CITY OF CARMEL BY THE SEA
AGENDA BILL
TO: Honorable Mayor and Members
of
the City Council
Douglas J Schmitz, City Administrator
FROM: Sharon Friedrichsen, Director of Budget and Contracts
AB 1002
September 1 2015
Consent Calendar
SUBJECT: Award Construction Contracts for the Sunset Center Retaining Wall Project and the
Carpenter Street Drainage Project
AMOUNT OF EXPENDITURE 235,000 for Sunset Center
Retaining Wall;
AMOUNT BUDGETED 380,000 for the Sunset
Center Retaining Wall
APPROPRIATION REQUIRED 0 for Sunset Center
Retaining Wall
AMOUNT OF EXPENDITURE 221,262
for
Carpenter
Street Drainage
AMOUNT BUDGETED 170,000 for Carpenter
Street Drainage
APPROPRIATION REQUIRED
51,262
for Carpenter
Street Drainage
RECOMMENDATION
Adopt Resolutions
of
the City Council of the City of Carmel-by-the-Sea to:
1. Award a construction contract to Monterey Peninsula Engineering, the lowest responsible bidder,
for
the Sunset Center Retaining Wall Project, in an amount not to exceed 157,510.
2 Award a construction contract to Anderson Pacific Engineering, the lowest responsible bidder, for the
Carpenter Street Drainage Project, in an amount not to exceed 154,817.
3 Authorize the transfer
of
up to 51,262 from the Sunset Center Retaining Wall Project to the
Carpenter Street Drainage Project.
SUMMARY
The retaining wall at the Sunset Center collapsed
in
the wake
of
heavy rains in December 2014. Upon
receiving funding on 3 February 2015, staff proceeded to design and put the project out to bid. The
project involves tree removal; demolition of a portion
of
the existing wall; construction of a new cast-in
place concrete retaining wall; wall backfill; installation of drainage and pavement repair. On 19 August
2015, four bids ranging from 158,000 to 198,000 were received, as shown in the attached City
Page 1
8/20/2019 Construction Contracts 09-01-15
2/10
Engineer's Tabulation
of
Bid Results, and Monterey Peninsula Engineering (MPE) was determined to
be the lowest responsible bidder with a bid of 157,510, compared to the engineering estimate of
205,000. In accordance with Municipal Code §3.12.420, public projects of 25,000 or more shall be let
by formal written contract, approved by resolution of the City Council. The project was funded for
380,000. The total project budget is estimated t 219,137, which includes design, construction,
project contingency and construction management. It is therefore recommended that Council award the
construction contract to MPE.
Portions of Carpenter Street have been affected by water seepage and drainage issues. As such,
Council approved funding for a drainage and overlay improvement project during its deliberations
regarding capital improvement projects in the fiscal year 2015-16 budget. The project, funded for
170,000, involves storm drainage improvements (installation of sub drains, storm drains and catch
basins and reconstruction of drainage channels). Upon further evaluation during the design phase, it
was recommended that a more long-term and substantial drainage system was needed, thereby
increasing the cost of the project. On 19 August 2015, four bids were received ranging from 155,000-
278,000, asshown
in
the attached City Engineer's Tabulation of Bid Results, and Anderson Pacific
Engineering was deemed the lowest responsible bidder with a bid of 154,817, compared to the
engineering estimate of 160,240. The total project budget is estimated at 221,262, which includes
design, construction costs, project contingency and construction management. In order to achieve
economies of scale, the overlay work will be included as part of the fiscal year 2015-16 streets paving
project.
It is recommended that Council award the construction contract to Anderson Pacific
Engineering and authorize the transfer of an amount not to exceed 51,262 from the Sunset Center
Retaining Wall Project to the Carpenter Street Drainage Project.
PRIOR CITY COUNCIL CTION
Council approved a mid-year budget adjustment of 380,000 for the Sunset Center Wall on 3 February
2015 and approved the funding for the Carpenter Street Drainage Project as part of the adopted Fiscal
Year 2015-16 Budget on 15 June 2015.
TT CHMENTS
1. City Engineer Tabulation of Bids and Recommendation- Sunset Center Retaining Wall
2 Resolution Awarding Contract to MPE for the Sunset Center Retaining Wall Project
3 City Engineer Tabulation of Bids and Recommendation- Carpenter Street Drainage Project
4. Resolution Awarding Construction Contract to Anderson Pacific for the Carpenter Street
Drainage Project
Douglas
c h m i t z
City Administrator
Date:
g
/ /
P P R O
~ U
Page 2
8/20/2019 Construction Contracts 09-01-15
3/10
N ILL
NGIN RS
Corp
SHERMAN W.
LOW lt .E
GARY W. WHITE. LS.
CtAYTON B NEl
ll.JII ItC.E.
GILBERT M.
NEILL
R.C
.E.
Mr. Doug Schmitz
City Administrator
City
of
Carmel
POBox CC
Carmel, CA 93921
Re: Sunset Center Parking Lot
Retaining Wall Repair
Dear Mr. Schmitz,
CONSUUJNG ENGINEERS
MISSION and FIFTH-BOX Ll
CARMEl
CAUFORNIA
93921
831) 624-2110
FAX: 831)624-3693
August 20, 2015
ATTACHMENT- 1
SUB
OMS IONS
, lAND PlANNING,
WATER
SUPP
LY SANITAllON,
SUI IIrnNG , AIRPORTS
MUNICIPAI.IllES
Bids were opened for the Sunset Center Parking
Lot-
Retaining Wall Repair Project
on
Wednesday, August 19, 2015. Four bids were received listed
in
ascending order as follows:
Contractor
Monterey Peninsula Engineering
Anderson Pacific Engineering
The Don Chapin Co., Inc.
Granite Rock Company
Engineer' s Estimate
157,510
164
,1
49
178,722
196,701
204,680
The bids were reviewed for mathematical accuracy and other proposal requirements. All
of
he bid proposals were in order and considered responsive. A copy
of
the Tabulation of Bids
is enclosed.
We recommend that the contract be awarded to the low bidder, Monterey Peninsula
Engineering.
c: Rob Mullane
baron c r i . ~ l i s e
Very truly yours,
> 1 : r m ~ 7 o ; J
City Engineer
Council Meeting Date: 09/01/2015
Agenda It
m
:
7
Page 3
8/20/2019 Construction Contracts 09-01-15
4/10
~
/ ; ENGINEER'S ' MONTEREY PENINSULA
I
ANDERSON PACIFIC . THE DONCHAPIN to ; 1 GRANITE ROCK
·--- I
ESTIMATE
i
ENGINEERING ENGINEERING I INC. ____EQMPANY
; Description J
Quantiii[
Unit : Price Amount 1 Price Amount
i
Price Amount Price 1 Amount : Price · Amount
Demo Portion of Exist
in
g Concrete Retaining a l l ~ I $300.00J $6,000.00 $700.00 - $14,000.001 $120.oo
1
$2,400.oo: _ $300.00 $6,000.001 $415.00
1
$8,300.00
~ - s .
o n - : " : s t r u c t
Cast-In-Place Concrete Retaining Wall
1
. 75 L.F. I $1,000.00 $75,000.001 $600.001 $ 4 5 , 0 0 0 . 0 ~ __ 5_5.00 ' $39,375.oo
1
$800.00' $60,000.00 $772.00
1
$57,900.00
Install 2" dia. Weepholes . 25 Each $200.001 $5,000.001 $35.00, $875.
00
1 $110.oo\ $2,750.00. $90.00 $2,250.ooi $252.
00
• $6,300.00
~ - : - -
p o r t Structure Backfill
·-
1
L.S
. · $7,500.00 $7,500.001 $15,000.001 $15,000.001 $5,000.00 $5,000.00 $7,000.001 $7,000.001 $7,600.001 $7,600.00
Remove Existing Objectionable Material 1 L.S. ; $20,000.001 $20,000.00T $2,700.00: $2,700.00' $9,000.00
0.
$9,000.00 j $7.500.00 $7,500.oo: $19,300.00
Remove 20" Pine Tree _t_ , Each
1
$10,000.00, $10,000.00 $2,200.00• $2,200.00
1
$3,000.00j $3,000.00 ' $6,800.00 $6,800.001 $2,775.001 $2,775.00
lnstall15" PVC, SDR 26 Storm Drain
1
92
I
LF . $130.001
11
,960.00 $260.00' $23,920.00· $460.00 $42,320.oo l $250.00
~ 2 3 , 0 0 0 . 0 0
$157.00
1
$14,444.00
8 lnstall12" PVC , SDR 26 Storm Drain
I
50 L.F. $80.00 $4,000.00 $80.00\ $4,000.00
1
__
75.00' $3,750.00
1
$90.00 ' $4,500.00 $167.00 $8 ,350.00
9 JPlace 2-sk Slurry Cement Backfill Encasement 2 C.Y. · $400.001 $800.00 $326.00 ' $652.ool_ $1,250.00
..
$2,500.00 $200.00. $400.00; $432.00' $864.00
10 \Remove Existing Catch Basin 3 Each , $500.00. $1,500.00 $610.001 $1,830.001 $950.00\ $2,85o.oo: $200.00' $600.00
1
$89.00· $267.00
11 Construct 2' x
3'
Catch Basin __ I 3 Each $6,500.00, $19,500.00i $4,600.00'
1 3 ~ 0 0 . 0 0 _ E _ , 7 0 0 . 0 0 0 0 . 0 0
$3,000.00 $9,000.00 $3,791.00,
$ 1 1 , ~ 7 3 . 0 0
12 .Construct Storm Drain Manhole _ 1 2 Each
1
$7,500.00, $15,000.00 / $4,400.00 $8,800.00• $13,000.2Q)_ $8,500.00
1
$17,000.00 $5,589.001 $11,178.00
13
I
onstruct Curb & Gutter 1 206
1
. i-.F. . $50.00 $10,300.001 $45.00. $9,270.001 $50.oo : $10,300.001 __ 9 0 . 0 0
~ ~ 5 4 0 . 0 0
$88.00: $18,128.q_Q_
14 •Construct Pavement Conform Strip i 935 S.F. _ $12.00, $11,220.00 $9.00• $8,415.00 ' $10.oo: $9,350.00 $7.20 $6,732.001 $14.00i $13,090.00
15 Construct Planter Curb 38 I
$60.00 \ $2,280.00 $36.00 $1,368.001 $43.00
1
,634.00
$50.00 $1,900.001 $154.00, $5,852.00
6 ~ c e l l a n e o u s Pavement Repair I 100 : $15.00 $1,500.00 $16.001 $1,600.001 . $12.00
1
$1,200.00: $12.00 $1,200.00 $30.00, $3,000.00
17 ConstructAC Rolled Berm
I
45 l L.F. -- $16.00 $720.00 $32.00• _11,440.00 $36.00j 1 ,620.00 $30.001 $1,350.00 $18.00. $810.00
18
Furnish & Place 12" thick lmeort Topsoil 30 · C.Y. , $80.00
2 , ~ 0 0 . 0 0
__ 88.001- $2,640.00 ' $3,00o.ool $165.00, $4,950.oo
1
$239.ool $7,170.00
_ _ _
TOTA.L:
j ; - -+ : 204,68Q.OOf ; $157,510.
00
. - $164,149.00 1 _ _ _ j _ $ 1 7 8
7 ~ ___
_ 7 0 1 ~ _ Q _
- i I - - -- - :_
LOWBID
_• - - --
-·-
. --- - . · - - - ·-
= t
t
- - - - - ~ - - I ·
. -- - - - ~ - - -
n
H -
-
----------
===
-
_ _ _ _ . _ - - +
~
_
j
____
L
__
·
===
-
-
- L -
~
- -
- ~ i _ : _ _ -
_
_r
- -
= -
= = =
g
I 1--- + , ' + --- - - - - i ---..1 .
- -
~ - - - -
i - +- I I - - - - -- - - - -·---- ,- - - -, ---- - I -
i- - - - - -- ---
--- ;--
----
' I -
--: ··
-
--
-
- - - : : ~ ~ ~ ~ ~ - -
· = = = -
_ - _ - - - - -
- '
-1----- '
==-=-·
-+
- - ~ = - - - ,
-
~ -
- - - ~ - -
.--· -
- - · - - - - 1 ·
·
f __ _ ~ - - - - l - - -
--
- - - -
- __
_ _ j
___
_ r--
_L_____ ____ .. __
-- I
s: - - - '. ' _ j_____j___ -:-:-.
1
WO: 8386 Page 1of 1
. :;
_ . , y r H ~ O w n e r
CITY OF CARMEL-BY-THE-SEA
~ W P « > j ~ t Soo t Ceotoc
lo t
- Rota;o;og Wall R•pa;,
1,
Bid Opening: Wednesday , August 19, 2015
I
0 ~
f
T BUL TION O BIDS
Engineer: NEILL ENGINEERS CORP., Carmel, CA
.,
8/20/2019 Construction Contracts 09-01-15
5/10
ATTACHMENT 2
RESOLUTION 2015-
A RESOLUTION O THE CITY COUNCIL OF THE CITY OF CARMEL-BY-THE-SEA
AWARDING A CONSTRUCTION CONTRACT TO MONTEREY PENINSULA
ENGINEERING FOR THE SUNSET CENTER RETAINING WALL PROJECT IN
N
AMOUNT NOT TO EXCEED 157,510
WHEREAS, winter storms and associated rain caused the collapse of a retaining
wall at the Sunset Center and Council approved funding for this project on 3 February
2015;and
WHEREAS, the Sunset Center Retaining Wall Project was advertised in the
Monterey County Herald on August 5 and August 11, 2015; and;
WHEREAS, four bids for the project were received August 19, 2015 and the City
Engineer has determined that the lowest responsible bidder is Monterey Peninsula
Engineering and the
bid
is less than the Engineering Estimate ; and
WHEREAS, the project has been determined to be categorically exempt under
CEQA section 15301.
NOW, THEREFORE, BE IT RESOLVED THAT THE CITY COUNCIL OF THE
CITY OF CARMEL-BY-THE-SEA DOES:
1. Award a contract for the Sunset Center Retaining Wall Project to Monterey
Peninsula Engineering
in
the estimated amount of 157.510,00, subject to the
provisions of the documents and certifications set forth
in
the plans and
specifications applicable to the project and as required by California law.
2. Authorize the City Administrator to execute the construction contract upon the
return of the contractor's executed contract documents and review and approval
of the City Attorney.
3. Approve a contingency in the not to exceed amount of 23,627.00,
or
15%,
and authorize the City Administrator to approve change orders in an amount not
to exceed 23,627.00.
4
Adopt the CEQA exemption finding.
PASSED AND ADOPTED BY THE CITY OF COUNCIL OF THE CITY OF CARMEL
BY-THE SEA this 1st day of September 2015, by the following roll call vote:
AYES:
NOES:
COUNCIL MEMBERS:
COUNCIL MEMBERS:
Council Meeting Date: 09/01/2015
Agenda Item: 7
Page 5
8/20/2019 Construction Contracts 09-01-15
6/10
ABSENT: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
ATTEST:
Lee Price MMC
Interim City Clerk
SIGNED
Jason Burnett Mayor
Council Meeting
Da
te:
91 112 15
Agenda Item: 7
Page 6
8/20/2019 Construction Contracts 09-01-15
7/10
SHERMAN
W.
LOW
R.C .E.
GN fW
WHITE,
LS.
CLAYTON B NfiLL, JR
,
R.C.E.
GILBERT
M.
NEILL
R.C
.E.
Mr. Doug Schmitz
City Administrator
City
of Carmel
POBox CC
Carmel, CA 93921
Re: Carpenter Street
Drainage Improvements
Dear Mr. Sclunitz,
N ILL
NGIN RS
Corp.
CONSULTING
ENGINEERS
MISSION
ond FIFTH-BOX U
CARMEL
CAUFORNIA
93921
(831) 624-2110
FAX: 831) 624-3693
August
20 2015
ATIACHMENT 3
SUBOMSIONS, l»>D Pl»>NING,
WAJIR
SUPPLY SANitAn ON,
SUJIVFIING AIRPORTS
MUNIC
IPAI.tnES
Bids were opened for the Carpenter Street - Drainage Improvements Project on
Wednesday, August 19, 2015. Four bids
were
received listed in ascending order as follows:
Contractor
Anderson Pacific Engineering
Monterey Peninsula Engineering
The Don
Chapin Co., Inc.
Granite Construction Company
Engineer's Estimate
154,817
177,656
210,664
277,536
160,240
The
bids were reviewed for mathematical accuracy and other proposal requirements. All
of he bid proposals were in order and considered responsive. A
copy
of the Tabulation
of
Bids
is enclosed.
We
recommend that the contract be awarded
to the low
bidder, Anderson Pacific
Engineering.
c : Rob Mullane
Slw:.gn Ftiec:Jlli:)lsen.
Very truly yours,
~ ~ ~ N ~
Sherman W . Low
City Engineer
Council
Me
eting Date: 09/01/2015
Agenda Item :
7
Page 7
8/20/2019 Construction Contracts 09-01-15
8/10
T BUL TION OF BIDS
Eng inee
r:
NEI
LL E
NGIN
EERS C
ORP
., Carmel, CA
Bid Openi
ng:
Wednesday,August
19,
2015
~ - - - - E N G I N E E R S
I
ANDERSON PACIFIC MONTEREY PENINSULA THE DON CHAPIN co ., I GRANITE
_ ·
__
ESTIMATE ~ I N E E R I N . £ _ _ _
i
ENGINEERING INC . CONSTRUCTION CO .
# I Description l auantity • Unit l Price Amount 1 Price --r-p;mount Price Amount ' Price Amount Price , Amount
&
InstallS" Subdrain
_ I
154 , .. : :_L
_
0 . 0 0 $12,320.001 $90.00 1 $13 ,860.00 _ 1 . 0 0 $24,794.oo : $125.00 _
1_9.
.250 .00
2 ,Furn ish & lnstall12" PVC SDR 26 Storm Dra1n I 314
'
L.F. I $100.00, $31,400.001 $132.00, $41,448.00' $108.00 1 $33,912.001 $174.00 $54,636.00 $294.00: $92,316.00
3 'Furnish & lnstall15" PVC SDR 26 Storm Dra in 252 L.F. : $135.00 ' $34,020.00 $137.001 $180.
00
' $45,360.0
Ql
$228.00 $57,456.00
1
$300.00' $75,600.00
c o n s t r u c t Rock-Faced Concrete Headwall at 1 Each $5,000.00'
$5
,000.00 $2,600.00 $2,600.
00
$2,400.00 $2,400.00'
$7 ,0
00.00
1
$7,000.00 $9,500.00· $9,500.
00
5_ Construct 2' x 4' Catch Basin
1
3 Each $6 ,000.00
1
$
8
,000.00 $5,300
.0
0: $15,900.00 $4
,1
00.00 1 $12,300.oo: $2,617.00
1
$7,851 .oo: $6,000
.0
0,_
6 .
,construct Storm Drain Manhole 1 3 Each . $6,500.00 $19,500.001 $5,100.00 · $15,300.00, $5 ,400.00. $16,200.001 $4,
000.001
$12,000.00 $9,200 .00 $27 ,600.00
7
1
Reconstruct Road side Drainage Swale
i
635 L.F. . $40.001 $25,400.
00
1
$31
.
00
$19
,685
.
00
$46.
00
$2
9,210.001 $54.00
$22.
00
'
13
,970.
00
8 iRepave Street Intersection
i
800 _ S.F . . $16.00- $12,800.001 $12.00 $9,600.oo j $30.oo l $24,000.00
1 -
$14.00 j 11)00.00 $24.00 $19,200.00
9
Ra
ise Manhole · 1 Each : $800.00 ' $ 8 0 0 $90o.ool $900.00 , $900.00 1 $900.00, $837.00 $837.00 $1,200.00 $1,200.00
10 j
Ra
lseWaterValveBox : 2 Each l $500.001 $1,000.00 - $500.00 $1.ooo:
oo
1 $45o.oo , $900.00. $300.ool $600
.0
0
$4
50.001 $900.00
W-
____
______ 9TA«::L _ _ _ ·_ · ~ 0 , 2 4 0 . o o $154,817.oo:
___
S 1 7 7 , s s s . o ~ i$210,664.00 ' $277,53s.oo
i I
i
I LOW BID i
i_
i_
I - • -
-
:
I . .
- r - - - · - -
- - - : - - - - ~ - --
~
r - ·
-
: :
-
---: E ~ - - - - + - - - = - = = · - :
- - - = ~ ~
= - - i - - =
-
....
-
·
l .. ·
_.___
-
- - -
• I
-___ - -
--
---- r I - :
- ~ ~ ~
~ --
_
-_-_
- - - - ~ - + = ~ . . : ~ - - - - - - = - ~
..
. . .
I ; --· '
-----: - - ~ - -
- - - r - +---- - ,
- ~ - - - - - -
- - - -·-
--=-=- -------
=-----:- I - - . - - - - - -
I ;- -
- . - - - - - r - -
I ·--=-;-
--:-_=.:·---. i
-; r----:.
I j ___ __ ,
.::=:c:=-
-.--
- --
-·---
-
- -
-·
~ - : -
..
=t---
:
----·--
-
·
~ · - ~ - - i - - - : :
- - - - ~ -
..--t-·- -·-:· - - -- - · I l
r - r : - ' - - - ~ I -·j--- , ~ - - -
__
~ ~ ~ = - - = - - - - - - - - - ;
- - - = - - - : - - --,--- - - 1 - - - = t = - = - - - = - = = - - = ~ - : · - - -
-
+-- - - ~ - - - , - - - - - · -
"T-
-·
£ -
I :
- -
I
,---
----
I I -l· =±=
- - -
- - -
- - - - - -
-
I · . I
I I -
i _ ___._ - ·- - r - - -
:J .
- I
-- ---
'
- ' -
- --
- : : - - ;
. , .-;
WO:
8391
Page 1
of
1
8/20/2019 Construction Contracts 09-01-15
9/10
ATTACHMENT 4
RESOLUTION 2015-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARMEL-BY-THE-SEA
AWARDING A ENGINEERING CONTRACT TO ANDERSON PACIFIC FOR THE
CARPENTER STREET DRAINAGE PROJECT IN
N
AMOUNT NOT TO EXCEED
154,817
WHEREAS, Carpenter Street is in need
of
improvements to its drainage
system winter as identified within the City's 2015-2018 Capital Improvement Plan and
Council approved funding for this project on 3 February 2015; and
WHEREAS, the Carpenter Street Drainage Project was advertised
in
the
Monterey County Herald on August 5 and August 11, 2015; and;
WHEREAS, four bids for the project were received August 19, 2015 and the City
Engineer has determined that the lowest responsible bidder is Anderson Pacific and the
bid is less than the Engineering Estimate; and
WHEREAS, the project has been determined to be categorically exempt under
CEQA section 15301.
NOW, THEREFORE, BE IT RESOLVED THAT THE CITY COUNCIL OF THE
CITY OF CARMEL-BY-THE-SEA DOES:
1. Award a contract for the Carpenter Street Drainage Project to Anderson
Pacific
in
the estimated amount
of
154,817.00, subject
to
the provisions
of
the
documents and certifications set forth in the plans and specifications applicable
to the project and as required by California law.
2. Authorize the City Administrator to execute the construction contract upon the
return of the contractor's executed contract documents and review and approval
of
the City Attorney.
3. Approve a contingency in the not to exceed amount of 30,963.00, or 20%,
and authorize the City Administrator to approve change orders in an amount not
to exceed 30,963.00.
4.
Adopt the CEQA exemption finding.
5. Authorize the transfer
of
up
to 51
,262.00 from Account 13-76909 (Sunset
Center Retaining Wall Project to Account 13-76912 (Carpenter Street Drainage
Project) to cover project contingency and engineering-related costs.
PASSED AND ADOPTED BY THE CITY OF COUNCIL OF THE CITY OF CARMEL
BY-THE SEA this 1st day
of
September 2015, by the following roll call vote :
Council Meeting Da te: 09/01/2015
Agenda Item: 7
Page 9
8/20/2019 Construction Contracts 09-01-15
10/10
AYES: COUNCIL MEMBERS:
NOES: COUNCIL MEMBERS:
ABSENT: COUNCIL MEMBERS:
ABSTAIN: COUNCIL MEMBERS:
ATTEST: SIGNED
Lee Price MMC Jason Burnett Mayor
Interim City Clerk
Council Meeting Date: 09/01/2015
Agenda Item: 7