JUBM Sdn Bhd (27638-X)Arcadis (Malaysia) Sdn Bhd (520443-H) Arcadis Projeks Sdn Bhd (233819-K)
KDN PP10466/05/2013(032500)
JUBM & ArcadisConstruction Cost Handbook
MALAYSIA2019
Sunway Velocity, Selangor
Desaru Adventure Water Park, Johor
Centre of Excellence (EPIC), Negeri Sembilan
Irama Wangsa Condominiums, Kuala Lumpur
Ritz Carlton Langkawi, Kedah
Asia Paci�c University Campus, Selangor
Pavilion Hotel, Kuala Lumpur
Impression Theatre, Melaka
The following handbook of information relating to the Malaysian construction industry has been compiled by:
JUBM Sdn BhdArcadis (Malaysia) Sdn BhdArcadis Projeks Sdn Bhd
Level 5, Menara TSR12 Jalan PJU 7/3, Mutiara Damansara47810 Petaling JayaSelangor
Telephone : (6 03) 2106 8000/ 2106 9000Fax : (6 03) 2106 9090Email : [email protected] : http://www.arcadis.com © Arcadis (Malaysia) Sdn Bhd
All rights reserved. No part of this publication may be reproduced or copied in any form without prior written permission from Arcadis (Malaysia) Sdn Bhd.
The information contained herein should be regarded as indicative and for general guidance only. Whilst every effort has been made to ensure accuracy, no responsi-bility can be accepted for errors and omissions, however caused.
Unless otherwise stated, costs reflected in this handbook are Malaysian costs at 4th Quarter 2018.
KDN : PP10466/05/2013 (032500)For private circulation to staff and business associates only.
Printed: January 2019by
Trumatch Printing & Packaging Sdn Bhd (KDN: PQ1780/4589)No.55, Jalan PBS 14/8,
Taman Perindustrian Bukit Serdang, 43300 Seri Kembangan, Selangor Darul Ehsan
1
JUBM Sdn Bhd (27638-X)
Arcadis Projeks Sdn Bhd (233819-K)Arcadis (Malaysia) Sdn Bhd (520443-H)
Page No.Table of Contents 2About Us 4Calendars 10
1. CONSTRUCTION COST DATAConstruction Cost Specification 12Kuala Lumpur Construction Cost Trend (2008 - 2018) 14Construction Costs for Kuala Lumpur 16Construction Costs for Johor Bahru 18Construction Costs for Penang 20Construction Costs for Kota Kinabalu 22Construction Costs for Kuching 24Construction Costs for Selected Asian Cities 26Major Rates for Malaysia 32Major Rates for Selected Asian Cities 34ACMV Costs for Various Designs & Developments in Kuala Lumpur 40M&E Costs for Selected Asian Cities 42Unit Costs for Ancillary Facilities for Kuala Lumpur 48Fit-Out Costs for Kuala Lumpur 50
2. GENERAL CONSTRUCTION DATAJUBM - Arcadis Building Works Composite Tender Price Index (BWCTPI) 52JKR Tender Price Index 53Value of Construction Work Done by Type of Construction Activity 54 Performance of The Construction Sector 55Estimating Rules of Thumb 56Technical Specifications 58Average Unit Prices 60Unit Price Index 62Construction Sector Indicators 63Commodities Price Trend (Jan to Oct 2018) 64Malaysia Construction Sector - Employment & GDP 66Progress Payments 67
3. PROPERTYResidential 70Hotel 72Office 74Shopping Complex 76Shop 78Industrial 79
TABLE OF CONTENTS2
TABLE OF CONTENTS
Page No.
4. FINANCIALFinancial Definitions & Formulae 82Mortgage Repayment Table 83Malaysia Balance of Payment - Goods & Services 84Consumer Price Index & Producer Price Index 85Prime Rates & Base Lending Rates 86Interest Rates : Banking Institutions 87Currency Chart 88Exchange Rates 89
5. OTHER INFORMATIONUtility Costs for Selected Asian Cities 92Weight & Measures 96Conversion Guide 98Public Holidays 100Arcadis Asia Leadership Team 106Arcadis Asia Services 108Directory of Offices 110Telephone Directory (Malaysia) 119
TABLE OF CONTENTS 3
Arcadis is the leading global Design & Consultancy firm for natural and built assets. Applying our deep market sector insights and collective design, consultancy, engineering, project and management services we work in partnership with our clients to deliver exceptional and sustainable outcomes throughout the lifecycle of their natural and built assets. In Asia, we have over 4,000 people covering the Asia market across all sectors focused on improving quality of life.
As Arcadis (Malaysia) Sdn Bhd, we are one of the largest and longest established Quantity Surveying practices in the country. Together with our collaborative partner, JUBM Sdn Bhd, we offer a multi-disciplinary construction cost consultancy service and provides integrated solutions to our clientele throughout Malaysia working from five offices in Kuala Lumpur, Penang, Johor Bahru, Kota Kinabalu and Kuching.
We provide our specialist services to nearly all market segments in the construction industry from religious buildings to residential homes, hospitality to corporate headquarters, mixed use developments to master planning.
The diverse range of project experience provides us with a rich and extensive construction cost database which enables the company to handle the simplest to the most complex projects entrusted by clients who recognized our value and dynamism.
(Log on to www.arcadis.com for more details.)
ABOUT US4
ABOUT US
ABOUT US 5
People First
We care for each other and create a safe and respectful working environment where our people can grow, perform, and succeed.
Integrity
We always work to the highest professional and ethical standards and establish trust by being open, honest and responsible.
Client Success
We are passionate about our clients’ success and bring insights, agility, and innovation to co-create value.
Collaboration
We value the power of diversity and our global capabilities and deliver excellence by working as One Arcadis.
Sustainability
We base our actions for clients and communities on environmental responsibility and social and economic advancement.
Our Core Values
ABOUT US6
ABOUT US
Legoland Malaysia Theme Park, Johor 2012
Calvary Convention Centre, Bukit Jalil 2013
St. Regis, Kuala Lumpur 2017
Sofitel Damansara City, Selangor 2017 Setia Subterranean Penang International Convention & Exhibition Centre (SPICE), Penang 2017
Malaysia International Trade and Exhibition Centre (MITEC), Kuala Lumpur 2016
Pavilion Hotel, Kuala Lumpur 2018
Ritz Carlton Langkawi, Kedah 2017
Impression Theatre, Melaka 2018
17.18.19.20.21.
22.
23.24.25.
Pandora Service Apartment, Selangor 2016
The Pearl Stonor, Kuala Lumpur 2010
Pantai Sentral Park, Kuala Lumpur 2018
Irama Wangsa Condominiums, Kuala Lumpur 2018
Setia Sky Residences, Kuala Lumpur 2016
Le Nouvel Condominium, Kuala Lumpur 2016
11.12.13.14.
15.16.
Sunway Nexis, Selangor 2014 KLP Fashion Avenue, Kuala Lumpur 2012
Sunway Velocity, Selangor 2016
Louis Vuitton, Kuala Lumpur 2006
Setia Walk, Selangor 2014
6.7.8.9.10.
Ilham Baru Tower, Kuala Lumpur 2014
Damansara City 2 Office Tower, Selangor 2017
PAM Centre, Kuala Lumpur 2016 Environmental Preservation and InnovationCentre (EPIC), Negeri Sembilan 2017
Sunway Putra Mall & Hotel, Kuala Lumpur 2015
1.2.
3.4.
5.
Hospitality, Sports & Leisure
Retail
Residential
Commercial
A Selection of Our Projects
14
11
10
5
4
3
2
ABOUT US 7
22
23
25
1615
24
21
17
1 19138
20
96 12
187
(Cont’d)
ABOUT US8
ABOUT US
50
46
45
26
39
31
32
34
(Cont’d)
Brunei Chancery, Putrajaya 2017
Citizenship and Immigration Canada (CIC)Annexe of Canadian High Commission,Kuala Lumpur 2004
Federal Government Administrative Centre,Putrajaya 2010
IBS Housing, Putrajaya 2011
47.48.
49.
50.
Public
Masjid Besar Sandakan, Sabah 1988
Lutheran Bible Training Institute, Selangor 2010
45.46.
Religious Buildings
PML Production Facility, Selangor 2011
Giant Distribution Centre (Sepang),Selangor 2009
Perodua - Second National Car Plant,Selangor 1994
42.43.
44.
Industrial
Electrified Double Track-Padang Besar to Ipoh (Station Building) 2014
6 Stations for Kelana Jaya LRT Line Extension, Kuala Lumpur 2014
KVMRT Sungai Buloh - Kajang Line 2017
KVMRT Sungai Buloh - Putrajaya Line 2022
Semangar Water Treatment Plant (Extension), Johor 2017
Integrated Water Supply, Kuala Lumpur 2008
Bus Rapid Transit (BRT) Sunway 2015
35.
36.
37.38.39.
40.41.
Transport & Infrastructure
Universiti Teknologi Petronas, Perak 2003
Sunway Monash University, Selangor 2007
Tropicana International School, Selangor 2016
Asia Pacific University Campus, Selangor 2016
Wesley Methodist International School, Penang 2018
30.31.32.33.34.
Private Educational
Women Children Hospital, Kuala Lumpur 2017
Sunway Medical Centre, Selangor 1998
Pantai Hospital (Extension), Kuala Lumpur 2015
UCSI Hospital, Negeri Sembilan 2019
26.27.28.29.
Healthcare
A Selection of Our Projects
ABOUT US 9
49
37 3842
483041
47
28
29
4336
35
27
40
33 44
CALENDARS
CALENDARS10
CALENDARS
JAN FEB MAR
APR MAY JUN
JUL AUG SEP
OCT NOV DEC
JAN FEB MAR
APR MAY JUN
JUL AUG SEP
OCT NOV DEC
2019
2020
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
S M T W T F S
31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
S M T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
S M T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
S M T W T F S
30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
S M T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
S M T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
S M T W T F S 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
S M T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
S M T W T F S 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
S M T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
S M T W T F S
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
S M T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
S M T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
S M T W T F S
1CONSTRUCTION COST DATA
Construction Cost Specification
Kuala Lumpur Construction Cost Trend(2008 - 2018)
Construction Costs for Kuala Lumpur
Construction Costs for Johor Bahru
Construction Costs for Penang
Construction Costs for Kota Kinabalu
Construction Costs for Kuching
Construction Costs for SelectedAsian Cities
Major Rates for Malaysia
Major Rates for Selected Asian Cities
ACMV Costs for Various Designs &Developments in Kuala Lumpur
M&E Costs for Selected Asian Cities
Unit Costs for Ancillary Facilitiesfor Kuala Lumpur
Fit-Out Costs for Kuala Lumpur
CONSTRUCTION COST SPECIFICATIONDOMESTIC INDUSTRIALHOTELSOFFICE /
COMMERCIALAp
artm
ent, h
igh ris
e, av
erag
e stan
dard
Apar
tmen
t, high
rise,
high e
nd
Terra
ced h
ouse
s, av
erag
e stan
dard
Detac
hed h
ouse
s, hig
h end
Mediu
m/hig
h rise
offic
es, a
vera
ge st
anda
rdHi
gh ris
e offic
es, p
resti
ge qu
ality
Out-o
f-tow
n sho
pping
centr
e, av
erag
e stan
dard
Retai
l mall
s, hig
h end
Budg
et ho
tels -
3-sta
r, mi
d mar
ket
Busin
ess h
otels
- 4/5
-star
Luxu
ry ho
tels -
5-sta
rInd
ustria
l unit
s, sh
ell on
ly (C
onve
ntion
al sin
gle st
orey
fra
med u
nits)
Owne
r ope
rated
facto
ries,
low ris
e, lig
ht we
ight in
dustr
y
Apar
tmen
t unit
s with
fit-o
ut, bu
t exc
ludi
ng de
cora
tive l
ight fi
ttings
and l
oose
furn
iture
. (M
alay
sia
only
) 6-1
2 unit
s per
floor
, 46m
2 - 83
m2 per
unit e
xclud
ing ai
r-con
dition
ing,
kitch
en ca
binets
and h
ome a
pplia
nces
.Ap
artm
ent u
nits w
ith go
od qu
ality
fit-ou
t, inc
luding
air-c
ondit
ioning
, kitc
hen c
abine
ts an
d ho
me ap
plian
ces,
but e
xclu
ding
deco
rativ
e ligh
t fittin
gs an
d loo
se fu
rnitu
re.
Hous
es w
ith fit
-out,
inclu
ding a
ir-co
nditio
ning,
kitch
en ca
binets
and h
ome a
pplia
nces
, bu
t exc
ludi
ng de
cora
tive l
ight fi
ttings
, loos
e fur
nitur
e, ga
rden
and p
arkin
g.(M
alay
sia
only
) Exc
ludi
ng ai
r-con
dition
ing, k
itche
n cab
inets
and h
ome a
pplia
nces
.Ho
uses
with
good
quali
ty fit-
out, i
nclud
ing ai
r-con
dition
ing, k
itche
n cab
inets
and h
ome
appli
ance
s, bu
t exc
ludi
ng de
cora
tive l
ight fi
ttings
, loos
e fur
nitur
e, ga
rden
and p
arkin
g.RC
stru
cture
, cur
tain w
all, in
cludin
g pub
lic ar
ea fit
-out,
tena
nt ar
ea w
ith ra
ised f
loor/
carp
et, pa
inted
wall
and f
alse c
eiling
.(M
alay
sia
only
) Ave
rage
stan
dard
and p
resti
ge qu
ality
office
s exc
lude t
enan
t fit-o
ut.
Includ
ing pu
blic a
rea f
it-out
and M
&E, b
ut ex
clud
ing
shop
fit-o
ut.
1) In
terior
deco
ratio
n2)
Fur
nitur
e (fix
ed an
d mov
able)
3) S
pecia
l ligh
t fittin
gs (c
hand
elier
s, etc
.)4)
Ope
ratin
g Sup
plies
and E
quipm
ent (
OS&E
) exc
lude
d.RC
stru
cture
with
stee
l roof
and M
&E to
main
distr
ibutio
n, bu
t exc
ludi
ng
air-co
nditio
ning,
heati
ng an
d ligh
ting.
RC st
ructu
re, in
cludin
g sma
ll offic
e with
simp
le fit-
out a
nd M
&E, b
ut ex
clud
ing
air-co
nditio
ning a
nd he
ating
.
BU
ILD
ING
TYP
EO
UTL
INE
SPEC
IFIC
ATI
ON
1. CONSTRUCTION COST DATA
CONSTRUCTION COST DATA12
CONSTRUCTION COST DATA1
RC st
ructu
reRC
stru
cture
, natu
ral v
entila
tion,
no fa
cade
enclo
sure
.Inc
luding
fit-o
ut an
d air-
cond
itionin
g, bu
t exc
luding
educ
ation
al eq
uipme
nt.(M
alay
sia
only
) Sch
ools
with
stand
ard g
over
nmen
t pro
vision
s.
Includ
ing fit
-out,
loos
e fur
nitur
e and
air-c
ondit
ioning
.(M
alay
sia
only
) Stud
ent h
ostel
s to u
niver
sity s
tanda
rd.
Dry s
ports
(no s
wimm
ing po
ol) an
d are
for ‘l
eisur
e cen
tre’ ty
pe sc
heme
s inc
luding
ma
in sp
orts
hall,
ancil
lary s
ports
facil
ities,
chan
ging a
nd sh
ower
s, re
staur
ant/c
afe,
bar,
etc. C
osts
includ
e a/c,
Fur
nitur
e, Fit
tings
and E
quipm
ent (
FF&E
).Ex
cludin
g med
ical a
nd op
erati
ng eq
uipme
nt.
Unde
rgro
und/b
asem
ent c
ar pa
rks (<
3 lev
els)
Multi
store
y car
parks
, abo
ve gr
ound
(<4 l
evels
)
Scho
ols (p
rimar
y and
seco
ndar
y)
Stud
ents’
resid
ence
s
Spor
ts clu
bs, m
ulti p
urpo
se sp
orts/
leisu
re ce
ntres
(dry
spor
ts)
Gene
ral h
ospit
als -
publi
c sec
tor
OTHERS
CONSTRUCTION COST DATA 13
Not
es:
1. Th
e cos
ts for
the r
espe
ctive
categ
ories
give
n abo
ve ar
e ave
rage
s bas
ed on
fixed
price
comp
etitiv
e ten
ders.
It mu
st be
unde
rstoo
d tha
t the a
ctual
cost
of a b
uildin
g will
depe
nd up
on th
e des
ign an
d man
y othe
r fac
tors a
nd m
ay va
ry fro
m the
figur
es sh
own.
2. Th
e co
sts p
er s
quar
e me
tre a
re b
ased
on
Cons
tructi
on F
loor A
reas
(CFA
) mea
sure
d to
the o
utside
face
of t
he e
xtern
al wa
lls/ e
xtern
al pe
rimete
r inc
luding
lift s
hafts
, stai
rwell
s, ba
lconie
s, pla
nt ro
oms,
water
tank
s and
the l
ike.
3. Al
l buil
dings
are a
ssum
ed to
have
no ba
seme
nts (e
xcep
t othe
rwise
state
d) an
d are
built
on fla
t gro
und,
with
norm
al so
il and
site
cond
ition.
Th
e cos
t exc
ludes
site
forma
tion w
orks
, exte
rnal
works
, land
cost,
profe
ssion
al fee
s, fin
ance
and l
egal
expe
nses
.4.
The s
tanda
rd fo
r eac
h cate
gory
of bu
ilding
varie
s fro
m re
gion t
o reg
ion an
d do n
ot ne
cess
ary f
ollow
that
of ea
ch ot
her.
5. Al
l cos
ts ar
e in U
S$/m
2 CFA
unles
s othe
rwise
state
d. Flu
ctuati
on in
exch
ange
rates
may
lead
to ch
ange
s in c
onstr
uctio
n cos
ts ex
pres
sed i
n U.S
. doll
ars.
KUALA LUMPUR CONSTRUCTION COST TREND 2008 - 2018
1. CONSTRUCTION COST DATA
All costs are at an average level unless otherwise stated
CONSTRUCTION COST DATA14
CONSTRUCTION COST DATA1
0500
1,0001,5002,0002,5003,0003,5004,0004,5005,000
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
RM/m2
Office/Commercial
Average standard offices, high risePrestige offices, high riseShopping Centres
0500
1,0001,5002,0002,5003,0003,5004,0004,500
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
RM/m2
Domestic
Bungalows (mass housing) Detached houses and bungalowsTerraced houses Luxury apts, high riseAverage standard apts high rise Low cost flats, high rise (<15 levels)Low cost flats, low rise (<6 levels) Low cost housing
All costs are at an average level unless otherwise stated
CONSTRUCTION COST DATA 15
0
600
1,200
1,800
2,400
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
Industrial
Light duty flatted factoriesHeavy duty flatted factories and warehousesSingle storey conventional factory of structural steelworkOwner operated factories, low rise
RM/m2
01,0002,0003,0004,0005,0006,0007,0008,0009,000
10,000
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
RM/m2
Hotels
Resort Hotel inclusive of F.F.&E.3-star budget hotels, ditto5-star luxury hotels, ditto
DO
MES
TIC
De
tache
d hou
ses (
mass
hous
ing)
Detac
hed h
ouse
s (hig
h end
)Te
rrace
d hou
ses
Aver
age s
tanda
rd ap
artm
ents,
high
rise
Luxu
ry ap
artm
ents,
high
rise
Low
cost
hous
ingLo
w co
st fla
ts, lo
w ris
e (<6
leve
ls)Lo
w co
st fla
ts, hi
gh ris
e (<1
5 lev
els)
OFF
ICE
/ CO
MM
ERC
IAL
Aver
age s
tanda
rd of
fices
, high
rise
Pres
tige o
ffices
, high
rise
Shop
ping c
entre
s
HO
TELS
Reso
rt ho
tels,
inclus
ive of
F.F
.&E.
3-sta
r bud
get h
otels,
ditto
5-sta
r luxu
ry ho
tels,
ditto
RM
/m2
1,620
2,285 72
51,1
402,1
70 440
615
720
1,515
2,205
1,995
3,250
3,375
6,270
- - - - - - - - - - - - - -
BU
ILD
ING 2,2
303,0
401,1
351,9
253,5
75 525
720
925
1,935
3,505
2,765
3,725
4,630
7,830
SER
VIC
ES
795
800
195
310
800
110
180
250
885
1,405 84
0
1,270 88
01,8
30
- - - - - - - - - - - - - -
1,065
1,065 30
550
01,1
05 130
215
325
1,170
1,735
1,415
1,700
1,210
2,350
TOTA
L
2,415
3,085 92
01,4
502,9
70 550
795
970
2,400
3,610
2,835
4,520
4,255
8,100
- - - - - - - - - - - - - -
3,295
4,105
1,440
2,425
4,680 65
593
51,2
50
3,105
5,240
4,180
5,425
5,840
10,18
0
CONSTRUCTION COST DATA16
CONSTRUCTION COST DATA1CONSTRUCTION COSTS FOR KUALA LUMPUR
IND
UST
RIA
LLig
ht du
ty fla
tted f
actor
iesHe
avy d
uty fla
tted f
actor
ies an
d war
ehou
ses
Sing
le sto
rey c
onve
ntion
al fac
tory o
f s
tructu
ral s
teelw
ork
Owne
r ope
rated
facto
ries,
low ris
e
OTH
ERS
Base
ment
car p
arks
(<3 l
evels
)El
evate
d car
parks
(<4 l
evels
)Pr
imar
y and
Sec
onda
ry sc
hools
Stud
ent h
ostel
sSp
orts
clubs
inclu
sive o
f F.F
.&E.
895
1,165 985
1,305 930
735
840
995
1,930
- - - - - - - - -
1,025
1,315
1,275
1,535
1,535
1,105
1,040
1,175
2,320
580
640
345
490
370
185
200
245
550
- - - - - - - - -
665
725
525
645
680
335
245
340
725
1,475
1,805
1,330
1,795
1,300 920
1,040
1,240
2,480
- - - - - - - - -
1,690
2,040
1,800
2,180
2,215
1,440
1,285
1,515
3,045
The
abov
e co
sts
are
at 4
th Q
uarte
r 201
8 le
vels
, inc
lusi
ve o
f pre
limin
arie
s (1
0%) b
ut e
xclu
sive
of c
ontin
genc
ies.
CONSTRUCTION COST DATA 17
DO
MES
TIC
De
tache
d hou
ses (
mass
hous
ing)
Detac
hed h
ouse
s (hig
h end
)Te
rrace
d hou
ses
Aver
age s
tanda
rd ap
artm
ents,
high
rise
Luxu
ry ap
artm
ents,
high
rise
Low
cost
hous
ingLo
w co
st fla
ts, lo
w ris
e (<6
leve
ls)Lo
w co
st fla
ts, hi
gh ris
e (<1
5 lev
els)
OFF
ICE
/ CO
MM
ERC
IAL
Aver
age s
tanda
rd of
fices
, high
rise
Pres
tige o
ffices
, high
rise
Shop
ping c
entre
s
HO
TELS
Reso
rt ho
tels,
inclus
ive of
F.F
.&E.
3-sta
r bud
get h
otels,
ditto
5-sta
r luxu
ry ho
tels,
ditto
RM
/m2
1,650
2,250 800
1,200
2,435 450
600
685
1,500
2,150
1,950
3,250
3,350
6,050
- - - - - - - - - - - - - -
BU
ILD
ING 2,1
502,8
051,1
301,6
003,0
50 550
750
785
1,800
3,250
2,400
3,450
4,350
7,250
SER
VIC
ES
750
800
200
300
600
105
155
230
775
1,350 855
1,250 780
1,900
- - - - - - - - - - - - - -
950
1,000 350
550
900
145
215
260
1,100
1,650
1,190
1,600
1,450
2,050
TOTA
L
2,400
3,050
1,000
1,500
3,035 555
755
915
2,275
3,500
2,805
4,500
4,130
7,950
- - - - - - - - - - - - - -
3,100
3,805
1,480
2,150
3,950 695
965
1,045
2,900
4,900
3,590
5,050
5,800
9,300
CONSTRUCTION COSTS FOR JOHOR BAHRU
CONSTRUCTION COST DATA18
CONSTRUCTION COST DATA1
IND
UST
RIA
LLig
ht du
ty fla
tted f
actor
iesHe
avy d
uty fla
tted f
actor
ies an
d war
ehou
ses
Sing
le sto
rey c
onve
ntion
al fac
tory o
f s
tructu
ral s
teelw
ork
Owne
r ope
rated
facto
ries,
low ris
e
OTH
ERS
Base
ment
car p
arks
(<3 l
evels
)El
evate
d car
parks
(<4 l
evels
)Pr
imar
y and
Sec
onda
ry sc
hools
Stud
ent h
ostel
sSp
orts
clubs
inclu
sive o
f F.F
.&E.
900
1,150 980
1,300
1,110 700
825
965
1,850
- - - - - - - - -
915
1,250
1,175
1,430
1,450 850
950
1,050
2,105
520
580
350
500
350
210
200
250
550
- - - - - - - - -
675
750
500
600
600
290
235
300
670
1,420
1,730
1,330
1,800
1,460 910
1,025
1,215
2,400
- - - - - - - - -
1,590
2,000
1,675
2,030
2,050
1,140
1,185
1,350
2,775
The
abov
e co
sts
are
at 4
th Q
uarte
r 201
8 le
vels
, inc
lusi
ve o
f pre
limin
arie
s (1
0%) b
ut e
xclu
sive
of c
ontin
genc
ies.
CONSTRUCTION COST DATA 19
DO
MES
TIC
De
tache
d hou
ses (
mass
hous
ing)
Detac
hed h
ouse
s (hig
h end
)Te
rrace
d hou
ses
Aver
age s
tanda
rd ap
artm
ents,
high
rise
Luxu
ry ap
artm
ents,
high
rise
Low
cost
hous
ingLo
w co
st fla
ts, lo
w ris
e (<6
leve
ls)Lo
w co
st fla
ts, hi
gh ris
e (<1
5 lev
els)
OFF
ICE
/ CO
MM
ERC
IAL
Aver
age s
tanda
rd of
fices
, high
rise
Pres
tige o
ffices
, high
rise
Shop
ping c
entre
s
HO
TELS
Reso
rt ho
tels,
inclus
ive of
F.F
.&E.
3-sta
r bud
get h
otels,
ditto
5-sta
r luxu
ry ho
tels,
ditto
RM
/m2
1,454
1,938 714
1,069
1,632 459
561
781
1,433
1,950
1,577
2,907
2,947
5,712
- - - - - - - - - - - - - -
BU
ILD
ING 1,7
851,9
581,0
141,3
462,2
95 479
612
859
1,683
2,750
2,144
3,188
4,106
7,167
SER
VIC
ES
918
826
153
320
755 87 145
121
867
1,350 847
1,148 969
1,923
- - - - - - - - - - - - - -
969
969
306
408
867
112
189
133
1,122
1,585 964
1,566
1,479
2,004
TOTA
L
2,372
2,764 867
1,389
2,387 546
706
903
2,300
3,300
2,424
4,055
3,916
7,635
- - - - - - - - - - - - - -
2,754
2,927
1,320
1,754
3,162 592
801
991
2,805
4,335
3,108
4,753
5,585
9,171
CONSTRUCTION COST DATA1
CONSTRUCTION COST DATA20
CONSTRUCTION COSTS FOR PENANG
IND
UST
RIA
LLig
ht du
ty fla
tted f
actor
iesHe
avy d
uty fla
tted f
actor
ies an
d war
ehou
ses
Sing
le sto
rey c
onve
ntion
al fac
tory o
f s
tructu
ral s
teelw
ork
Owne
r ope
rated
facto
ries,
low ris
e
OTH
ERS
Base
ment
car p
arks
(<3 l
evels
)El
evate
d car
parks
(<4 l
evels
)Pr
imar
y and
Sec
onda
ry sc
hools
Stud
ent h
ostel
sSp
orts
clubs
inclu
sive o
f F.F
.&E.
775
923
785
1,020 842
622
673
867
1,581
- - - - - - - - -
918
1,122 949
1,265
1,387 842
898
984
1,800
530
597
495
510
326
192
199
214
541
- - - - - - - - -
714
760
571
612
561
326
255
281
714
1,306
1,520
1,280
1,530
1,168 814
872
1,081
2,122
- - - - - - - - -
1,632
1,882
1,520
1,877
1,948
1,168
1,153
1,265
2,514
The
abov
e co
sts
are
at 4
th Q
uarte
r 201
8 le
vels
, inc
lusi
ve o
f pre
limin
arie
s (1
0%) b
ut e
xclu
sive
of c
ontin
genc
ies.
CONSTRUCTION COST DATA 21
DO
MES
TIC
De
tache
d hou
ses (
mass
hous
ing)
Detac
hed h
ouse
s (hig
h end
)Te
rrace
d hou
ses
Aver
age s
tanda
rd ap
artm
ents,
high
rise
Luxu
ry ap
artm
ents,
high
rise
Low
cost
hous
ingLo
w co
st fla
ts, lo
w ris
e (<6
leve
ls)Lo
w co
st fla
ts, hi
gh ris
e (<1
5 lev
els)
OFF
ICE
/ CO
MM
ERC
IAL
Aver
age s
tanda
rd of
fices
, high
rise
Pres
tige o
ffices
, high
rise
Shop
ping c
entre
s
HO
TELS
Reso
rt ho
tels,
inclus
ive of
F.F
.&E.
3-sta
r bud
get h
otels,
ditto
5-sta
r luxu
ry ho
tels,
ditto
RM
/m2
1,540
2,350 790
1,050
2,460 420
540
610
1,580
2,240
1,610
3,340
4,070
6,310
- - - - - - - - - - - - - -
BU
ILD
ING 1,6
502,8
601,0
501,5
802,9
90 460
590
670
1,790
3,310
2,180
3,550
4,540
7,450
SER
VIC
ES
430
1,015 285
355
945
120
165
210
880
1,465 880
1,190
1,450
2,325
- - - - - - - - - - - - - -
540
1,250 340
430
1,070 165
185
220
1,015
1,670
1,015
1,450
1,600
2,485
TOTA
L
1,970
3,365
1,075
1,405
3,405 540
705
820
2,460
3,705
2,490
4,530
5,520
8,635
- - - - - - - - - - - - - -
2,190
4,110
1,390
2,010
4,060 625
775
890
2,805
4,980
3,195
5,000
6,140
9,935
CONSTRUCTION COSTS FOR KOTA KINABALU
CONSTRUCTION COST DATA22
CONSTRUCTION COST DATA1
IND
UST
RIA
LLig
ht du
ty fla
tted f
actor
iesHe
avy d
uty fla
tted f
actor
ies an
d war
ehou
ses
Sing
le sto
rey c
onve
ntion
al fac
tory o
f s
tructu
ral s
teelw
ork
Owne
r ope
rated
facto
ries,
low ris
e
OTH
ERS
Base
ment
car p
arks
(<3 l
evels
)El
evate
d car
parks
(<4 l
evels
)Pr
imar
y and
Sec
onda
ry sc
hools
Stud
ent h
ostel
sSp
orts
clubs
inclu
sive o
f F.F
.&E.
930
1,190 990
1,330
1,000 670
720
960
1,910
- - - - - - - - -
990
1,260
1,240
1,500
1,190 860
850
1,030
2,050
430
500
355
430
250
185
235
260
720
- - - - - - - - -
525
570
430
510
285
220
370
285
880
1,360
1,690
1,345
1,760
1,250 855
955
1,220
2,630
- - - - - - - - -
1,515
1,830
1,670
2,010
1,475
1,080
1,220
1,315
2,930
The
abov
e co
sts
are
at 4
th Q
uarte
r 201
8 le
vels
, inc
lusi
ve o
f pre
limin
arie
s (1
0%) b
ut e
xclu
sive
of c
ontin
genc
ies.
CONSTRUCTION COST DATA 23
DO
MES
TIC
De
tache
d hou
ses (
mass
hous
ing)
Detac
hed h
ouse
s (hig
h end
)Te
rrace
d hou
ses
Aver
age s
tanda
rd ap
artm
ents,
high
rise
Luxu
ry ap
artm
ents,
high
rise
Low
cost
hous
ingLo
w co
st fla
ts, lo
w ris
e (<6
leve
ls)Lo
w co
st fla
ts, hi
gh ris
e (<1
5 lev
els)
OFF
ICE
/ CO
MM
ERC
IAL
Aver
age s
tanda
rd of
fices
, high
rise
Pres
tige o
ffices
, high
rise
Shop
ping c
entre
s
HO
TELS
Reso
rt ho
tels,
inclus
ive of
F.F
.&E.
3-sta
r bud
get h
otels,
ditto
5-sta
r luxu
ry ho
tels,
ditto
1,175
1,785
1,030
1,215
1,815 575
795
845
1,570
1,870
1,765
2,815
3,010
4,805
- - - - - - - - - - - - - -
BU
ILD
ING 1,3
102,9
501,0
801,3
201,9
80 635
830
920
1,840
2,985
1,845
3,330
3,330
6,990
SER
VIC
ES
480
830
170
310
945
115
160
165
930
1,570 810
1,405
1,590
2,435
- - - - - - - - - - - - - -
630
985
210
410
1,200 145
190
240
1,095
1,690
1,005
1,690
1,740
2,590
TOTA
L
1,655
2,615
1,200
1,525
2,760 69
095
51,0
10
2,500
3,440
2,575
4,220
4,600
7,240
- - - - - - - - - - - - - -
1,940
3,935
1,290
1,730
3,180 780
1,020
1,160
2,935
4,675
2,850
5,020
5,070
9,580
RM
/m2
CONSTRUCTION COSTS FOR KUCHING
CONSTRUCTION COST DATA24
CONSTRUCTION COST DATA1
IND
UST
RIA
LLig
ht du
ty fla
tted f
actor
iesHe
avy d
uty fla
tted f
actor
ies an
d war
ehou
ses
Sing
le sto
rey c
onve
ntion
al fac
tory o
f s
tructu
ral s
teelw
ork
Owne
r ope
rated
facto
ries,
low ris
e
OTH
ERS
Base
ment
car p
arks
(<3 l
evels
)El
evate
d car
parks
(<4 l
evels
)Pr
imar
y and
Sec
onda
ry sc
hools
Stud
ent h
ostel
sSp
orts
clubs
inclu
sive o
f F.F
.&E.
1,040
1,120 925
1,130
1,070 835
980
1,155
1,815
- - - - - - - - -
1,255
1,285
1,020
1,280
1,320 94
51,0
701,3
201,9
90
360
415
310
440
365
220
210
240
720
- - - - - - - - -
390
490
450
525
390
245
340
315
875
1,400
1,535
1,235
1,570
1,435
1,055
1,190
1,395
2,535
- - - - - - - - -
1,645
1,775
1,470
1,805
1,710
1,190
1,410
1,635
2,865
The
abov
e co
sts
are
at 4
th Q
uarte
r 201
8 le
vels
, inc
lusi
ve o
f pre
limin
arie
s (1
0%) b
ut e
xclu
sive
of c
ontin
genc
ies.
CONSTRUCTION COST DATA 25
SING
APO
RE^ ++
1,30
5 -
1,4
852,
030
- 3
,045
1,70
5 -
1,9
202,
175
- 2
,900
1,70
5 -
1,9
201,
920
- 2
,100
1,92
0 -
2,0
30
2,03
0 -
2,2
45
2,14
0 -
2,3
552,
755
- 3
,115
2,75
5 -
3,1
15
DO
MES
TIC
Apar
tmen
ts, hi
gh ris
e, av
erag
e stan
dard
Apar
tmen
ts, hi
gh ris
e, hig
h end
Terra
ced h
ouse
s, av
erag
e stan
dard
Detac
hed h
ouse
s, hig
h end
OFF
ICE
/ CO
MM
ERC
IAL
Mediu
m/hig
h rise
offic
es, a
vera
ge st
anda
rdHi
gh ris
e offic
es, p
resti
ge qu
ality
Out-o
f-tow
n sho
pping
centr
e, a
vera
ge st
anda
rdRe
tail m
alls,
high e
nd
HO
TELS
Budg
et ho
tels -
3 sta
r, mi
d mar
ket
Busin
ess h
otels
- 4/5
star
Luxu
ry ho
tels -
5 sta
r
MA
NIL
A@
JAK
AR
TA#
BA
NG
KO
K*
US$
/m2
345
-
580
710
- 1
,120
220
-
345
740
-
980
575
-
745
865
- 1
,255
550
-
715
680
-
1,00
0
1,02
0 -
1,3
951,
720
- 2
,175
1,94
0 -
2,4
35
KU
ALA
LUM
PUR
703
-
871
978
- 1
,207
458
-
565
794
-
962
642
-
794
871
- 1
,176
626
-
810
840
-
886
1,14
6 -
1,2
681,
466
- 1
,680
1,71
1 -
1,9
86
722
-
817
996
- 1
,124
383
-
498
1,04
2 -
1,1
65
712
-
789
1,05
0 -
1,1
7461
1 -
6
75
675
-
730
1,23
7 -
1,4
611,
691
- 1
,827
1,80
1 -
2,0
30
937
- 1
,135
1,26
5 -
2,1
0776
2 -
9
171,
631
- 2
,724
933
- 1
,076
1,26
4 -
1,3
9076
2 -
9
35
1,09
3 -
1,5
08
1,19
5 -
1,3
121,
347
- 1
,607
1,85
1 -
2,5
24
CONSTRUCTION COSTS FOR SELECTED ASIAN CITIES
CONSTRUCTION COST DATA26
CONSTRUCTION COST DATA1
++
The
abov
e co
sts
are
at 4
th Q
uarte
r 201
8 le
vels
, inc
lusi
ve o
f pre
limin
arie
s bu
t exc
lusi
ve o
f con
tinge
ncie
s.*
Rat
es e
xclu
de V
AT a
nd c
ontin
genc
ies.
# R
ates
are
net
t of V
AT.
@ R
ates
are
exc
lusi
ve o
f con
tinge
ncie
s &
incl
ude
12%
VAT
. ^
Rat
es a
re n
ett o
f GS
T an
d ex
clus
ive
of c
ontig
enci
es.
+ In
clud
es ra
ised
floo
r and
cei
ling
to te
nant
ed a
reas
but
exc
lude
s of
fice
carp
ets
(nor
mal
ly u
nder
tena
nt’s
fit-o
ut)
++ O
pen
all s
ides
with
par
apet
.
(Cont’d)
CONSTRUCTION COST DATA 27
IND
UST
RIA
LInd
ustria
l unit
s, sh
ell on
ly. (C
onve
ntion
al s
ingle
store
y fra
med u
nits).
Ow
ner o
pera
ted fa
ctorie
s, low
rise,
light
weig
ht ind
ustry
OTH
ERS
Unde
rgro
und/b
asem
ent c
ar pa
rks (<
3 lev
els)
Multi
store
y car
parks
, abo
ve gr
ound
(<4 l
evels
)Sc
hools
(prim
ary &
seco
ndar
y)St
uden
ts’ re
siden
ces
Spor
ts clu
bs, m
ulti p
urpo
se sp
orts/
leisu
re c
entre
s (dr
y spo
rts)
Gene
ral h
ospit
als -
publi
c sec
tor
Exch
ange
Rate
Use
d : U
S$1 =
320
-
430
430
-
520
310
-
530
220
-
345
250
-
305
295
-
360
595
-
730
855
- 1,
155
RM 4.
18
489
-
611
N/A
550
-
733
183
-
299
N/A
N/A
N/A
N/A
BAH
T 32
.73
327
-
356
355
-
392
505
-
619
327
-
356
N/A
N/A
1,095
- 1
,640
N/A
IDR
15,18
0
485
-
538
685
-
789
494
-
610
475
-
661
701
-
952
742
-
937
1,186
- 1
,699
1,287
- 1
,523
PHP
52.88
725
-
930
N/A
930
- 1,
255
640
-
930
N/A
1,560
- 1
,705
1,955
- 2
,100
2,755
- 2
,900
S$ 1.
38
CONSTRUCTION COSTS FOR SELECTED ASIAN CITIES
(Cont’d)
CONSTRUCTION COST DATA28
CONSTRUCTION COST DATA1
DO
MES
TIC
Apar
tmen
ts, hi
gh ris
e, av
erag
e stan
dard
Apar
tmen
ts, hi
gh ris
e, hig
h end
Terra
ced h
ouse
s, av
erag
e stan
dard
Detac
hed h
ouse
s, hig
h end
OFF
ICE
/ CO
MM
ERC
IAL
Mediu
m/hig
h rise
offic
es, a
vera
ge st
anda
rdHi
gh ris
e offic
es, p
resti
ge qu
ality
Out-o
f-tow
n sho
pping
centr
e, a
vera
ge st
anda
rdRe
tail m
alls,
high e
nd
HO
TELS
Budg
et ho
tels -
3 sta
r, mi
d mar
ket
Busin
ess h
otels
- 4/5
star
Luxu
ry ho
tels -
5 sta
r
MAC
AU$
HO
NG
KO
NG
^H
O C
HI M
INH
#
576
-
660
869
- 1
,047
398
-
419
525
-
550
435
-
471
544
-
576
424
-
461
592
-
639
817
-
905
1,27
2 -
1,5
081,
607
- 1
,759
US$
/m2
645
-
800
820
-
940
435
-
510
495
-
605
755
-
875
870
- 1
,185
N/A
705
-
920
1,40
0 -
1,7
10N/
A
1,76
5 -
2,1
20
3,06
0 -
3,5
704,
020
- 4
,690
4,13
0 -
4,8
606,
140
up
2,99
0 -
3,5
003,
630
- 4
,260
2,97
0 -
3,5
40
3,95
0 -
4,7
20
3,84
0 -
4,1
604,
020
- 4
,720
4,72
0 -
5,4
60
2,27
9 -
2,7
883,
183
- 4
,864
3,88
4 -
4,6
354,
737
- 6
,163
2,62
3 -
3,3
873,
387
- 3
,705
2,47
0 -
3,7
05
3,88
4 -
4,6
86
3,45
1 -
3,9
094,
686
- 5
,602
5,60
2 -
6,6
21
IND
IA*
The
abov
e co
sts
are
at 4
th Q
uarte
r 201
8 le
vels
, inc
lusi
ve o
f pre
limin
arie
s bu
t exc
lusi
ve o
f con
tinge
ncie
s.#
Rat
es a
re n
ett o
f VAT
and
con
tinge
ncie
s.*
Rat
es a
re b
ased
on
proj
ects
in B
anga
lore
and
are
net
t of G
ST.
Mum
bai c
osts
are
gen
eral
ly 8
% h
ighe
r.^
Rat
es a
re e
xclu
sive
of c
ontin
genc
ies.
Offi
ces
of a
vera
ge s
tand
ard
are
built
to th
e fo
llow
ing
prov
isio
ns:
(i)
Cur
tain
wal
l/win
dow
wal
l fac
ade.
(ii
) Ten
ant a
re w
ith s
cree
ded
floor
, pai
nted
wal
l and
cei
ling.
Sch
ools
(prim
ary
and
seco
ndar
y) a
re o
f pub
lic a
utho
rity
stan
dard
, no
a/c
and
com
plet
e w
ith b
asic
ext
erna
l wor
ks.
$ R
ates
are
exc
lusi
ve o
f con
tinge
ncie
s an
d an
y m
anag
emen
t con
tract
fee.
(Cont’d)
CONSTRUCTION COST DATA 29
IND
UST
RIA
LInd
ustria
l unit
s, sh
ell on
ly. (C
onve
ntion
al s
ingle
store
y fra
med u
nits).
Ow
ner o
pera
ted fa
ctorie
s, low
rise,
light
weig
ht ind
ustry
OTH
ERS
Unde
rgro
und/b
asem
ent c
ar pa
rks (<
3 lev
els)
Multi
store
y car
parks
, abo
ve gr
ound
(<4 l
evels
)Sc
hools
(prim
ary &
seco
ndar
y)St
uden
ts’ re
siden
ces
Spor
ts clu
bs, m
ulti p
urpo
se sp
orts/
leisu
re c
entre
s (dr
y spo
rts)
Gene
ral h
ospit
als -
publi
c sec
torEx
chan
ge R
ate U
sed :
US$
1 =
340
-
398
361
-
424
288
-
309
230
-
252
285
-
324
309
-
340
602
-
628
660
-
723
INR
71.90
310
-
390
350
-
460
640
-
765
410
-
450
540
-
590
540
-
695
800
-
855
N/A
VND
22,60
0
N/A
2,330
- 2
,950
3,200
- 3
,840
1,920
- 2
,280
2,520
- 2
,710
2,930
- 3
,310
3,820
- 4
,450
4,950
- 5
,580
HK$ 7
.82
N/A
N/A
2,050
- 3
,005
1,133
- 1
,490
2,266
- 2
,623
1,795
- 2
,088
N/A
N/A
MOP
8.07
CONSTRUCTION COSTS FOR SELECTEDASIAN CITIES
(Cont’d)
CONSTRUCTION COST DATA30
CONSTRUCTION COST DATA1
DO
MES
TIC
Apar
tmen
ts, hi
gh ris
e, av
erag
e stan
dard
Apar
tmen
ts, hi
gh ris
e, hig
h end
Terra
ced h
ouse
s, av
erag
e stan
dard
Detac
hed h
ouse
s, hig
h end
OFF
ICE
/ CO
MM
ERC
IAL
Mediu
m/hig
h rise
offic
es, a
vera
ge st
anda
rdHi
gh ris
e offic
es, p
resti
ge qu
ality
Out-o
f-tow
n sho
pping
centr
e, a
vera
ge st
anda
rdRe
tail m
alls,
high e
nd
HO
TELS
Budg
et ho
tels -
3 sta
r, mi
d mar
ket
Busin
ess h
otels
- 4/5
star
Luxu
ry ho
tels -
5 sta
r
BEIJ
ING
*SH
ENZH
EN/
GU
AN
GZH
OU
*C
HO
NG
QIN
G/
CH
ENG
DU
*
668
-
740
1,55
4 -
1,6
9744
6 -
4
7766
6 -
7
40
868
- 1
,156
1,15
8 -
1,4
45N/
A
1,22
8 -
1,5
85
952
- 1
,169
1,55
6 -
2,1
202,
117
- 2
,538
US$
/m2
552
-
661
907
- 1
,149
445
-
541
591
-
682
882
- 1
,025
1,12
2 -
1,5
2070
6 -
9
12
1,06
7 -
1,5
05
958
- 1
,189
1,74
7 -
2,1
882,
159
- 2
,592
534
-
590
874
-
958
405
-
446
553
-
609
777
-
860
1,13
2 -
1,3
6174
9 -
8
22
1,08
8 -
1,5
21
985
- 1
,084
1,59
2 -
2,2
732,
165
- 2
,386
613
-
673
1,48
4 -
1,6
9044
7 -
5
2267
3 -
7
49
857
- 1
,154
1,15
4 -
1,8
9565
3 -
8
73
1,18
1 -
1,6
26
966
- 1
,191
1,61
5 -
2,1
322,
057
- 2
,646
SHA
NG
HA
I*
The
abov
e co
sts
are
at 4
th Q
uarte
r 201
8 le
vels
, inc
lusi
ve o
f pre
limin
arie
s bu
t exc
lusi
ve o
f con
tinge
ncie
s.*
Rat
es a
re e
xclu
sive
of c
ontin
genc
ies.
Hou
ses
are
built
to s
hell
and
core
sta
ndar
d on
ly, w
here
all
tena
nt o
r occ
upan
t are
as a
re
unf
urni
shed
. Sch
ools
(prim
ary
and
seco
ndar
y) a
re o
f pub
lic a
utho
rity
stan
dard
, no
a/c
and
com
plet
e w
ith b
asic
ext
erna
l wor
ks.
CONSTRUCTION COST DATA 31
IND
UST
RIA
LInd
ustria
l unit
s, sh
ell on
ly. (C
onve
ntion
al s
ingle
store
y fra
med u
nits).
Ow
ner o
pera
ted fa
ctorie
s, low
rise,
light
weig
ht ind
ustry
OTH
ERS
Unde
rgro
und/b
asem
ent c
ar pa
rks (<
3 lev
els)
Multi
store
y car
parks
, abo
ve gr
ound
(<4 l
evels
)Sc
hools
(prim
ary &
seco
ndar
y)St
uden
ts’ re
siden
ces
Spor
ts clu
bs, m
ulti p
urpo
se sp
orts/
leisu
re c
entre
s (dr
y spo
rts)
Gene
ral h
ospit
als -
publi
c sec
torEx
chan
ge R
ate U
sed :
US$
1 =
280
-
342
432
-
540
742
- 1,
033
382
-
532
528
-
676
377
-
527
955
- 1,
172
1,418
- 1
,839
RMB
6.94
426
-
542
N/A
413
-
589
324
-
405
438
-
487
N/A
N/A
N/A
RMB
6.94
497
-
547
N/A
513
-
820
367
-
404
407
-
448
264
-
297
754
-
832
N/A
RMB
6.94
270
-
329
522
-
598
746
-
820
449
-
454
520
-
671
368
-
520
890
-
897
1,170
- 1
,465
RMB
6.94
RM
1. E
xcav
ating
base
ment
≤ 2m
deep
2. E
xcav
ating
for f
ootin
gs ≤
1.5m
deep
3. R
emov
e exc
avate
d mate
rials
off si
te 4
. Har
dcor
e bed
blind
ed w
ith fin
e mate
rials
5. M
ass c
oncre
te gr
ade 1
5 6
. Rein
force
d con
crete
grad
e 30
7. M
ild st
eel ro
d rein
force
ment
8. H
igh te
nsile
rod r
einfor
ceme
nt 9
. Saw
n for
mwor
k to s
offits
of su
spen
ded
s
labs
10. S
awn f
ormw
ork t
o colu
mns a
nd w
alls
11. 1
12.5m
m thi
ck br
ick w
alls
12. “
Klipl
ok C
olorb
ond”
0.64
mm pr
ofiled
stee
l
she
eting
13. A
lumini
um ca
seme
nt wi
ndow
s, sin
gle
glaz
ed
m3 m3 m3 m3 m3 m3 kg kg m2 m2 m2 m2 m2
MAJOR RATES FOR MALAYSIA
CONSTRUCTION COST DATA32
CONSTRUCTION COST DATA1K
UA
LA
LUM
PUR
15.0
-
25.0
15.0
-
25.0
20.0
-
30.0
72.0
-
95.0
240.0
- 3
15.0
260.0
- 3
20.0
3.40
-
3.80
3.40
-
3.80
38.0
-
45.0
38.0
-
45.0
42.0
- 5
0.0
65.0
- 7
0.0
380.0
- 6
00.0
PEN
AN
G 18
.0 -
30.0
18.0
- 2
2.0 15
.0 -
30.0
80
.0 -
100.0
240.0
- 2
80.0
260.0
- 3
00.0
3.20
- 3
.803.2
0 -
3.80
38.0
- 4
5.038
.0 -
45.0
42.0
- 5
0.0
75.0
- 9
5.0
220.0
- 4
20.0
JOH
OR
BA
HR
U
18.0
- 3
5.018
.0 -
35.0
18.0
- 2
8.075
.0 -
120.0
215.0
265.0
3.50
- 3
.703.5
0 -
3.70
40.0
- 5
0.040
.0 -
50.0
40.0
- 5
5.0
80.0
300.0
- 3
80.0
KO
TA
KIN
AB
ALU
14.0
20.0
20.0
100.0
345.0
395.0
4.00
4.00
45.0
45.0
50.0
96.0*
250.0
- 3
50.0
KU
CH
ING
22.0
22
.0
25.0
10
5.0
36
0.0
4
00.0
3.
90
3.
90
48
.0
48
.0
50.0
100.0
360
.0
14. S
tructu
ral s
teelw
ork -
beam
s, sta
nchio
ns
and
the l
ike15
. Stee
lwor
k - an
gles,
chan
nels,
flats
and
th
e like
16. 2
5mm
ceme
nt an
d san
d (1:3
) pav
ing17
. 20m
m ce
ment
and s
and (
1:4) p
laster
to
wall
s18
. Cer
amic
tiles b
edde
d to f
loor s
creed
(
meas
ured
sepa
ratel
y)19
. 12m
m fib
rous
plas
terbo
ard c
eiling
lining
20. T
wo co
ats of
emuls
ion pa
int to
p
laster
ed su
rface
s
Aver
age e
xpec
ted pr
elimi
narie
s
kg kg m2 m2 m2 m2 m2 %
6.50
- 8
.00
6.50
- 8
.0020
.0 -
28.0
22.0
- 2
8.0 60
.0 -
90.0
35
.0 -
45.0
4.00
- 8
.50 3
- 6
5.5
0 -
7.00
5.50
- 7
.00 18
.0 -
25.0
25.0
- 3
5.0 65
.0 -
90.0
35.0
- 5
0.0
3.50
- 5
.50 7
- 1
2
9.00
9.00
25
.0
25.0
10
0.0
62.0
10.0
10
7.50
-
9.50
7.50
-
9.50
17.0
-
25.0
18.0
-
25.0
50.0
-
70.0
35.0
- 4
5.0
3.50
-
5.00
6 -
15
7.00
- 7
.50 6.5
0 -
7.00
25.0
25.0
80.0
48.0
7.80
5 -
7 Th
e ab
ove
cost
s ar
e at
4th
Qua
rter 2
018
leve
ls, e
xclu
sive
of c
ontin
genc
ies
and
prel
imin
arie
s.*
Rat
e fo
r “K
liplo
k C
olor
bond
” 0.5
4mm
pro
filed
ste
el s
heet
ing.
CONSTRUCTION COST DATA 33
20
20
15 -
20
50
17
5 -
185
115
- 12
01.2
5 -
1.35
1.25
- 1.3
540
40
35
-
40
43
29
0
4.00
- 4.5
04.0
0 -
4.50
21
SING
APO
RE@
S$
+
m3 m3 m3 m3 m3 m3 kg
kg
m2 m2 m2 m2 m2 kg kg m2
1. E
xcav
ating
base
ment
≤ 2m
deep
2. E
xcav
ating
for f
ootin
gs ≤
1.5m
deep
3. R
emov
e exc
avate
d mate
rials
off si
te 4
. Har
dcor
e bed
blind
ed w
ith fin
e mate
rials
5. M
ass c
oncre
te gr
ade 1
5 6
. Rein
force
d con
crete
grad
e 30
7. M
ild st
eel ro
d rein
force
ment
8. H
igh te
nsile
rod r
einfor
ceme
nt 9
. Saw
n for
mwor
k to s
offits
of su
spen
ded s
labs
10. S
awn f
ormw
ork t
o colu
mns a
nd w
alls
11. 1
12.5m
m thi
ck br
ick w
alls
12. “
Klipl
ok C
olorb
ond”
0.64
mm pr
ofiled
stee
l
she
eting
13. A
lumini
um ca
seme
nt wi
ndow
s, sin
gle gl
azed
14. S
tructu
ral s
teelw
ork -
beam
s, sta
nchio
ns
and
the l
ike15
. Stee
lwor
k - an
gles,
chan
nels,
flats
and t
he lik
e16
. 25m
m ce
ment
and s
and (
1:3) p
aving
15
- 2
5
15 -
25
2
0 -
30
72
- 9
524
0 -
315
260
- 32
0 3
.40 -
3.80
3.40
- 3
.80 3
8 -
45
38
- 4
542
-
50
65 -
70
380
- 60
0
7.50
- 9.5
0 7
.50 -
9.50
17 -
25
KU
ALA
LUM
PUR
RM
120
- 1
40 14
0 -
180
120
- 1
5065
0 -
750
2,300
- 2
,500
2,600
- 2
,800
26 -
2
9 26
-
28
420
- 4
80 42
0 -
480
650
- 7
50 1,
200
7,000
60 -
7
5 60
-
75
200
- 2
40
BANG
KOK*
BAHT
40
75
35
65
0
950
1,1
35
1
2.5
1
2.5
20
0
195
25
0
300
1,6
50
27
27
90
JAK
AR
TA*
IDR
’000
270
50
0
350
1,8
00
3,4
00
4,8
00
54
55
1,0
00
95
0
N/A
1,400
11,50
0#
160
16
0
650
MA
NIL
APH
PMAJOR RATES FOR SELECTED ASIAN CITIES
CONSTRUCTION COST DATA34
CONSTRUCTION COST DATA1
22
74
30
3.50
- 4
.00
12 -
15
m2 m2 m2 m2
%
17. 2
0mm
ceme
nt an
d san
d (1:4
) plas
ter to
wall
s18
. Cer
amic
tiles b
edde
d to f
loor s
creed
(me
asur
ed se
para
tely)
19. 1
2mm
fibro
us pl
aster
boar
d ceil
ing lin
ing20
. Two
coats
of em
ulsion
paint
to p
laster
ed
sur
faces
Aver
age e
xpec
ted pr
elimi
narie
s
18
-
25 5
0 -
70
35 -
45
3.50
- 5
.00
6 -
15
220
- 26
0 1,
200
750
- 85
0
120
- 16
012
- 1
8
100
20
0
215$
30
8 - 1
0
700
1,8
00
1,400
500
12
- 18
The
abov
e co
sts
are
base
d on
lum
p su
m fi
xed
pric
e co
ntra
ct ra
te e
xclu
sive
of p
relim
inar
ies
and
cont
inge
ncie
s un
less
oth
erw
ise
stat
ed.
* R
ates
are
net
t of V
AT.
$ 9
mm
gyp
sum
boa
rd.
# A
lum
iniu
m w
ith a
nodi
zed
finis
h; 6
mm
thic
k.@
Rat
es a
re n
ett o
f GS
T.+
Rat
e fo
r lea
n co
ncre
te b
lindi
ng.
(Cont’d)
CONSTRUCTION COST DATA 35
92,40
0
92
,400
84,70
0
28
0,900
1,696
,400
1,865
,650
19,76
4
19
,908
215,0
00
24
5,000
312,7
80
401,1
10 -
597,6
006,3
15,00
0
52,65
0
52
,650
94,00
0
m3 m3 m3 m3 m3 m3 kg
kg
m2 m2 m2 m2 m2 kg kg m2
1. E
xcav
ating
base
ment
≤ 2m
deep
2. E
xcav
ating
for f
ootin
gs ≤
1.5m
deep
3. R
emov
e exc
avate
d mate
rials
off si
te 4
. Har
dcor
e bed
blind
ed w
ith fin
e mate
rials
5. M
ass c
oncre
te gr
ade 1
5 6
. Rein
force
d con
crete
grad
e 30
7. M
ild st
eel ro
d rein
force
ment
8. H
igh te
nsile
rod r
einfor
ceme
nt 9
. Saw
n for
mwor
k to s
offits
of su
spen
ded s
labs
10. S
awn f
ormw
ork t
o colu
mns a
nd w
alls
11. 1
12.5m
m thi
ck br
ick w
alls
12. “
Klipl
ok C
olorb
ond”
0.64
mm pr
ofiled
stee
l
she
eting
13. A
lumini
um ca
seme
nt wi
ndow
s, sin
gle gl
azed
14. S
tructu
ral s
teelw
ork -
beam
s, sta
nchio
ns
and
the l
ike15
. Stee
lwor
k - an
gles,
chan
nels,
flats
and t
he lik
e16
. 25m
m ce
ment
and s
and (
1:3) p
aving
199
225
N/A
4,620
6,248
7,822
70
72
708
761
1,155
1,785
6,300
126
126
498
IND
IA*
INR
HO C
HI M
INH^
VND
150
18
0
150
1,2
00
1,3
50
1,2
50
9.0
0
9.00
28
0
280
45
0
N/A
4,0
00
35
40
120
MAC
AUM
OP
200
180
300#
950
1,100
1,200
9.70
9.70
410
410
400
1,000
3,800
36
42
160
HONG
KO
NGHK
$MAJOR RATES FOR SELECTED ASIAN CITIES(Cont’d)
CONSTRUCTION COST DATA36
CONSTRUCTION COST DATA1
150
45
0
650
200
1
0
165
400
600
90
10 -
15
m2 m2 m2 m2
%
17. 2
0mm
ceme
nt an
d san
d (1:4
) plas
ter to
wall
s18
. Cer
amic
tiles b
edde
d to f
loor s
creed
(me
asur
ed se
para
tely)
19. 1
2mm
fibro
us pl
aster
boar
d ceil
ing lin
ing20
. Two
coats
of em
ulsion
paint
to p
laster
ed
sur
faces
Aver
age e
xpec
ted pr
elimi
narie
s
40
9
1,7
85
1,4
17
252
9
- 13
The
abov
e co
sts
are
base
d on
lum
p su
m fi
xed
pric
e co
ntra
ct ra
te e
xclu
sive
of p
relim
inar
ies
and
cont
inge
ncie
s un
less
oth
erw
ise
stat
ed.
^ R
ates
are
net
t of V
AT.
* R
ates
are
sup
ply
& fi
x ba
sed
on p
roje
cts
in B
anga
lore
and
are
net
t of G
ST.
Mum
bai c
osts
are
gen
eral
ly 8
% h
ighe
r.#
Rat
e in
clud
ing
dum
ping
cha
rges
.
(Cont’d)
CONSTRUCTION COST DATA 37
144,0
00
67
4,180
234,0
00
88,90
0
8
- 12
m3 m3 m3 m3 m3 m3 kg
kg
m2 m2 m2 m2 m2 kg kg m2
1. E
xcav
ating
base
ment
≤ 2m
deep
2. E
xcav
ating
for f
ootin
gs ≤
1.5m
deep
3. R
emov
e exc
avate
d mate
rials
off si
te 4
. Har
dcor
e bed
blind
ed w
ith fin
e mate
rials
5. M
ass c
oncre
te gr
ade 1
5 6
. Rein
force
d con
crete
grad
e 30
7. M
ild st
eel ro
d rein
force
ment
8. H
igh te
nsile
rod r
einfor
ceme
nt 9
. Saw
n for
mwor
k to s
offits
of su
spen
ded s
labs
10. S
awn f
ormw
ork t
o colu
mns a
nd w
alls
11. 1
12.5m
m thi
ck br
ick w
alls
12. “
Klipl
ok C
olorb
ond”
0.64
mm pr
ofiled
stee
l
she
eting
13. A
lumini
um ca
seme
nt wi
ndow
s, sin
gle gl
azed
14. S
tructu
ral s
teelw
ork -
beam
s, sta
nchio
ns
and
the l
ike15
. Stee
lwor
k - an
gles,
chan
nels,
flats
and t
he lik
e16
. 25m
m ce
ment
and s
and (
1:3) p
aving
30
30
1
35
19
0
54
0
57
0
5.8
0
5.8
0
90
90
90
*
N/A
700
11
9.5
0
35
SHAN
GHA
IRM
B
30
26
95
17
0
42
0
55
0
5.3
0
5.3
0
65
60
80
N/A
650+
11.00
11.10
25
CHO
NGQ
ING
/CH
ENG
DURM
B
SHEN
ZHEN
/G
UANG
ZHO
URM
B 30
30
1
05
19
0
540
58
0
6.00
6.0
0
90
85
80
N/A
70
0
12.50
11.50
35
MAJOR RATES FOR SELECTED ASIAN CITIES(Cont’d)
CONSTRUCTION COST DATA38
CONSTRUCTION COST DATA130
33
60
180
530
550
5.60
5.60
90
85
80
N/A
815+
11
9.5
0
32
BEI
JIN
GR
MB
32
14
5
162
32
7 -
10
m2 m2 m2 m2
%
17. 2
0mm
ceme
nt an
d san
d (1:4
) plas
ter to
wall
s18
. Cer
amic
tiles b
edde
d to f
loor s
creed
(me
asur
ed se
para
tely)
19. 1
2mm
fibro
us pl
aster
boar
d ceil
ing lin
ing20
. Two
coats
of em
ulsion
paint
to p
laster
ed
sur
faces
Aver
age e
xpec
ted pr
elimi
narie
s
35
160
150
40
5 -
10
30
15
5
190
35
5 -
12
35
13
0
150
35
6
- 1
2
The
abov
e co
sts
are
base
d on
lum
p su
m fi
xed
pric
e co
ntra
ct ra
te e
xclu
sive
of p
relim
inar
ies
and
cont
inge
ncie
s un
less
oth
erw
ise
stat
ed.
* R
ate
for 1
20m
m th
ick
conc
rete
blo
ck w
alls
.+
Rat
e fo
r dou
ble
glaz
ed w
indo
w.
CONSTRUCTION COST DATA 39
ACMV COSTS FOR VARIOUS DESIGNS & DEVELOPMENTS IN KUALA LUMPURACMV : Air Conditioning & Mechanical Ventilation System
310
100
350
115
60
280 278
391
190
450
205
90
450
400
0
100
200
300
400
500
Hos
pita
l
Aca
dem
icIn
stitu
tion
Offi
ce
Res
iden
tial
Fact
ory
Hot
el
Com
mer
cial
Com
plex
RM/m2 of Construction Floor Area
210
260
360
250
350
400
0
100
200
300
400
500
Central Variable Air Volume
Central Constant Air Volume
Central VariableRefrigerant Volume
RM/m2 of Construction Floor Area
CONSTRUCTION COST DATA40
CONSTRUCTION COST DATA1
RM/Tonne of Refrigeration
4000
5200
6650
4500
6000
7400
0
2000
4000
6000
8000
Central Variable Air Volume
Central Constant Air Volume
Central VariableRefrigerant Volume
RM/Tonne of Refrigeration
62006600
1200
4600
1300
65007500
7500
8500
2000
5000
2000
76008400
0
2500
5000
7500
10000
Hos
pita
l
Aca
dem
icIn
stitu
tion
Offi
ce
Res
iden
tial
Fact
ory
Hot
el
Com
mer
cial
Com
plex
CONSTRUCTION COST DATA 41
153
- 2
49
34 -
117
129
- 2
78 1
47 -
246
90 -
170
158
- 2
58 55
- 1
3618
1 -
356
160
- 3
04 97
- 2
13 26
-
5518
-
3691
- 1
7246
-
8072
- 1
46
SING
APO
RE^
S$/m
2
MEC
HA
NIC
AL
SER
VIC
ESOf
fices
Indus
trial*
Hotel
sSh
oppin
g Cen
tres
Apar
tmen
tsEL
ECTR
ICA
L SE
RVI
CES
Offic
esInd
ustria
l**Ho
tels
Shop
ping C
entre
sAp
artm
ents
HYD
RA
ULI
C S
ERVI
CES
Offic
esInd
ustria
lHo
tels
Shop
ping C
entre
sAp
artm
ents
320
- 4
90
85 -
190
300
- 5
90 3
00 -
475
120
- 2
10
290
- 4
60 14
5 -
190
295
- 5
5029
5 -
460
105
- 2
10 35
-
65 40
-
5017
5 -
270
30 -
35
50 -
100
KU
ALA
LUM
PUR
RM
/m2
4,400
- 4
,800
1,550
- 1
,600
4,600
- 5
,100
4,600
- 4
,800
4,300
- 4
,500
3,400
- 3
,800
1,950
- 2
,200
3,800
- 4
,500
2,800
- 3
,200
2,800
- 3
,350
780
-
900
750
-
790
1,400
- 1
,650
790
-
950
1,200
- 1
,400
BANG
KOK@
BAHT
/m2
1,028
- 1
,183
466
-
744
1,022
- 1
,210
905
- 1,
087
915
- 1
,001
830
- 1,
060
589
-
833
835
-
937
723
-
910
878
- 1
,049
209
-
294
139
-
214
835
- 1,
054
198
-
305
889
- 1
,124
JAK
AR
TA#
IDR
’000
/m2
4,000
- 5
,930
800
- 1
,500
3,5
00 -
9,67
02,8
90 -
6,84
01,3
60 -
4,43
0
3,700
- 7
,000
2,000
- 3
,500
4,700
-12
,000
3,600
- 6
,000
3,600
- 6
,800
1,230
- 2
,200
800
- 1,
300
2,250
- 6
,820
1,220
- 1
,600
2,250
- 3
,600
MA
NIL
A$
PHP/
m2
M&E COSTS FOR SELECTED ASIAN CITIES
CONSTRUCTION COST DATA42
CONSTRUCTION COST DATA1
FIR
E SE
RVI
CES
Offic
esInd
ustria
lHo
tels
Shop
ping C
entre
sAp
artm
ents
LIFT
S / E
SCA
LATO
RS
Offic
esInd
ustria
lHo
tels
Shop
ping C
entre
sAp
artm
ents
60 -
80
45
-
65 6
5 -
90
55
-
8015
-
30
125
- 3
50 55
- 1
8010
0 -
285
95 -
120
65 -
110
780
-
850
730
-
750
780
-
890
780
-
820
720
-
850
1,100
- 1
,350
N/A
1,100
- 1
,400
250
-
450
500
-
580
284
-
375
150
-
214
284
-
332
278
-
326
294
-
343
444
- 1,
065
N/A
434
-
707
326
-
878
434
-
798
950
- 1,
560
800
- 2,
000
1,1
00 -
2,03
01,0
90 -
1,73
090
0 -
1,30
0
1,600
- 4
,620
0 -
40
01,8
00 -
3,40
01,6
00 -
2,68
085
0 -
3,44
0Th
e ab
ove
cost
s ar
e at
4th
Qua
rter 2
018
leve
ls, e
xclu
sive
of c
ontin
genc
ies
unle
ss o
ther
wis
e st
ated
.*
Gen
eral
ly w
ithou
t air
cond
ition
.**
Exc
lude
s sp
ecia
l pow
er s
uppl
y.@
Bas
ed u
pon
nett
encl
osed
are
a an
d ne
tt of
VAT
.#
All
rate
s ar
e ne
tt of
VAT
. Rat
es fo
r Ele
ctric
al S
ervi
ces
are
excl
udin
g ge
nset
. Rat
es fo
r Hyd
raul
ic S
ervi
ces
are
excl
udin
g S
TP.
R
ates
for M
echa
nica
l Ser
vice
s re
fers
to A
CM
V R
ates
onl
y.$
Tra
nsfo
rmer
incl
uded
in E
lect
rical
Ser
vice
s.^
Rat
es a
re n
ett o
f GS
T an
d ex
clud
ing
BA
S.
(Cont’d)
CONSTRUCTION COST DATA 43
33 -
56
23
-
51 2
8 -
57
37 -
56
25 -
43
63 -
162
41 -
104
49 -
108
56 -
90
41
- 1
00
1,900
- 2
,700
16
0 -
26
0 2,
100
- 2,
650
2,20
0 -
2,75
085
0 -
2,00
0
1,750
- 2
,450
620
-
860
1,900
- 2
,600
1,800
- 2
,450
1,10
0 -
2,10
0 70
0 -
90
050
0 -
70
02,0
00 -
3,00
070
0 -
90
01,4
00 -
2,20
0
HO
NG
KO
NG
HK
$/m
2
N/A
N/A
2,64
0 -
3,05
0 2
,400
- 3,
000
900
- 1,
200
N/A
N/A
2,640
- 3
,150
2,640
- 3
,000
1,020
- 1
,320
N/A
N/A
1,830
- 2
,240
610
-
810
1,520
- 2
,030
MA
CA
UM
OP/
m2
MEC
HA
NIC
AL
SER
VIC
ESOf
fices
Indus
trial*
Hotel
sSh
oppin
g Cen
tres
Apar
tmen
tsEL
ECTR
ICA
L SE
RVI
CES
Offic
esInd
ustria
l**Ho
tels
Shop
ping C
entre
sAp
artm
ents
HYD
RA
ULI
C S
ERVI
CES
Offic
esInd
ustria
lHo
tels
Shop
ping C
entre
sAp
artm
ents
4,800
- 6
,805
2,210
- 3
,925
5,880
- 6
,420
4,585
- 6
,005
2,620
- 3
,245
4,250
- 5
,840
2,500
- 4
,150
4,710
- 6
,425
4,050
- 5
,420
2,040
- 2
,805
740
- 1,
130
510
-
890
3,868
- 5
,825
1,100
- 1
,990
1,745
- 2
,410
INDI
A#IN
R/m
2
2,036
- 2
,902
N/A
N/A
N/A
1,537
- 2
,106
2,275
- 2
,723
N/A
N/A
N/A
2,006
- 2
,534
332
-
621
N/A
N/A
N/A
647
-
752
HO
CH
I MIN
HVN
D(’0
00)/m
2
M&E COSTS FOR SELECTED ASIAN CITIES(Cont’d)
CONSTRUCTION COST DATA44
CONSTRUCTION COST DATA1
up up
550
-
700
400
-
500
600
-
850
550
-
700
100
-
600
700
- 1,
200
550
-
750
550
-
850
850
- 1,
000
450
-
850
N/A
N/A
910
- 1
,120
610
-
810
250
-
300
N/A
N/A
610
-
810
460
-
710
460
-
610
FIR
E SE
RVI
CES
Offic
esInd
ustria
lHo
tels
Shop
ping C
entre
sAp
artm
ents
LIFT
S / E
SCA
LATO
RS
Offic
esInd
ustria
lHo
tels
Shop
ping C
entre
sAp
artm
ents
1,185
- 1
,545
540
-
745
1,375
- 1
,760
1,130
- 1
,310
630
-
750
985
- 1,
250
640
-
825
1,430
- 2
,085
1,675
- 2
,145
890
- 1,
150
704
- 1,
167
N/A
N/A
N/A
483
-
606
670
- 1,
279
N/A
N/A
1,364
- 1
,931
761
- 1,
101
Th
e ab
ove
cost
s ar
e at
4th
Qua
rter 2
018
leve
ls, e
xclu
sive
of c
ontin
genc
ies
unle
ss o
ther
wis
e st
ated
.*
Gen
eral
ly w
ithou
t air
cond
ition
.**
Exc
lude
s sp
ecia
l pow
er s
uppl
y.#
Rat
es a
re b
ased
on
proj
ects
in B
anga
lore
and
are
net
t of G
ST.
Mum
bai c
osts
are
gen
eral
ly 8
% h
ighe
r.
(Cont’d)
CONSTRUCTION COST DATA 45
MEC
HA
NIC
AL
SER
VIC
ESOf
fices
Indus
trial*
Hotel
sSh
oppin
g Cen
tres
Apar
tmen
tsEL
ECTR
ICA
L SE
RVI
CES
Offic
esInd
ustria
l**Ho
tels
Shop
ping C
entre
sAp
artm
ents
HYD
RA
ULI
C S
ERVI
CES
Offic
esInd
ustria
lHo
tels
Shop
ping C
entre
sAp
artm
ents
790
- 1,00
5
176
- 2
95 1
,010
- 1,31
6 1
,070
- 1,12
532
0 -
423
620
- 7
00 31
1 -
440
677
- 8
6454
0 -
677
262
-
383
112
- 1
66 89
-
131
375
- 4
9814
0 -
188
171
- 2
31
SHA
NG
HA
IR
MB
/m2
775
- 1,07
0
155
- 2
85 1
,080 -
1,35
0 7
15 -
91
015
2 -
410
540
- 7
95 32
0 -
459
715
- 1,02
050
0 -
690
285
-
500
128
- 1
84 89
-
124
390
- 5
0011
4 -
168
150
- 2
80
SHEN
ZHEN
/G
UA
NG
ZHO
URM
B/m
2
730
- 9
90
140
- 2
30 9
30 -
1,28
0 8
90 -
1,01
015
0 -
300
450
- 6
60 26
0 -
360
580
- 8
3051
0 -
660
230
-
340
85 -
12
0 85
-
120
330
- 4
5010
0 -
150
100
- 1
80
CH
ON
GQ
ING
/C
HEN
GD
UR
MB
/m2
M&E COSTS FOR SELECTED ASIAN CITIES(Cont’d)
CONSTRUCTION COST DATA46
CONSTRUCTION COST DATA1
775
- 1,0
71 17
0 -
280
950
- 1,2
2480
6 -
970
143
-
459
470
- 7
17 32
6 -
459
719
- 9
6249
0 -
690
258
- 4
06 97
-
143
97 -
14
3 37
7 -
490
143
- 2
04 1
73 -
23
4
BEI
JIN
GR
MB
/m2
FIR
E SE
RVI
CES
Offic
esInd
ustria
lHo
tels
Shop
ping C
entre
sAp
artm
ents
LIFT
S / E
SCA
LATO
RS
Offic
esInd
ustria
lHo
tels
Shop
ping C
entre
sAp
artm
ents
232
- 3
25 16
0 -
268
294
- 3
9726
3 -
391
56
- 1
05 28
8 -
567
139
- 4
0222
6 -
510
335
- 5
1017
0 -
300
230
- 3
50 14
3 -
272
285
- 4
2524
8 -
383
72 -
15
2 29
5 -
517
150
- 4
4025
0 -
480
325
- 4
7013
0 -
500
240
- 2
90 13
0 -
230
250
- 3
5025
0 -
370
60 -
11
0 30
0 -
550
150
- 3
5025
0 -
430
290
- 4
4014
0 -
240
The
abov
e co
sts
are
at 4
th Q
uarte
r 201
8 le
vels
, exc
lusi
ve o
f con
tinge
ncie
s un
less
oth
erw
ise
stat
ed.
* G
ener
ally
with
out a
ir co
nditi
on.
**
Exc
lude
s sp
ecia
l pow
er s
uppl
y.
CONSTRUCTION COST DATA 47
184
- 2
7015
3 -
230
224
- 3
8322
4 -
383
71
- 1
38
294
- 5
77 1
45 -
40
0 23
2 -
520
327
- 5
20 1
75 -
28
9
UNIT RM
per set 55,700
per room 15,100
per room 26,200
per set 230,200
DESCRIPTION PLAYGROUND EQUIPMENTSOutdoor playground equipments comprising various activities and safety mat including fitness park.Age group: 4 to 12Child Capacity: 15 - 20* Price varies according to equipment and design.
SAUNASSauna room complete with timber finishes (Finland Spruce), Finland Harvia sauna heater with built-in control panel and all accessories.Size: 8’x8’x7’6”
STEAM BATHSSteam bath complete with stainless steel steam generator, swing glass door, tempered glass wall, aluminium finishes, aroma pump, auto drain system, lighting and all accessories.Size 8’x8’x7’6”
GOLF SIMULATORComplete high performance, commer-cial grade impact hitting screen. Durable, lush green, premium nylon putting turf (9.0 stimp meter). TruTrac revolutionary tracking system with illuminated hitting area. 21” touchscreen monitor, computer, and projector.
UNIT COSTS FOR ANCILLARY FACILITIESFOR KUALA LUMPUR
CONSTRUCTION COST DATA48
CONSTRUCTION COST DATA1
UNIT RM
per court 62,300
per court 60,000
per pool 820,000
per pool 172,500
per pool 241,500
per pool 1,202,000
per pool 287,500
per pool 345,000
DESCRIPTION SQUASH COURTSSingle court with glass back wall including associated mechanical and electrical services but excluding any public facilities (enclosing structure not included)
TENNIS COURTSSingle court on grade with acrylic surfacing complete excluding chain link fence
SWIMMING POOLSSize: 25m x 10.5mDepth: approx. 1.2m to 1.8mOutdoor swimming pool built on ground, fully tiled, completed with 5m wide deck and associated equipment
Extra for heating equipment (solar)
Extra for ozone system
Size: 25m x 10.5mDepth: approx. 1.8m to 3.0mIndoor swimming pool built with suspended structure (enclosing structure not included) fully tiled and completed with 5m wide deck, including mechanical ventilation and associated equipment
Extra for heating equipment (solar)
Extra for ozone system
CONSTRUCTION COST DATA 49
RM/m2
2,360 - 3,3603,110 - 4,1004,050 - above
1,180 - 1,7701,620 - 2,7002,650 - above
460 - 640620 - 1,060
1,050 - above
2,370 - 3,7505,400 - above
DESCRIPTION
HOTELSPublic Area (Front of House):3 - star Hotel4 - star Hotel5 - star HotelGuest Rooms:3 - star Hotel4 - star Hotel5 - star HotelNotes:1. Includes furniture, floor, wall and ceiling finishes, drapery,
sanitary fittings and light fittings.2. Excludes partitioning, M&E works, chandelier, building shell,
operational items and equipment (e.g. bed, cutlery, crockery, linen, television, refrigerator etc.), opening expenses, stage equipment and computer systems.
OFFICESGeneral OfficeExecutive OfficePrestige OfficeNotes:1. Local furniture allowed for general offices.2. Includes furniture, partitioning, minor alteration to fire services,
air-conditioning and suspended ceiling to suit layout.3. Excludes telephones, Local Area Network, office equipment
(e.g. computers, photocopies, fax machines,UPS, etc).
RESTAURANTSGeneral dining restaurantFine dining restaurantNotes:1. Includes furniture, floor, wall and ceiling finishes, minor
alteration to air-conditioning and fire services installation to suit layout, exhaust for kitchen but excludes exhaust flue, operational items (e.g. cutlery, crockery, linen, utensils, etc.).
FIT-OUT COSTS FOR KUALA LUMPUR
CONSTRUCTION COST DATA50
CONSTRUCTION COST DATA1
2GENERAL CONSTRUCTION DATA
JUBM - Arcadis Building WorksComposite Tender Price Index (BWCTPI)
JKR Tender Price Index
Value of Construction Work Done byType of Construction Activity
Performance of The Construction Sector
Estimating Rules of Thumb
Technical Specifications
Average Unit Prices
Unit Price Index
Construction Sector Indicators
Commodities Price Trend (Jan to Oct 2018)
Malaysia Construction Sector - Employment & GDP
Progress Payments
JUBM - ARCADIS BUILDING WORKSCOMPOSITE TENDER PRICE INDEX (BWCTPI)
Bas
e Ye
ar =
200
0
Sou
rce:
JU
BM
& A
rcad
is
GENERAL CONSTRUCTION DATA52
GENERAL CONSTRUCTION DATA2Te
nder
Pric
e In
dex
100.
0
110.
0
120.
0
130.
0
140.
0
150.
0
160.
0
170.
0
180.
0
190.
0
200.
0
Q1 2012
Q2 2012
Q3 2012
Q4 2012
Q1 2013
Q2 2013
Q3 2013
Q4 2013
Q1 2014
Q2 2014
Q3 2014
Q4 2014
Q1 2015
Q2 2015
Q3 2015
Q4 2015
Q1 2016
Q2 2016
Q3 2016
Q4 2016
Q1 2017
Q2 2017
Q3 2017
Q4 2017
Q1 2018
Q2 2018
Q3 2018
Q4 2018
1H 2019 (F)
177.
9
177.
0
176.
1
1 73.
5
169.
5 16
5.1
167.
8 16
4.7
163.
1
163.
3 16
9.8
163.
5
166.
5
166.
4
169.
5 17
5.8
174.
9
173.
317
1.5
172.
0 17
0.3
169.
416
7.6
154.
9
154.
3
152.
5
150.
8
149.
1
163.
9
JKR TENDER PRICE INDEX
Bas
e Ye
ar =
198
0S
ourc
e: C
ontra
ct a
nd Q
uant
ity S
urve
y B
ranc
h, P
ublic
Wor
ks D
epar
tmen
t (JK
R),
Mal
aysi
a
Year
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
TEN
DER
PR
ICE
IND
EX
1/2 415.4
444
1.68
427.1
441
0.18
408.4
942
0.49
415.2
444
6.03
461.8
247
7.15
491.9
6
2/2 426.1
345
8.76
446.0
339
8.59
411.3
642
9.32
437.3
545
3.99
469.5
448
4.69
491.9
630
0
350
400
450
500
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
Tend
er P
rice
Inde
x
GENERAL CONSTRUCTION DATA 53
VALUE OF CONSTRUCTION WORK DONE BYTYPE OF CONSTRUCTION ACTIVITY
Qua
rter
/ Y
ear
RM
mill
ion
(%)
Res
iden
tial
Bui
ldin
gsN
on-r
esid
entia
lB
uild
ings
Civ
ilEn
gine
erin
g(%
)(%
)
Spec
ial T
rade (%
)
Tota
l
(%)
RM
mill
ion
RM
mill
ion
RM
mill
ion
RM
mill
ion
Q1/20
14Q2
/2014
Q3/20
14Q4
/2014
Q1/20
15Q2
/2015
Q3/20
15Q4
/2015
Q1/20
16Q2
/2016
Q3/20
16Q4
/2016
Q1/20
17Q2
/2017
Q3/20
17Q4
/2017
Q1/20
18Q2
/2018
Q3/20
18
7,202
7,657
7,598
8,059
8,606
8,253
8,227
8,760
9,331
9,283
9,579
9,615
10,22
09,6
399,7
299,7
28
9,876
8,906
8,981
28.8
30.4
30.0
29.7
29.9
30.3
28.5
29.1
29.2
30.5
30.0
29.5
29.2
28.5
28.2
27.7
26.6
25.0
24.7
8,052
8,157
8,724
9,382
10,00
69,4
189,9
379,7
19
10,38
29,6
159,8
019,9
64
10,81
710
,546
10,08
010
,109
10,68
510
,036
10,11
8
32.2
32.4
34.5
34.6
34.8
34.6
34.5
32.3
32.5
31.6
30.7
30.6
30.9
31.2
29.2
28.8
28.8
28.2
27.9
8,399
8,167
7,838
8,285
8,753
8,288
9,330
10,21
7
10,61
510
,075
11,13
311
,495
12,31
412
,018
13,14
213
,613
14,71
514
,855
15,46
3
33.6
32.4
31.0
30.6
30.5
30.4
32.4
33.9
33.2
33.1
34.9
35.3
35.1
35.5
38.1
38.8
39.6
41.7
42.6
1,320
1,192
1,141
1,373
1,376
1,280
1,340
1,433
1,613
1,453
1,397
1,486
1,702
1,622
1,544
1,627
1,848
1,827
1,726
5.3 4.7 4.5 5.1 4.8 4.7 4.6 4.8 5.1 4.8 4.4 4.6 4.9 4.8 4.5 4.6 5.0 5.1 4.8
24,97
325
,173
25,30
127
,099
28,74
127
,239
28,83
430
,129
31,94
130
,427
31,91
032
,560
35,05
333
,825
34,49
535
,078
37,12
435
,625
36,28
7
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
Sou
rce:
Qua
rterly
Con
stru
ctio
n S
tatis
tics,
Dep
artm
ent o
f Sta
tistic
s M
alay
sia
GENERAL CONSTRUCTION DATA54
GENERAL CONSTRUCTION DATA2
PERFORMANCE OF THE CONSTRUCTION SECTOR
Sou
rce:
Qua
rterly
Con
stru
ctio
n S
tatis
tics,
Dep
artm
ent o
f Sta
tistic
s M
alay
sia
No. o
fPr
oject
Value
of
Wor
k Don
e (R
M’00
0)
Perce
ntage
Ch
ange
(%)
(QoQ
)(Y
oY)
2016 2017 2018Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3
10,04
39,9
839,7
259,7
919,5
729,4
058,8
448,7
479,2
599,5
809,9
05
31,94
1,170
30,42
7,274
31,90
9,993
32,55
9,568
35,05
3,464
33,82
5,084
34,49
5,002
35,07
7,956
37,12
3,931
35,62
4,699
36,28
7,482
6.0 - 4.7 4.9 2.0 7.7 -3.5 2.0 1.7 5.8 -4.0 1.9
11.1
11.7
10.7 8.1 9.7 11.2 8.1 7.7 5.9 5.3 5.2
GENERAL CONSTRUCTION DATA 55
-6-4-202468101214
Q1
Q2
Q3
Q4
Q1
Q2
Q3
Q4
Q1
Q2
Q3
20
162
017
20
18
Perc
enta
ge C
hang
e (%
)(Q
oQ)
Perc
enta
ge C
hang
e (%
)(Y
oY)
(%)
ESTIMATING RULES OF THUMB
Composition of Concrete (per m3)
Mix Cement Sand Aggregate 1:3:6 216kg 0.45m3 0.90m3
1:2:4 308kg 0.43m3 0.86m3
1:1:2 540kg 0.38m3 0.75m3
Weight of Concrete Items
Item WeightConcrete 2,400 kg/m3
Cement 1,441 kg/m3
Sand 1,600 kg/m3
Aggregate 1,350 kg/m3
Steel 7,843 kg/m3
Average Loads VolumeLorry 10.0 m3
Concrete truck (24 ton) 5.5 m3
Barge 200 - 1,450 m3
Dimensions for Standard Parking Space, Loading/Unloading Bays and Lay-bys
Minimum Length Width HeadroomPrivate Cars, Taxis 5 m 2.5 m 2.4 mand Light VansCoaches and Buses 12 m 3.0 m 3.8 mLorries 11 m 3.5 m 4.1 mContainer Vehicles 16 m 3.5 m 4.5 m
Minimum headroom means the clearance between thefloor and the lower most projection from the ceilingincluding any lighting units, ventilation duct, conduitsor similar.
GENERAL CONSTRUCTION DATA56
GENERAL CONSTRUCTION DATA2
Structure Design - Concrete Ratios
The following is a range of concrete ratios for buildingsuperstructure design:
Concrete/floor area 0.3 m3/m2 to 0.6 m3/m2
Formwork/floor area 2.2 m2/m2 to 3.0 m2/m2
Reinforcement/concrete vol. 160 kg/m3 to 250 kg/m3
Average External Wall/Floor Ratio
Residential Apartments 1.0 m2/m2
Office, Hotel 0.4 m2/m2
Industrial 0.4 m2/m2
Average Internal Wall/Floor Ratio
Residential Apartments 1.0 m2/m2
Office 0.5 m2/m2
Hotel 1.5 m2/m2
Air - Conditioning
Average 0.05 tonne/m2 of floor area
The above ratios are indicative and for reference purposesonly. They do not account for buildings with special shapes,configurations or particular small foot prints.
Indicative Dimensions for Sports Grounds
Length Width Tennis Court 40 m 20 m Squash Court 13 m 6 m Basketball Court 38 m 23 m Volleyball Court 30 m 20 m Badminton Court 20 m 10 m Rink 61 m 26 m Soccer Playing Feld 110 - 120 m 70 - 80 mFutsal 25 - 42 m 15 - 25 m
The above dimensions are for a single court with appropriateclearance. No spectator seating or support area has beenallowed.
GENERAL CONSTRUCTION DATA 57
TECHNICAL SPECIFICATIONS Table for Standard BRC Fabrics
A 10
A 9
A 8
A 7
A 6/5
A 5
A 4
BR
CR
ef.
No.
BS
4483
or S
S-32
Ref
No.
Size
mm
Spac
ing
mm
Size
mm
Spac
ing
mm
Mai
nm
m2 /m
Cro
ssm
m2 /m
Mas
s Pe
rU
nit A
rea
Kg/
m2
Mai
n W
ireC
ross
Wire
Cro
ss-S
ectio
nal A
rea
A 39
3
- A
252
A 19
3
-A
142
A 98
-
10.0 9.0 8.0 7.0 6.5 6.0 5.0 4.0
200
200
200
200
200
200
200
200
10.0 9.0 8.0 7.0 6.5 6.0 5.0 4.0
200
200
200
200
200
200
200
200
393
318
252
193
166
142 98 63
393
318
252
193
166
142 98 63
6.16
4.99
3.95
3.02
2.61
2.22
1.54
0.99
SQU
AR
E M
ESH
ES
B 12
B 10
B 9
B 8
B 7
B 6
B 5
C 10
C 9
C 8
C 7
C 6
C 5
B 11
31B
385
-
B 50
3B
385
B 28
3B
196
C 78
5C
636
C 50
3C
385
C 28
3
-
12.0
10.0 9.0 8.0 7.0 6.0 5.0 10.0 9.0 8.0 7.0 6.0 5.0
100
100
100
100
100
100
100
100
100
100
100
100
100
8.0 8.0 8.0 8.0 7.0 7.0 7.0 6.0 6.0 5.0 5.0 5.0 5.0
200
200
200
200
200
200
200
400
400
400
400
400
400
1,131 785
636
503
385
283
196
785
636
503
385
283
196
252
252
252
252
193
193
193 71 71 49 49 49 49
10.90 8.1
46.9
75.9
34.5
33.7
33.0
5
6.72
5.55
4.34
3.41
2.61
1.93
REC
TAN
GU
LAR
MES
HES
STA
ND
AR
D S
IZES
Shee
ts
(all R
ef. N
o’s)
Leng
th : 6
.0 me
tres
Widt
h : 2
.2 me
tres
Rol
ls
(Ref.
No’s
: A4,
A5, A
6, A6
/5 on
ly)Le
ngth
: 40.0
metr
esW
idth
: 2.0
metre
s
GENERAL CONSTRUCTION DATA58
GENERAL CONSTRUCTION DATA2
Weight Tables for Mild Steel Round Bar & High Tensile Deformed Bar
* High Yield Deformed Bar Standard Length : 12 metres straight.* Mild Steel Round Bar Standard Length : 12 metres straight or 12 metres once folded.* Special cut length can be produced from 6m to 15m on a certain min. quality per size per order upon request.
No. of Pcs.12m LengthPer Bundle
WeightPer Bundle
(MT)High YieldDeformed
Mild SteelRound
Std. Size (mm)
3762101681389654342822181412109
1.0020.9951.0061.0201.0231.0231.0061.0031.0171.0441.0611.0881.0681.065
D 6D 8D 9D 10D 12D 16D 20D 22D 25D 28D 32D 35D 38D 40
Ø 6Ø 8Ø 9Ø 10Ø 12Ø 16Ø 20Ø 22Ø 25Ø 28Ø 32Ø 35Ø 38 -
28.350.363.678.5
113.1201.1314.2380.1490.9615.8804.2962.1
1,134.11,256.6
CrossSectional Area (mm2)
UnitWeight(kg/m)
0.2220.3950.4990.6160.8881.5792.4662.9843.8544.8346.3137.5538.9039.864
GENERAL CONSTRUCTION DATA 59
AVERAGE UNIT PRICES
Regio
n: A
= Ce
ntral
Penin
sular
Mala
ysia;
B =
Kota
Kina
balu;
C =
Kuc
hing
Nove
mber
& D
ecem
ber r
ates a
re no
t ava
ilable
at tim
e of p
rintin
g.So
urce
: Spe
cial R
eleas
e 1, F
or C
ivil E
ngine
ering
Wor
ks, D
epar
tmen
t of S
tatist
ics, M
alays
ia.
2018 Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
AC
B
Riv
er S
and
AC
B
Ord
inar
y Po
rtla
nd
AC
B
Cem
ent
RM
/50
kg B
ag
Regio
n
Sand
RM
/Met
ric T
onA
utom
ativ
e G
as O
ilR
M/L
itre
Die
sel R
etai
l Pric
e
2.31
2.24
2.17
2.18
2.18
2.18
2.18
2.18
2.18
2.18
2.31
2.24
2.17
2.18
2.18
2.18
2.18
2.18
2.18
2.18
2.31
2.24
2.17
2.18
2.18
2.18
2.18
2.18
2.18
2.18
48.01
47.64
47.64
48.35
46.13
44.94
48.06
49.34
49.47
49.49
78.83
78.83
78.83
78.00
78.00
78.00
56.06
56.06
56.06
56.06
40.25
44.00
44.00
44.00
46.00
41.50
43.00
43.00
44.00
42.50
18.05
18.06
17.87
17.88
17.88
17.26
17.26
17.65
17.68
17.48
18.41
18
.64
18.64
18
.64
18.64
18
.37
18.37
18
.37
18.26
18.26
19.72
19
.72
19.72
19
.72
19.72
19
.49
19.46
19
.46
19.18
19.18
GENERAL CONSTRUCTION DATA60
GENERAL CONSTRUCTION DATA2
Regio
n: A
= Ce
ntral
Penin
sular
Mala
ysia;
B =
Kota
Kina
balu;
C =
Kuc
hing
Nove
mber
& D
ecem
ber r
ates a
re no
t ava
ilable
at tim
e of p
rintin
g.So
urce
: Spe
cial R
eleas
e 1, F
or C
ivil E
ngine
ering
Wor
ks, D
epar
tmen
t of S
tatist
ics, M
alays
ia.
GENERAL CONSTRUCTION DATA 61
2018 Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Agg
rega
tes
Gra
nite
10m
m (3
/ 8” )
RM
/Met
ric T
on
AC
B
Gra
nite
20m
m (3
/ 4” )
AC
B
Gra
nite
40m
m (1
1 /2” )
AC
B
Cru
sher
run
AC
BRe
gion
34.85
34
.85
34.85
34
.85
34.85
28
.70
28.70
28
.70
29.60
29
.60
29.97
29.97
29.97
29.97
29.97
29
.94
29.94
29
.43
29.43
29.63
34.83
34
.98
34.73
34
.73
34.58
33
.71
33.81
33
.66
33.63
33
.63
65.19
65.19
65.19
65.19
65.19
63.39
63.39
63.39
63.39
63.39
33.63
33.63
33.63
33.63
33.63
30.00
30.75
31.17
31.17
31.17
33.02
33.03
33
.03
33.03
33
.03
31.64
32
.78
32.78
32
.7832
.78
38.58
35
.93
35.93
35
.93
35.93
33
.90
33.90
33
.90
33.05
33
.05
26.97
26.97
26.97
26.97
25.40
24.80
24.80
25.40
25.40
25.40
26.87
26
.97
26.71
26
.71
26.71
25
.89
26.00
26
.00
26.00
26
.00
34.79
34.19
34.19
34.19
34.19
32.47
32.47
32.47
32.10
31.73
24.00
24.00
24.00
24.00
24.00
22.64
24.00
24.00
24.00
24.00
32.78
33
.20
33.20
33
.20
33.20
32
.02
32.47
32
.47
32.47
32
.47
UNIT PRICE INDEX
Note:
July
2017
= 10
0
U
nit P
rice I
ndex
abov
e are
appli
cable
for W
ilaya
h Per
seku
tuan K
uala
Lump
ur, M
elaka
, Neg
eri S
embil
an an
d Sela
ngor
Reg
ion.
Nov
embe
r & D
ecem
ber r
ates a
re no
t ava
ilable
at tim
e of p
rintin
g.So
urce
: Spe
cial R
eleas
e 2, F
or B
uildin
g and
Stru
ctura
l Wor
ks, D
epar
tmen
t of S
tatist
ics, M
alays
ia.
2018
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Bricks & Wall
CeilingMaterials
Glass
Roofing Materials
Plywood
Timber
SanitaryFittings
Plumbing Materials
Floor & Wall Tiles
Steel & Metal Sections
Paints
99.7
99.7
99.8
99.8
99.8
96.7
96.7
96.7
96.7
97.1
100.0
10
0.0
100.0
10
0.0
100.0
10
0.0
100.0
10
0.0
100.0
10
0.0
100.0
9
9.6
99.6
9
9.6
99.6
9
6.3
96.3
9
6.3
97.0
9
7.0
103.6
10
3.6
103.6
10
3.6
103.6
10
0.8
101.2
10
1.2
101.2
101.2
94.9
94.9
94.9
94.9
94.9
94.9
91.2
91.7
91.7
91.7
92.4
92.4
92.4
92.4
92.4
92.4
90.0
90.0
90.0
90.0
100.1
10
0.6
100.6
10
0.6
100.6
95
.9 95
.9 95
.9 95
.9 95
.9
100.5
10
0.9
100.9
10
0.4
100.4
97
.4 97
.4 97
.4 98
.3 99
.4
100.5
10
0.7
100.7
10
0.7
100.9
98
.7 98
.7 98
.7 98
.9 98
.9
108.3
108.5
109.0
109.2
109.3
106.4
106.5
106.7
106.9
107.1
100.7
10
0.9
100.9
10
1.0
100.4
96
.6 96
.8 96
.7 97
.3 98
.9
GENERAL CONSTRUCTION DATA62
GENERAL CONSTRUCTION DATA2
0500
1,00
01,
500
2,00
02,
500
3,00
03,
500
4,00
0
0
5,00
0
10,0
00
15,0
00
20,0
00
25,0
00
JanFebMarApr
MayJuneJulyAug
SeptOctNovDecJanFebMarApr
MayJuneJulyAug
Sept
2017
2018
RM M
illion
Num
ber
Hou
sing
App
rova
ls* (
num
ber)
Loan
s Ap
prov
ed fo
r Con
stru
ctio
n Se
ctor
(RM
milli
on)
Oth
er A
rtic
les
of C
oncr
ete,
C
emen
t &
Plas
ter
2018
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
145.9
113.7
141.4
116.8
119.4
115.8
112.1
105.1 N/
A
110.0
103.2
116.7
112.7
105.1
112.7
119.0
114.8 N/
A
108.8
102.9
113.7
111.6
112.5
117.1
119.8
116.8 N/
A
Bas
ic Ir
on
and
Stee
l Pr
oduc
ts
Con
stru
ctio
n R
elat
ed
Prod
ucts
Prod
uctio
n# (I
ndex
)
16,58
818
,338
16,18
217
,362
12,65
811
,928
4,449
9,594
5,552
Hou
sing
App
rova
ls*
(num
ber)
2,740
1,029
1,942
1,869
2,396
1,662
2,809
1,421
1,722
Loan
sA
ppro
ved
for
Con
stru
ctio
nSe
ctor
(RM
mill
ion)
GENERAL CONSTRUCTION DATA 63
CONSTRUCTION SECTOR INDICATORS
Not
e: #
All
rate
s ar
e ba
sed
on th
e ne
w In
dust
rial p
rodu
ctio
n In
dex
(201
0 =
100)
.
* N
o. o
f hou
sing
uni
ts a
ppro
ved
by M
inis
try o
f H
ousi
ng a
nd L
ocal
Gov
ernm
ent
in P
enin
sula
r Mal
aysi
a fo
r con
stru
ctio
n by
priv
ate
deve
lope
r.S
ourc
e: M
onth
ly S
tatis
tical
Bul
letin
, Cen
tral B
ank
of M
alay
sia.
80.0
90.0
100.
0
110.
0
120.
0
130.
0
140.
0
150.
0
Jan
Feb
Mar
Apr
May
June
July
Aug
Sept
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
June
July
Aug
2017
2018
Inde
x
Oth
er a
rticl
es o
f con
cret
e, c
emen
t and
pla
ster
Bas
ic ir
on a
nd s
teel
pro
duct
s
Pro
duct
ion
of c
onst
ruct
ion
rela
ted
prod
ucts
COMMODITIES PRICE TREND (JAN TO OCT 2018)
5,800
6,000
6,200
6,400
6,600
6,800
7,000
7,200
7,400
Jan Feb Mar Apr May Jun Jul Aug Sep Oct
GENERAL CONSTRUCTION DATA64
GENERAL CONSTRUCTION DATA2
Nickel
Copper (Grade A)
USD/Tonne
USD/Tonne
11,000
12,000
13,000
14,000
15,000
16,000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Source: London Metal Exchange
Aluminium Year2018
JanFebMarAprMayJunJulAugSepOct
2,213.682,184.252,075.812,257.682,289.552,239.622,099.402,045.392,022.002,033.54
7,079.457,000.856,794.746,841.926,820.836,953.556,248.696,046.336,019.186,214.57
Copper (Grade A)
12,871.8213,568.7513,395.9513,946.5814,346.9015,103.1013,764.0513,439.5712,520.5013,319.13
Nickel
Monthly Average (USD / Tonne)
AluminiumUSD/Tonne
GENERAL CONSTRUCTION DATA 65
1,900
2,000
2,100
2,200
2,300
2,400
2,500
2,600
2,700
Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Note: * For the first half 2018 ** Estimate by Ministry of Finance Malaysia *** Forecast by Ministry of Finance MalaysiaSource: Economic Report 2018/2019, Ministry of Finance, Malaysia
GENERAL CONSTRUCTION DATA66
GENERAL CONSTRUCTION DATA2MALAYSIA CONSTRUCTION SECTOR - EMPLOYMENT & GDP
Gross Domestic Product (GDP) for Construction SectorContribution to Total GDP
Year
%GDP (RM million)
%
Employment in Construction Sector (person)Employment in Construction Sector to Total Employment (%)
Employment (’000 persons)
3.00
3.20
3.40
3.60
3.80
4.00
4.20
4.40
4.60
4.80
20,000
25,000
30,000
35,000
40,000
45,000
50,000
55,000
60,000
2015 2016 2017 2018** 2019***
8.00%
8.20%
8.60%
8.80%
9.00%
9.20%
9.40%
9.60%
1,180
1,200
1,220
1,240
1,260
1,280
1,300
1,320
2017
8.40%
20162015 2018*Year
PROGRESS PAYMENTSTh
e fo
llow
ing
grap
h an
d ta
ble
are
an in
dica
tion
of th
e ra
te o
f exp
endi
ture
for c
onst
ruct
ion
proj
ects
.
The
rate
of e
xpen
ditu
re is
an
aver
age
rate
and
will
var
y fro
m p
roje
ct to
pr
ojec
t whe
n sp
ecifi
c pr
ojec
t circ
umst
ance
s ar
e ta
ken
into
acc
ount
.
No
acco
unt h
as b
een
mad
e fo
r ret
entio
n.
Pro
gres
s C
laim
s (%
)
Con
tract
Per
iod
(%)
100
80 60 40 20 00
2
0
40
6
0
80
100
Con
trac
t Pe
riod
5% 10%
15%
20%
25%
30%
35%
Cum
ulat
ive
Prog
ress
Cla
ims
2% 5% 8% 13%
18%
24%
30%
Con
trac
t Pe
riod
40%
45%
50%
55%
60%
65%
70%
Cum
ulat
ive
Prog
ress
Cla
ims
36%
43%
50%
57%
64%
70%
76%
Con
trac
t Pe
riod
75%
80%
85%
90%
95%
100%
Cum
ulat
ive
Prog
ress
Cla
ims
82%
87%
92%
95%
98%
100%
GENERAL CONSTRUCTION DATA 67
GENERAL CONSTRUCTION DATA68
GENERAL CONSTRUCTION DATA2
3PROPERTY
Residential
Hotel
Office
Shopping Complex
Shop
Industrial
Res
iden
tial
Q2
2018
p
WP
Kuala
Lump
urW
P Pu
trajay
aW
P La
buan
Selan
gor
Joho
rPu
lau P
inang
Pera
kNe
geri S
embil
anMe
laka
Keda
hPa
hang
Tere
ngga
nuKe
lantan
Perlis
Saba
hSa
rawa
kM
ALA
YSIA
Exis
ting
Stoc
k (u
nit)
476,6
2810
,849
11,92
11,5
22,63
579
9,990
502,8
8647
1,638
266,4
6918
8,420
325,6
6926
9,961
99,32
579
,958
25,74
420
9,433
251,9
685,
513,
494
30,66
0 7,
663
1,19
1 11
1,634
76
,149
47,38
7 35
,665
21,54
4 20
,282
16,75
8 22
,739
16,54
3 11
,787
1,30
3 24
,295
20,1
18
465,
718
Inco
min
g Su
pply
(uni
t)
p =
prel
imin
ary
Sou
rce:
Res
iden
tial P
rope
rty S
tock
Rep
ort,
2nd
Qua
rter
201
8, b
y V
alua
tion
& P
rope
rty S
ervi
ces
Dep
artm
ent.
Sou
rce:
Res
iden
tial P
rope
rty S
tock
Rep
ort,
2nd
Qua
rter
201
5 - 2
018,
by
Val
uatio
n &
Pro
perty
Ser
vice
s
D
epar
tmen
t.
RESIDENTIAL
PROPERTY70
PROPERTY3
0
100
200
300
400
500
600
700
2 - 3
Sto
rey
Terr
ace
Cond
omin
ium
/Apa
rtm
ent
Q22
015
Q22
016
Q22
017
Q22
018
Exis
ting
Supp
ly o
f Res
iden
tial b
y Ty
pe in
Kua
la L
umpu
r & S
elan
gor
No. of Units ('000)
Loca
lity
Ask
ing
G
ross
Ren
tal
(RM
psf
/mon
th)
Ave
rage
A
skin
g Pr
ice
(
RM
psf
)
KL C
ity*
2.20 -
5.20
660 -
1,70
0Am
pang
Hilir
/ U-T
hant*
*
2.00 -
3.50
550 -
1,20
0Da
mans
ara H
eights
***
2.20 -
4.30
550 -
1,00
0Ke
nny H
ills
2.00 -
3.00
550 -
90
0Ba
ngsa
r
2.20 -
4.00
650 -
1,30
0Mo
nt Ki
ara*
*** 1.8
0 - 3.
5050
0 -
850
Ave
rage
Ask
ing
Pric
es a
nd R
enta
ls o
f Ex
istin
g H
igh
End
Con
dom
iniu
ms
(1H
201
8)
Not
es:
*
E
xclu
des
Bin
jai o
n th
e P
ark
and
Pav
ilion
Ban
yan
Tree
S
igna
ture
but
incl
udes
Pav
ilion
Res
iden
ces
**
Exc
lude
s S
eri H
enin
g**
*
Exc
lude
s D
C R
esid
ency
but
incl
udes
Tw
ins
@ D
aman
sara
H
eigh
ts**
** E
xclu
des
Ver
ve S
uite
s w
hich
com
pris
e m
ainl
y fu
lly
fur
nish
ed s
mal
l uni
ts
Sou
rce:
Kni
ght F
rank
Rea
l Est
ate
Hig
hlig
hts
1st H
alf 2
018
Sour
ce: K
nigh
t Fra
nk R
eal E
stat
e H
ighl
ight
s 1s
t Hal
f 201
8
Proj
ectio
n of
Cum
ulat
ive
Supp
ly fo
r Hig
h En
d Co
ndom
iniu
ms
/Re
side
nces
201
5 - 2
H201
8(f)
0102030405060
2015
1H20
162H
2016
1H20
172H
2017
1H20
182H
2018
(f)
No. of Units ('000)
Year
Bang
sar/D
aman
sara
Hei
ghts
Mon
t' Ki
ara/
Harta
mas
Ampa
ng H
ilir/U
-Tha
ntKL
City
PROPERTY 71
Hot
elQ
2 20
18p
WP
Kuala
Lum
pur
WP
Putra
jaya
WP
Labu
anSe
lango
rJo
hor
Pulau
Pina
ngPe
rak
Nege
ri Se
mbil
anM
elaka
Keda
hPa
hang
Tere
ngga
nuKe
lanta
nPe
rlisSa
bah
Sara
wak
MA
LAYS
IA
Exis
ting
Stoc
k ( R
oom
)
39,8
181,
311
1,67
521
,651
28,6
0719
,278
16,3
659,
357
16,1
7216
,568
28,9
868,
405
4,41
41,
118
21,1
0119
,388
254,
214
5,9
15
0
384
1
,607
3
,027
3
,306
7
80
1,5
02
2,1
20
994
1
40
102
1
61
232
1
,288
5
53
22,
111
Inco
min
g Su
pply
(Roo
m)
p =
prel
imin
ary
5060708090100
110
120
130
140
1Q15
2Q15
3Q15
4Q15
1Q16
2Q16
3Q16
4Q16
1Q17
2Q17
3Q17
4Q17
Poin
ts
Tour
ism M
arke
t Ind
ex -
dow
n
Sou
rce:
Lei
sure
Pro
perty
Sto
ck R
epor
t, 1s
t and
2nd
Qua
rter
S
ourc
e: M
alay
sia
Inst
itute
of E
cono
mic
Res
earc
h
2
018,
by
Val
uatio
n &
Pro
perty
Ser
vice
s D
epar
tmen
t
Tour
ism
Mar
ket I
ndex
HOTEL
PROPERTY72
PROPERTY3
Year
Sou
rce:
Tou
rism
Mal
aysi
a S
ourc
e: 2
018
Asi
a P
acifi
c R
eal E
stat
e M
arke
t Out
look
(M
alay
sia)
, CB
RE
/ W
TW R
esea
rch
01020304050607080
050100
150
200
250
300
350
400
2013
2014
2015
2016
eYT
D Ja
n - S
ept
2017
Percentage %
RM
Year
Aver
age
Room
Rat
e (R
M)
Aver
age
Occ
upan
cy R
ate
(%)
PROPERTY 73
Year
2017
2016
2015
2014
2013
2012
2011
2010
2009
2008
2007
Arr
ival
s (m
illio
n)
25.95
26.76
25.72
27.44
25.72
25.03
24.71
24.58
23.65
22.05
20.97
82.1
82.1
69.1
72.0
65.4
60.6
58.3
56.5
53.4
49.6
53.4
Rec
eipt
s (R
M b
illio
n)
Tour
ist
Arriv
als
& R
ecei
pts
to M
alay
sia
Perf
orm
ance
of H
otel
s
KL
City
Integ
ra To
wer
Mena
ra M
axis
Vista
Towe
rG
Towe
rMe
nara
Dar
ussa
lamMe
nara
Binj
aiMe
nara
Hap
Sen
g 2K
L Fr
inge
Wism
a Guo
colan
dMe
nara
CIM
BAx
iata T
ower
(for
merly
Quil
l 7)
1 Sen
trum
The G
arde
ns N
orth
& So
uth To
wers
Mena
ra B
RDB
Mena
ra LG
BB
eyon
d K
L (S
elan
gor)
1 Firs
t Ave
nue
Quill
18 (B
lock B
)Su
rian T
ower
The A
scen
t @ P
arad
igmTh
e Pinn
acle
Wism
a Mus
tapha
Kam
al
Ask
ing
Gro
ss R
enta
l (R
M p
sf/m
onth
)
Sele
cted
Gra
de A
Offi
ce A
skin
g R
enta
ls (1
H20
18)
11.00
10.50 9.0
08.0
08.5
08.8
07.0
0
7.00
8.00
7.50
7.80
7.50
6.50
6.50
6.00
5.00
5.50
5.50
5.50
4.80
All
Gra
de C
BD
Ove
rall
Ren
t & V
acan
cy R
ate
Sou
rce:
Kua
la L
umpu
r Offi
ce M
arke
tbea
ts (J
une
2018
), C
ushm
an &
Wak
efie
ld
R
esea
rch
Pub
licat
ion
Sou
rce:
Kni
ght F
rank
Rea
l Est
ate
Hig
hlig
hts
1st H
alf 2
018
14.5
0
15.5
0
16.5
0
17.5
0
18.5
0
19.5
0
20.5
0
21.5
0
0.00
2.00
4.00
6.00
8.00
10.0
0
1Q20
172Q
2017
3Q20
174Q
2017
1Q20
182Q
2018
Rent (MYR/sf/month)
Ove
rall
Rent
Vaca
ncy
Rate
(%)
Vacancy (%)
OFFICE
PROPERTY74
PROPERTY3
Purp
ose
Bui
lt O
ffice
Q2
2018
p
WP
Kuala
Lump
urW
P Pu
trajay
aW
P La
buan
Selan
gor
Joho
rPu
lau P
inang
Pera
kNe
geri S
embil
anMe
laka
Keda
hPa
hang
Tere
ngga
nuKe
lantan
Perlis
Saba
hSa
rawa
kM
ALA
YSIA
Exis
ting
Stoc
k To
tal S
pace
(m2 )
8,890
,157
2,231
,321
66,70
63,6
50,98
01,1
39,31
31,1
23,15
662
0,131
306,3
2640
2,247
389,1
1442
0,221
343,7
1138
6,070
131,0
3880
4,851
714,6
7521
,620
,017
1,149
,235
364,5
6519
,222
455,2
6920
0,798
20,39
017
,456
14,34
1 0
27
,623
36,37
52,0
428,7
4416
,176
57,67
487
,894
2,4
77,8
04
Inco
min
g Su
pply
Tota
l Spa
ce (m
2 )
p =
prel
imin
ary
Sou
rce:
Kni
ght F
rank
Rea
l Est
ate
Hig
hlig
hts
1st H
alf 2
018
Sou
rce:
Com
mer
cial
Pro
perty
Sto
ck R
epor
t, 2n
d Q
uarte
r 201
8
by
Val
uatio
n &
Pro
perty
Ser
vice
s D
epar
tmen
t
PROPERTY 75
Kua
la L
umpu
r - O
ccup
ancy
and
Ren
tal T
rend
s 1H
2013
- 1H
2018
0102030405060708090100
012345678
Occupancy (%)
Rental (RM psf/month)
Occu
panc
y (%)
Rent
al (R
M p
sf/m
onth
)
Exis
ting
Stoc
k To
tal S
pace
(m2 )
Shop
ping
Com
plex
Q2
2018
p
WP
Kuala
Lump
urW
P Pu
trajay
aW
P La
buan
Selan
gor
Joho
rPu
lau P
inang
Pera
kNe
geri S
embil
anMe
laka
Keda
hPa
hang
Tere
ngga
nuKe
lantan
Perlis
Saba
hSa
rawa
k
3,0
53,89
761
,090
28,43
43,4
92,53
62,0
74,05
91,7
38,91
295
6,434
543,6
6559
6,074
580,6
7838
4,215
165,1
2133
4,880
55,87
273
8,029
901,1
00M
ALA
YSIA
15,7
04,9
96
208,1
4426
,456
0 42
4,056
364,3
3683
,942
100,4
3847
,737
53,44
39,0
7749
,820
8,745
115,2
876,8
0695
,192
157,8
22
1,7
51, 3
01
Inco
min
g Su
pply
Tota
l Spa
ce (m
2 )
p = pr
elimi
nary
Sou
rce:
Com
mer
cial
Pro
perty
Sto
ck R
epor
t 2nd
Qua
rter 2
018
by V
alua
tion
& P
rope
rty S
ervi
ces
Dep
artm
ent
SHOPPING COMPLEX
PROPERTY76
PROPERTY3D
istr
ibut
ion
of S
hopp
ing
Com
plex
Exi
stin
g Sp
ace
in M
alay
sia
as a
t Q2
2018
p
19.4
5%
22.2
4%
13.2
1%11
.07%
34.0
4%
WP
Kual
aLu
mpu
rO
ther
St
ates
Joho
r
Pul
au
Pina
ng
Sel
ango
r
Ret
ail S
pace
Sup
ply
in 2
018
Shop
pes @
Fou
r Sea
sons
Plac
eEv
o Sho
pping
Mall
The L
incGM
Buk
it Bint
ang
KL E
co C
ity R
etail P
odium
EKO
Cher
as M
allKi
ara 1
63Pi
nnac
leEm
pire C
ity D
aman
sara
Mall
Trop
icana
Gar
dens
Skyp
ark @
Cyb
erjay
aPa
cific
Star
Centr
al i-C
ity S
hopp
ing C
entre
(Cen
tral P
laza @
i-City
)
200,0
0025
0,000
120,0
0010
0,000
250,0
0062
5,000
300,0
0014
0,000
2,300
,000
1,000
,000
565,0
0024
0,000
940,0
00
New
Pro
ject
sEs
timat
e N
et.
Letta
ble
Are
a (s
f)*
Sou
rce:
Com
mer
cial
Pro
perty
Sto
ck R
epor
t 2nd
Qua
rter 2
018
by
Valu
atio
n &
Pro
perty
Ser
vice
s D
epar
tmen
t S
ourc
e: K
nigh
t Fra
nk R
eal E
stat
e H
ighl
ight
s 1s
t Hal
f 201
8
Shop
ping
Com
plex
’s E
xist
ing
Stoc
k in
Kua
la L
umpu
r & S
elan
gor (
By
Loca
tion)
as a
t Q2
2018
p
PROPERTY 77
- 1
00,0
00 2
00,0
00 3
00,0
00 4
00,0
00 5
00,0
00 6
00,0
00 7
00,0
00
Petaling Jaya
Subang Jaya/Sunway
Shah Alam
Klang
Bangsar
Central Commercial Area
Jalan Ampang
Bukit Bintang / Jalan RajaChulan
m2
p =
prel
imin
ary
Not
e: *
New
Com
plet
ion
and
Exp
ecte
d C
ompl
etio
n
WP
Kuala
Lump
urW
P Pu
trajay
aW
P La
buan
Selan
gor
Joho
rPu
lau P
inang
Pera
kNe
geri S
embil
anMe
laka
Keda
hPa
hang
Tere
ngga
nuKe
lantan
Perlis
Saba
hSa
rawa
k
Shop
Q2
2018
p
MA
LAYS
IA
Exis
ting
Stoc
k (u
nit)
31,22
153
895
510
4,825
84,49
136
,917
60,33
425
,472
21,89
030
,788
23,89
38,0
6912
,814
5,186
30,81
932
,955
511,
167
1,92
6 0
46
6,
934
10,41
7 2,
091
4,41
7 2,
305
1,68
2 1,
574
2,10
2 1,
222
1,63
4 42
6 2,
606
2,58
4 4
1,96
6
Inco
min
g Su
pply
(uni
t)
p = pr
elimi
nary
Sou
rce:
Com
mer
cial
Pro
perty
Sto
ck R
epor
t, 2n
d Q
uarte
r 201
8, b
y V
alua
tion
& P
rope
rty S
ervi
ces
Dep
artm
ent
SHOP
PROPERTY78
PROPERTY3
58.5
0%
13.1
2%
14.6
0%
2.8
0%
5.9
0%
Inco
min
g Su
pply
p
5.07
%
Existi
ngSt
ockp
Pre-
War
1- 1
1/2
Sto
rey
2- 2
1/2
Sto
rey
3- 3
1/2
Sto
rey
4- 4
1/2
Sto
rey
5- 5
1/2
Sto
rey
6- 6
1/2
Sto
rey
Abov
e 6
1/2
Stor
ey
p =
preli
mina
ry
Dis
trib
utio
n of
Exi
stin
g an
d In
com
ing
Supp
ly o
f Sho
p in
K
uala
Lum
pur a
nd S
elan
gor a
s at
Q2
2018
p
2.0
8%
8.04
%
33.8
3%
29.7
6%19
.04% 2
.97%
2
.55%
1
.72%
Exis
ting
Stoc
k (u
nit)
Indu
stria
lQ
2 20
18p
WP
Kuala
Lump
urW
P Pu
trajay
aW
P La
buan
Selan
gor
Joho
rPu
lau P
inang
Pera
kNe
geri S
embil
anMe
laka
Keda
hPa
hang
Tere
ngga
nuKe
lantan
Perlis
Saba
hSa
rawa
k
5,1
38 48 635
40,13
416
,574
9,157
8,325
5,503
6,870
3,858
3,538
866
604
222
6,067
6,854
0 0 3 1,
087
1,79
4 18
8 27
1 22
1,
051
22
89
47
18
36
392
390
MA
LAYS
IA11
4,39
3 5
,410
Inco
min
g Su
pply
(uni
t)
p =
prel
imin
ary
Dis
trib
utio
n of
Exi
stin
g an
d In
com
ing
Supp
ly o
f Ind
ustr
ial U
nits
in
Kua
la L
umpu
r and
Sel
ango
r as
at Q
2 20
18p
p =
prel
imin
ary
Terra
ced
Sem
i-Det
ache
dD
etac
hed
Flat
ted
Fact
ory
Indu
stria
l Com
plex
68.3
3%
14.8
9%12
.27%
4.27
%0.
24%
Exis
ting
Stoc
kp
39.8
3%
40.7
5%
19.3
2%0.00
%0.
09%
Inco
min
g Su
pply
p
INDUSTRIAL
Sou
rce:
Indu
stria
l Pro
perty
Sto
ck R
epor
t, 2n
d Q
uarte
r 201
8, b
y V
alua
tion
& P
rope
rty S
ervi
ces
Dep
artm
ent
PROPERTY 79
PROPERTY80
PROPERTY3
4FINANCIAL
Financial Definitions & Formulae
Mortgage Repayment Table
Malaysia Balance of Payment- Goods & Services
Consumer Price Index & ProducerPrice Index
Prime Rates & Base Lending Rates
Interest Rates : Banking Institutions
Currency Chart
Exchange Rates
Discount Rate
The rate of return a developer expects when investing in a project. i.e. opportunity cost
Internal Rate of Return (IRR)
The IRR may be defined as the interest rate that equates the present value of expected future cash flows to the cost of the investment.
The IRR can be compared to the Discount Rate.
Net Present Value (NPV)
The NPV is the present value of all future cash flows, discounted back to today’s values at the Discount Rate.
The NPV indicates in today’s dollars the profit or loss a developer makes above or below his required profit (based on a nominated Discount Rate).
72 Rule
The approximate number of years required to double your capital can be calculated by dividing the interest rate into 72.
e.g. If interest rate = 10% p.a. Then 72 ÷ 10 = 7.2 years It will take approximately 7.2 years to double your capital if it is invested at 10% p.a.
Future value of $1Future value of $1 per periodSinking fund (the amount required to be put away periodically to realise some future sum)Present value of $1Present value of $1 per periodAnnuity with a PV of $1 (Mortgage bond formula)
FV = PV (1+i)n
FV = PMT [((1+i)n – 1) ÷ i]
PMT = FV [i ÷ ((1+i)n – 1)]
PV = FV [1÷ (1+i)n]PV = PMT [((1+i)n – 1) ÷ (i(1+i)n)]
PMT = PV[(i(1+i)n) ÷ ((1+i)n - 1)]
PV = present valueFV = future valuePMT = payment amountn = period (e.g. 10 years with monthly payments, n = 10 x 12 = 120)i = interest rate per period (e.g. 12% p.a. compounded monthly; i = 12% ÷ 12 month = 1% per period)
FINANCIAL DEFINITIONS
FINANCIAL FORMULAE
FINANCIAL82
FINANCIAL4
Based on:* 1,000 units of currency* Interest compounded monthly* Equal monthly repayments
Example
Borrow $1,000,000 to be repaid monthly at 10% p.a. over 10 years.
Repayments = 1,000,000 / 1,000 x $13.22 = $13,220 per month
MORTGAGE REPAYMENT TABLE
REPAYMENT (years) Interest p.a. 5 10 15 20 5% 18.87 10.61 7.91 6.60 6% 19.33 11.10 8.44 7.16 7% 19.80 11.61 8.99 7.75 8% 20.28 12.13 9.56 8.36 9% 20.76 12.67 10.14 9.00 10% 21.25 13.22 10.75 9.65 11% 21.74 13.78 11.37 10.32 12% 22.24 14.35 12.00 11.01 13% 22.75 14.93 12.65 11.72 14% 23.27 15.53 13.32 12.44 15% 23.79 16.13 14.00 13.17 16% 24.32 16.75 14.69 13.91 17% 24.85 17.38 15.39 14.67 18% 25.39 18.02 16.10 15.43 19% 25.94 18.67 16.83 16.21 20% 26.49 19.33 17.56 16.99 21% 27.05 19.99 18.31 17.78 22% 27.62 20.67 19.06 18.57 23% 28.19 21.35 19.82 19.37 24% 28.77 22.05 20.58 20.17 25% 29.35 22.75 21.36 20.98
FINANCIAL 83
-40,000
-20,000
0
20,000
40,000
60,000
80,000
100,000
120,000
140,000
0
20,000
40,000
60,000
80,000
100,000
120,000
2014 2015 2016 2017 2018*
Goods/ServicesNet Payment(RM million)
Balance on Goods & Services
(RM million)
Balance on Goods and ServicesGoods Net PaymentServices Net Payment
Year
20142015201620172018*
Balance on Goods & Services(RM mil)
102,62088,59283,12893,95149,709
Goods Net Payment(RM mil)
113,327109,224102,046116,76661,736
Services Net
Payment(RM mil)
- 10,706- 20,632- 18,917- 22,815- 12,027
MALAYSIA BALANCE OF PAYMENT- GOODS & SERVICES
Note: * January to June 2018 onlySource: Department of Statistics Malaysia
FINANCIAL84
FINANCIAL4
Year CPI PPI*
2015 2.1 % -7.4 %
2016 2.1 % -1.1 %
2017 3.7 % 6.7 %
2018** 0.6 % -0.2 %
Note: Year 2010 is the Base Year * Local Production ** CPI 2018: Oct 2018 compared to Oct 2017 PPI 2018: Sept 2018 compared to Sept 2017Source: Bank Negara Malaysia, Department of Statistics Malaysia
CONSUMER PRICE INDEX & PRODUCER PRICE INDEX
-8
-6
-4
-2
0
2
4
6
8
10
12
2015 2016 2017 2018**
%
Year
Consumer Price Index (CPI) Producer Price Index (PPI)*
FINANCIAL 85
Annual Change (%)
Country Rate (%) China* 4.75 Hong Kong 5.13 India 9.45 Indonesia 6.75 Macau 5.38 Malaysia** 4.60 Philippines 4.35 Singapore 5.33 Thailand+ 7.00 United Kingdom 0.75 United States of America 5.25 Vietnam# 9.00
PRIME RATES & BASE LENDING RATESas at 4th Quarter 2018
Source:Arcadis Asia Offices
* 5-Year Benchmark Lending Rate** Indicative Effective Lending Rate+ Minimum Loan Rate % pa (Average Based on Local Bank)# Minimum and in VND per year
FINANCIAL86
FINANCIAL4
Commercial Banks Investment Banks 2018 Base Average Average Lending Lending Rates Lending Rates Rates (%) (%) (%)
Jan 6.72 4.63 6.20Feb 6.89 4.79 6.31Mar 6.89 4.86 6.33Apr 6.89 4.90 6.51May 6.90 4.97 6.48Jun 6.90 5.05 6.59Jul 6.91 5.07 6.54Aug 6.91 4.98 6.59Sep 6.91 4.93 6.58Oct 6.91 4.98 6.54
Note: Only Jan until Oct rates are available at time of publication.Source: Monthly Statistical Bulletin, Central Bank of Malaysia
INTEREST RATES: BANKING INSTITUTIONS
FINANCIAL 87
4.00
5.00
6.00
7.00
8.00
9.00
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
Commercial Banks : Base Lending RatesCommercial Banks : Average Lending RatesInvestment Banks : Average Lending Rates
Percent Per Annum
CURRENCY CHART
FINANCIAL88
FINANCIAL4R
ingg
it (R
M)
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
5.50
6.00
6.50
7.00
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
Yea
rR
M p
er 1
US
DR
M p
er 1
GB
PR
M p
er 1
00 J
PY
RM
per
1 E
UR
OR
M p
er 1
SG
D
Country Currency RM1 US $1 Australia dollar 0.3415 1.4192 Bahrain dinar 0.0904 0.3754 Brunei dollar 0.3286 1.3656 China rmb 1.6547 6.8761 Egypt pound 4.2975 17.8581 European Currency Unit ecu 0.2102 0.8736 Hong Kong dollar 1.8842 7.8297 India rupees 16.7201 69.4804 Indonesia rupiah 3,502.76 14,555.80 Japan yen 26.530 110.240 Kenya shillings 24.3706 101.272 Lebanon pound 362.771 1,507.50 Malaysia ringgit 1.0000 4.1510 New Zealand dollar 0.3583 1.4888 Pakistan rupee 33.3524 138.5960 Philippines peso 12.6475 52.5567 Qatar riyal 0.8759 3.6398 Singapore dollar 0.3286 1.3656 South Africa rand 3.4681 14.4117 South Korea won 268.456 1,115.570 Sri Lanka rupee 43.9910 182.8050 Thailand baht 7.7965 32.3986 United Arab Emirates dirham 0.8837 3.6724 United Kingdom pound 0.1894 0.7871 United States of America dollar 0.2406 1.0000 Vietnam dong 5,579.82 23,187.00
Source: www.oanda.com/currency/converter/
EXCHANGE RATESas at 31 December 2018
FINANCIAL 89
FINANCIAL92
FINANCIAL4
FINANCIAL90
FINANCIAL4
5OTHER INFORMATION
Utility Costs for Selected Asian Cities
Weight & Measures
Conversion Guide
Public Holidays
Arcadis Asia Leadership Team
Arcadis Asia Services
Directory of Offices
Telephone Directory (Malaysia)
CO
UN
TRY
Exch
ange
R
ate
US
$1 =
Dom
estic
Com
mer
cial
/ In
dust
riaI
Dom
estic
Com
mer
cial
/ In
dust
rial
Die
sel
Lead
edU
nlea
ded
ELEC
TRIC
ITY
(US$
/kw
h)
WA
TER
(US$
/m3 )
FU
EL (U
S$/li
tre)
HO
NG
KO
NG
HK$ 7
.82
0.110
0.130
0.830
0.590
1.830
N/A
2.210
ELEC
TRIC
ITY
(Dom
estic
): 0 -
400 k
Wh =
US$
0.11;
400 -
1,00
0kW
h = U
S$0.1
2; 1,0
00 -
1,800
kWh =
US$
0.14;
1,800
- 2,6
00kW
h = U
S$0.1
8; 2,6
00 -
3,400
kWh =
US$
0.21;
3,4
00 -
4,200
kWh =
US$
0.23;
Abov
e 4,20
0 kW
h = U
S$0.2
3 (Ba
sed o
n tar
iff sc
heme
of C
LP H
olding
Limi
ted an
d is c
harg
ed on
bi-m
onthl
y
cons
umpti
on)
WAT
ER (D
omes
tic):
0 - 12
m3 =
F.O
.C; 1
2 - 43
m3 = U
S$0.5
4/m3 ;
43 -
62m3 =
US$
0.83/m
3 ; Ab
ove 6
2m3 =
US$
1.17/m
3 .
GU
AN
GZH
OU
RMB
6.94
0.085
- 0.1
280.0
89 -
0.124
0.285
- 0.5
710.5
000.9
70N/
A1.1
20UN
LEAD
ED F
UEL:
Unlea
ded g
asoli
ne 97
BEI
JIN
GRM
B 6.9
40.0
71 -
0.113
0.721
- 1.2
961.2
96 -
1.368
1.10
0N/
A1.2
20
ELEC
TRIC
ITY
(Dom
estic
/ mon
th): 1
- 24
0kW
h = U
S$0.0
71; 2
41 -
400k
Wh =
US$
0.078
; 400
kWh a
bove
= U
S$0.1
13EL
ECTR
ICIT
Y (C
omme
rcial
/ Indu
strial
): Ce
ntral
Distr
icts -
Pea
k = U
S$0.2
21, -
Nor
mal =
US$
0.126
; Othe
r Dist
ricts
- Pea
k = U
S$0.2
19, -
Nor
mal =
US$
0.124
WAT
ER (D
omes
tic / y
ear):
1 - 1
80m3 =
US$
0.721
; 181
- 26
0m3 =
US$
1.008
; 261
m3 abo
ve =
US$
1.296
WAT
ER (C
omme
rcial
/ Indu
strial
): Ce
ntral
Distr
icts =
US$
1.368
; Othe
r Dist
ricts
= US
$1.29
6
KU
ALA
LU
MPU
RRM
4.18
0.052
- 0.1
370.0
91 -
0.122
0.1
36 -
0.478
0.4
95 -
0.545
0.5
22N/
A0.5
26UN
LEAD
ED F
UEL:
Unlea
ded p
etrol
RON
95EL
ECTR
ICIT
Y (C
omme
rcial
/ Indu
strial
): Ta
riff A
& T
ariff
D (L
ow vo
ltage
)
0.219
- 0.2
21 (p
eak)
0.124
- 0.1
26 (n
orma
l)
UTILITY COSTS FOR SELECTED ASIAN CITIESas at 4th Quarter 2018
OTHER INFORMATION92
OTHER INFORMATION5
CO
UN
TRY
Exch
ange
R
ate
US
$1 =
Dom
estic
Com
mer
cial
/ In
dust
riaI
Dom
estic
Com
mer
cial
/ In
dust
rial
Die
sel
Lead
edU
nlea
ded
ELEC
TRIC
ITY
(US$
/kw
h)
WA
TER
(US$
/m3 )
FU
EL (U
S$/li
tre)
CH
ON
GQ
ING
RMB
6.94
0.110
0.610
0.850
1.220
N/A
1.280
0.080
SHA
NG
HA
IRM
B 6.9
40.1
57 (p
eak)
0.075
(nor
mal)
0.497
- 0.8
400.6
801.1
60N/
A1.2
200.0
89 (p
eak)
0.044
(nor
mal)
UNLE
ADED
FUE
L: Un
leade
d 93#
= U
S$0.9
3/litre
; 97#
= U
S$0.9
8/litre
ELEC
TRIC
ITY
(Dom
estic
): 0 -
3,12
0 kW
h = U
S$0.0
89 (p
eak)
/ US$
0.044
(nor
mal);
3,120
- 4,80
0kW
h = U
S$0.0
98 (p
eak)
/ US$
0.049
(nor
mal);
Abov
e 4,80
0 kW
h = U
S$0.1
41
(
peak
) / U
S$0.0
70 (n
orma
l). Ch
arge
d on y
early
cons
umpti
on.
ELEC
TRIC
ITY
(Com
merci
al): C
harg
es on
cons
umpti
on le
ss th
an 1,
000k
Wh p
er m
onth
for su
mmer
perio
d only
. Refe
r to w
ww.sh
drc.g
ov.cn
for d
etaile
d cha
rges
for d
iffere
nt
tie
rs an
d cha
rges
for n
on-su
mmer
perio
d.W
ATER
(Dom
estic
): 0-
220m
3 = U
S$0.4
97/m
3 ; 22
0 - 30
0m3 =
US$
0.696
/m3 ;
Abov
e 300
m3 = U
S$0.8
40/m
3.
UNLE
ADED
FUE
L: Un
leade
d 95.
MOP
8.07
0.170
0.560
- 0.90
00.7
501.7
00 N
/A1.4
50
ELEC
TRIC
ITY:
Elec
tricity
tariff
are c
ompo
sition
of de
mand
char
ges,
cons
umpti
on ch
arge
s, fue
l clau
se ad
justm
ent a
nd go
vern
ment
tax.
WAT
ER (D
omes
tic):
Cons
umpti
on ch
arge
= US
$0.56
/m3 f
or 28
m3 or
below
; US$
0.64/m
3 for
29m3
to 60
m3; U
S$0.7
5/m3 f
or 61
m3 to
79m3
and U
S$0.9
0/m3 f
or 80
m3 or
abov
e.W
ATER
Com
merci
al/Ind
ustria
l): Ch
arge
s for
ordin
ary u
sers
(e.g.
Bus
iness
, gov
ernm
ent b
uildin
gs, s
choo
ls, as
socia
tions
, hos
pitals
and o
thers)
only.
Spe
cial u
sers
(e.g.
gami
ng
in
dustr
ies, h
otels,
saun
as, g
olf co
urse
s, co
nstru
ction
, pub
lic in
frastr
uctur
es an
d othe
r tem
pora
ry co
nsum
ption
) are
exclu
ded.
0.170
MA
CA
U
93OTHER INFORMATION
(Cont’d)
UTILITY COSTS FOR SELECTED ASIAN CITIES(Cont’d)
BA
NG
ALO
RE
INR
71.90
0.069
- 0.1
00
0.087
- 0.1
280.5
56 -
0.695
1.390
1.00
1N/
A1.0
72
HO
CH
I MIN
HVN
D 22
,600
0.750
/ 0.43
00.1
10 0.
100
0.06
00.2
40
All ra
tes ar
e VAT
inclu
sive.
0.820
0.920
N/A
INR
71.90
NEW
DEL
HI
0.069
- 0.1
11 0.
070 -
0.11
10.3
50 -
1.050
1.390
- 2.4
400.9
921.1
41N/
A
BA
NG
KO
KBA
HT 32
.730.
259 -
0.44
10.8
950.8
810.0
72 -
0.136
0.0
96 -
0.098
0.290
- 0.4
83N/
A
UNLE
ADED
FUE
L: Ga
soho
l 95
ELEC
TRIC
ITY
(Dom
estic
): Fo
r nor
mal ta
riff w
ith co
nsum
ption
not e
xcee
ding 1
50kW
h/mon
th.
OTHER INFORMATION94
OTHER INFORMATION5C
OU
NTR
YEx
chan
ge
Rat
eU
S $1
=D
omes
ticC
omm
erci
al/
Indu
stria
ID
omes
ticC
omm
erci
al/
Indu
stria
lD
iese
lLe
aded
Unl
eade
d
ELEC
TRIC
ITY
(US$
/kw
h)
WA
TER
(US$
/m3 )
FU
EL (U
S$/li
tre)
JAK
AR
TAID
R 15
,180
0.097
0.097
0.450
- 0.9
650.0
69 -
0.491
0.481
N/A
0.543
WAT
ER &
ELE
CTRI
CITY
- (D
omes
tic):
Dome
stic g
roup
in In
done
sia w
ill co
ver r
eside
nce,
relig
ion bu
ilding
, non
-pro
fit or
ganiz
ation
build
ing an
d gov
ernm
ent h
ospit
al.W
ATER
& E
LECT
RICI
TY -
(Com
merci
al / In
dustr
ial):
Comm
ercia
l gro
up in
Indo
nesia
will
cove
r luxu
ry re
siden
ce, a
partm
ent, o
ffices
, hote
l, com
merci
al bu
ilding
, and
facto
ries.
SIN
GA
POR
ES$
1.38
0.170
0.170
1.990
1.990
2.670
1.340
N/A
1.940
MA
NIL
A 0
.210
PHP
52.88
0.19
00.2
90 -
0.740
1.3
700.9
72N/
A
ELEC
TRIC
ITY
- (Do
mesti
c): 19
0 kW
h - 2,
099 k
Wh;
ELEC
TRIC
ITY
- (Co
mmer
cial /
Indus
trial):
185,4
04 kW
h; W
ATER
- (D
omes
tic):
24m3 -
101m
3 ; W
ATER
- (C
omme
rcial
/ Indu
strial
): 3,7
50m3
1.146
All ra
tes ar
e nett
of G
ST.
ELEC
TRIC
ITY:
Tar
iff is
base
d on l
ow te
nsion
powe
r sup
ply.
WAT
ER (D
omes
tic) -
Effe
ctive
from
1 Ju
ly 20
18. R
ate in
clude
s wate
r con
serva
tion t
ax, w
ater-b
orne
fee,
sanit
ary a
pplia
nce f
ee an
d is a
n ave
rage
for t
he 1s
t 40m
3 .
W
ATER
(Com
merci
al / In
dustr
ial) -
Effe
ctive
from
1 Ju
ly 20
18. R
ate in
clude
s wate
r con
serva
tion t
ax, w
ater b
orne
fee &
sanit
ary a
pplia
nce f
ee.
FUEL
(Dies
el) -
As at
2 No
vemb
er 20
18.
UNLE
ADED
FUE
L: 98
Unle
aded
petro
l as a
t 2 N
ovem
ber 2
018.
CO
UN
TRY
Exch
ange
R
ate
US
$1 =
Dom
estic
Com
mer
cial
/ In
dust
riaI
Dom
estic
Com
mer
cial
/ In
dust
rial
Die
sel
Lead
edU
nlea
ded
ELEC
TRIC
ITY
(US$
/kw
h)
WA
TER
(US$
/m3 )
FU
EL (U
S$/li
tre)
95OTHER INFORMATION
OTHER INFORMATION96
LENGTH 1 millimetre (mm) = 0.0394 in 1 centimetre (cm) = 10 mm = 0.3937 in 1 metre (m) = 100 cm = 1.0936 yd 1 kilometre (km) = 1,000 m = 0.6214 mile AREA 1 sq cm (cm2) = 100 mm2 = 0.1550 in2
1 sq metre (m2) = 10,000 cm2 = 1.1960 yd2 1 hectare (ha) = 10,000 m2 = 2.4710 acres 1 sq km (km2) = 100 ha = 0.3861 mile2 VOLUME / CAPACITY 1 cu cm (cm3) = 0.0610 in3 1 cu decimetre (dm3) = 1,000 cm3 = 0.0353 ft3 1 cu metre (m3) = 1,000 dm3 = 1.3080 yd3 1 litre (l ) = 1 dm3 = 1.76 pt 1 hectolitre (hl ) = 100 l = 21.997 gal MASS (WEIGHT) 1 milligram (mg) = 0.0154 grain 1 gram (g) = 1,000 mg = 0.0353 oz 1 kilogram (kg) = 1,000 g = 2.2046 lb 1 tonne (t) = 1,000 kg = 0.9842 ton USA MEASURES AND EQUIVALENTS USA Dry Measure Equivalents 1 pint = 0.9689 UK pint = 0.5506 l USA Liquid Measure Equivalents 1 fluid ounce = 1.0408 UK fl oz = 29.574 ml 1 pint (16 fl oz) = 0.8327 UK pt = 0.4723 l 1 gallon = 0.8327 UK gal = 3.7854 l
WEIGHT AND MEASURES
Metric Measures and Equivalents
OTHER INFORMATION5
LENGTH 1 inch (in) = 2.54 cm 1 foot (ft) = 12 in = 0.3048 m 1 yard (yd) = 3 ft = 0.9144 m 1 mile = 1,760 yd = 1.6093 km 1 int. nautical mile = 2,025.4 yd = 1.853 km AREA 1 sq inch (in2) = 6.4516 cm2 1 sq foot (ft2) = 144 in2 = 0.0929 m2 1 sq yard (yd2) = 9 ft2 = 0.8361 m2 1 acre = 4,840 yd2 = 4,046.9 m2 1 sq mile (mile2) = 640 acres = 2.59 km2 VOLUME / CAPACITY 1 cu inch (in3) = 16.387 cm3 1 cu foot (ft3) = 1,728 in3 = 0.0283 m3 1 fluid ounce (fl oz) = 28.413 ml 1 pint (pt) = 20 fl oz = 0.5683 l 1 gallon (gal) = 8 pt = 4.5461 l MASS (WEIGHT) 1 ounce (oz) = 437.5 grains = 28.35 g 1 pound (lb) = 16 oz = 0.4536 kg 1 stone = 14 lb = 6.3503 kg 1 hundredweight (cwt) = 112 lb = 50.802 kg 1 ton = 20 cwt = 1.016 t Temperature Conversion oC = 5/9 (oF - 32) oF = (9/5 oC) + 32
oC
oF
Imperial Measures and Equivalents
97OTHER INFORMATION
LENGTHTo Convert Multiply bymili-inches into micrometres 25.4inches into milimetres 25.4inches into centimetres 2.54inches into metres 0.0254
feet into centimetresfeet into milimetres 304.8
30.48feet into metres 0.3048yards into metres 0.9144fathoms into metres 1.8288chains into metres 20.1168furlongs into metres 201.168miles, statute into kilometres 1.609344miles, nautical into kilometres 1.852
VOLUME & CAPACITY
To Convert Multiply bycubic inches into cubic centimetres 16.387064cubic inches into litres 0.016387cubic feet into cubic metres 0.0283168cubic feet into litres 28.316847
UK quarts into litresUK pints into litres 0.5682613
1.1365225cubic yards into cubic metres 0.7645549UK gallons into litres 4.54609UK gallons into cubic metres 0.0045461UK fluid ounces into cubic centimetres 28.413063
Conversion Formulae
To use the conversion formulae simply multiply the Imperial measurement by the factor beside the conver-sion you wish to make. For example 6 inches into milimetres. 6 inches multiplied by 25.4 equals 152.4 milimetres. Conversely if you wish to convert Metric measure into Imperial measure simply divide by the same factor.
CONVERSION GUIDE
OTHER INFORMATION5
OTHER INFORMATION98
POWER
To Convert Multiply byfoot pounds-force per second into watts 1.35582horsepower into watts 745.7foot pounds-force per second into kilowatts 0.001356horsepower into kilowatts 0.7457horsepower into metric horsepower 1.01387
AREATo Convert Multiply bysquare inches into square milimetres 645.16square inches into square centimetres 6.4516square feet into square centimetres 929.0304square feet into square metres 0.092903
square yards into (0.01 hectare)square yards into square metres 0.836127
0.0083613acres into square metres 4046.8564acres into hectares 0.4046856square miles into square kilometres 2.589988
MASS
To Convert Multiply bygrains into miligrams 64.79891grains into metric carats 0.323995grains into grams 0.064799pennyweights into grams 1.555174
ounces troy into gramsounces into grams 28.349523
31.103477ounces into kilograms 0.0283495pounds into kilograms 0.4535924stones into kilograms 6.35023932hundredweights into kilograms 50.802345tons into kilograms 1016.0469tons into metric tonnes 1.01605tahils into grams 37.799kati into kilograms 0.60479
99OTHER INFORMATION
VIETNAM (Normal Scheduled Holidays)New Year’s DayLunar New YearHung Vuong King CelebrationLiberation Day of SaigonInternational Labour DayNational DayChristmas Day
* Substitute for 14 Apr (Sunday)
01 04 - 08 14 - 15*
3001
02 24 - 25
JanFebAprAprMaySepDec
2019MALAYSIANew Year’s Day**Chinese New YearLabour DayWesak Day#Hari Raya Aidilfitri*Hari Raya Qurban*National DayAwal Muharam (Maal Hijrah)#King/Agong’s BirthdayMalaysia DayDeepavali*#Prophet Muhammad’s BirthdayChristmas Day
* Subject to change** Except Johor, Kelantan, Kedah, Perlis & Terengganu# The following day will be an additional Public Holiday
0105 - 06
0119
05 - 061131010916270925
JanFebMayMayJunAugAugSepSepSepOctNovDec
PUBLIC HOLIDAYS
OTHER INFORMATION5
OTHER INFORMATION100
2019
(Cont’d)
HONG KONGNew Year’s DayLunar New Year (Day 1)Lunar New Year (Day 2)Lunar New Year (Day 3)Ching Ming FestivalGood FridayHoly SaturdayEaster MondayLabour DayThe day following the Birthday of the BuddhaTuen Ng FestivalHKSAR Establishment DayThe day Following Chinese Mid-Autumn FestivalNational DayChung Yeung FestivalChristmas DayThe 1st weekday after Christmas Day
* As the Birthday of the Buddha in 2019 falls on a Sunday, the day following it is designated as a general holiday in substitution
0105060705192022011307011401072526
JanFebFebFebAprAprAprAprMayMayJunJulSepOctOctDecDec
CHINANew Year’s DayChinese New Year’s EveChinese New Year$
Women’s Day*@Tomb-Sweeping FestivalLabour DayDragon Boat FestivalMid-Autumn FestivalNational Day#
Chung Yeung Festival@
$ 05 - 10 February 2019 are holidays.* All women can have half day holiday. # 30 Sept - 7 October 2019 are public holidays. 05 October 2019 is a working day.
01040508050107130107
JanFebFebMarAprMayJunSepOct Oct
101OTHER INFORMATION
2019
New Year’s DayLunar New Year’s Eve (Afternoon)*Lunar New Year’s DayThe 2nd day of Lunar New YearThe 3rd day of Lunar New YearChing Ming FestivalGood FridayHoly SaturdayEaster Monday*Labour DayBirthday of the Buddha Holiday*Tung Ng FestivalThe day following the Chinese Mid-Autumn FestivalNational DayThe day following National DayChung Yeung FestivalAll Soul's DayAll Soul's Day Holiday*Feast of the Immaculate ConceptionFeast of the Immaculate Conception Holiday*Macau SAR Establishment DayWinter SoslticeWinter Sosltice Holiday*Christmas EveChristmas DayNew Year’s Eve (Afternoon)*
* Special holiday granted by Chief Executive for staff in Public.
010405060705192022011307
1401020702040809202223242531
JanFebFebFebFebAprAprAprAprMayMayJun
SepOctOctOctNovNovDecDecDecDecDecDecDecDec
MACAU
(Cont’d)
PUBLIC HOLIDAYS
OTHER INFORMATION5
OTHER INFORMATION102
(Cont’d)
103OTHER INFORMATION
2019INDIANew Year's DayMaharashtra DayRamzanIndependence DayGanesh ChaturthiGandhi JayanthiDasaraDiwaliChristmas Day
01 01 05
150202082825
JanMayJunAugSepOctOctOctDec
INDONESIANew Year’s DayChinese New Year (Imlek)Hindu Day of Quiet (Nyepi)Ascension of Prophet MohammadGood FridayInternational Labour DayWaisak DayAscension Day of Jesus ChristPancasila Day*Idul FitriIdul Adha DayNational Independence DayHijriyah New YearProphet Muhammad’s BirthdayChristmas Day
* Subject to changes
010507031901
1930
01 05 - 06
1117010925
JanFebMarAprAprMayMayMayJunJunAugAugSepNovDec
2019PHILIPPINES Regular HolidaysNew Year's Day*Chinese New Year#EDSA People Power Revolution (Additional)#Araw ng Kagitingan*Maundy Thursday*Good Friday*Black Saturday (Additional)#Labor Day*End of Eid-ul-Fitre (Feast of Ramadhan)*Independence Day*Eid-ul-Adha*Ninoy Aquino Day#National Heroes Day*All Saint's Day#All Soul's Day (Additional)#Bonifacio Day*Feast of the Immaculate Conception of Mary#Christmas Eve (Additional)#Christmas Day*Rizal Day*Last Day of the Year (Additional)#
* Regular Holidays# Special Non-Working Day
010525091819200106121221260102300824253031
JanFebFebAprAprAprAprMayJunJunAugAugAugNovNovNovDecDecDecDecDec
SINGAPORENew Year’s DayChinese New YearGood FridayLabour DayVesak DayHari Raya PuasaNational DayHari Raya HajiDeepavali*Christmas Day
* Subject to change# The following Monday will be a public holiday
01 05 - 06
1901190509112725
JanFebAprMayMay#
JunAugAug#
Oct#Dec
(Cont’d)
PUBLIC HOLIDAYS
OTHER INFORMATION5
OTHER INFORMATION104
2019THAILANDNew YearMakha Bucha DayChakri Memorial daySongkran FestivalLabour DayWisakha Bucha DayAsarnha Bucha DayH.M. King Maha Vajiralongkorn's BirthdayH.M. The Queen’s BirthdayH. M. King Bhumibol Adulyadej Memorial DayChulalongkorn dayH.M. King Bhumibol Adulyadej's Birthday / Father's DayConstitution DayNew Year’s Eve
0119
08 15 - 16
012016291214
23
05 10 31
JanFebApr*Apr**MayMay***JulJul****AugOct*****Oct
DecDecDec
* As Chakri Memorial Day falls on Saturday (6 Apr) , Monday is designated as a general holiday in substitution** As Songkran Festival falls on Saturday (13 Apr) and Sunday (14 Apr); Monday and Tuesday is designated as a general holidays in substitution*** As Wisakha Bucha Day falls on Saturday (18 May) , Monday is designated as a general holiday in substitution**** As H. M. King Maha Vajiralongkorn's Birthday falls on Sunday (28 July) , Monday is designated as a general holiday in substitution***** As H. M. Bhumibol Adulyadej Memorial Day falls on Sunday (13 Oct) , Monday is designated as a general holiday in substitution
105OTHER INFORMATION
Eric de KruifChief Financial Offi cer, [email protected]
Adam SuttonHR and Change Director
Glenn LutzChief Executive Officer, Asia
Penny Murphy Head of Digital [email protected]
Niek NiensChief Operating Officer, Asia
Grant SprickHead of HSEQ, Asia
Loo Ming CheeTechnical Innovation Lead
Carl WatsonGeneral Counsel, Asia
ARCADIS ASIA LEADERSHIP TEAM
OTHER INFORMATION5
OTHER INFORMATION106
107OTHER INFORMATION
Justin TeohHead of Malaysia
Francis Au Head of Hong Kong and Macau
Joe ChanHead of China East
Andrew ChanHead of China North
Weibin XuHead of China South & West
Tim RisbridgerHead of Singapore
ARCADIS ASIA SERVICES
OTHER INFORMATION5
OTHER INFORMATION108
COST MANAGEMENT
Be it a high-rise office building, a state-of-the-art rail station or a large scale industrial development, the need to achieve value for money is central to every investment strategy. Our people understand the need to accurately advise on costs and procurement at planning stage, ensuring a development or program is both economi-cally and environmentally viable for many years to come.
BUSINESS ADVISORY
From rapid urbanization and pressure on natural resources, to tighter regulation and market consolida-tion, we live in an increasingly complex world. We under-stand your business challenges and have first-hand experience of the assets you own and operate. We partner with you and bring unique insights to support you in getting better results, with more certainty from strategy, optimizing performance, enhancing resiliency or transformation of your asset - Arcadis has helped clients globally deliver success.
DESIGN & ENGINEERING
From tall buildings to the busy airports; from under-ground tunnels to iconic bridges, engineering feats help to improve the quality of life for us all. Our specialist engineers use their expertise and knowledge to deliver exceptional and sustainable outcomes for clients through working on some of the world’s most impressive and well-known buildings and structures.
109OTHER INFORMATION
ENVIRONMENT
We all deserve a clean, safe environment in which to live. Now more than ever, businesses and governments recognize the need to incorporate environmental concerns into their decision making. Arcadis is a global leader in inventive technical and financial approaches, helping some of the world’s leading corporates and governments understand their impact on the natural world.
PROJECT & PROGRAMME MANAGEMENT
WATER
Organizing the creation of the world’s largest, most complex and iconic programs of work in the built and natural environment today is no easy task. Budgets, supply chains, health and safety, time-frames and the large number of parties involved can be daunting. We work alongside our clients to create the right strategy, manage and mitigate risk, and assure the outcomes to meet our clients’ business objectives and create exce tional value. As construction programs grow more complex, often with multi-geography delivery and faster paced schedules, the risks are getting.
From source to tap and then back to nature, the planet’s most precious resource should be cherished. Thanks to over a century of experience in the water sector, Arcadis’ specialist teams around the globe are uniquely positioned to provide safe and secure water technology that is built to withstand the demands of a rapidly chang-ing world.
MALAYSIASELANGORJUBM SDN BHDARCADIS (MALAYSIA) SDN BHDARCADIS PROJEKS SDN BHDLevel 5, Menara TSR12 Jalan PJU 7/3, Mutiara Damansara47810 Petaling JayaSelangor Darul Ehsan, MalaysiaGPS : 3.1616, 101.6129Tel/Fax : (60 3) 2106 8000 / (60 3) 2106 9090Email : [email protected] : Justin Teoh / Nur Aziz Abu Bakar / Syed Mahadzir Syed Ahmad / Rozila Abdul Rahman / Yap Sai Hoe / Jeffrey Lim JOHOR47, Jalan Setia Tropika 1/30Taman Setia Tropika81200 Johor BahruJohor Darul Takzim, MalaysiaGPS : 1.5422, 103.7111Tel/Fax : (60 7) 232 8300 / (60 7) 232 8232Email : [email protected] : Syed Mahadzir Syed Ahmad / Tan Pei Ling
PENANGSuite 3A-3, Level 3AWisma Great EasternNo.25, Lebuh Light10200 Penang, MalaysiaGPS : 5.4201, 100.3408Tel : (60 4) 264 2071 / 264 2072 / 264 2073Fax : (60 4) 264 2068Email : [email protected] : Nur Aziz Abu Bakar
SABAHLot No. H-06-07 & H-06-08Level 6, Block HAeropod Commercial Square Tanjung AruJalan Aeropod Off Jalan Kepayan88100 Kota Kinabalu, Sabah, MalaysiaGPS : 5.9492, 116.0596Tel : (60 88) 215 530 / 215 531Fax : (60 88) 215 570Email : [email protected] : Jeffrey Lim / VK Wong
SARAWAKJUBM SDN BHDNo.2 (3rd Floor)Jalan Song Thian Cheok93100 KuchingSarawak, MalaysiaGPS : 1.5532, 110.3532Tel/Fax : (60 82) 232 212 / (60 82) 232 198Email : [email protected] : Nor Azman Bin Baharum
DIRECTORY OF OFFICES
OTHER INFORMATION5
OTHER INFORMATION110
VIETNAMHO CHI MINH CITYL12-03, Level 12, VINCOM Center B 72 Le Thanh Ton StreetBen Nghe wardDistrict 01, Ho Chi Minh City, VietnamGPS : 10.778068, 106.702063Tel/Fax : (84 28) 3823 8297 / (84 28) 3823 8197Email : [email protected] : Mark Olive / Truong Minh Tri
CHINAHONG KONGARCADIS HONG KONG LIMITED17/F, Two Harbour Square180 Wai Yip Street, Kwun TongKowloon, Hong KongGPS : 22.310065, 114.221216Tel/Fax : (852) 2911 2000 / (852) 2911 2002Email : [email protected] : Francis Au
BEIJINGBEIJING ARCADIS CONSTRUCTION CONSULTANTS CO. LTD.Suite 1225 - 1242, South Wing Central Tower, Junefield Plaza10 Xuan Wu Men Wai StreetBeijing 100052, ChinaGPS : 39.896738,116.375676Tel/Fax : (86 10) 6310 1136 / (86 10) 6310 1143Email : [email protected] : Andrew Chan
CHANGSHA ARCADIS CONSULTANCY (SHANGHAI) CO. LTD. CHANGSHA BRANCHRoom 2315-2317HUAYUAN International CenterNo.36 Section 2, Xiangjiang Middle RoadTianxin District, Changsha, Hunan Province410002, ChinaGPS : 28.195233,112.976893Tel : (86 731) 8277 2500Email : [email protected] : Chen Yong
CHENGDUARCADIS CONSULTANCY (CHENGDU) CO. LTD.Room 807, Block A, Times Plaza2 Zongfu Road, Chengdu, Sichuan Province 610 016, ChinaGPS : 30.656666,104.080567Tel/Fax : (86 28) 8671 8373 / (86 28) 8671 8535Email : [email protected] : Gary Lin / Marco Foo
(Cont’d)
111OTHER INFORMATION
CHONGQING ARCADIS CONSULTANCY (CHENGDU) CO. LTD. CHONGQING BRANCHRoom 3409-3410, International Trade Centre38 Qing Nian Road, Central District Chongqing 400010, ChinaGPS : 29.556331,106.574332Tel/Fax : (86 23) 8655 1333 / (86 23) 8655 1616Email : [email protected] : Gary Lin
DALIANBEIJING ARCADIS CONSTRUCTION CONSULTANTS CO. LTD. DALIAN BRANCHUnit 07, 32F, Xiwang Tower136 Zhongshan Road, Zhongshan DistrictDalian, Liaoning Province116001, ChinaGPS : 38.914864,121.631245Tel/Fax : (86 411) 8800 8018 / (86 411) 8800 8823Email : [email protected] : Kenn Ng
FOSHANARCADIS CONSULTANCY (SHENZHEN) CO. LTD.FOSHAN BRANCHRM. 1002-1004, 10/F, Lingnan TiandiZu Miao Road, FoshanGuangdong Province528000, ChinaGPS : 23.031224,113.11278Tel : (86 757) 8203 0028 / (86 757) 8203 0029Email : [email protected] : Dickey Lee
GUANGZHOUARCADIS CONSULTANCY (SHENZHEN) CO. LTD.GUANGZHOU BRANCH3A10-18 Unit, 3A/F Bank of America Plaza555 Ren Min Zhong RoadGuangzhou, Guangdong Province, 510145, ChinaGPS : 23.123148,113.253628Tel/Fax : (86 20) 8130 3813 / (86 20) 8130 3812Email : [email protected] : Xu Wei Bin
HAIKOU ARCADIS CONSULTANCY (SHENZHEN) CO. LTD.HAIKOU BRANCH Unit B 10/F Times Square2 Guomao Road, HaikouHainan Province, 570100, ChinaGPS : 20.029509,110.326235Tel/Fax : (86 898) 6652 7808 / (86 898) 6652 7809Email : [email protected] : Yi Zheng Gang
(Cont’d)
DIRECTORY OF OFFICES
OTHER INFORMATION5
OTHER INFORMATION112
HANGZHOU ARCADIS CONSULTANCY (SHANGHAI) CO. LTD. HANGZHOU BRANCHRoom 1306 WinNing International100 Min Xin RoadHangzhou, Zhejiang Province310016, ChinaGPS : 30.251755,120.218913Tel/Fax : (86 571) 2829 7766 / (86 571) 2829 7622Email : [email protected] : Alex Zou
HENGQIN ARCADIS CONSULTANCY ZHUHAI HENGQIN CO. LTD.7/F, 156 Nan Shan Ju RoadHengqin, Zhuhai Guangdong Province 519031, China GPS : 22.142774, 113.544438Tel/Fax : (86 756) 868 8986 / (86 756) 868 8969Email : [email protected] : Stanley Wan
MACAUARCADIS MACAU LIMITEDAvenida da Praia Grande, No. 594 Edificio BCM, 12th Floor, MacauGPS : 22.192210,113.541252Tel/Fax : (853) 2833 1710 / (853) 2833 1532Email : [email protected] : Katherine Chan
NANJING ARCADIS CONSULTANCY (SHANGHAI) CO. LTD. NANJING BRANCH1104 South Tower Jinmao Plaza201 Zhong Yang Road, NanjingJiangsu Province 210009, ChinaGPS : 32.071984, 118.783443Tel/Fax : (86 25) 57911860 / (86 25) 6698 1860Email : [email protected] : Taofen Chen
QINGDAO ARCADIS CONSULTANCY (SHANGHAI) CO. LTD. QINGDAO BRANCHRoom 2008, 20F, HNA Center234 Yan An San Road, Shinan DistrictQingdao, Shangdong Province266071, ChinaGPS : 36.060852,120.375351Tel/Fax : (86 532) 8280 1818 / (86 532) 8280 1881Email : [email protected] : Andy Feng
(Cont’d)
113OTHER INFORMATION
SHANGHAI ARCADIS CONSULTANCY (SHANGHAI) CO. LTD. 11th Floor, Building C, The PlaceNo. 150, Zunyi RoadChangning DistrictShanghai 200051, China GPS : 31.207363, 121.407984Tel/Fax : (86 21) 6026 1300 / (86 21) 6026 1800Email : [email protected] : Joe Chan
SHENYANG BEIJING ARCADIS CONSTRUCTION CONSULTANTS CO. LTD. SHENYANG BRANCHRoom 3013-3015, Office Tower 1Forum66, 1-1 Qingnian AvenueShenhe District, Shenyang 110063Liaoning, ChinaGPS : 41.799603,123.433787Tel/Fax : (86 24) 3195 8880 / (86 24) 3128 6983Email : [email protected] : Simon Chow
SHENZHENARCADIS CONSULTANCY (SHENZHEN) CO. LTD.Room 1001, AVIC Centre1018 Huafu Road, Shenzhen Guangdong Province 518031, ChinaGPS : 22.543241, 114.082051Tel/Fax : (86 755) 2598 1841 / (86 755) 2598 1854Email : [email protected] : Kenneth Lo / Ricky Ho
SUZHOU ARCADIS CONSULTANCY (SHANGHAI) CO. LTD. SUZHOU BRANCHRoom 906, The Summit118 Suzhou Avenue WestSuzhou, Jiangsu Province215021 ChinaGPS : 31.315966, 120.669099Tel/Fax : (86 512) 8777 5599 / (86 512) 8777 5600Email : [email protected] : Zhang Rui
TIANJIN BEIJING ARCADIS CONSTRUCTION CONSULTANTS CO. LTD. TIANJIN BRANCH4002, 40/F Tianjin World Financial Centre Office Tower 2 Dagubei Road, He Ping District, Tianjin 300 020, ChinaGPS : 39.129619,117.202758Tel/Fax : (86 22) 2329 8611 / (86 22) 2319 3186Email : [email protected] : Kenn Ng
(Cont’d)DIRECTORY OF OFFICES
OTHER INFORMATION5
OTHER INFORMATION114
WUHAN ARCADIS CONSULTANCY (SHANGHAI) CO. LTD. WUHAN BRANCHRM.1703, Citic Pacific MansionNo.1627 Zhongshan Avenue, Jiangan DistrictWuhan, Hubei Province 430010, ChinaGPS : 30.616813, 114.317276Tel/Fax : (86 27) 5920 9299 / (86 27) 5920 9298Email : [email protected] : Wong Chin Ying
XI’AN ARCADIS CONSULTANCY (SHENZHEN) CO. LTD. XI’AN BRANCHRoom 1606-1607CapitaMall Office Building64 South Second Ring WesternXi’an, Shaanxi Province710065, ChinaGPS : 34.230397,108.934893Tel/Fax : (86 29) 8866 9711 / (86 29) 8866 9760Email : [email protected] : Wang Zhu Zhu
INDIA BANGALOREARCADIS INDIA PRIVATE LIMITED135, 4th Floor, RMZ TitaniumOld Airport Road, KodihalliBangalore 560 017, IndiaGPS : 12.9591527 / 77.6481456Tel : (00 91 80) 4123 9141Email : [email protected] : Sreekanth A P V
DELHIARCADIS INDIA PRIVATE LIMITED3rd Floor, Tower BLogix Techno ParkPlot No.5, Sector 127Noida 201 304, Uttar PradeshGPS : 28.5359691 / 77.34585591Tel/Fax : (00 91 120) 436 8400 / (00 91 120) 436 8401Email : [email protected] : Sreekanth A P V
MUMBAIARCADIS INDIA PRIVATE LIMITED#1001, 10th Floor, Vishwaroop Infotech ParkPlot No. 34, 35, 38, Sector 30AVashi, Navi Mumbai – 400 705MaharashtraGPS : 19.0644562 / 72.9965259Tel/Fax : (00 91 22) 4125 6060 / (00 91 22) 4125 6050Email : [email protected] Contact : Sreekanth A P V
(Cont’d)
115OTHER INFORMATION
INDONESIABALIP.T. ARCADIS INDONESIALevel 2, Alamanda OfficeJalan By Pass Ngurah Rai No. 67Banjar Pengenderan, KedongananBali 80361, IndonesiaGPS : 8.7893, 115.2106Tel/Fax : (00 62 361) 472 5353 / (00 62 361) 472 5354Email : [email protected] : Putu Arya Canti
JAKARTAP.T. ARCADIS INDONESIALevel 18, Ratu Plaza Office TowerJalan Jenderal Sudirman 9Jakarta 10270, IndonesiaGPS : 6.2271, 106.8008Tel/Fax : (00 62 21) 739 7550 / (00 62 21) 739 7846Email : [email protected] [email protected] Contact : Ben McGeachie / Haelly Hamid / Gary Miles / Natalia Pujiyanti
PHILIPPINESMANILAARCADIS PHILIPPINES INC25th Floor, Circuit Corporate Center OneCircuit Makati, A.P. Reyes StreetBgy CarmonaMakati City 1207PhilippinesGPS : 14.57333, 121.01802Tel : (00 63 2) 908 2888Email : [email protected] : Ross McKenzie / Darneil Perez / Brian Parsons / Michael Hearn / Monina Munsayac / Carla Cruz / Paul Magbanua
CEBU12Floor, 2Quad Building Cardinal Rosales AvenueCorner Sumilon RoadCebu Business ParkCebu City 6000, PhilippinesGPS : 10.3142574, 123.9053502Tel : (00 63 32) 2322 200Fax : (00 63 32) 2603 699Email : [email protected] : Ross McKenzie / Darneil Perez / Brian Parsons / Michael Hearn / Monina Munsayac / Carla Cruz / Paul Magbanua
(Cont’d)DIRECTORY OF OFFICES
OTHER INFORMATION5
OTHER INFORMATION116
JAKARTALevel 18, Ratu Plaza Office TowerJalan Jenderal Sudirman 9Jakarta 10270, IndonesiaGPS : 6.2271, 106.8008Tel/Fax : (00 62 21) 739 7550 / (00 62 21) 739 7846Email : [email protected] : Peter Robinson
JAKARTALevel 18, Ratu Plaza Office TowerJalan Jenderal Sudirman 9Jakarta 10270, IndonesiaGPS : 6.2271, 106.8008Tel/Fax : (00 62 21) 739 7550 / (00 62 21) 739 7846Email : [email protected] : Peter Robinson
SINGAPOREARCADIS SINGAPORE PTE LTD1 Magazine Road#05-01 Central MallSingapore 059567GPS : 1.288526,103.842085Tel/Fax : (65) 6222 3888 / (65) 6224 7089Email : [email protected] : Khoo Sze Boon / Lorimer A. Doig
ARCADIS PROJECT MANAGEMENT PTE LTD1 Magazine Road#05-01 Central MallSingapore 059567GPS : 1.288526,103.842085Tel/Fax : (65) 6222 3888 / (65) 6224 7089Email : [email protected] Contact : Tim Risbridger
THAILANDBANGKOKARCADIS (THAILAND) LTD10th Floor, Kian Gwan II Building140/1 Wireless RoadLumpini, PratumwanBangkok 10330 ThailandGPS : 13.734969, 100.545448Tel/Fax : (00 66 2) 253 1438 / (00 66 2) 253 4977Email : [email protected] : Ang Yen Kooi / Wong Soon Bin
(Cont’d)
117OTHER INFORMATION
ARCADIS ASIA HEADQUARTERS HONG KONG ARCADIS ASIA LIMITEDARCADIS ASIA REGIONAL HEADQUARTERS LIMITED17/F, Two Harbour Square,180 Wai Yip Street, Kwun Tong, Kowloon, Hong KongGPS : 22.310065, 114.221216Tel/Fax : (852) 2911 2000 / (852) 2911 2002Email : [email protected] : Glenn Lutz, CEO, Asia / Eric De Kruif, CFO Asia
ARCADIS HEADQUARTERS AMSTERDAMARCADIS NV“Symphony”Gustav Mahlerplein 97-1031082 MS AmsterdamP.O. Box 78951008 AB AmsterdamThe NetherlandsTel/Fax : (31 20) 201 1011 / (31 20) 201 1002Email : [email protected] : www.arcadis.comContact : Greg Steele, Group Executive – Asia Pacific
DIRECTORY OF OFFICES
OTHER INFORMATION5
OTHER INFORMATION118
119OTHER INFORMATION
TELEPHONE DIRECTORY (MALAYSIA)
Ministries/DepartmentsDepartment of Statistics MalaysiaDepartment of Town and Country PlanningMinistry of Domestic Trade, Co-operatives & ConsumerismMinistry of Urban Wellbeing, Housing & Local GovernmentMinistry of Works MalaysiaKuala Lumpur City Hall (DBKL)Perbadanan PutrajayaPetaling Jaya City Council (MBPJ)Shah Alam City Council (MBSA)Subang Jaya Municipal Council (MPSJ)Kajang Municipal Council (MPK)Selayang Municipal Council (MPS)Ampang Jaya Municipal Council (MPAJ)City Council of Penang Island (MBPP)SIRIM BerhadThe Malaysia Highway AuthorityContractor’s AssociationMaster Builders Association MalaysiaContractor’s Registration BoardConstruction Industry Development Board (CIDB)Professional Registration BoardsBoard of Architects MalaysiaBoard of Engineers MalaysiaBoard of Quantity Surveyors MalaysiaProfessional BodiesAssoc. of Consulting Engineers Malaysia (ACEM)Malaysia Institute of Architects (PAM)Malaysia Institute of Planners (MIP)The Institution of Engineers Malaysia (IEM)Royal Institution of Surveyors Malaysia (RISM)Other Important NumbersAmbulance & PoliceCivil Defence (Rescue)Fire FighterGeneral Hospital KLSYABAS Sdn BhdTenaga Nasional (KL)
03-8885 700003-2265 0600
03-8882 5500
03-8000 800003-8000 800003-2617 900003-8000 800003-7956 354403-5510 513303-8024 770003-8737 789903-6126 580003-4296 800004- 259 202003-5544 600003-8738 3000
03-7984 8636
03-4047 7000
03-2698 287803-2691 209003-2610 8140
03-2095 003103-2202 286603-7877 063603-7968 400103-7955 1773
999999999
03-2615 63911800 88 525203-2296 5566
5
JUBM SDN BHDARCADIS (MALAYSIA) SDN BHD ARCADIS PROJEKS SDN BHDLevel 5, Menara TSR, 12 Jalan PJU 7/3Mutiara Damansara, 47810 Petaling JayaSelangor, MalaysiaTel: (603) 2106 8000 / 2106 9000Fax: (603) 2106 9090Email: [email protected]
FOLLOW US@Arcadis_Asia
JOIN USLinkedln Arcadis
www.arcadis.com