14
Site Design Associates Consulting Engineering and Land Planning 23 Whitney Way – Topsham, Maine 04086 Phone: (207) 449-4275 email: [email protected] August 1, 2016 Alex Jaegerman Director of Planning and Development Town of Yarmouth 200 Main Street Yarmouth, Maine 04096 RE: Proposed Drive Through 936 Route 1 Minor Site Plan Application Dear Planning Board Members: On behalf of C.N. Brown Co., Site Design Associates is pleased to submit a Minor Site Plan application and supporting documentation for review. As we have discussed with you, C.N. Brown Company is proposing to add a drive up window and the associated site improvements at the site of the existing convenience store and Dunkin Donuts take out location. The project will involve the construction of a 5.33 ft x 12 ft bumpout for the pick up window, construction of a service lane and bypass lane around the building, relocation of the dumpster and propane tank enclosure, and associated grading and drainage improvements. We have included 8 copies of the following information for the staff review: Town of Yarmouth Minor Site Plan Review Application Letter of agent authorization Proposed lighting catalog cuts The following drawings ( 4 full size sets and 4 reduced sets) : o C-100 – Existing Conditions Plan o C-101 –Site Plan o C-102 – Grading, Drainage, and Erosion Control Plan o C-300 – Erosion and Sedimentation Control Details and Specifications o C-301 – Site Details o C-302 – Site details o A-1 – Proposed Floor Plan o A-5 – Exterior Elevations

Consulting Engineering and Land Planning - Yarmouth, …27541806-6670-456… ·  · 2016-08-02Consulting Engineering and Land Planning 23 ... associated site improvements at the

Embed Size (px)

Citation preview

Site Design Associates Consulting Engineering and Land Planning

23 Whitney Way – Topsham, Maine 04086

Phone: (207) 449-4275 email: [email protected]

August 1, 2016

Alex Jaegerman Director of Planning and Development Town of Yarmouth 200 Main Street Yarmouth, Maine 04096 RE: Proposed Drive Through

936 Route 1

Minor Site Plan Application

Dear Planning Board Members:

On behalf of C.N. Brown Co., Site Design Associates is pleased to submit a

Minor Site Plan application and supporting documentation for review. As we have discussed with you, C.N. Brown Company is proposing to add a drive up window and the associated site improvements at the site of the existing convenience store and Dunkin Donuts take out location.

The project will involve the construction of a 5.33 ft x 12 ft bumpout for the pick

up window, construction of a service lane and bypass lane around the building, relocation of the dumpster and propane tank enclosure, and associated grading and drainage improvements. We have included 8 copies of the following information for the staff review:

• Town of Yarmouth Minor Site Plan Review Application

• Letter of agent authorization

• Proposed lighting catalog cuts

• The following drawings ( 4 full size sets and 4 reduced sets) : o C-100 – Existing Conditions Plan o C-101 –Site Plan o C-102 – Grading, Drainage, and Erosion Control Plan o C-300 – Erosion and Sedimentation Control Details and

Specifications o C-301 – Site Details o C-302 – Site details o A-1 – Proposed Floor Plan o A-5 – Exterior Elevations

Page 2 of 2 8/1/2016

P:\2015 projects\15-208-02 Yarmouth DD\coverletter08-01-16.doc

The project will result in approximately 4,980 sf of new drive and structure area. Accordingly, we have also enclosed a check in the amount of $498.00 for the application fee.

The convenience store with fuel pumps was originally approved by the town in

March of 2000. Subsequent to that the car wash was added in 2004. The project is subject to a Maine DOT Traffic Movement Permit (TMP), and an application for modification of the permit to accommodate the drive through has been submitted to Maine DOT. The project meets the Maine DOT requirement for drive through queue length, which is 15 vehicles from the pick up window and 12 vehicles form the order board.

The project as designed will maintain stormwater runoff patterns similar to the

existing conditions. Given the relatively minimal increase in impervious area, we do not anticipate an impact on the existing infrastructure.

As noted on the site plan, the project will impact a portion of the existing

landscape beds behind the building. We are currently working with our landscape architect to evaluate whether the plant materials can be salvaged and relocated or whether new materials should be installed. We will be prepared to report our findings when we meet with you and the review committee.

Please let me know when you have found the application complete, or if you

require additional information to find the application complete, so that we can undertake the public notification process on the appropriate form.

If you or staff have any questions or comments, please do not hesitate to contact me. Sincerely, Site Design Associates

Tom Saucier, P.E. President

*120F*

*101

D*

*101

Q-3*

9'-0" CSTM

D/T COFFEE STATION

201A

101P-3

102A

96J

VDU

395Hand

Sink

412

ICE MACH.

409C

production: 776 lbs/24 hrs

storage: 536 lbs

READY ACCESS

BUMP-OUT 10 DRIVE-

THRU WINDOW

A1

JA

ME

S D

. S

MIT

H,

AR

CH

IT

EC

T, A

IA

HAND-OFF

OTGo

Mat

OTGo

Order Printer

CONDIMENTS

289

3' x 6'

FINISHING TABLE

563

560B

421A

7' X 15'WALK-IN FREEZER7' X 11'

WALK-INCOOLER

*480

*

421C

421B 421A

421L

541B 541C

541B 541B

421C

421L

420A 420B

Double

Hydrovection

OVEN

539B539B

A-5

JA

ME

S D

. S

MIT

H,

AR

CH

IT

EC

T, A

IA