CONSTRUCTION CONTRACT RECORD KEEPING REVIEW CHECKLIST MURK 40 (03/17) Page 1 of 8 Job Stamp (Contract #, PIN, Description, Rte #, County, Contractor) Review Date Review # EIC / Project Manager Office Engineer/RE Area Supervisor Reviewer Region % Complete YES NO N/A ISSUE FIELD OFFICE YES NO N/A ISSUE Project Contact Phone #s Posted at Entrance & Accessible to the Public when FO is Closed Custom Templates Completed as per QRG #32 (Project Info/Emergency Contacts) FO Sign Posted & Clearly Visible to the Public Files in Fire Resistant Filing Cabinets If FO is Offsite, OnSite Sign w/ FO Address Files Kept Together, Organized, in Good Condition & Readily Accessible FO Bulletin Board Completed, Up to Date, & Record of Inspection on File Filing System Easy to Follow & Use Contractor’s Bulletin Board Inspected & Record of Inspection on File Key Contract Data Backed Up Regularly to an OffSite Place as per Regional Policy List of State/CSMIN/Personal Property in FO Given to Contractor for Insurance Notes : YES NO N/A ISSUE SAFETY & HEALTH YES NO N/A ISSUE Accepted S&H Plan on File Record of Periodic Nighttime WZTC Reviews S&H Plan Acceptance Letter Sent Safety Data Sheets (SDS) on File, Current, & Readily Accessible Subs Provide S&H Plan or HC108 Form (& Compiled w/ Prime's S&H Plan) Record of Requests for Missing SDS Asbestos Abatement Records on File OSHA Worker Safety Training Cards on File for All Workers & Sorted by Firm Lead Control Plan on File Record of Verification of OSHA Cards Contractor Tailgate Safety Mtgs Held Frequently (as per contractor’s S&H Plan) Record of Requests for Missing OSHA Cards Contractor Tailgate Safety Mtg Signature Sheets on File Flagger Certifications on File Record of Regular DOT Safety Meetings (Form SAF14 or Equivalent) Crane Operator Licenses on File Appropriate Notifications Sent to Permits & Regional Transportation Mgmt Center Welder Certifications on File Record of Regular Daytime WZTC Reviews Notes :

CONSTRUCTION CONTRACT RECORD KEEPING REVIEW … · CONSTRUCTION CONTRACT RECORD KEEPING REVIEW CHECKLIST MURK 40 ... Regional Transportation Mgmt Center Welder Certifications on File

  • Upload
    others

  • View
    19

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CONSTRUCTION CONTRACT RECORD KEEPING REVIEW … · CONSTRUCTION CONTRACT RECORD KEEPING REVIEW CHECKLIST MURK 40 ... Regional Transportation Mgmt Center Welder Certifications on File

     CONSTRUCTION CONTRACT RECORD KEEPING REVIEW CHECKLIST 

MURK 40 (03/17)      Page 1 of 8  

  Job Stamp 

(Contract #, PIN, Description, Rte #, County, Contractor)  Review Date              Review #                    EIC / Project Manager             

Office Engineer/RE             

Area Supervisor             

Reviewer             

Region             

% Complete              

YES 

NO 

N/A 

ISSU

FIELD OFFICE    YES 

NO 

N/A 

ISSU

 

        Project Contact Phone #s Posted at Entrance & Accessible to the Public when FO is Closed

          Custom Templates Completed as per QRG #32 (Project Info/Emergency Contacts)

        FO Sign Posted & Clearly Visible to the Public            Files in Fire Resistant Filing Cabinets 

        If FO is Off‐site, On‐Site Sign w/ FO Address             Files Kept Together, Organized, in Good Condition & Readily Accessible

        FO Bulletin Board Completed, Up to Date, & Record of Inspection on File 

          Filing System Easy to Follow & Use 

        Contractor’s Bulletin Board Inspected & Record of Inspection on File 

          Key Contract Data Backed Up Regularly to an Off‐Site Place as per Regional Policy

        List of State/CSMIN/Personal Property in FO Given to Contractor for Insurance 

           

Notes:            

 

YES 

NO 

N/A 

ISSU

SAFETY & HEALTH    YES 

NO 

N/A 

ISSU

 

        Accepted S&H Plan on File            Record of Periodic Nighttime WZTC Reviews 

        S&H Plan Acceptance Letter Sent            Safety Data Sheets (SDS) on File, Current,  & Readily Accessible 

        Subs Provide S&H Plan or HC108 Form (& Compiled w/ Prime's S&H Plan)

          Record of Requests for Missing SDS 

        Asbestos Abatement Records on File            OSHA Worker Safety Training Cards on File for All Workers & Sorted by Firm

        Lead Control Plan on File            Record of Verification of OSHA Cards 

        Contractor Tailgate Safety Mtgs Held Frequently (as per contractor’s S&H Plan)

          Record of Requests for Missing OSHA Cards 

        Contractor Tailgate Safety Mtg Signature Sheets on File 

          Flagger Certifications on File 

        Record of Regular DOT Safety Meetings  (Form SAF‐14 or Equivalent) 

          Crane Operator Licenses on File 

        Appropriate Notifications Sent to Permits & Regional Transportation Mgmt Center

          Welder Certifications on File 

        Record of Regular Daytime WZTC Reviews             

Notes:            

Page 2: CONSTRUCTION CONTRACT RECORD KEEPING REVIEW … · CONSTRUCTION CONTRACT RECORD KEEPING REVIEW CHECKLIST MURK 40 ... Regional Transportation Mgmt Center Welder Certifications on File

     CONSTRUCTION CONTRACT RECORD KEEPING REVIEW CHECKLIST 

MURK 40 (03/17)      Page 2 of 8  

YES 

NO 

N/A 

ISSU

SCHEDULE    YES 

NO 

N/A 

ISSU

 

        Current Record of Dept. & Contractor Delay Days 

          Record of Requests to Contractor for Late Schedule Updates 

        Daily/Weekly Work Plan Consistently Provided & in Advance (to Assign Staff)

          Timely Updates Provided for Significant Changes/New Construction Season

        Baseline Schedule Provided within 10 Days of Award & Timely Revision Submittals

          CPM Schedule Required? 

        Accepted Schedule in Place within 40 Days of Award (w/ comments OK) 

          Monthly CPM Updates Provided Timely 

        Schedule Review/Comments Provided Timely            Payments Made in Accordance with the CPM Specification Basis of Payment

        Schedule Acceptance Letter Sent & on File             

Notes:            

YES 

NO 

N/A 

ISSU

LOGS & REVIEWS    YES 

NO 

N/A 

ISSU

 

        Key Correspondence Logged & Up to Date            Shop Drawings Logged & Up to Date 

        Accident File Being Maintained Timely            Shop Drawings Processed Timely 

        Log of Subcontractor Approvals Up to Date            Demolition Plans Processed Timely 

        No Subs Allowed to Work Prior to Approval            Lifting Plans Processed Timely 

        All Insurance Policies Up to Date            Erection Plans Processed Timely 

        Office Tech Supply Item Log Up to Date            Copies of Submittals Sent to Regional Office as per Regional Policy 

Notes:             

YES 

NO 

N/A 

ISSU

DIARY    YES 

NO 

N/A 

ISSU

 

        Timely Diary Entries            Important Phone Calls Noted & Described 

        Pertinent Events & Info Recorded Timely During Shut Down Periods 

          Official Visitors Logged 

        Start Up & Shut Down Dates Entered in Custom Templates 

          Entries of/References to  Key Contract Correspondence 

        Notes in Appropriate Remarks Type            Directions/Orders to Contractor Noted 

        Detailed WZTC Information            Contractor's & Subcontractors' 1st Day of Work Clearly Noted 

        Detailed General Narrative            Date & Location of Initial Entry onto ROW for Temp. Easement/Occupancy Noted

        Start & End of Significant Operations Noted            Important Details are Made Prominent (Use Caps, Symbols, Spacing, etc.)

        Supporting Documentation Attached or Reference Provided to File Location

          Weather Information Recorded for Weather Sensitive Operations 

        Contractor's Work Hours Documented            Inspectors & Assignments Identified Daily Notes:            

Page 3: CONSTRUCTION CONTRACT RECORD KEEPING REVIEW … · CONSTRUCTION CONTRACT RECORD KEEPING REVIEW CHECKLIST MURK 40 ... Regional Transportation Mgmt Center Welder Certifications on File

     CONSTRUCTION CONTRACT RECORD KEEPING REVIEW CHECKLIST 

MURK 40 (03/17)      Page 3 of 8  

                     YES 

NO 

N/A 

ISSU

DAILY WORK REPORTS    YES 

NO 

N/A 

ISSU

 

        Timely DWR Submissions            Other Remarks 

        Timely DWR Approvals            Prime's & Subs' Work Hours Documented 

        Easy to Follow Audit Trail for Entry Revisions/Corrections/Additions 

          Materials Received, Item & Quantity Noted in DWR / LIMS 

        Notes in Appropriate Remark Type            Labor & Equipment Recorded 

        Supporting Documentation/Sketches are Attached/Referenced 

          Appropriate Equipment Details Added in 'Remarks' Under the ‘Contractor’s Equip.’ Tab

        Supporting Photos Attached/Referenced            Contractor's Start of Entry for Each Site Clearly Recorded 

        Proper Templates or MURK Forms Used & Attached for Specialized Work 

          Pay Quantities 

        Work Zone Traffic Control Remarks            Pay Items Recorded Under ‘Work Items’ Tab 

        Detailed Set Up & Location Notes            'Remarks' Field Under ‘Work Items’ Tab Used to Provide Additional Detail

        Personal Protection & Equip. Safety Appurtenances Noted Regularly 

          Appropriate Pay Item Templates Used 

        Reference to Appropriate Phasing, Plan Sheet/Detail, Std Sheet, and/or MUTCD

          Correct Use of Progress Payments 

        WZTC Checklist Used (optional)             Measurements Correctly Identified as ‘Interim’ or ‘Final’ on the ‘Work Items’ Tab

        General  Remarks            Correct Sub Assigned to Pay Items 

        Identify Who Performed Work (Prime/Sub)            Hot Mix Asphalt 

        Identify Work Site Location            MURK 4 Attached or Template Used for HMA Production Paving Work 

        Weather Recorded Daily for Each Site            Delivery Tickets Collected & on File 

        Daily Operations Noted            Item #, Temperature, & Inspector’s Full Name on Delivery Tickets 

        Observations of Non‐Standard Operations & Discussions with Contractor Noted

          Plant Reports Received & Attached to Corresponding Delivery Tickets

        Tests & Measurements Noted            Plant Reports (BR 343) Signed by NYSDOT 

        Identify Any Field Measurements Taken as ‘(Field Measured)’ or ‘(FM)’   

          Total # of Delivery Tickets Recorded 

        Related Requirements & References Noted            Waste/Rejected Material Documented 

        ‘No Payment At This Time’ (NPATT) Stated When Appropriate 

          Mix / Type Code Recorded 

        Correct Categories (Fiscal Shares) Used            Proper Sampling & Testing for HMA Series Performed & Recorded (Cores, Density)

        Pay Calculations Shown & Supported            Test Strips Properly Recorded & Paid 

        Record of Pay Calculations Being Checked, Including Attachments  (Initials are OK)

          Yield Checks Performed 

        Subs' 1st Day of Work Clearly Noted            Plant QAF Properly Calculated & Reported on DWR

        Material Manufacturer's Info Listed            Compaction QAF Properly Calculated & Reported on DWR 

                    Material Acceptance Done At Least Once for Each Nuclear Density Gauge Operator

                     

                     

Page 4: CONSTRUCTION CONTRACT RECORD KEEPING REVIEW … · CONSTRUCTION CONTRACT RECORD KEEPING REVIEW CHECKLIST MURK 40 ... Regional Transportation Mgmt Center Welder Certifications on File

     CONSTRUCTION CONTRACT RECORD KEEPING REVIEW CHECKLIST 

MURK 40 (03/17)      Page 4 of 8  

YES 

NO 

N/A 

ISSU

DAILY WORK REPORTS (cont.)  YES 

NO 

N/A 

ISSU

 

        Concrete             

        MURK 3 Attached or Template Used for Concrete Pavement Work 

          Total # of Delivery Tickets Recorded 

        MURK 5 Attached or Template Used for Structural Concrete Work 

          Material Usage Recorded 

        Delivery Tickets Collected            Waste/Rejected Material Documented 

        Item #, Placement Location, Inspector’s Full Name & Test Results on Delivery Ticket

          Truck / Mixing Information Recorded 

        Plant Reports Received & Attached to Corresponding Delivery Tickets 

          Concrete Field Testing, Results & Cylinders Recorded

Notes:            

YES 

NO 

N/A 

ISSU

LABOR     YES 

NO 

N/A 

ISSU

 

        Training Requirements (#, GFE, Program, Hours & Payments) Managed as per Spec

          Wage Rate Interviews 

        Certified Payrolls            Adequate Total # of Prime Interviews (30%±) 

         Prime Payroll Rates & Hours Checked             Adequate Total # of Subs Interviews (30%±) 

        Subs Payroll Rates & Hours Checked            Adequate # of Interviews Conducted Under Current Year Rate Schedule (7/1 to 6/30)

        Only Last 4 Digits of Social Security #s, Race & Gender Shown 

          Interviews Conducted Across Various Labor Classifications 

        Checkmarks Next to Verified Rates & Discrepancies Noted on Payroll Reports

          Verification Section (Part II) of Wage Rate Interview Forms (MURK 10) Completed

        Payroll Records Organized (Separate Folders for Each Sub) 

           

        Payroll Audit Reviewed in EBO             Notes:              

YES 

NO 

N/A 

ISSU

CIVIL RIGHTS    YES 

NO 

N/A 

ISSU

 

        Prime Entering Complete & Accurate EEO Data in EBO Timely 

          Good Faith Efforts Continually Documented If Goal Not Met At Pre‐Award

        Subs Entering Complete & Accurate EEO Data in EBO Timely  

          Record of Requests for Missing Good Faith Effort Documentation 

        Review of the Monthly Utilization (EEO) Report (EBO) Recorded 

          DBE Subcontractors' Commercially Useful Function (CUF) Documented in Diary / DWR

        Review of Contract Goal (D/M/WBE) Analysis Report (EBO) Recorded 

         Signed DBE Self‐Certification Forms On File  

Notes:                  

Page 5: CONSTRUCTION CONTRACT RECORD KEEPING REVIEW … · CONSTRUCTION CONTRACT RECORD KEEPING REVIEW CHECKLIST MURK 40 ... Regional Transportation Mgmt Center Welder Certifications on File

     CONSTRUCTION CONTRACT RECORD KEEPING REVIEW CHECKLIST 

MURK 40 (03/17)      Page 5 of 8  

YES 

NO 

N/A 

ISSU

MATERIALS    YES 

NO 

N/A 

ISSU

 

        Material Acceptance Item Files/Binder Established & Clearly Organized & Labeled

          Tracking IAST Performed/Required for all Testers & Current Status Report on File

        Material Acceptance Documents on File            Soil Compaction Test Results Recorded 

        Item #, Quantity, Inspector Full Name, Date on Mat'l Acceptance Documents 

          Testers have Current Soil Compaction Testing Qualifications 

        Approved List Verification in Item File            Testers have Current Concrete Testing Qualifications 

        Sample Testing/Certification Data Properly Inputted 

          Concrete Cylinder Break Log Up to Date 

        Approved List & Visual Acceptance Properly Inputted 

          Structural Concrete Placement Log Up to Date 

        'Not Needing Certification' Correctly Identified/Used 

           

Notes:            

 

YES 

NO 

N/A 

ISSU

ENVIRONMENTAL    YES 

NO 

N/A 

ISSU

 

        Hazardous Waste Manifests on File            SPDES Inspection Reports (MURK 6) Logged  (1/wk, 2/wk > 5 acres, 1/mo Shutdown)

        Is this a GreenLITES Certified job?            SPDES Reviews by Certified Person 

        GreenLITES Scorecard on File & Changes Documented 

          SPDES Inspection Photos Taken 

        SPDES Permit Certification (CONR 5) Signed & on File for Prime & All Subs 

          HC 210 (Inspect. Freq. Reduction Notice) to DEC & on File for Temp. Shutdowns

Notes:               

YES 

NO 

N/A 

ISSU

PAYMENTS    YES 

NO 

N/A 

ISSU

 

        Estimates Processed Timely            Notes Made for Any Missing Receipt of Payment Entries by Subs (EBO)

        Any Withheld Payments? If Yes, Note Reason Below 

          Record of Requests for Missing Receipt of Payment Entries (EBO)  

        CONR 22 Report on File & Current            Fuel Price Adj. Current  

        Estimate/Quantities Paid (CONR 22) Provided to the Contractor for Each Estimate Period

          Asphalt Price Adj. Current  

        Overruns & Missing Material Acceptances Reviewed  

          Contractor Elected to Identify Items for Steel Price Adjustment (within 30 Days of Award)?

        WZTC % Payment Report Up to Date & Attached to DWR 

          Steel Price Adj. Current  

        Payment Processed Timely for Mobilization            Has the Contractor Requested Payment for Stockpiled Materials? 

        Regular Review of Prompt Payment Rpt (EBO) & Significant Late Payments Recorded

          Payments Processed Properly for Stockpiled Materials

Notes:            

Page 6: CONSTRUCTION CONTRACT RECORD KEEPING REVIEW … · CONSTRUCTION CONTRACT RECORD KEEPING REVIEW CHECKLIST MURK 40 ... Regional Transportation Mgmt Center Welder Certifications on File

     CONSTRUCTION CONTRACT RECORD KEEPING REVIEW CHECKLIST 

MURK 40 (03/17)      Page 6 of 8  

  

YES 

NO 

N/A 

ISSU

CHANGE ORDERS    YES 

NO 

N/A 

ISSU

 

        Have Changes Increased the Contract Value by 5% or More 

          Is There Agreed Price Work? 

        Change Orders Submitted Timely            Cost Analysis Worksheets Completed & on File for Agreed Prices 

        Field Change Payment (FCP) Being Utilized Appropriately 

          Is There Force Account Work (FAW)? 

        SiteManager Override Used Appropriately            Force Account Records (MURK 11) on File & Reviewed/Signed 

        Time Extensions Submitted Timely            FAW Payments Based on Submitted Records Only

        VECP Procedures Properly Followed            Standard 15% FAW Labor Markup Used 

        At/Over Threshold Notification Sent to Contractor & on File 

          Was a FAW Estimate Processed? 

        Authorization of Extra Work (CONR 104) Initiated Timely (In Advance of Work)

          FAW Estimate Only Paid Up to Max. of 90% 

        CONR 104 Signed by Supervisor & RCE            Final FAW Change Order Processed to Reconcile FAW Estimate 

        Overruns Addressed Timely             Notes:             

 

YES 

NO 

N/A 

ISSU

MISCELLANEOUS    YES 

NO 

N/A 

ISSU

 

        As‐Built Revisions on File            Correct Forms Used for Releases 

        PE Approval on File for Significant Design Changes 

          ROW Agreements Executed/Not Pending 

        Job Stamp/Contract Info on Records            HC 114 Submitted & on File for Initial Entry onto ROW for Temp. Easement/Occupancy

        Initial Site Condition Photos Taken            Utilities / Railroad 

        Photos Taken of Areas of Potential Concern/Interest/Discussion 

          Utility Agreements Executed/Not Pending 

        Photos Documented & Organized            Record of Tracking the Utility Agreements 

        Photos are Remotely Accessible (as per Regional Policy)  

          Utility Delay File Up to Date 

        Real Estate            Rail Agreements Executed/Not Pending 

        Necessary Releases on File (ROW, Driveway, Walkway, Planting, Grade/Turf,  Util. Lateral)

          Record of Tracking the Rail Agreements 

Notes:            

        

Page 7: CONSTRUCTION CONTRACT RECORD KEEPING REVIEW … · CONSTRUCTION CONTRACT RECORD KEEPING REVIEW CHECKLIST MURK 40 ... Regional Transportation Mgmt Center Welder Certifications on File

     CONSTRUCTION CONTRACT RECORD KEEPING REVIEW CHECKLIST 

MURK 40 (03/17)      Page 7 of 8  

 ADDITIONAL NOTES:                                                                       

Page 8: CONSTRUCTION CONTRACT RECORD KEEPING REVIEW … · CONSTRUCTION CONTRACT RECORD KEEPING REVIEW CHECKLIST MURK 40 ... Regional Transportation Mgmt Center Welder Certifications on File

     CONSTRUCTION CONTRACT RECORD KEEPING REVIEW CHECKLIST 

MURK 40 (03/17)      Page 8 of 8  

   

SIGNATURES     Report Prepared By:              Date:              Optional Reviews/Signatures:    Secondary Review By:              Date:             

   Management Review By:              Date:             

     Received By:              Date:             

  Checklist Notes:   1.  A box around ‘Yes’ and ‘No’ indicates it is an item for which a ‘No’ entry does not necessarily imply a direct concern with the NYSDOT 

field office record keeping efforts.   2.  Check ‘Yes’ if the overall status is acceptable.  If there are minor concerns, they should be noted.   3.  Check both ‘Yes’ and ‘No’ if the overall status is between acceptable and unsatisfactory.   4.  Check ‘No’ if the overall status is unsatisfactory.   ‘No’ should not be used to identify an item/event that has not yet occurred and which 

is still within an acceptable timeframe (use ‘N/A’ for this situation).   5.  Check ‘N/A’ if the item is not applicable to the contract or not applicable at the time of the review (e.g., There will be crane work next 

year but there are no crane licenses currently on file).   4.  Check ‘Issue’ if action is required to improve the contract record keeping.  ‘Issue’ can be checked even if ‘Yes’ is checked.   5.  Under ‘Additional Notes’, to note improvements since the last review, precede the note with an asterisk (*); conversely if there have 

been inadequate improvements since the last review, precede the note with a double asterisk (**).   7.  In general, when ‘on File’ is stated it indicates a paper copy requirement; ‘Recorded’ or ‘Record of’ indicates it can be a paper or 

electronic copy.