Upload
others
View
15
Download
0
Embed Size (px)
Citation preview
Consultancy Services HighlightsStefan R. Bergström, Howard Stevens, Lars Johansson, Jennifer ArnessonMay 29, 2017, Sunlight Hotel and Conference
• Overview Consultancy Services• Vision
• Five business units – Global presence
• Case studies: • Waste Treatment utilizing the THOR Technology - Experience and Innovation
• Classification and clearance – Proven world leading methodology allowing major customer savings
Content
Studsvik 70th Anniversary 2May 29, 2017
Vision
Consultancy Services will become the preferred specialised global supplier of advanced technical, design and engineering services within its five business units
Studsvik 70th Anniversary 3May 29, 2017
Vision ConsultancyServices
Studsvik 70th Anniversary
Overview Consultancy Services - Five business units
4
Global presence in key markets:
• Nordic Markets
• Europe
• USA
• China
• Middle East - Kuwait, Qatar, UAE
• Japan
• Korea
Business AreaConsultancy
Services
Waste Treatment Technologies
Facility Decommissioning
Facility Operations
Facility Licensing & Planning
Environmental
May 29, 2017
Vision ConsultancyServices
Repositories – What Studsvik offers
Pre Operational Operational Post Closure
Establishment of waste management
Framework
Waste inventory evaluation and
characterisation
Waste acceptance criteria (WAC)
Approval Licencing and regulatory
oversight
Assessment of Safety and Environmental
impact
Operational management
Monitoring and surveillance
Management of Lifetime Records
“Specialist capabilities to support repository developments worldwide”
Studsvik 70th Anniversary 5May 29, 2017
Vision ConsultancyServices
Environmental
“Providing innovative solutions in the oil & gas, petrochemical, mining and ore/mineral extraction & processing sectors, offering a full cradle to grave NORM waste management service for our customers”
Studsvik 70th Anniversary 6May 29, 2017
Vision ConsultancyServices
Facility Decommissioning
“Studsvik is a leading supplier of nuclear decommissioning services”
“Utilizing unmatched decommissioning planning expertise to ensure any and all decommissioning projects are completed safely, efficiently, reliably, and in the most cost effective manner”
IInitial
Planning
IIDefueling
IIIInventory &
Charac-terization
IVDeconta-mination
VDismant-
ling
VIWaste
Manage-ment
VIIClearance & Demolition
VIIISite
Clearan-ce
Studsvik 70th Anniversary 7May 29, 2017
Vision ConsultancyServices
Facility Operations
“Studsvik is a leading supplier of licensed and trained personnel to support the short, mid and long-term staffing needs of the nuclear industry”
“With over 50 years’ experience in radiological and nuclear markets, we facilitate seamless transitions into any role or customer need”
Decommissioning and dismantling execution
Studsvik 70th Anniversary 8May 29, 2017
Vision ConsultancyServices
“Studsvik delivers global engineering, design, and analysis with expertise in the implementation of thermal and chemical processes centred around our patented technologies”
“We build long term relationships by delivering innovative, safe, reliable, and environmentally beneficial solutions for our customers”
Waste Treatment Technology
1996Studsvik Start
THOR Demonstration
1999Studsvik
Erwin Facility Startup
2002DOE
Demonstrations
2005 IWTU Demonstrations
Start
2008IWTUDesign
2009AREVA
Demonstrations
2012AREVA
PreliminaryDesign
2015AREVA
Detailed Design
2012IWTU
Startup
2017Hot
Startup
2020AREVAStartup
THOR 2.0Published
2016
2009Tank 48
Studsvik 70th Anniversary 9May 29, 2017
Vision ConsultancyServices
• Waste Treatment utilizing the THOR Technology - Experience and Innovation • Howard Stevens, VP WTT, based in the U.S.
• Classification and clearance – Proven world leading methodology allowing major customer savings• Lars Johansson, VP, based in Sweden• Jennifer Arnesson, Consultant, based in Sweden
Two Case Studies
Studsvik 70th Anniversary 10May 29, 2017
Waste Treatment Technology Matrix
ModularTHOR
Traditional THOR
THERMAL In-drum Pyrolysis
Metal Treatment
Hazardous Waste
Treatment
Freeze-Tec
FUTURE IPDevelopment
THOR 2.0
(NEW)
NEW Developments
Waste TreatmentTechnologies
Classification and clearance
Studsvik 70th Anniversary 11May 29, 2017
THOR Key Development Milestones
1996Studsvik Start THOR
Demonstration
1999Studsvik Erwin Facility Startup
2002DOE Demonstrations
2005 IWTU Demonstrations
Start
2008IWTUDesign
2009AREVA
Demonstrations
2012AREVA
PreliminaryDesign
2015AREVA
Detailed Design
2012IWTU
Startup
2017IWTU Hot
Startup
2020Anticipated
AREVAStartup
2016THOR 2.0
Patent Published
2009Tank 48
Studsvik 70th Anniversary 12May 29, 2017
Waste TreatmentTechnologies
Classification and clearance
• Combined experience of over 50 years working with THOR
• More than 12 dedicated engineers with a focus on innovative solutions for radioactive waste treatment and volume reduction
• Experts in… • Fluid Bed Operations
• Engineering scale testing
• MEB development/analysis
• Detailed design of waste processes
• Design of vessels, fluidization, and other equipment
• Environmental off gas treatment options for regulatory compliance.
Expertise
Studsvik 70th Anniversary 13May 29, 2017
Waste TreatmentTechnologies
Classification and clearance
Research and Development ExperiencePilot Plant Design and Operations
14
Waste TreatmentTechnologies
Classification and clearance
History of Plant Experience
CWI - IWTU• Flowsheet: THOR steam reforming, dual FBSR in series• Duration: 4 Series, ~4.0 months, 2002 to 2006• Scale-up: 3” to 6” to 15” to 48” (10x)• Location: STAR Center and Hazen Research
15
Waste TreatmentTechnologies
Classification and clearance
CURRENT AND FUTURE DEPLOYMENT
Studsvik 70th Anniversary
Idaho Waste Treatment Unit – US DOE
Japan – Organic Waste Treatment
US DOE – Hanford Site China – Organic Waste TreatmentFRANCE - AREVA
Nitrate Waste Treatment
16May 29, 2017
Waste TreatmentTechnologies
Classification and clearance
• Innovative processes such as THermal Organic Reduction (THOR) using fluid steam reforming
• Ability to design and demonstrate the technology through engineering scale operations
• Optimization of treatment process for various low and intermediate level waste forms
• Understanding of final waste disposal requirements
• Development of solutions for volume reduction of various waste types
• Shortened project time by using Studsvik’s lessons learned
• Equipment optimization and cost saving for design and fabrication
• Turnkey option for waste processing process equipment
• Long-term engineering services for development and deployment of THOR or other technologies
Value Offered by Studsvik Waste Treatment Technologies
Studsvik 70th Anniversary 17May 29, 2017
Waste TreatmentTechnologies
Classification and clearance
Studsvik Decommissioning
May 29, 2017 Studsvik 70th Anniversary
Radiological services
Project management &Strategy and planning
Licensing,Safety assessments &Environmental
Waste treatmentR&D Technologies
Waste TreatmentTechnologies
Classification and clearance
May 29, 2017 Studsvik 70th Anniversary
Radiological Services -Risk mitigation from the start
”Radiological characterisation is undoubtedly one of the key
factors for any successful decommissioning project.“
Waste TreatmentTechnologies
Classification and clearance
May 29, 2017 Studsvik 70th Anniversary
How do we estimate radioactive inventories?
Waste TreatmentTechnologies
Classification and clearance
May 29, 2017 Studsvik 70th Anniversary
Radiological Services -Modelling approach to activity inventories
Neutron Flux- MCNP
Core inventory- Origen-S- SNF
Neutron induced activity – Structural mat.- FISPACT
Activation of coolant- CoolAct
Activated corrosion products- CrudAct
Fuel leakage- DFL
Activity in systems and buildings
Commercial codeSelf-developed codes
Waste TreatmentTechnologies
Classification and clearance
May 29, 2017 Studsvik 70th Anniversary
What can we learn based on the estimated radioactive inventory?
Waste TreatmentTechnologies
Classification and clearance
May 29, 2017 Studsvik 70th Anniversary
Radiological Services -Estimation of radioactive releases
Waste TreatmentTechnologies
Classification and clearance
May 29, 2017 Studsvik 70th Anniversary
Radiological Services -Planning and optimization when decommissioning
Waste TreatmentTechnologies
Classification and clearance
May 29, 2017 Studsvik 70th Anniversary
How do we optimize the process of free release of building structures?
Waste TreatmentTechnologies
Classification and clearance
May 29, 2017 Studsvik 70th Anniversary
Radiological Services -Free release
Radiological characterisation
Few measurements
Adaptive approach to clearance
Preferred supplier for certifying and education of staff for clearance of
materials/buildings and soil according to regulations
Waste TreatmentTechnologies
Classification and clearance
Studsvik 70th Anniversary 27May 29, 2017