    Construction Measurement III(SBQ 3314)

    Electrical Installations Single Phase

    Lecture By Dr Sarajul Fikri Mohamed

    Department of Quantity Surveying, FAB, UTM Skudai Johor, Malaysia

    05th January 2010

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    2/102

    Pre-cast and Pre-stressed ConcreteCIVIL WORKS

    Electrical Installations

    Fire Fighting Installations

    Air Conditioning Installations

    Unit/Split Package/Central

    Landscape Works

    Single Phase Three Phase

    Gas Installations

    ELECTRICAL WORKS

    MECHANICAL WORKS

    LANDSCAPE WORKS

    Hard Landscape Soft Landscape

    MAIN COURSE COMPONENTS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    3/102

    2009 Sarajul Fikri Mohamed

    Read and check drawing

    Drawing numbering and scale

    used.

    Taking off list Heading and Description

    Take off

    Annotation / Side Cast

    Query list

    Final checking

    BQs FOR ELECTRICAL

    INSTALLATIONS SINGLE PHASE

    PROJECT DRAWINGS

    Output

    3

    Building services technology

    Electrical components

    Measurement rules: SMM2

    Description Taking Off

    Case Study

    KNOWLEDGE

    Table of contents

    ELECTRICAL INSTALLATIONS: SINGLE PHASE

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    4/102

    2009 Sarajul Fikri Mohamed

    1. Electrical installations: main components

    2. SMM2 measurement rules for electrical installations

    3. Taking off list for electrical installations

    4. Heading and description.

    5. Case study: CADANGAN MEMBINA DEWAN SERBAGUNA TAMAN

    KOTA JAYA, KOTA TINGGI, JOHOR

    6. Studio work

    Table of contents

    ELECTRICAL INSTALLATIONS: SINGLE PHASE

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    5/102

    2009 Sarajul Fikri Mohamed

    Electrical installation

    and components

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    6/102

    Electrical distribution

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    7/102

    Electrical distribution

    ELECTRICAL INSTALLATIONS

    Power transmission and distributions

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    8/102

    Types of electrical work

    ELECTRICAL INSTALLATIONS

    From substationto substation

    External

    Supply

    From DB to powerpoints and fittings

    InternalSupply 240V with a less

    load and domesticuse

    Single

    Phase

    415V with abigger load andsupply needed for(comercial danindustrial)

    Three Phase

    Two options

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    9/102

    Voltan yang dikenakan ialah 415 v dan juga boleh mencecah 880 v bagikilang yang menjalankan kerja berat seperti kilang besi dan kilang simen.

    Ia mempunyi tiga pengalir hidup dan neutral.

    Pengalir-pengalir hidup dikenalkan dengan kod-kod aksara berikut:

    LI atau R (red): Fasa pertama

    L2 ataU Y (yellow): Fasa kedua

    L3 atau B (blue) : Fasa ketiga

    Single and three phase

    ELECTRICAL INSTALLATIONS

    Bagi penggunaan rumah kediaman, voltan tiga fasa adalah terlalu tinggi dan

    merbahaya.

    Oleh itu voltan rendah daripada satu fasa lebih sesuai digunakan untuk tujuan

    domestik.

    Voltan piawai satu fasa ialah 240 v. Biasanya satu pengalir hidup digunakanbersama pengalir neutral iaitu:

    RN

    YN

    BN

    Three Phase

    Single Phase

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    10/102

    VIDEO PRESENTATION I

    SINGLE PHASE ANDTHREE PHASE : THE THEORY

    Fakulti Alam Bina

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    11/102

    2009 Sarajul Fikri Mohamed

    INCOMING SERVICES

    MAIN INSTALLATION

    POWER INSTALLATION

    LIGHTING INSTALLATION

    CABLES

    Main components

    ELECTRICAL INSTALLATIONS

    ELECTRICAL APPLIANCES

    CONDUIT AND FITTING

    LIGHTNING PROTECTION SYSTEM

    TESTING

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    12/102

    Electrical distribution

    ELECTRICAL INSTALLATIONS

    INCOMING SERVICES

    MAIN INSTALLATION

    POWER INSTALLATION

    LIGHTING INSTALLATION

    ELECTRICAL APPLIANCES

    FINAL SUB-CIRCUIT

    CABLE

    CONDUIT

    LIGHTNING PROTECTION

    TESTING

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    13/102

    VIDEO PRESENTATION 2

    BASIC HOMES ELECTRICALSYSTEM

    Fakulti Alam Bina

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    14/102

    POWER

    INSTALLATION

    LIGHTING

    INSTALLATION

    ELECTRICAL

    APPLIANCES

    3 pin switch socket Fluorescent light

    Wall light

    EXIT sign

    High bay light

    EL light

    Exhaust fan

    Sweep ceiling fan

    CONDUIT &

    FITTING

    CABLES TESTING

    Chased into brickwallCeiling level

    2x1c/2.5mm PVC cable2x1c/1.5mm PVC cable

    On completion of the electricalinstallation test all switches, switch

    socket, wiring etc and make good

    all defects an leave everything

    perfect working order to the

    satisfaction of the S.O and TNB

    Main components

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    15/102

    Electrical typical legend in M&E drawings

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    16/102

    DB & FUSES

    ELCB

    MAIN SWITCH FUSE

    TNBMETER

    CUT OFF FUSE

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    17/102

    To monitor and record the total amount of electrical

    energy that is being consumed for the purpose ofcharging consumers through the issuance of

    electricity bills .

    Property of TNB

    2 types of meter

    Analog

    Digital

    METERING BOARD

    TNB CUT OUT FUSE

    Consumers back up protection 2 purposes:

    As a measure of back up protection to the fuse in theDistribution Board and also ELCB

    As mean of cutting of electrical supply to the consumerswhen required

    Cutout fuse is connected to live wire and it is use tocontrol current supply. Both belong to TNB.

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    18/102

    Main switch

    ELECTRICAL INSTALLATIONS

    Locate at the main incoming supply of the consumers Distribution Board

    The purpose is to cut all of the power supply to the consumer in the event thatany maintenance work needs to be carried out.

    Connect, cut off and control the current if their any excess current.

    A two terminal one way switch that contains fuse.

    Main switch

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    19/102

    Circuit breaker : ELCB

    ELECTRICAL INSTALLATIONS

    A mechanical device to connect and cutout circuit It will cut off any faulty circuit immediately Sensitive to lightning 2 types:

    Earth Leakage Circuit Breaker: ELCB Miniature Circuit Breaker: MCB

    ELCB

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    20/102

    This is where distribution of electrical energy to various connected load takeplace inside the consumer premises.

    It also distributes the path for the earthing and neutral wire, and acts asmeans of flowing leakage and return current respectively.

    Distribution board

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    21/102

    Miniature circuit breaker : MCB

    ELECTRICAL INSTALLATIONS

    MC

    B& FUSE

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    22/102

    No. Of Ways Outline Dimensions (mm)

    M.C.B. SIZE L W H H1

    8.0 143 215 71 93

    10.0 175 255 71 93

    14.0 175 320 71 93

    18.0 182 380 71 93

    22.0 210 460 71 93

    Consumer unit: 1 row : 8-22 modules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    23/102

    No. Of Ways Outline Dimensions (mm)

    M.C.B. SIZE L W H H1

    28 434 320 71 93

    Consumer unit: 2 row : 28 modules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    24/102

    No. Of Ways Outline Dimensions (mm)

    M.C.B. SIZE L W H H1

    42 434 320 71 93

    Consumer unit: 3 rows : 42 modules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    25/102

    RCCB AND RCBO INSIDE A DISTRIBUTION BOARD

    WIRING IN DISTRIBUTION BOARD

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    26/102

    WIRING TO DISTRIBUTION BOARD

    MAIN SWITCH AND ELCB

    MAIN SWITCH

    4 POLE ELCB

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    27/102

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    28/102

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    29/102

    29

    Clause Description

    R4-R5 Equipments and Control Gear

    R6-R8 Fittings and Accessories

    R9-R13 Conduits, trunking and cable tray

    R14-R17 Cabling

    R18 Final Sub-circuits

    R19 Earthing

    R20-R21 Ancillaries

    R22 Sundries

    R23-R24 Builders Work

    Related SMM2 clauses

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    30/102

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    31/102

    R.2 CLASIFICATION OF WORK

    a. Incoming servicesb. Standby equipmentc. Mains installation-switch gears, sub-main cables.

    d. Power installatione. Lighting installationf. Heating installationg. Electrical appliancesh. Electrical work

    k. Clock installation

    I. Sound distribution

    m. Alarm systemn. Earthing system installation

    p. Lightning protection installation

    q. Special services

    r. Any other installation

    s. Trunking, ducting and cable trays

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    32/102

    LOCATION OF ELECTRICAL WORKS

    R3 - Location of work

    a. Internallyb. Externally

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    33/102

    ELEMENT: ELECTRICAL SERVICES ubb/N/01

    BIL UNIT KUANTITI

    A Preamble

    B

    M 3.05

    M 3.05

    C

    M 1.00

    M 1.00

    To Collection

    All quantities in this bill are provisional quantities

    subject to remeasurement upon construction of the

    said item. The tenderer must allow for testing the

    electrical installation and handling over of test

    certificate to S.O.

    Incoming Services-Externally (All Provisional)

    25mm x 25mm Telekom PVC trunking from lightingarrestors run at high level and drops to computer

    server.

    100mm UPVC class 'D' pipe complete with long

    bend extended beyond drain for entry of TNB,

    incoming cable to MSB inclusive of excavation and

    backfilling.

    4 x 25mm pilestas (AC) cable in UPVC class 'D'

    pipe (m/s) buried underground to TNB panel.

    75mm x 38mm electrical trunking from meter to

    DB/M3B.

    Incoming Services-Internally (All Provisional)

    Cadangan Membina Dan Menyiapkan Sebuah Makmal KomputerDi Sekolah Kebangsaan Sri

    Selangor, Petaling Jaya, Selangor.

    KETERANGAN HARGA

    (RM)

    JUMLAH

    (RM)

    BILLS OF

    QUANTITI

    ES FOR:

    INCOMINGSERVICES

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    34/102

    ITEM DESCRIPTION UNIT

    POWER INSTALLATION

    (INTERNALLY)

    Cable

    A2 x 1C-2.5mm2 PVC insulated colour coded

    cable as specified drawn into conduit.

    M

    Cl R.2.1(d)

    Classification of work

    Cl R.3.1(a)

    Location of Work

    Cl R.14.2

    Generally

    Cl R.15.2(a)

    Cables

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    35/102

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    36/102

    EQUIPMENT AND CONTROL GEAR (NO)

    R4 Equipment (generator, motors)

    Control gear (isolator, switch fuses)

    Packaged item described with a manufacturers detail.

    Limiting dimension on size shall be given.

    Connecting cable ends or cable tails shall be deemed to be

    included with the item.

    Platework and supporting steelwork Section P.

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    37/102

    METERING BOARD

    Equipment and Control Gear

    Measurement rules

    ELECTRICAL INSTALLATIONS

    Manufacturers details and dimension on size

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    38/102

    Usually for houses and small loaded.

    Situated inside building.

    Including equipment such as circuit breaker and fuse

    SMM2 Refer to clause R.4.1(NO.)

    Distribution board

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    39/102

    EQUIPMENT SUPPORTS : R5

    Equipment supports enumerated and described (NO)

    Method of fixing given in the description with clauses R.1.5-6.

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    40/102

    FITTING AND ACCESSORIES (N0)

    R6 Fittings (clock , alarm bells)

    Accessories (socket outlets)

    R7 Pendant fittings NO length stages 300mm

    R8 Accessories - NO (in gang)

    a) rated capacity

    b) type

    c) no. accessories in each gang

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    41/102

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    42/102

    Switch socket outlet & socket

    point.

    Different Types for different

    capacity. SMM2 Refer to clause R.18.2

    (No.)

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    43/102

    SOCKET

    Power installation

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    44/102

    TV Co-axial socket outlet 1 gang 15A Switched

    Socket Outlet

    13A 2 gangswitched socket outlet

    13A 2 gang switched

    socket outlet with neon

    Power installation

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    45/102

    13A 2 gangs/s/o

    13A 2 gangs/s/o with neon

    Bell push switch

    Telephonesocket

    Power installation

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    46/102

    Fluorescents Lights and

    emergency light.

    Specification refer to

    manufacturer.

    SMM2 Refer to clause

    R.4.1(NO.)

    Lighting installation

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    47/102

    Fluorescent light

    KELUAR emergency sign

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    48/102

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    49/102

    Fan, MATV point and

    telephone point.

    SMM2 Refer to clause R.6,R.22.1 (NO.)

    Electrical appliance

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    50/102

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    51/102

    CONDUIT, TRUNKING AND CABLE TRAYS

    R9.1 Conduit and fittings. (m)

    a) type

    b) size

    c) specificationd) saddles & crampets pattern

    e) nature of background

    Except for final sub-circuit (measured overall conduit fittings)

    e.g tees, elbows, bend, cover plates, bushes, locknuts, nipples,stopping-lugs and reducing bushes), short running lengths and

    branches).

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    52/102

    PVC Conduit

    Conduit, trunking and metal tray

    ELECTRICAL INSTALLATIONS

    Galvanized Iron Conduit

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    53/102

    CONDUIT, TRUNKING AND CABLE TRAYS

    Classification :

    a) conduits fixed to surfaces

    b) conduits fixed in chases

    c) conduits embedded in floor screeds

    d) conduits embedded in concrete

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    54/102

    Conduit inside the suspended ceiling

    Conduit, trunking and metal tray

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    55/102

    Conduit, trunking and metal tray

    ELECTRICAL INSTALLATIONS

    Conduits fixed in chases

    brickwall

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    56/102

    Drilling works to chases wiring to the brickwall

    Conduit, trunking and metal tray

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    57/102

    CONDUIT, TRUNKING AND CABLE TRAYS

    R9.2 Special boxes, adaptable box, floor trap boxes,

    purposes made boxes, rectangular junction boxes required fordrawing in cables , flameproof boxes & expansion joint

    ( N0 EXTRA OVER)

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    58/102

    Munson ring

    Conduit support

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    59/102

    Conduit Adaptor

    (Isometric to PG Thread)

    Coupling

    Flange Coupling

    Long Nipple Short Nipple

    Solid Male

    BendReducer

    Conduit assecories

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    60/102

    Stainless

    Steel ChainLead

    WasherNeoprene

    Washer Stopping Plug

    Locking Ring Locknut Female BushMale Bush

    Conduit assecories

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    61/102

    Terminal Box Angle Box Through Box

    Inspection Elbow Branch Two

    Way BoxTee Box

    Conduit assecories

    ELECTRICAL INSTALLATIONS

    El i l d i

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    62/102

    Electrical conduit

    ELECTRICAL INSTALLATIONS

    M t l

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    63/102

    CONDUIT, TRUNKING AND CABLE TRAYS

    R9.3 Flexible conduits & extensible conduit (NO)

    i) size ii) overall length iii) type

    iv) size & type termination glands

    R9.4 Components & special boxes (N0)

    ( for making connection of conduit in trunking )

    Measurement rules

    ELECTRICAL INSTALLATIONS

    M t l

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    64/102

    CONDUIT, TRUNKING AND CABLE TRAYS

    R10.1 Trunking (m)

    i) type

    ii) size

    iii) no & size compartment

    iv) method of connecting

    R10.2 Fitting (NO) and EXTRA OVER

    R10.3 Connection between trunking & item of equipment &control gear use flanges and or the forming of apertures

    (N0)

    Measurement rules

    ELECTRICAL INSTALLATIONS

    T ki

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    65/102

    A rectangular metal made system

    that either horizontally or vertically

    fixed to wall.

    A good mechanical protection.

    Made from 18 gauge steel sheet. Available size:

    50mm x 50mm

    70mm x 100mm

    150mm x 75mm

    150mm x 150mm

    Equipped with bend, tee, and

    junction.

    Trunking

    ELECTRICAL INSTALLATIONS

    T ki

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    66/102

    Cable and trunking use for connection from main to distribution board or

    distribution board to socket. Size and Material.

    SMM2 Refer to clause R.15, R.9 (M)

    Trunking

    ELECTRICAL INSTALLATIONS

    T ki fitti

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    67/102

    90r Gusset Bend

    Front Lid(Traditional)

    90r Gusset Bend

    Inside Lid

    (Traditional)

    45r BendOutside Lid

    45r Bend

    Front Lid

    90r Gusset Bend

    Front Lid45r Bend

    Inside Lid

    Trunking fittings

    ELECTRICAL INSTALLATIONS

    Measurement rules

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    68/102

    CONDUIT, TRUNKING AND CABLE TRAYS

    R10.4 Pin racks (NO)

    i) type; and ii) size

    R11.1 Busbar Trunking (m)

    Clauses R.10.1

    a) type; b) width; c) rated capacity; and

    d) method of capacity

    R11.2 Tap-off units, feeder units, fire barries & the like (NO)

    Measurement rules

    ELECTRICAL INSTALLATIONS

    Measurement rules

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    69/102

    CONDUIT, TRUNKING AND CABLE TRAYS

    R12.1 Trays (m)

    i) type; ii) width; and iii) method of jointing

    R12.2 Stools (NO)

    i) type; and ii) size

    R12.3 Fitting (NO and EXTRA OVER )

    Measurement rules

    ELECTRICAL INSTALLATIONS

    Cable tray

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    70/102

    Cable tray

    ELECTRICAL INSTALLATIONS

    Measurement rules

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    71/102

    Measurement rules

    ELECTRICAL INSTALLATIONS

    Measurement rules

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    72/102

    CABLES

    R15.1 Cables (m)

    measured as the net length of the conduit, trunking or tray.

    other cable measured as fix (without any allowance for sag)between boxes, equipment control gear, fittings, accessories

    etc.

    except for final sub-circuits.

    Measurement rules

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    73/102

    The conductors used in domestic installations are called cables andconsist of a conductor of low resistance such as copper and aluminiumsurrounded by an insulator of high resistance such as rubber andplastic.

    Cable sizes are known by the nominal cross sectional area of theconductor and up to 2.5mm2 are usually of one strand.

    Flexible PVC insulated cord

    Types of wire

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    74/102

    Types of wire

    ELECTRICAL INSTALLATIONS

    Measurement rules

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    75/102

    Cables

    R15.2 Cables (m)

    i) type ii) size iii) classification

    CLASSIFICATION

    a) drawn into conduits or ducts

    b) laid or drawn into trunking

    c) laid or drawn into trunking and laced into ciucuit

    d) fixed to surfaces

    e) wrapped around pipework

    f) laid in trenches

    g) fixed to insulators in overhead lines

    h) suspended from catenary cables

    R15.4 Cable joints (NO)

    R15.5 Line taps (NO)

    i) size ii) type of cable iii) shrouds (type)

    Measurement rules

    ELECTRICAL INSTALLATIONS

    Cable classification

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    76/102

    Underground cable Fixed to wall Fixed in ceiling

    Cable classification

    ELECTRICAL INSTALLATIONS

    Measurement rules

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    77/102

    CABLE

    R15.6 Cable termination glands (NO)

    i) type & size of cable ii) type of gland

    R15.7 Conduit: boxes, adaptable boxes & the like used with

    cable termination glands (NO - separately)

    i) type ii) size of cable iii) joint-boxes, sealing boxes (type)

    R16.1 Components for supporting cable given in the descriptionof the cable stating type and spacing.

    Alternatively, components of combination system (NO)

    Measurement rules

    ELECTRICAL INSTALLATIONS

    Measurement rules

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    78/102

    CABLE

    R17 Connections to public mains, making good public highway and

    other work which may only carried out by Public Undertaking

    or Local Authority PROVISIONAL SUM

    Measurement rules

    ELECTRICAL INSTALLATIONS

    Measurement rules

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    79/102

    FINAL SUB-CIRCUITS

    R18.1 Distribution sheets and drawing showing layout shall be given.

    R18.2 Points (NO)

    i) cable & conduit installations

    ii) ampere rating

    iii) classification

    CLASSIFICATION

    a) Lighting points: one way or two way

    b) Socket or switch socket pointsc) Immersion heater points, cooker outlet points etc.

    Measurement rules

    ELECTRICAL INSTALLATIONS

    Measurement rules

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    80/102

    Measurement rules

    ELECTRICAL INSTALLATIONS

    Measurement rules

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    81/102

    EARTHING

    R19.1 Tapes for earthing (m)

    i) size; ii) type; andiii) type & spacing of saddles, cleats, clip holdfasts & the like

    R19.2 Conductor connections & junctions (NO)

    i) type; and ii) size

    R19.4 Test clamps (NO)

    i) type ii) size; and iii) method of connecting

    Measurement rules

    ELECTRICAL INSTALLATIONS

    Earthing installation

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    82/102

    Typical earth-electrode pit

    Earthing using cooper stripEarthing & Bonding requirement

    Earthing installation

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    83/102

    Earth electrode pit

    Cooper strip

    Measurement rules

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    84/102

    EARTHING

    R19.5 Earth electrodes (NO)

    i) type ii) size; and iii) driving electrode into ground

    R19.6 Air termination points (NO)

    i) type ii) size; and iii) method of connecting

    ELECTRICAL INSTALLATIONS

    Lightning protection installation

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    85/102

    Air Termination (NO.)

    Copper Tape Roof Conductor. (M)

    SMM2 Refer to clause R.19.6, R.22.2, R.19.

    Lightning protection installation

    ELECTRICAL INSTALLATIONS

    Measurement rules

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    86/102

    ANCILLARIES

    R20 Loose keys, tools, spares and the like (NO separately)

    i) type; and ii) quantity

    Rack for holding tools (NO)

    ELECTRICAL INSTALLATIONS

    Measurement rules

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    87/102

    SUNDRIES

    R22.1 Marking the position of holes, mortice, chases & the like

    (ITEM)

    R22.2 General earth bonding & earthing (ITEM)

    R22.3 Disconnecting, setting aside & refixing equipment (ITEM)

    R22.4 Temporary operating each installation (ITEM)

    R22.5 Testing each installation (ITEM)R22.6 Preparing plans or diagrams of the installations (ITEM)

    ELECTRICAL INSTALLATIONS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    88/102

    2009 Sarajul Fikri Mohamed

    Summary of

    measurement rules

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    89/102

    ITEM METHOD OF MEASUREMENT UNIT CLAUSE

    1) Main Installation

    sub main cables stating the type and size m R.2.1.c

    meter panel shall be described with no R.4.2

    manufacture's detail

    specification

    distribution board ditto no

    cables stating the type, size and the m R.15.2

    location ( net length )

    conduits stating the type, external size m R.9.1

    and the location

    sundries

    mark the holes & etc. stating the nature of works & item R.22.1

    relevant particulars

    general bonding each installation item R.22.2

    testing ditto and stating particulars of item R.22.5

    any special insurance cover

    required by Employer

    SUMMARY OF MEASUREMENT RULES

    SUMMARY OF MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    90/102

    ITEM METHOD OF MEASUREMENT UNIT CLAUSE

    2) PowerInstallation

    fittings & accessories

    socket unless stated all shall be enumerated no R.6.1

    cables stating the type, size and the m R.15.2

    location ( net length )

    conduits stating the type, external size m R.9.1

    and the location

    final sub-circuit stating the ampere rating no R.18.2

    sundries

    mark the holes & etc. stating the nature of works & item R.22.1

    relevant particulars

    general bonding each installation item R.22.2testing ditto and stating particulars of item R.22.5

    any special insurance cover

    required by Employer

    SUMMARY OF MEASUREMENT RULES

    SUMMARY OF MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    91/102

    ITEM METHOD OF MEASUREMENT UNIT CLAUSE

    3) Lighting Installation

    fittings & accessories

    switch unless stated all shall be enumerated no R.6.1

    cables stating the type, size and the m R.15.2

    location ( net length )

    conduits stating the type, external size m R.9.1

    and the location

    final sub-circuit stating the ampere rating no R.18.2

    sundries

    mark the holes & etc. stating the nature of works & item R.22.1

    relevant particularsgeneral bonding each installation item R.22.2

    testing ditto and stating particulars of item R.22.5

    any special insurance cover

    required by Employer

    SUMMARY OF MEASUREMENT RULES

    SUMMARY OF MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    92/102

    ITEM METHOD OF MEASUREMENT UNIT CLAUSE

    4) Electrical Appliances

    fittings & accessories

    switch unless stated all shall be enumerated no R.6.1

    cables stating the type, size and the m R.15.2

    location ( net length )

    conduits stating the type, external size m R.9.1

    and the location

    final sub-circuit stating the ampere rating no R.18.2

    sundries

    mark the holes & etc. stating the nature of works & item R.22.1

    relevant particulars

    general bonding each installation item R.22.2

    testing ditto and stating particulars of item R.22.5

    any special insurance cover

    required by Employer

    SUMMARY OF MEASUREMENT RULES

    SUMMARY OF MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    93/102

    ITEM METHOD OF MEASUREMENT UNIT CLAUSE

    5) Earthing System

    Installation

    cables given in accordance with clause R.15 m R.19.1

    copper tape stating the type & size m R.19.1

    conductor connection stating the type & size no R.19.2

    test clamps ditto & method of connecting no R.19.4earth electrodes ditto & driving electrodes into no R.19.5

    groundshall be given

    air termination stating the type & size & method of no R.19.6

    connection

    sundries

    mark the holes & etc. stating the nature of works & item R.22.1

    relevant particulars

    testing each installation and stating item R.22.5

    particulars ofany special insurance

    cover required by Employer

    SUMMARY OF MEASUREMENT RULES

    SUMMARY OF MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    94/102

    ITEM METHOD OF MEASUREMENT UNIT CLAUSE

    6) Builder's Work

    excavating trenches for cables and pipe ducts n. exc. m R.24.1

    55mm nominal size refer to clause

    D.12.9 & exc. 55mm refer to clause

    V.2cable covers stating the type & size m R.24.2

    SUMMARY OF MEASUREMENT RULES

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    95/102

    2009 Sarajul Fikri Mohamed

    Taking off list

    Taking off list

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    96/102

    2009 Sarajul Fikri Mohamed

    Preamble

    General notes

    Main installation

    Meter panel (no)

    Main Switch Board (no)

    Distribution Board (no) Main & sub main cabling (m)

    Conduit and trunking (m)

    Sundries (no)

    Testing (item)

    Power installation

    Fittings and accessories

    Socket (no)

    Point (no)

    Cables (m)

    Conduits (m)

    Final sub circuit (no) Sundries

    Mark the holes (item)

    General earth bonding (item)

    Testing (item)

    ELECTRICAL INSTALLATIONS

    Taking off list

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    97/102

    2009 Sarajul Fikri Mohamed

    Lighting installation Fittings & accessories Swicth (no) Point (no)

    Final sub-circuit (no)

    Sundries Mark the holes (item) General earth bonding (item) Testing (item)

    Lightning installation Copper tape (no) Test clamps (no) Air termination (no) Earth chamber(no)

    SundriesMark the holes (item) Testing (item)

    Builders work Excavation trenches (m)

    ELECTRICAL INSTALLATIONS

    TAKING OFF LISTS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    98/102

    TAKING OFF LISTSDOMESTIC HOUSING SINGLEPHASE

    1.Main Installation- sub main cables m

    - meter panel no

    - distribution board no

    - cables m- conduits no

    - sundries

    = mark holes item

    = general bonding item

    = testing item

    TAKING OFF LISTS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    99/102

    2. Power Installation- fitting & accessories

    = socket no

    - cables m

    -conduits m

    - final sub-circuit no

    - sundries

    = mark holes item

    = general bonding item

    = testing item

    TAKING OFF LISTSDOMESTIC HOUSING SINGLEPHASE

    TAKING OFF LISTS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    100/102

    3. Lighting Installation- fittings & accessories

    = switch no

    - cables m- conduits m

    - final sub circuit no

    - sundries

    = mark holes item

    = general bonding item

    = testing item

    TAKING OFF LISTSDOMESTIC HOUSING SINGLEPHASE

    TAKING OFF LISTS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    101/102

    4. Electrical Appliances- fitting & accessories

    = switch no

    - cables m

    - conduits m- final sub circuit no

    - sundries

    = mark holes item

    = general bonding item

    = testing item

    TAKING OFF LISTSDOMESTIC HOUSING SINGLEPHASE

    TAKING OFF LISTS

  • 8/2/2019 Construction Measurement III Week 4 Electrical Single Phase

    102/102

    5. Earthing System Installation- cables m

    - copper tape no

    - test clamps no- conductor connection no

    - earth electrodes no

    - air termination no

    - sundries

    = mark holes item

    = testing item

    O S SDOMESTIC HOUSING SINGLEPHASE