (1 day) ($2,500)(1,400)
Heating and AC: rough in $2000 (a week) ($2,500)
Drywall and Taping: $5,000 (2 weeks)
Ceramic tile floor installation: $2,500 (a week)
Wood Bar construction or fabrication: $200 (5hrs.)
Soundproof Studio: $300 (12 hrs.)
Total.................................................................................................... ($26,718) ($32,000)
The Finish Phase:
Finish sound system $1,200 (a week) ($5,000)
Lighting installation :$1,000 (2 days) ($1,500)
Finish heating.AC: $2,000 (4 days) ($3,200)
Finish Appliance : $3,000 (2 days) ($3,500)
Total................................................................................................... ($21,100)
Change Order List:
Const. 118 Class Project 2014, Contract Documents
Const. 118 Homework and notesAllen Green [email protected] Date: 4/5/2014
1. Revamp Design Change: $3000 ($5000)
2. Revamp Change: $3250 ($5100)
3. Revamp Change: $3475 ($5500)
Total Bid Overall including the change orders.............................................. ($72,200)
Total Bid....................................................................................................... ($ 56,600)
Material Bid: $350,000.00 $350,000.00
Total -$56,600.00 -72,200.00
Sub Total: = $56,250.00 = $ 27,788.00
Start up and Material Bid :.......................................................................... ($81,000.00)
Total Bid “As Now”..................................................................................... ( $56,250.00) $75,375.00
Const. 118 Homework and notesAllen Green [email protected] Date: 4/5/2014
Const. 118 Class Project, Project Labor Breakdown
A Two Car Garage (Wood or Vinyl) Permit: $2,500-3,500
New Construction and Excavation: $1200-3000 (22,000-35,000)
A two car garage (28x40) wood $18,716 other $23,118. Possibly looking at 2 weeks most
Electrical
Tying in with existing and established electrical ........(13.75 hr.)2 $5502.00 (40hrs)
New electrical rough in.............................................. (37.50)2 $15002.00 (40hrs)
Media rough in .......................................................... ( 118.75)2 $47502.00 (40hrs)
Plumbing
Plumbing rough in; tap in established plumbing- $25,000/40,000
Rough in plumbing labor (tap in: $300)2.......actual rough in..(27.50)2 $11002.00 (40hrs)
New plumbing rough in ................................................ (27.50)2 $11002.00 (40hrs)
Heating and AC
Heating and AC rough in -$30,000................................ (26.00)2 $10402.00 (40hrs)
Insulating
Insulation installation ......................................................... ( 14.00)2 $5602.00 (16hrs)
Drywall, Taping and Painting
Drywall installation; [28000+40000 sq.ft. ] ( 68000 total sq.ft,) $136,000 (24.00)2 $5752.00 (40hrs)
Drywall Taping; [68000 total sq.ft.] $119,000 ( 22.00)2 $5282.00 (24hrs)
Interior Painting; $119000 ................................................... (35.00)2 $5602.00 (16hrs)
Bar fabrication and construction
Fabrication and construction.................................................... (30.00)2 $2402.00 (8hrs)
Ceramic Floor installation --$2500............................................ (39.75)2 $15902.00 (40hrs)
Const. 118 Homework and notesAllen Green [email protected] Date: 4/5/2014
Sound Proof Studio Installation----$300.......................................... ( 30.00)2 $2402.00 (8hrs)
Finish Phase
Electrical finish lighting........................................................................ ( 13.75)2 $2202.00 (16hrs)
Finish heating AC................................................................................... (26.00)2 $8322.00 (32 hrs)
Finish Sound System Installation....$5000 . ............................................ (30.00)2 $12002.00 (40hrs)
Finish Appliance Installation--------$3500............................................. (750)3 $2252.00 (16hrs)
Total Labor Hours........................... 408 hours
Total Wage Cost............................. $18,262.00
Note : “The items that are highlighted are:
The Permit Cost
New Plumbing
New AC Heating Installation
The “D.T.P” per square footage
1. Drywall @ $2.00 square foot
2. Taping @ $1.75 square foot
3. Painting @ $1.75 square foot
Sound Proof Installation
The Sound System Installation
Electrical, Heating and Sound Appliance Finish