United States Department of the Interior National Park Service Class B Construction Cost Estimate BASIS OF ESTIMATE document.xls Basis of Estimate Page 1 of 207 Print Date: 04/21/2022 PROJECT INFORMATION Project: Project Name Park Name Park Alpha: Park Code PMIS: TBD or PMIS number if known Estimate Date: Estimate Date Park: Prepared By: Estimator Name Company: Company Address: Address City Phone: Phone BACKGROUND SUPPORTING MATERIAL (Scope of Work): SOURCE OF COST DATA: ESTIMATE ASSUMPTIONS: MAJOR CHANGES FROM PREVIOUS ESTIMATE: City, State Briefly describe scope of work included in the estimate, plan dates, exclusions, etc. List Government Furnished Property (GFP) Document all sources of cost information used in the estimate. (Attach additional informatio necessary) Describe any assumptions made to prepare estimate and highlight areas needing clarification future estimates. Describe any major changes in scope of work, materials, systems, assumptions, etc. from the estimate version.

Construction Cost Estimate Template

Embed Size (px)

DESCRIPTION

Construction Cost Estimate Template

Citation preview

Class B Construction Cost Estimate Template

Basis of EstimatePROJECT INFORMATIONProject:Project NamePark:Park NamePark Alpha:Park CodePMIS:TBD or PMIS number if knownEstimate Date:Estimate DatePrepared By:Estimator NameCompany:CompanyAddress:AddressCity, State Zip:CityPhone:PhoneBACKGROUND SUPPORTING MATERIAL (Scope of Work):Briefly describe scope of work included in the estimate, plan dates, exclusions, etc. List any Government Furnished Property (GFP)SOURCE OF COST DATA:Document all sources of cost information used in the estimate. (Attach additional information if necessary)ESTIMATE ASSUMPTIONS:Describe any assumptions made to prepare estimate and highlight areas needing clarification for future estimates.MAJOR CHANGES FROM PREVIOUS ESTIMATE:Describe any major changes in scope of work, materials, systems, assumptions, etc. from the previous estimate version.DESCRIPTION OF MARK-UP & ADD-ONS:Location Factor:0.00%Describe source and rationale for location factor hereRemoteness Factor:0.00%Site is___miles from published commercial center. Describe other impacts includedWage Rate Factor:0.00%Explain method and justify valueState & Local Taxes:0.00%Describe type of tax and rates usedDesign Contingency:0.00%Explain & JustifyStandard. General Conditions:0.00%Explain & JustifyGovernment General Conditions:0.00%Explain & JustifyHistoric Preservation Factor:0.00%Describe rationale for using this factorContractor Overhead:0.00%Explain & JustifyContractor Profit:0.00%Explain & JustifyBonds and Permits:0.00%Explain & JustifyContracting Method Adjustment:0.00%Describe anticipated contract method and justify value used.Annual Inflation Escalation Factor:0.00%Projected annual inflation rate.Time Until Project Midpoint (Months)0Number of months from estimate (or data) date until the projects midpoint of construction.OTHER COMMENTS:Provide any additional information, qualifications, etc.

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate&4

&13BASIS OF ESTIMATE&L&6&F &A&C&11Page &P of &N&R&6Print Date: &DWhen using City Cost Index (CCI) published by RS Means, a CCI of 112.1 should be converted to +12.1 location factor and a CCI of 93.5 converted to a -6.5 location factor.

Project Cost SummaryProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodePMIS Number:TBD or PMIS number if knownReviewed By:Reviewer NameDate:Review DateAsset / Project ElementSize/CountUnitsAsset / Project Element Name0UnitItem No.WBSDescriptionMaterial Cost/UnitTotal Material CostInstallation Cost/UnitTotal Install CostDirect Cost/UnitTotal Direct CostsNET Cost/UnitTotal NET Costs1A10Foundations0.00.00.00.00.00.00.00.02A20Basement Construction0.00.00.00.00.00.00.00.03B10Superstructure0.00.00.00.00.00.00.00.04B20Exterior Enclosure0.00.00.00.00.00.00.00.05B30Roofing0.00.00.00.00.00.00.00.06C10Interior Construction0.00.00.00.00.00.00.00.07C20Stairs0.00.00.00.00.00.00.00.08C30Interior Finishes0.00.00.00.00.00.00.00.09D10Conveying Systems0.00.00.00.00.00.00.00.010D20Plumbing Systems0.00.00.00.00.00.00.00.011D30HVAC0.00.00.00.00.00.00.00.012D40Fire Protection0.00.00.00.00.00.00.00.013D50Electrical0.00.00.00.00.00.00.00.014E10Equipment0.00.00.00.00.00.00.00.015E20Furnishings0.00.00.00.00.00.00.00.016F10Special Construction0.00.00.00.00.00.00.00.017F20Selective Building Demolition0.00.00.00.00.00.00.00.018G10Site Preparation0.00.00.00.00.00.00.00.019G20Site Improvements0.00.00.00.00.00.00.00.020G30Site Mechanical Utilities0.00.00.00.00.00.00.00.021G40Site Electrical Utilities0.00.00.00.00.00.00.00.022G50Other Site Construction0.00.00.00.00.00.00.00.023XXSpecial Use - 10.00.00.00.00.00.00.00.024XXSpecial Use - 20.00.00.00.00.00.00.00.025XXSpecial Use - 30.00.00.00.00.00.00.00.0Subtotal Direct Construction Costs0.00.00.00.00.0$00.0$0Total Value of Government Furnished Property (GFP) Included in Direct Costs .$0.000.00.0$0In most cases GFP is normally zero - see footnote-Direct Cost Subtotal without GFP .0.00.0$0Published Location Factor0.00%$0Notes & Comments:Remoteness Factor0.00%$0Federal Wage Rate Factor0.00%Generally applied against Labor Costs only.$0State & Local Taxes0.00%Generally applied against Material Costs only. Please Note if application differs.$0Design Contingency0.00%$0Total Direct Construction Costs$0Standard General Conditions0.00%Applied to Total Direct Construction Cost less GFP$0Government General Conditions0.00%Applied to Total Direct Construction Cost less GFP$0Historic Preservation Factor0.00%Applied to Total Direct Construction Cost less GFP$0Subtotal NET Construction Cost$0Overhead0.00%$0Profit0.00%$0Estimated NET Construction Cost$0Bonds & Permits0.00%$0Contracting Method Adjustment0.00%$0Inflation Escalation0MonthsAnnual Rate =0.00%Inc. Bonds & CMA$0Total Estimated NET Cost of Construction$0GFP costs are only used when the Government pre-purchases items, or provides other materials out of Government inventory, to be installed by contractor. Adjustments and Markup on GFP only include Inflation Escalation; No other adjustment factors or O&P markup have been applied.

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate&4&"Arial,Regular"&"Arial,Bold"&13PROJECT COST SUMMARY&L&6&F&A&CPage &P of &N&R&6Print Date: &D, &T

A10 - FoundationsProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemA10FoundationsTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostA1010STANDARD FOUNDATIONSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSTANDARD FOUNDATIONS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostA1020SPECIAL FOUNDATIONSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSPECIAL FOUNDATIONS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostA1030SLAB ON GRADEOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSLAB ON GRADE0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemA10FoundationsUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostA10Foundations0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate &8(expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

A20 - BasementProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemA20Basement ConstructionTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostA2010BASEMENT EXCAVATIONOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASEMENT EXCAVATION0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostA2020BASEMENT WALLSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASEMENT WALLS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemA20Basement ConstructionUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostA20Basement Construction0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate &8(expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

B10 - SuperstructureProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemB10SuperstructureTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostB1010FLOOR CONSTRUCTIONOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALFLOOR CONSTRUCTION1000Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostB1020ROOF CONSTRUCTIONOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALROOF CONSTRUCTION0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemB10SuperstructureUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostB10Superstructure0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate &8(expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

B20 - Exterior EnclosureProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemB20Exterior EnclosureTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostB2010EXTERIOR WALLSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALEXTERIOR WALLS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostB2020EXTERIOR WINDOWSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALEXTERIOR WINDOWS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostB2030EXTERIOR DOORSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALEXTERIOR DOORS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemB20Exterior EnclosureUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostB20Exterior Enclosure0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate&8 (expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

B30 - RoofingProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemB30RoofingTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostB3010ROOF COVERINGSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALROOF COVERINGS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostB3020ROOF OPENINGSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALROOF OPENINGS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemB30RoofingUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostB30Roofing0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate&8 (expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

C10 - Interior ConstructionProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemC10Interior ConstructionTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostC1010INTERIOR PARTITIONSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALINTERIOR PARTITIONS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostC1020INTERIOR DOORSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALINTERIOR DOORS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostC1030FITTINGSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALFITTINGS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemC10Interior ConstructionUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostC10Interior Construction0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate &8(expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

C20 - StairsProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemC20StairsTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostC2010STAIR CONSTRUCTIONOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSTAIR CONSTRUCTION0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostC2020STAIR FINISHESOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSTAIR FINISHES0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemC20StairsUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostC20Stairs0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate &8(expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

C30 Interior FinishesProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemC30Interior FinishesTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostC3010WALL FINISHESOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALWALL FINISHES0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostC3020FLOOR FINISHESOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALFLOOR FINISHES0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostC3030CEILING FINISHESOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALCEILING FINISHES0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemC30Interior FinishesUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostC30Interior Finishes0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate &8(expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

D10 Conveying SystemsProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemD10Conveying SystemsTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD1010ELEVATORSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALELEVATORS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD1020ESCALATORS & MOVING WALKSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALESCALATORS & MOVING WALKS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD1030MATERIAL HANDLING SYSTEMSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALMATERIAL HANDLING SYSTEMS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD1090OTHER CONVEYING SYSTEMSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALOTHER CONVEYING SYSTEMS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemD10Conveying SystemsUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD10Conveying Systems0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate &8(expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

D20 - PlumbingProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemD20Plumbing SystemsTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD2010PLUMBING FIXTURESOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALPLUMBING FIXTURES0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD2020DOMESTIC WATER DISTRIBUTIONOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALDOMESTIC WATER DISTRIBUTION0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD2030SANITARY WASTEOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSANITARY WASTE0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD2040RAIN WATER DRAINAGEOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALRAIN WATER DRAINAGE0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD2050SPECIAL PLUMBING SYSTEMSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSPECIAL PLUMBING SYSTEMS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD2090OTHER PLUMBING SYSTEMSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALOTHER PLUMBING SYSTEMS0Unit0.0$00.0$00.0$0Summary ItemD20Plumbing SystemsUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD20Plumbing Systems0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate&6 &8(expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

D30- HVACProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemD30HVACTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD3010ENERGY SUPPLYOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALENERGY SUPPLY0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD3020HEAT GENERATING SYSTEMSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALHEAT GENERATING SYSTEMS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD3030COOLING GENERATING SYSTEMSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALCOOLING GENERATING SYSTEMS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD3040DISTRIBUTION SYSTEMS (HVAC)Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALDISTRIBUTION SYSTEMS (HVAC)0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD3050TERMINAL & PACKAGE UNITSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALTERMINAL & PACKAGE UNITS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG3060CONTROLS & INSTRUMENTATIONOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALCONTROLS & INSTRUMENTATION0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG3070SPECIAL HVAC SYSTEMS & EQUIPMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSPECIAL HVAC SYSTEMS & EQUIPMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG3080SYSTEM TESTING & BALANCINGOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSYSTEM TESTING & BALANCING0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG3090OTHER HVAC SYSTEMS & EQUIPMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALOTHER HVAC SYSTEMS & EQUIPMENT0Unit0.0$00.0$00.0$0Summary ItemD30HVACUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD30HVAC0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate &8(expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

D40- Fire ProtectionProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemD40Fire ProtectionTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD4010FIRE PROTECTION SPRINKLERS SYSTEMSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALFIRE PROTECTION SPRINKLERS SYSTEMS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD4020STANDPIPE & HOSE SYSTEMSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSTANDPIPE & HOSE SYSTEMS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD4030FIRE PROTECTION SPECIALTIESOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALFIRE PROTECTION SPECIALTIES0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD4090OTHER FIRE PROTECTION SYSTEMSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALOTHER FIRE PROTECTION SYSTEMS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemD40Fire ProtectionUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD40Fire Protection0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate &8(expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

D50 - ElectricalProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemD50ElectricalTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD5010ELECTRICAL SERVICE & DISTRIBUTIONOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALELECTRICAL SERVICE & DISTRIBUTION0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD5020LIGHTING & BRANCH WIRINGOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALLIGHTING & BRANCH WIRING0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD5030COMMUNICATIONS & SECURITYOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALCOMMUNICATIONS & SECURITY0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD5040SPECIAL ELECTRICAL SYSTEMSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSPECIAL ELECTRICAL SYSTEMS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD5090OTHER ELECTRICAL SYSTEMSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALOTHER ELECTRICAL SYSTEMS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemD50ElectricalUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostD50Electrical0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate &8(expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

E10 - EquipmentProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemE10EquipmentTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostE1010COMMERCIAL EQUIPMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALCOMMERCIAL EQUIPMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostE1020INSTITUTIONAL EQUIPMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALINSTITUTIONAL EQUIPMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostE1030VEHICULAR EQUIPMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALVEHICULAR EQUIPMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostE1090OTHER EQUIPMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALOTHER EQUIPMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemE10EquipmentUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostE10Equipment0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate&8 (expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

E-20 FurnishingsProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemE20FurnishingsTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostE2010FIXED FURNISHINGSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALFIXED FURNISHINGS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostE2020MOVABLE FURNISHINGSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALMOVABLE FURNISHINGS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostE2090OTHER FURNISHINGSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALOTHER FURNISHINGS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemE20FurnishingsUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostE20Furnishings0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate&8 (expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

F10 - Special ConstructionProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemF10Special ConstructionTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostF1010SPECIAL STRUCTURESOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSPECIAL STRUCTURES0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostF1020INTEGRATED CONSTRUCTIONOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALINTEGRATED CONSTRUCTION0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostF1030SPECIAL CONSTRUCTION SYSTEMSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSPECIAL CONSTRUCTION SYSTEMS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostF1040SPECIAL FACILITIESOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSPECIAL FACILITIES0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostF1050SPECIAL CONTROLS & INSTRUMENTATIONOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSPECIAL CONTROLS & INSTRUMENTATION0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemF10Special ConstructionUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostF10Special Construction0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate&8 (expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

F20 - Selective DemolitionProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemF20Selective Building DemolitionTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostF2010BUILDING ELEMENTS DEMOLITIONOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBUILDING ELEMENTS DEMOLITION0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostF2020HAZARDOUS COMPONENTS ABATEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALHAZARDOUS COMPONENTS ABATEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemF20Selective Building DemolitionUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostF20Selective Building Demolition0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate&8 (expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

G10 Site PreparationProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemG10Site PreparationTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG1010SITE CLEARINGOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSITE CLEARING0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG1020SITE DEMOLITION & RELOCATIONSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSITE DEMOLITION & RELOCATIONS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG1030SITE EARTHWORKOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSITE EARTHWORK0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG1040HAZARDOUS WASTE REMEDIATIONOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALHAZARDOUS WASTE REMEDIATION0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG1090OTHER SITE PREPARATIONOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALOTHER SITE PREPARATION0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostBASE CODEBASE ELEMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALBASE ELEMENT0Unit0.0$00.0$00.0$0Summary ItemG10Site PreparationUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG10Site Preparation0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate&8 (expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

G20 - Site ImprovementsProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemG20Site ImprovementsTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG2010ROADWAYSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALROADWAYS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG2020PARKING LOTSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALPARKING LOTS0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG2030PEDESTRIAN PAVINGOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALPEDESTRIAN PAVING0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG2040SITE DEVELOPMENTOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSITE DEVELOPMENT0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG2050LANDSCAPINGOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALLANDSCAPING0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG2060SITE FURNISHINGSOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSITE FURNISHINGS0Unit0.0$00.0$00.0$0Summary ItemG20Site ImprovementsUniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG20Site Improvements0Unit0.0$00.0$00.0$0

&C&"Arial,Bold"United States Department of the InteriorNational Park ServiceClass B Construction Cost Estimate &8(expanded)&6

&12LINE ITEM COST SUMMARY&L&6&F, &A&C&9&P of &N&R&6&D &T

G-30 - Site MechanicalProject:Project NameEstimate By:Estimator NamePark:Park NameDate:Estimate DatePark Alpha:Park CodeReviewed By:Reviewer NamePMIS Number:TBD or PMIS number if knownDate:Review DateSummary ItemG30Site Mechanical UtilitiesTotal Cost:$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG3010WATER SUPPLYOptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALWATER SUPPLY0Unit0.0$00.0$00.0$0Uniformat II WBS CodeDescriptionQuantityUnitMATERIALINSTALLATIONTOTALSMaterial Cost/UnitTotal Material CostInstall Cost/UnitTotal Install CostTotal Cost/UnitTotal CostG3020SANITARY SEWEROptional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0Optional CodeDescription0Unit0.0$00.0$00.0$0SUBTOTALSANITARY SEWER0Unit0.0$00.0$00.0$0Uniformat