6
REG.004.00 (11/12) CONSTRUCTION INSPECTION CHECKLIST - (FOR STAFF USE ONLY ) ENVIRONMENTAL RESOURCE PERMITTING Permit No. CT # Project: Name of Inspector: Date of Inspection: (mm/dd/year) The verification questions listed below are to be answered by District staff during inspection of the project. If needed, notations, references or explanations should be supplied on attached reference pages. 1. Construction Status: ( ) Not started ( ) Underway ( ) Complete Reinspection: ( )Yes ( )No Comments: 2. CONSTRUCTION OBSERVATIONS : At the time of inspection, did the following components of the surface water management system appear to be underway substantially in accordance with the permit; and any minor deviations from the permitted construction plans and information are not expected to prevent the system from functioning in compliance with the applicable District permitting rules? A. Wells - Are wells located within project area or in the path of Construction? Are wells remaining on the site properly protected and/or permitted? B. Construction phase surface water management – Are erosion and sediment control measures in place and functioning properly? Project activities and/or dewatering activities are not causing or contributing to erosion and sediment deposition or flooding offsite, wetland impacts, or water quality violations? ( ) Yes (Explain) ( ) No ( ) N/A ( ) Yes ( ) No (Explain) ( ) N/A ( ) Yes ( ) No (Explain) ( ) N/A C. Discharge structures - Are the locations, dimensions of weirs, orifices, gates, pumps, pipes, and oil and grease skimmers in accordance with permitted design? ( ) Yes ( ) No (Explain) ( ) N/A D. Under drain filters, or exfiltration trenches - Are the locations, dimensions of clean-outs, collector pipes, connections to control structures and points of discharge downstream in accordance with permitted design? ( ) Yes ( ) No (Explain) ( ) N/A E. Storage areas for treatment and attenuation (wet or dry, as permitted) - Are the dimensions, water levels, contours or cross-sections sufficient to contain storage volume as designed? ( ) Yes ( ) No (Explain) ( ) N/A F. System grading - Are the dimensions, contours, final grades or cross- sections of runoff around or through the new system in accordance with permitted design? ( ) Yes ( ) No (Explain) ( ) N/A G. Diversions/Conveyances/ Easements - Are the dimensions, contours, final grades or cross-sections of system facilities used to divert or convey runoff around or through the new system in accordance with permitted design? ( ) Yes ( ) No (Explain) ( ) N/A H. Floodplain Compensation Areas – Identified with no impacts? ( ) Yes ( ) No (Explain) ( ) N/A I. Wetland mitigation or restoration areas - Are construction or restoration activities underway in accordance with permitted design? ( ) Yes ( ) No (Explain) ( ) N/A 26991.015 376148 Fishhawk Ranch W Phase 3A-C Matt Worner 07/28/2015 Site visit performed. Site is under construction with no problems noted. Portions of 3A are complete, 3B is under construction, 3C has not started. Reset Print Save As

CONSTRUCTIONINSPECTION CHECKLIST - FOR STAFF USE …

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CONSTRUCTIONINSPECTION CHECKLIST - FOR STAFF USE …

REG.004.00 (11/12)

CONSTRUCTION INSPECTION CHECKLIST - (FOR STAFF USE ONLY) ENVIRONMENTAL RESOURCE PERMITTING

Permit No. CT # Project:

Name of Inspector:

Date of Inspection: (mm/dd/year)

The verification questions listed below are to be answered by District staff during inspection of the project. If needed, notations, references or explanations should be supplied on attached reference pages.

1. Construction Status: ( ) Not started ( ) Underway ( ) Complete Reinspection: ( )Yes ( )No

Comments:

2. CONSTRUCTION OBSERVATIONS: At the time of inspection, did the following components of the surface water management system appear to be underway substantially in accordance with the permit; and any minor deviations from the permitted construction plans and information are not expected to prevent the system from functioning in compliance with the applicable District permitting rules?

A. Wells - Are wells located within project area or in the path of Construction?

Are wells remaining on the site properly protected and/or permitted?

B. Construction phase surface water management – Are erosion and sediment control measures in place and functioning properly? Project activities and/or dewatering activities are not causing or contributing to erosion and sediment deposition or flooding offsite, wetland impacts, or water quality violations?

( ) Yes (Explain) ( ) No ( ) N/A ( ) Yes ( ) No (Explain) ( ) N/A ( ) Yes ( ) No (Explain) ( ) N/A

C. Discharge structures - Are the locations, dimensions of weirs, orifices, gates, pumps, pipes, and oil and grease skimmers in accordance with permitted design?

( ) Yes ( ) No (Explain) ( ) N/A

D. Under drain filters, or exfiltration trenches - Are the locations, dimensions of clean-outs, collector pipes, connections to control structures and points of discharge downstream in accordance with permitted design?

( ) Yes ( ) No (Explain) ( ) N/A

E. Storage areas for treatment and attenuation (wet or dry, as permitted) - Are the dimensions, water levels, contours or cross-sections sufficient to contain storage volume as designed?

( ) Yes ( ) No (Explain) ( ) N/A

F. System grading - Are the dimensions, contours, final grades or cross-sections of runoff around or through the new system in accordance with permitted design?

( ) Yes ( ) No (Explain) ( ) N/A

G. Diversions/Conveyances/ Easements - Are the dimensions, contours, final grades or cross-sections of system facilities used to divert or convey runoff around or through the new system in accordance with permitted design?

( ) Yes ( ) No (Explain) ( ) N/A

H. Floodplain Compensation Areas – Identified with no impacts?

( ) Yes ( ) No (Explain) ( ) N/A

I. Wetland mitigation or restoration areas - Are construction or restoration activities underway in accordance with permitted design?

( ) Yes ( ) No (Explain) ( ) N/A

26991.015 376148 Fishhawk Ranch W Phase 3A-C

Matt Worner 07/28/2015

✔ ✔

Site visit performed. Site is under construction with no problems noted. Portions of 3A are complete, 3B is under construction, 3C has not started.

Reset Print Save As

Page 2: CONSTRUCTIONINSPECTION CHECKLIST - FOR STAFF USE …

REG.004.00 (11/12)

CONSTRUCTION INSPECTION CHECKLIST - (FOR STAFF USE ONLY) ENVIRONMENTAL RESOURCE PERMITTING

REFERENCE INSPECTION NOTES, SPECIFIC COMMENTS & ATTACHMENTS

(i.e., file reference information, site observations, measurements, photos, other field notes, etc.

REFERENCE COMPONENT NO.: DECRIPTION OF NOTES, DRAWINGS, SKETCHES & OTHER DOCUMENTATION RELATIVE TO THIS INSPECTION REPORT

Inspection follow-up items needed:

3. SOC/As- built Request letter? ( ) Yes ( ) No 6. Expiration Letter? ( ) Yes ( ) No

4. Construction Insp. Letter? ( ) Yes ( ) No 7. Compliance Engineer / ES? ( ) Yes ( ) No

5. Copy Engineer of Record? ( ) Yes ( ) No 8. Permit Condition letter? ( ) Yes ( ) No

Reset Print Save As

Page 3: CONSTRUCTIONINSPECTION CHECKLIST - FOR STAFF USE …

Photo.form 7/11/13

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT REGULATORY SUPPORT BUREAU

INSPECTION / INVESTIGATION REPORT PHOTOGRAPHS

Inspector: Date: CT: Permit: Comments:

Comments:

Matt Worner 07/28/2015 376148 26991.015

Looking N at Pond 400, CS in SE corner

Looking E along Water Color Dr, just east of Boyette and Water Color.

Page 4: CONSTRUCTIONINSPECTION CHECKLIST - FOR STAFF USE …

Photo.form 7/11/13

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT REGULATORY SUPPORT BUREAU

INSPECTION / INVESTIGATION REPORT PHOTOGRAPHS

Inspector: Date: CT: Permit: Comments:

Comments:

07/28/2015 376148

Looking E at Pond 100. MES in NE corner

Weir wall in SW corner of Pond 100

Page 5: CONSTRUCTIONINSPECTION CHECKLIST - FOR STAFF USE …

Photo.form 7/11/13

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT REGULATORY SUPPORT BUREAU

INSPECTION / INVESTIGATION REPORT PHOTOGRAPHS

Inspector: Date: CT: Permit: Comments:

Comments:

07/28/2015 376148

Looking SE at Pond 300. MES on west bank

CS in NE corner of Pond 300

Page 6: CONSTRUCTIONINSPECTION CHECKLIST - FOR STAFF USE …

Photo.form 7/11/13

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT REGULATORY SUPPORT BUREAU

INSPECTION / INVESTIGATION REPORT PHOTOGRAPHS

Inspector: Date: CT: Permit: Comments:

Comments:

07/28/2015 376148

Looking north along Village Center Dr, just west of Pond 300, towards complete Phase 1

Save As Reset Form