INTRODUCTION TO THE
CONTAINER SHIPPING
INDUSTRY
University of Wisconsin MilwaukeePaper No. 11-1
National Center for Freight & Infrastructure Research & EducationCollege of Engineering
Department of Civil and Environmental EngineeringUniversity of Wisconsin, Madison
Author:Matthew E. H. PeteringDepartment of Industrial and Manufacturing EngineeringUniversity of Wisconsin Milwaukee
Principal Investigator:Alan J. HorowitzProfessor, Civil Engineering and Mechanics Department, University of Wisconsin Milwaukee
January 6, 2011
5/21/2018 Container Shipping Course Module
2/49
Introduction to the Container Shipping Industry
INTRODUCTION
This document contains images of all slides in a course module about the container
shipping industry and container port operations. Sources and additional content are found on the
note pages of the original slide presentation. The full presentation contains videos. Thispresentation is available upon request to Alan Horowitz, [email protected].
5/21/2018 Container Shipping Course Module
3/49
1
Introduction to theIntroduction to theContainer Shipping IndustryContainer Shipping Industry
Matthew E. H. Petering
Assistant Professor
Department of Industrial and Manufacturing Engineering
University of WisconsinMilwaukee
2010 Matthew E. H. Petering
2
OutlineOutline1. Introduction to maritime shipping
2. Introduction to container shipping
3. Container vessels and shipping lines
4. Seaports
5. Railway container transportation / facilities
6. Conclusion
5/21/2018 Container Shipping Course Module
4/49
3
OutlineOutline
1. Introduction to maritime shipping
2. Introduction to container shipping
3. Container vessels and shipping lines
4. Seaports
5. Railway container transportation / facilities
6. Conclusion
4
Introduction to Maritime ShippingIntroduction to Maritime Shipping Ships carry 99% of overseas trade in volume terms
and 62% in value terms, the remainder beingconveyed by air.
90% of all international trade moves by sea
Globally, the ton-miles of f reight moved by waterare more than twice the total ton-miles moved byroad, railway, and air put together.
http://www.greatlakes-seaway.com/en/aboutus/competitiveness.html
Water transportationis less costly andmore energy efficientthan other modes oftransport:
5/21/2018 Container Shipping Course Module
5/49
5
Maritime Shipping: Cargo TypesMaritime Shipping: Cargo Types
Dry Bulk(salt, grain, minerals, cement/gypsum, coal byproducts)
Liquid Bulk(crude oil, gasoline, chemicals, liquefied natural gas)
Break Bulk(steel, lumber, heavy machinery)
Automobile
Containerized(finished consumer goods)
6
Shippers (importers/exporters)(Nike, Wal-Mart, ExxonMobil, Toyota)
Shipping lines (ocean carriers, vessel operators)(Maersk Sealand, MSC, CMA CGM, Evergreen, Hapag Lloyd)
Seaport terminal operatorsMorton Salt (dry bulk)Shell Oil (liquid bulk)Toyota (automobile)Containerized cargo:
PSA Corporation (Singapore)Hutchison Port Holdings (Hong Kong)Dubai Ports World (United Arab Emirates)
APM Terminals (Netherlands, Denmark)
Railway operators(Union Pacific, BNSF, CSX, Norfolk Southern, CN, CP)
Trucking companies (motor vehicle carriers)
Maritime Shipping: Major PlayersMaritime Shipping: Major Players
5/21/2018 Container Shipping Course Module
6/49
7
OutlineOutline
1. Introduction to maritime shipping
2. Introduction to container shipping
3. Container vessels and shipping lines
4. Seaports
5. Railway container transportation / facilities
6. Conclusion
8
Container ShippingContainer Shipping
World fleet, Feb 2004: 3167 vessels, capacity = 6.5 mill ion 20-ft conts . (TEU)
World fleet, Dec 2008: 4661 vessels, capacity = 12.1 million 20-ft conts. (TEU)
Port of Long Beach
Port of Long Beach
5/21/2018 Container Shipping Course Module
7/49
9
Container ShippingContainer Shipping
Port of Long Beach Frankfurt am Main East
Port of Singapore
10
VesselsVessels
5/21/2018 Container Shipping Course Module
8/49
11
ContainersContainersContents
furniture, toys, footware, clothing, auto parts, electronics,computers, bananas, pineapples, foodstuffs, meat, fish
Sizes20' x 8' x 8.5' high (TEU)40' x 8' x 8.5' high (FEU)45' x 8' x 8.5' high
Capacity30 tons
Where are they manufactured?China
Typesstandard dry, high cube (9.5' high) (90%)refrigerated ("reefer") (5%)other: ventilated, open top, adjustable height (5%)
QuantityGlobal stock = 35 million (10 mill leased); 3.5 million produced in 2008
CostNew: $2000 - $20,000; lease rate $1 - $6 per day (5 year term)
12
ContainersContainers Hoisted, lowered, and secured at the corners
5/21/2018 Container Shipping Course Module
9/49
13
ContainersContainers Hoisted, lowered, and secured at the corners
Secured aboard vessels, trains, truck chassies using(1) twist locks
for securing adjacent containers in the same stack
(2) lashing rods (vessels only)for securing containers in high tiers directly to the deck
14
ContainersContainers Hoisted, lowered, and secured at the corners
Secured aboard vessels, trains, truck chassies using(1) twist locks
for securing adjacent containers in the same stack
(2) lashing rods (vessels only)for securing containers in high tiers directly to the deck
5/21/2018 Container Shipping Course Module
10/49
15
ContainersContainers Hoisted, lowered, and secured at the corners
Secured aboard vessels, trains, truck chassies using(1) twist locks
for securing adjacent containers in the same stack
(2) lashing rods (vessels only)for securing containers in high tiers directly to the deck
16
ContainersContainers Hoisted, lowered, and secured at the corners
Secured aboard vessels, trains, truck chassies using(1) twist locks
for securing adjacent containers in the same stack
(2) lashing rods (vessels only)for securing containers in high tiers directly to the deck
5/21/2018 Container Shipping Course Module
11/49
17
Port of Long Beach Website
Import cargo g enerally starts at an overseasmanufacturer, supplier or consolidation facility.The US buyer may contact an industry professionalknown as a Freight forwarder or logistics company.
Import cargo g enerally starts at an overseasmanufacturer, supplier or consolidation facility.The US buyer may contact an industry professionalknown as a Freight forwarder or logistics company.
1- Product Ordered: A t ypical import transaction startswhen a U.S. wholesaler, retailer or other bu yer ordersproducts from an overseas manufactures
1- Product Ordered: A t ypical import transaction startswhen a U.S. wholesaler, retailer or other bu yer ordersproducts from an overseas manufactures
2- To port: Once the product has been ordered and packaged, the buyer orfreight forwarder will arrange for a local trucking company to move thecontainer to seaport, and then for a ship to transport the container oversea.
2- To port: Once the product has been ordered and packaged, the buyer orfreight forwarder will arrange for a local trucking company to move thecontainer to seaport, and then for a ship to transport the container oversea.
3- Security checks: A U.S. Customs official based at the port receives informationfrom a U.S.-based command center about which containers may be a security risk.
3- Security checks: A U.S. Customs official based at the port receives informationfrom a U.S.-based command center about which containers may be a security risk.
4- All abroad: When the container is cleared by security it will be placed on a ship along with asmany as 8,000 TEU (twenty-foot equivalent) con tainers.
4- All abroad: When the container is cleared by security it will be placed on a ship along with asmany as 8,000 TEU (twenty-foot equivalent) con tainers.
5- Coast Guard review: The U.S. Coast Guard reviews crew and cargo manifestinformati on, which must be delivered at least three days before any ship arrives
at U.S. shores.
5- Coast Guard review: The U.S. Coast Guard reviews crew and cargo manifestinformati on, which must be delivered at least three days before any ship arrivesat U.S. shores.
6- Vessel docked: As the ship nears the harbor itwill be boarded by a port pilot, maritim e specialistswith expert knowledge of the harbor waters.
6- Vessel docked: As the ship nears the harbor itwill be boarded by a port pilot, maritim e specialistswith expert knowledge of the harbor waters.
7- Unloading the ship: As the ship is arriving, the terminal operator will contact thelocal union hall and arrange for unionized longshore workers to unload the container(using a giant, electric gantr y crane) and place it onto a truck, a rail car o r temporarystorage area on the termin al property. Unloadin g an 8,000 TEU ship takes about th reedays.
7- Unloading the ship: As the ship is arriving, the terminal operator will contact thelocal union hall and arrange for unionized longshore workers to unload the container(using a giant, electric gantr y crane) and place it onto a truck, a rail car o r temporarystorage area on the termin al property. Unloadin g an 8,000 TEU ship takes about th reedays.
8- Security Checks: U.S. Customs officials conduct fu rther analysis and determinewhich containers warrant further inspection.
8- Security Checks: U.S. Customs officials conduct fu rther analysis and determinewhich containers warrant further inspection.
9- Radiation detection: As a final security safeguard, containers pass through largeportals that detect radiation.
9- Radiation detection: As a final security safeguard, containers pass through largeportals that detect radiation.
18
Port of Long Beach Website
As wi th i mpor ted go ods, ex port ed cargo may requ ireseveral intermediate stops between the producer ormanufacturer of the cargo and the Port.
As wi th i mpor ted go ods, ex port ed cargo may requ ireseveral intermediate stops between the producer or
manufacturer of the cargo and the Port.
1- Direct Delivery: In the most straightforward route, asingle container from a local exporting company,produce grower or manufacturer would be delivered bytruck directly to the marine terminal.
1- Direct Delivery: In the most straightforward route, asingle container from a local exporting company,produce grower or manufacturer would be delivered bytruck directly to the marine terminal.
2- Warehouse/consolidator: Cargo delivered from local ornonlocal destinations may be stored temporarily at awarehouse or consolidated with other cargo bound for
export. Cargo may also be transferred from domestic trucktrailers to marine shipping containers at this facility.
2- Warehouse/consolidator: Cargo delivered from local ornonlocal destinations may be stored temporarily at awarehouse or consolidated with other cargo bound for
export. Cargo may also be transferred from domestic trucktrailers to marine shipping containers at this facility.
3- Off-dock railyards: Some export cargo containers aredelivered by train to off-dock railyards, where they areplaced onto trucks for final delivery to marine terminals.
3- Off-dock railyards: Some export cargo containers aredelivered by train to off-dock railyards, where they areplaced onto trucks for final delivery to marine terminals.
4- On-dock railyards: Cargobound for export can bedelivered by train directly toon-dock railyards, where itis loaded onto an oceanvessel. On-dock deliveryrequires no local truck trips.
4- On-dock railyards: Cargobound for export can bedelivered by train directly toon-dock railyards, where itis loaded onto an oceanvessel. On-dock deliveryrequires no local truck trips.
5- Near-dock railyards: Export deliveries are also made to near-dock railyards,where the cargo is picked up by truck for a short trip to the marine terminal..
5- Near-dock railyards: Export deliveries are also made to near-dock railyards,where the cargo is picked up by truck for a short trip to the marine terminal..
6- Vessel loading: Outbound cargo is loaded ontoan ocean vessel headed for an overseas port.
6- Vessel loading: Outbound cargo is loaded ontoan ocean vessel headed for an overseas port.
5/21/2018 Container Shipping Course Module
12/49
19
Port of Long Beach Website
From the port o f Long Beach, containers are either transported by train or by truck to their finaldestination, or to one of several intermediate destinations such as a railyard, warehouse, distribution center,or transload facility ( a sorting, routing and short-term storage building). A containers final destinationdetermine exactly what path it will take once it leaves the dock.
From the port o f Long Beach, containers are either transported by train or by truck to their finaldestination, or to one of several intermediate destinations such as a railyard, warehouse, distribution center,or transload facility ( a sorting, routing and short-term storage building). A containers final destinationdetermine exactly what path it will take once it leaves the dock.
1- Unloading the ship: When a shiparrives at the Port, the marineterminal operator will arrange forunionized longshore workers tounload the vessel. The terminaloperator directs th e longshor eworkers to place the cargo
containers where they belong:on trains, trucks or on terminalproperty for temporary storage.
1- Unloading the ship: When a shiparrives at the Port, the marineterminal operator will arrange forunionized longshore workers tounload the vessel. The terminaloperator directs th e longshor eworkers to place the cargo
containers where they belong:on trains, trucks or on terminalproperty for temporary storage.
2- Freight forwarder: A containers
movements are determined by thecargos owner, or an industryprofessional known as a freightforwarder or logistics provider.
2- Freight forwarder: A containers
movements are determined by thecargos owner, or an industryprofessional known as a freightforwarder or logistics provider.
3-On-dock railyard: Cargo can be placed directly onto trains at the marine terminals on-dock railyards.3-On-dock railyard: Cargo can be placed directly onto trains at the marine terminals on-dock railyards.
4- Near-dock railyards: Cargo is often transportedby truck to larger near-dock railyards close tothe Port.
4- Near-dock railyards: Cargo is often transportedby truck to larger near-dock railyards close tothe Port.
5- Off-dock railyards: Off-dock railyards are used to coordinate rail deliveries tonon-local destinations. Containers are delivered here by truck, then sorted andgrouped by final destination. These railyards handle Port cargo as well as domesticcargo from other sources.
5- Off-dock railyards: Off-dock railyards are used to coordinate rail deliveries to
non-local destinations. Containers are delivered here by truck, then sorted andgrouped by final destination. These railyards handle Port cargo as well as domesticcargo from other sources.
6- Transload or storage yard: Shippi ng containers are oftenmoved initially to a transload facility where workers unload thecargo fromthe marine container, sort it and repackage it intolarger-sized truck trailers. The larger trailers are used to transportthe cargo from the transload facility to regional distributioncenters, local stores or off-dock railyards.
6- Transload or storage yard: Shippi ng containers are oftenmoved initially to a transload facility where workers unload thecargo fromthe marine container, sort it and repackage it intolarger-sized truck trailers. The larger trailers are used to transport
the cargo from the transload facility to regional distributioncenters, local stores or off-dock railyards.
7- Direct delivery: In thesimplest transportationplan, a single containerimported by a companyfor its own use would bedelivered by truckdirectly from the marineterminal to a local storeor factory.
7- Direct delivery: In thesimplest transportationplan, a single containerimported by a companyfor its own use would bedelivered by truckdirectly from the marineterminal to a local storeor factory.
20
OutlineOutline1. Introduction to maritime shipping
2. Introduction to container shipping
3. Container vessels and shipping lines
4. Seaports
5. Railway container transportation / facilities
6. Conclusion
5/21/2018 Container Shipping Course Module
13/49
21
VesselsVesselsCapacity
from 100 to 14,000 TEU
Divided into 45 sections called baysship length can be from 3 to 25 bays
Newbuild cost$1 million per 100 TEU capacity
Speed20 - 25 knots
FuelMarine diesel oil; efficiency ~ 500 ton-miles/gal
20 crew memberscaptain/master, 3 deck officers, chief engineer w/ 3 assistants,
radio operator, cooks, qualified members of the engine department(QMEDs), etc.
Fully cellular or gearedGeared vessels can unload and load themselves
Itineraries are cyclical
Every 4 weeks:Naples-Genoa-Barcelona-New York-Norfolk-Charleston-Naples
Where are they built?Korea: Hyundai, Samsung, Daewoo, HanjinChina: Jiangsu, Shanghai, Xiamen, Dalian
22
2007TEU deployed Revenue
Ocean Carrier Country in 2006 (billion $)
1. A.P. Moller-Maersk Denmark 1,600,0122. Mediterranean Shipping Co Sw itzerland 937,1453. CMA CGM France 597,677 11.84. Evergreen Taiwan 539,8015. Hapag-Lloyd Germany 448,840 8.86. Cosco China 385,368 6.57. China Shipping Cont. Lines China 339,545 5.38. Hanjin South Korea 328,327 7.49. American President Lines Singapore 323,319 8.210. NYK Japan 313,049 25.811. Mitsui OSK Lines Japan 284,848 19.412. OOCL China (HK) 268,502 5.213. CSAV Chile 249,885 4.114. K Line Japan 241,772 13.315. Yang Ming Taiwan 223,192 4.1
The Shipping Line BusinessThe Shipping Line Business
5/21/2018 Container Shipping Course Module
14/49
23
The Shipping Line BusinessThe Shipping Line Business
Mediterranean Shipping Co. Website
Number of Vessels Operated
24
The Shipping Line BusinessThe Shipping Line BusinessPort to Port Freight Rates ($ per TEU, Sept 2008):
Asia N. Amer ica $1800 Europe Asia $1100Asia N. Amer ica $1000 Europe Asia $1900
N. America Europe $1300N. America Europe $1700
Mediterranean Shipping Co. Website
5/21/2018 Container Shipping Course Module
15/49
25
The Shipping Line Business:The Shipping Line Business:Planning DecisionsPlanning Decisions
1. When to purchase/charter additional vessels?
2. What kind of vessels to purchase/charter?
3. When to sell/scrap old vessels?
4. Which vessels to sell/scrap?
5. Which ports should be served?
6. Which routes should be served?
7. Which vessels should be assigned to which routes? (fleet deployment)
8. Scheduling the vessels assigned to each route. At what times will theyarrive/depart from each port in the route sequence?
9. Determine performance requirements for each vessel at each port.How fast must each vessel be served at each port it visit s?
10. Negotiating vessel service agreements with seaport facilities (containerterminals).
11. Hiring crew members
Decision .
26
The Shipping Line Business:The Shipping Line Business:
Operational DecisionsOperational Decisions
1. What should the freight rates be?
2. When to cancel a vessel call at a port?
3. Which containers should be loaded onto which vessel?(applies to large shipping lines or lines belonging to an alliance)
4. How many empty containers should be loaded onto each vessel at eachport? ( empty container repositioning)
5. Where should individual containers be placed on the vessel?( vessel stowage)
6. Assigning crew members to vessels.
Decision .
5/21/2018 Container Shipping Course Module
16/49
27
Port of Long Beach Website
Because the United States imports mor e goods than it exports, many empty containers are sent overseas to be refilled with goods. Typically,about a third of the containers loaded onto a ship at the Port of Long Beach will be filled with cargo, while about two-thirds will be empty.
Because the United States imports mor e goods than it exports, many empty containers are sent overseas to be refilled with goods. Typically,about a third of the containers loaded onto a ship at the Port of Long Beach will be filled with cargo, while about two-thirds will be empty.
1- Delivery to local exporter : A local
exporter who needs to fill emptycontainers may arrange to receivethem by truck directly from a marineterminal, from an empty containerstorage yard or from a local importer.Direct delivery between importers andexporters is encour aged because iteliminates an additional truck trip to astorage yard or marine terminal.
1- Delivery to local exporter : A local
exporter who needs to fill emptycontainers may arrange to receivethem by truck directly from a marineterminal, from an empty containerstorage yard or from a local importer.Direct delivery between importers andexporters is encour aged because iteliminates an additional truck trip to astorage yard or marine terminal.
2- Empty container storage yard:Empty containers are oftentransported by truck from a transloadfacility or local importer to an emptycontainer storage yard. From thestorage yard, the empty containerscan be transported to a marineterminal for export, or to a localexporter to be filled with cargo.Empty containers are alsotransported from marine terminalsto storage yards, usually when theterminal needs more space for full,incoming containers.
2- Empty container storage yard:Empty containers are oftentransported by truck from a transloadfacility or local importer to an emptycontainer storage yard. From thestorage yard, the empty containerscan be transported to a marineterminal for export, or to a localexporter to be filled with cargo.Empty containers are alsotransported from marine terminals
to storage yards, usually when theterminal needs more space for full,incoming containers.
3- Direct Delivery:The simplest route for an emptycargo container would be a returntrip to the Port from a transloadfacility or local importer after itsimported goods had beenunloaded.
3- Direct Delivery:The simplest route for an emptycargo container would be a returntrip to the Port from a transloadfacility or local importer after itsimported goods had beenunloaded.
4- Ocean Vessel: Empty containers areloaded onto an ocean vessel, alongwith containers filled with exportgoods, bound for an overseas port.
4- Ocean Vessel: Empty containers areloaded onto an ocean vessel, alongwith containers filled with exportgoods, bound for an overseas port.
28
The Shipping Line BusinessThe Shipping Line Business
5/21/2018 Container Shipping Course Module
17/49
29
OutlineOutline
1. Introduction to maritime shipping
2. Introduction to container shipping
3. Container vessels and shipping lines
4. Seaports
5. Railway container transportation / facilities
6. Conclusion
30
Introduction to Container TerminalsIntroduction to Container Terminals
Unloading and loading of containerships Temporary storage of containers
Port of Hong Kong
Port of Singapore
Aerial view ofNorthport's
containerterminal
5/21/2018 Container Shipping Course Module
18/49
31
The Container Port BusinessThe Container Port Business
Globally, 474 million TEU worth of (empty and loaded) containerswere transferred between ships and shore in 2007.
Worlds Busiest Million TEU
Container Ports Country handled in 2007
1. Singapore Singapore 27.92. Shanghai China 26.23. Hong Kong China (HK) 24.04. Shenzhen China 21.15. Busan South Korea 13.36. Rotterdam Netherlands 10.87. Dubai UAE 10.78. Kaohsiung Taiwan 10.39. Hamburg Germany 9.910. Qingdao China 9.511. Ningbo-Zhoushan China 9.412. Guangzhou China 9.313. Los Angeles USA 8.414. Antwerp Belgium 8.215. Long Beach USA 7.3
32
The Container Port BusinessThe Container Port BusinessMillion 2007
TEU handled RevenueTerminal Operator Country in 2007 (billion $)
1. Hutchison Port Holdings China (Hong Kong) 66.3 4.92. PSA Corp. Singapore 58.9 3.03. DP World UAE 43.3 2.74. Cosco Pacific China 39.8 0.15. APM Terminals Netherlands 31.4 2.56. HHLA Germany 7.2 1.9
Globally, 474 million TEU worth of (empty and loaded) containerswere transferred between ships and shore in 2007.
The DP World controversy began in February 2006 and rose toprominence as a national security debate in the United States. Atissue was the sale of port management businesses in s ix major U.S.seaports to DP World, and whether such a sale would compromiseport security.
5/21/2018 Container Shipping Course Module
19/49
Container TerminalsContainer Terminals
33
Vessels
quay to yard
yard to quayStorageyard
Trains
import
export
transshipment
Externaltrucks(XTs)
Horizontaltransportof cargo
Container lifting &stacking
1. 2. 3.
Terminal-owned equipment performs 3 kinds of tasks:
On-dockrail yard
XTsGate
Unloading andloading of vessels
Trains
Typically a24-houroperation
34Port of Singapore
Land-Scarce Container Terminals
Quay cranes (QCs)
Yardtrucks(YTs)
Rubber-tired gantrycranes (RTGCs)
External trucks (XTs)
1.
2.
3. Rail-mounted gantrycranes (RMGCs)
Gate
5/21/2018 Container Shipping Course Module
20/49
35
Port of Singapore
LandLand--Scarce Container TerminalsScarce Container Terminals
Cargo stacked up to7 tiers high in largeblocks
0-3 truck traffic lanesbetween bl ocks
Storage density:1000-1200 TEUper hectare
Manually operatedtrucks and c ranes
No on-dock rail yard
Cargo throughput:2000-2500 TEU permeter of wharf lineper year
Rubber-tired gantrycranes (RTGCs)
Quay cranes (QCs)
36
Port of Hong Kong
LandLand--Scarce Container TerminalsScarce Container Terminals
5/21/2018 Container Shipping Course Module
21/49
37
Straddle CarrierStraddle Carrier--Based Container TerminalsBased Container Terminals Common on U.S. East Coast and in Europe Cargo stacked 3 tiers high in lanes that are 1 container wide Spaces between lanes very narrow Storage density: 750 TEU per hectare Manually operated straddle carriers perform operations 2 and 3 On-dock rail yard a possibility: RMGCs may be needed Cargo throughput: 1500 TEU per meter of wharf line per year
3.
Straddle carriers(SCs)
2.
1. Quay cranes (QC)
Port of Hamburg
38
Straddle CarrierStraddle Carrier--Based Container TerminalsBased Container Terminals Common on the U.S. East Coast and in Europe Cargo stacked 3 tiers high in lanes that are 1 container wide Spaces between lanes very narrow Storage density: 750 TEU per hectare Manual/automated straddle carriers perform operations 2 and 3 On-dock rail yard a possibility: RMGCs may be needed Cargo throughput: 1500 TEU per meter of wharf line per year
3.
Straddle carriers(SCs)
2.
1. Quay cranes (QC)
Port of Hamburg
5/21/2018 Container Shipping Course Module
22/49
39
Straddle CarrierStraddle Carrier--Based Container TerminalsBased Container Terminals
Port of Bremerhaven (Germany)
Aeri al vi ewof
Northport'scontainerterminal
40
Simulation of a terminal in which
SCs used in quay and s torage yard areas
RMGCs used at on-dock rail yard to load tr ains
Straddle CarrierStraddle Carrier--Based Container TerminalsBased Container Terminals
Source: HHLA website (http://hhla.de)
5/21/2018 Container Shipping Course Module
23/49
41
TTI/Hanjin Terminal (Seattle)
YC/SCYC/SC--Free, GroundFree, Ground--Based TerminalsBased Terminals Common on U.S. West Coast
Large forklifts called top-handlers and reach-stackersstack containers up to 4 tiers high in blocks Large spaces needed between blocks Storage densi ty: 500 TEU per hectare Manually operated reach-stackers, top-handlers, side-picks,
and tractor-trailers On-dock rail yard a possibil ity Cargo throughput: 1000 TEU per meter of wharf line per year
3.
Quay cranes (QCs)1.
Top- handlers
Reach-stackers
2. Yard trucks
42
Global Gateway North Terminal (Seattle)
WheelWheel--Based Container TerminalsBased Container Terminals Common on U.S. West Coast Loaded containers sitting on trailers (chassies) parked in
storage yard (stacking height = 1 tier) Empty containers stacked up to 4 tiers high by side-picks Storage density: 250 TEU per hectare Manually operated equipment On-dock rail yard a possib ility Cargo throughput: 500 TEU per meter of wharf line per year
On-dock rail yard
Quay cranes (QCs)
1.
3.
Side-picks 2. Yard trucks
Top-handlers
Reach-stackers
5/21/2018 Container Shipping Course Module
24/49
43
Automated Container Terminals IAutomated Container Terminals I Ports of Rotterdam and Hamburg
Cargo stacked up to 5 tiers high in large blocks Spaces between blocks very narrow Automated guided vehic les (AGVs) perform operat ion 2 Automated stacking cranes (ASCs) perform operation 3 in yard On-dock rail yard a possibility: RMGCs may be needed
Container Terminal Altenwerder (Hamburg)
ASCs
3.
AGVsQCs1.
RMGCs
2.
www.hhla.de www.hhla.de
44Patrick Terminal (Brisbane, Australia)
Patrick Terminal at Port of Bri sbane Only automated SC-based terminal i n the world Cargo stacked 2 tiers high in lanes Automated straddle carr iers perform operations 2 and 3
3. Automated straddle carriers2.1. Quay cranes (QC)
Automated Container Terminals IIAutomated Container Terminals II
5/21/2018 Container Shipping Course Module
25/49
45
Straddle carriers and ASCs used in storage yard
RMGCs used in on-dock rail yard
Other PossibilitiesOther Possibilities
Source: HHLA website (http://hhla.de)
46
Container Terminal Characterist icsContainer Terminal Characterist icsMost terminals never close workload processed continuously: 24 hours per day, 365 days per year uneven distribution of workload over time (late vessel arrivals, cust. requests)
Highly uncertain equipment processing times truck travel times affected by road traffic conditions inside terminal crane handling times are variable
10,000+ decisions made per day equipment dispatching, container storage location assignment, etc. decision opportunities come with no prior warning decisions made immediately, usually one at a time inter-decision time highly stochastic, avg. as low as 1 sec.
Quay, yard, and gate operations h ighly interconnected bottlenecks in yard late vessel departures few or no inter-equipment buffers
5/21/2018 Container Shipping Course Module
26/49
47
Measures of Terminal PerformanceMeasures of Terminal Performance
Gross crane rate (GCR) Also known as the quay crane work rate Avg. # QC lifts made per QC hour beside a vessel that is being worked
Average vessel turnaround t ime Avg. time it takes to fully process a vessel From time of berthing to time of un-berthing
Average external t ruck (XT) turnaround t ime Avg. time it takes for external truck to be serviced at the terminal Drop-off or pick-up From time of gate entry to time of gate departure
Abil ity to keep vessels and trains on schedule Consistency in performance more important than maximizing avg. performance Another goal: keep operations on-time at minimum cost
Cost per TEU moved between ship and shore USD $150 at U.S. ports
48
Container Terminal Planning and Design
1. Where should the terminal be located?
2. What kind of cargo will be handled (import, export, transshipment)?
3. What is the planned throughput capacity?
4. How much cargo storage capacity is needed in the yard?
5. Will there be an on-dock rail yard? A large empty container yard?
6. How much land area will the terminal occupy? What is its shape?
7. What type of container handling equipment will be used? Specs?
8. How many work shifts wil l there be per day?
9. Should the yard layout be parallel or perpendicular?
10. How many storage blocks should there be? What are their dimensions?
11. How many vehicle lanes should there be between the blocks?12. How much equipment should be deployed on an average day?
Yard Trucks(YTs)
Decision .
Vessels
Yard Cranes (YCs)
unloading
loadingYard
Quay Cranes(QCs)
5/21/2018 Container Shipping Course Module
27/49
49
Design Issue #7:Design Issue #7:Equipment Selection and SpecificationEquipment Selection and Specification
Yard Equipment Type Horizontal L i ft ing StackingTransport
1. Tractor-trailers (YTs) X2. Automated guided vehicles (AGVs) X
3. Rubber-tired gantry cranes (RTGCs) X X4. Rail-mounted gantry cranes (RMGCs) X X5. Automated stacking cranes (ASCs) X X6. Bridge cranes X X7. Top-handlers X X8. Reach-stackers X X9. Side-picks X X
10. Straddle carriers (SCs) X X X11. Shuttle carriers X X12. Automated lifting vehicles (ALVs) X X
2. 3. 3.
Specification issues for Quay CranesSpecification issues for Quay Cranes
50
Single troll ey quay cranehandles one cont. at a time
Port of Long Beach
container-terminal of Bremerhaven
5/21/2018 Container Shipping Course Module
28/49
QC Issue A: The Double Trolley Quay CraneQC Issue A: The Double Trolley Quay Crane
51
The Double Trolley Quay CraneThe Double Trolley Quay Crane
52Double Trolley QCs and Straddle Carriers at Port of Hamburg
www.hhla.de
5/21/2018 Container Shipping Course Module
29/49
QC Issue B: TwinQC Issue B: Twin--lift (two 20lift (two 20 conts) and tandemconts) and tandem
(two 40(two 40 conts) spreadersconts) spreaders
53
54
Design Issue #10.1: Block WidthDesign Issue #10.1: Block Width
What is the optimal width forthe storage blocks?(storage capacity is unchanged)
5/21/2018 Container Shipping Course Module
30/49
Block Width: TradeoffsBlock Width: Tradeoffs
55
10 rows per block (3 zones)
3 rows per block (10 zones) 5 rows per block (6 zones)
6 rows per block (5 zones)?
56
Group 2: scenarios 3-4
13
18
23
28
33
38
1 3 5 7 9 11 13 15
Rows per block (block width)
Grosscranerate
(QC
lifts/hr)
Less equip
More equip
Group 3: scenarios 5-7
13
18
23
28
33
38
1 3 5 7 9 11 13 15
Rows per block (block width)
Grosscranerate
(QClifts/hr)
Less equip
More equip
Group 4: sc enarios 8-10
13
18
23
28
33
38
1 3 5 7 9 11 13 15
Rows per block (block width)
Grosscranerate
(QClifts/hr)
Less equip
More equip
Group 5: scenario 11
13
18
23
28
33
38
1 3 5 7 9 11 13 15
Rows per block (block width)
Grosscranerate
(QC
lifts/hr)
Less equip
More equip
Group 6: scenario 12
13
18
23
28
33
38
1 3 5 7 9 11 13 15
Rows per block (block width)
Grosscranerate
(QClifts/hr)
Less equip
More equip
Group 7: s cenarios 13-14
13
18
23
28
33
38
1 3 5 7 9 11 13 15
Rows per block (block width)
Grosscranerate
(QClifts/hr)
Less equip
More equip
Block Width: ResultsMostOblong
MostSquare
From: M.E.H. Petering, Effect of block wi dth andstorage yard layout on marine container terminalperformance, Transportation Research E, doi:10.1016/j.tre.2008.11.004,accept ed Nov 2008.
5/21/2018 Container Shipping Course Module
31/49
57
Design Issue #10.2: Block LengthDesign Issue #10.2: Block Length
What is the optimal length for
the storage blocks?(storage capacity is unchanged)
58
Longer blocks
Fewer vertical traffic lanes
Less land area
More congestion
Shorter blocks
More vertical traffic lanes
More land area
Less congestion
Block Length: Tradeoffs
5/21/2018 Container Shipping Course Module
32/49
Design Issue #11: Vehicle LanesDesign Issue #11: Vehicle Lanes
59
Container Terminal Operations ManagementContainer Terminal Operations Management
60Vessels
Quay Cranes (QCs)
Yard Cranes (YCs)
unloading
loading Yard
1. Allocation of berths to arriving vessels 000010
2. Allocation of QCs to docked vessels 000010
3. QC scheduling and job sequencing 10 (off-line) or 10,000 (real-time)
4. Container storage location assignment 010,000
5. Container retrieval location assignment 010,000
6. YC job assignment 010,000
7. Inter-zone YC deployment 010,000
8. YT job assignment 010,000
9. YT routing 100,000
10. Selecting appointment times for external trucks 010,000
Yard Trucks (YTs)
Decision Frequency (decs/day)
Land-scarceterminal:
5/21/2018 Container Shipping Course Module
33/49
61
Terminal ManagerTerminal Managers Goal:s Goal:
Find solutions for operationsFind solutions for operationsmanagement (OM) issues thatmanagement (OM) issues that
(1) are viable in a real(1) are viable in a real --time settingtime setting(2) maximize performance(2) maximize performance (e.g. gros s crane rate)(e.g. gros s crane rate)
GCR =
total # QC lifts made
total hours of QC time beside a busy berth
62
Terminal Operating System (TOS)Terminal Operating System (TOS)
TOS is idle
TOS deciding nextactivity for a particularQC/YC/YT/container
TOS manipulating data internally
TOS receiving input:
- QC/YC/YT task completed
- Vessel arr ives(new jobs added to system)
- XT arrives(new job added to system)
storagelocations
YCdisp
YCdeploy
YTdisp
To be viable, a TOS must :
Use less than 1 second ofCPU time per decision on100% of occasions
Avoid deadlocks on 100%of occasions
5/21/2018 Container Shipping Course Module
34/49
63
OM Issues #1 and #2: Terminal, Berth, andOM Issues #1 and #2: Terminal, Berth, andQuay Crane Allocation to Arriving VesselsQuay Crane Allocation to Arriving Vessels
Where should anarriving vessel beberthed? (Whichterminal, which berth?)
Which quaycranes shouldwork on thevessel?
64
Terminal, Berth, and Quay Crane Allocation:Terminal, Berth, and Quay Crane Allocation:
A MultiA Mult i --objective Problemobjective ProblemObjectives:
(1) Minimize vessel turnaround times
(2) Maximize berth utilization and terminal throughput
(3) Maximize satisfaction of customer shipping lines
(4) Minimize cost (labor and equipment used) when processing vessels
(5) Maximize efficiency of vessel-to-vessel transshipment operations
Constraints:
Water depth
Berth and vessel lengths
Quay crane availability and specs
Vessel schedules
Transshipment requests
5/21/2018 Container Shipping Course Module
35/49
65
Once a vessel is securedalongside the terminal,
(A) Which containers aremoved by which QC?
(B) What is the sequence ofmoves for each QC?
OM Issue #3:OM Issue #3:QC Scheduling and Job SequencingQC Scheduling and Job Sequencing
Objectives:
Minimize vessel turnaround time
Unload hot containers quickly
Minimize cost of unloading andloading vessel
66
Constraints:
1. Ship balance must be maintained
2. Stress on vessel may not exceedcertain limits
3. Precedence constraints due tocontainer stacks
4. QCs must remain a minimumdistance apart to avoid collisions
5. Visibi li ty: crane operators must beable to easily see containers
6. Stabili ty of above-deck stacks: no chimneys (stacks jutting outvertically by more than 2 tiers)
OM Issue #3:OM Issue #3:QC Scheduling and Job SequencingQC Scheduling and Job Sequencing
5/21/2018 Container Shipping Course Module
36/49
67
Further complexity:
1. Some cargo booked for a vesselarrives after loading has begun
2. Cranes may work at differentspeeds
3. Not all container moves are loadsor unloadsthere are alsorepositioning moves!
OM Issue #3:OM Issue #3:QC Scheduling and Job SequencingQC Scheduling and Job Sequencing
68
QCQC Scheduling: Current PracticeScheduling: Current Practice
Perform a Crane Split:(a set partitioning problem)
Vessel bays are partitioned intocontiguous areas
Each area is served by one crane
Partitioning done so that the timewhen last QC finishes is minimized
Each QC works the bays in its areafrom L to R
5/21/2018 Container Shipping Course Module
37/49
69
QCQC Scheduling: The Crane SplitScheduling: The Crane Split(Equal Crane Speeds)(Equal Crane Speeds)
70
QCQC Scheduling: The Crane SplitScheduling: The Crane Split
Containers to be moved Time required (min)
Bay # Unloading Loading Total QC1 QC2 QC3 QC4
2 15 19 34 82 102 102 136
3 9 8 17 41 51 51 68
4 66 52 118 283 354 354 472
7 35 35 70 168 210 210 280
10 26 24 50 120 150 150 200
11 40 43 83 199 249 249 332
14 72 76 148 355 444 444 592
18 55 45 100 240 300 300 400
Total 318 302 620
(Unequal Crane Speeds)(Unequal Crane Speeds)
5/21/2018 Container Shipping Course Module
38/49
71
QCQC Scheduling: The Crane SplitScheduling: The Crane Split
Containers to be moved Time required (min)
Bay # Unloading Loading Total QC1 QC2 QC3 QC4
2 15 19 34 82 102 102 136
3 9 8 17 41 51 51 68
4 66 52 118 283 354 354 472
7 35 35 70 168 210 210 280
10 26 24 50 120 150 150 200
11 40 43 83 199 249 249 332
14 72 76 148 355 444 444 592
18 55 45 100 240 300 300 400
Total 318 302 620 574 399 444 400
Optimal solut ion: 574 minutes is the minimumvessel turnaround time
(Unequal Crane Speeds)(Unequal Crane Speeds)
Yard Control IssuesYard Control Issues
72
Zone 1
Zone 2
Zone 3
Zone 4
Quay crane: 1 2 3 4 5 6 7 8 9
Vessel 1Vessel 3
Vessel 2
1 2
20 21
3
13
87
14
4 5 6
9 10 11 12
15 16 17 18 19
22 24
Block 1 Bk 2 Bk 3
Bk 4 Bk 5 Bk 6
Bk 7 Bk 8 Bk 9
Bk 10 Bk 11 Bk 12
cross-gantry
linear gantry
? ??
???
? ? ? ?
23
? ?
?
? ? ? ?
?
? ? ? ?
Yard Crane Yard Truck
5/21/2018 Container Shipping Course Module
39/49
73
OM Issue #4:OM Issue #4:Selection of Cargo Storage LocationsSelection of Cargo Storage Locations
Where should containers beplaced in the yard upon theirarrival?(e.g. after being unloaded from a vessel)
74
I. Re-marshalling strategy Containers have multiple places of rest
II. Sort and store strategy Containers have a single place of rest
Containers stored based on attributes (e.g. length, heigh t,weight class, loading vessel, destination port)
Containers with similar attributes stored in same stack
Two versions:
1) Storage locations determined off-line in advance2) Storage locations determined in real-time
immediately after container is discharged
Container Storage StrategiesContainer Storage Strategies
5/21/2018 Container Shipping Course Module
40/49
75
Possible objectives to pursuePossible objectives to pursue
1. Minimize container travel distance2. Minimize congestion in vicinity of storage locations3. Minimize number of times each container is touched
Container Storage: Competing ObjectivesContainer Storage: Competing Objectives
Not all objectives can be pursued simultaneously.
Thus, managers need to determine which objectivesare most important!! This is not easy!
76
Zone 1
Zone 2
Zone 3
Zone 4
Quay crane: 1 2 3 4 5 6 7 8 9
Vessel 1Vessel 3
Vessel 2
1 2
20 21
3
13
87
14
4 5 6
9 10 11 12
15 16 17 18 19
22 23 24
Block 1 Bk 2 Bk 3
Bk 4 Bk 5 Bk 6
Bk 7 Bk 8 Bk 9
Bk 10 Bk 11 Bk 12
? ? ? ?
Which stack in the yard, among those which are eligible,should provide the container(s) loaded by a QC ??
OM Issue #5: Container Retrieval Location AssignmentOM Issue #5: Container Retrieval Location Assignment
5/21/2018 Container Shipping Course Module
41/49
OM Issue #6: Yard Crane Job AssignmentOM Issue #6: Yard Crane Job Assignment
77
Zone 1
Zone 2
Zone 3
Zone 4
Vessel 1Vessel 3
Vessel 2
1 2
20 21
3
13
87
14
4 5 6
9 10 11 12
15 16 17 18 19
24
Block 1 Bk 2 Bk 3
Bk 4 Bk 5 Bk 6
Bk 7 Bk 8 Bk 9
Bk 10 Bk 11 Bk 12
? ???
22 23
?
(1) When a YC becomes free, which YT does it serve next?
(2) How to avoid deadlocks when YCs are working in close proximityand containers halfway between them need to be moved?
?
OM Issue #8: YT Job AssignmentOM Issue #8: YT Job Assignment
78
(2) When to carry two 20 containers?
(3) Should YTs be pooled at the QC, vessel, or terminal level?
Zone 1
Zone 2
Zone 3
Zone 4
QC: 1 2 3 4 5 6 7 8 9
Vessel 1Vessel 3
Vessel 2
1 2
20 21
3
13
87
14
4 5 6
9 10 11 12
15 16 17 18 19
22 24
Block 1 Bk 2 Bk 3
Bk 4 Bk 5 Bk 6
Bk 7 Bk 8 Bk 9
Bk 10 Bk 11 Bk 12
23
Q1:24U
Q1:25U
Q1:26U
Q1:27U
...
Q2:22U
Q2:23U
Q2:24U
Q2:25U
...
Q3:25U
Q3:26U
Q3:27U
Q3:28U
...
Q4:89L
Q4:90L
Q4:91L
Q4:92L
...
Q5:89L
Q5:90L
Q5:91L
Q5:92L
...
Q6:88L
Q6:89L
Q6:90L
Q6:91L
...
Q7:90L
Q7:91L
Q7:92L
Q7:93L
...
Q8:75U
Q8:76U
Q8:77U
Q8:78U
...
Q9:71U
Q9:72U
Q9:73U
Q9:74U
...
?
(1) When a YT becomes free, what should it do next?
?
?
PendingQC jobs
QC jobsalreadyassignedto YTs
5/21/2018 Container Shipping Course Module
42/49
79
What kind of truck appointment system best serves the interests ofthe terminal, trucking industry, neighboring community, andenvironment?
What should the appointment date and time be for a specific truck?
OM Issue #10:OM Issue #10:Appointment System for External TrucksAppointment System for External Trucks
Global Gateway North Terminal, Seattle
80
Appointment system should:
automatically generate appointment t imes for customers who call theterminal or log onto the internet
determine the number of appointments to be made for a given regionof the container yard for a given time period
minimize average truck service time at the terminal
minimize truck congestion overflow into local highway system
maximize gate throughput
enhance yard and vessel operations in the container terminal
OM Issue #10: XT Appointment SystemOM Issue #10: XT Appointment System
5/21/2018 Container Shipping Course Module
43/49
Other Container Terminal IssuesOther Container Terminal Issues
81Vessels
Quay Cranes (QCs)
Yard Cranes (YCs)
unloading
loading Yard
1. Labor (union or non-union)2. Container identification and tracking (OCR, RFID)
3. Equipment identification and tracking (GPS, local radar, RFID)
4. Customs
5. Security (scanning equipment, manual inspections)
6. Negotiating service agreements with shipping lines
7. Negotiating lease rates with public municipalities
8. Purchasing/developing a terminal operating system (TOS)
9. Tactical issues: when to purchase more equipment (QCs, YCs, YTs)
Yard Trucks (YTs)
Issue .
82
OutlineOutline1. Introduction to maritime shipping
2. Introduction to container shipping
3. Container vessels and shipping lines
4. Seaports
5. Railway container transportation / facilities
6. Conclusion
5/21/2018 Container Shipping Course Module
44/49
83
Railway Container TransportationRailway Container Transportation
84
Railway Container TransportationRailway Container Transportation2007
North American TEU moved RevenueRailway Operator Country in 2007 (billion $)
1. BNSF USA 5,065,0052. Union Pacific USA 3,453,0003. Norfolk Southern USA 3,120,0004. CSX Corp. USA 2,111,0005. Canadian National Canada 1,324,0006. Canadian Pacific Canada 1,238,1007. Kansas City Southern USA 526,370
5/21/2018 Container Shipping Course Module
45/49
85
Railway Container TransportationRailway Container Transportation
BNSF Intermodal Network
Railway Container TransportationRailway Container Transportation
Union Pacifics intermodal lanes, 2009 86
5/21/2018 Container Shipping Course Module
46/49
87Union Pacific Intermodal Network, 2008
Railway Container TransportationRailway Container Transportation
88
Inland (Rail) Container TerminalsInland (Rail) Container Terminals
Transferring containersbetween trains andtrucks
Unloading and loadingof intermodal trains
Temporary s torage ofcontainers Port of Long Beach
Frankfurt am Main East
Rochelle, Illinois
5/21/2018 Container Shipping Course Module
47/49
89
OutlineOutline
1. Introduction to maritime shipping
2. Introduction to container shipping
3. Container vessels and shipping lines
4. Seaports
5. Railway container transportation / facilities
6. Conclusion
90
Container shipping supp lies cities and their inhabitants withfinished consumer goods
Chicago: inland container shipping hub of the USA
Milwaukee: CP Canadian Pacific rail facility at the Port ofMilwaukee
Congestion
Pollution
Maritime shipping constitutes 4.5% of global CO2 emissions
Containerization Impact on CitiesContainerization Impact on Cities
5/21/2018 Container Shipping Course Module
48/49
91
Inspired architectural innovation
Containerization Impact on CitiesContainerization Impact on Cities
92
Literature on Container Terminal Ops.Literature on Container Terminal Ops.Briskorn, D., Drexl, A. and Hartmann, S. (2006) Inventory-based dispatching of automated guided vehicles oncontainer terminals. OR Spectrum, 28, 611-630.Dekker, R., P. Voogd, van Asperen, E. (2006). "Advanced methods for container stacking." OR Spectrum V28(4).Grunow, M., Gnther, H.-O. and Lehmann, M. (2004). Dispatching multi-load AGVs in highly automated seaportcontainer terminals. OR Spectrum, 26, 211-235.Grunow, M., Gnther, H.-O. and Lehmann, M. (2006). Strategies for dispatching AGVs at automated seaportcontainer terminals. OR Spectrum, 28, 587-610Hussein, M. (2010). Efficient container handling systems and crane scheduling algorithms for seaport containerterminal. Industrial and Manufacturing Engineering Department. University of Wisconsin-MilwaukeeKim, K. H., and Bae, J. W. (2004). "A Look-Ahead Dispatching Method for Automated Guided Vehicles in AutomatedPort Container Terminals." Transportation Science, 38(2), 224-234.Kim, K. H., and Bae, J. W. (1998). "Re-marshaling export containers in port container terminals." Computers &Industrial Engineering, 35(3-4), 655-658.Kim, K. H., Jeon, S. M., and Ryu, K. R. (2006). "Deadlock prevention for automated guided vehicles in automatedcontainer terminals." OR Spectrum, V28(4), 659-679.Kim, K. H., Kang, J. S., and Ryu, K. R. (2004). "A beam search algorithm for the l oad sequencing of outboundcontainers in port container terminals." OR Spectrum, V26(1), 93-116.Kim, K. H., and Kim, H. B. (1998). "The optimal determination of the space requirement and the number of transfercranes for import containers." Computers & Industrial Engineering, 35(3-4), 427-430.Kim, K. H., and Kim, H. B. (2002). "The optimal sizing of the storage space and handling facilities for importcontainers." Transportation Research Part B: Methodological, 36(9), 821-835.Kim, K. H., and Kim, H. B. (1999). "Segregating space allocation models for container inventories in port containerterminals." International Journal of Production Economics, 59(1-3), 415-423.Murty, K. G., J. Liu, et al. (2005). "A decision support system for operations in a container terminal." DecisionMurty, K. G., Y.-W. Wan, et al. (2005). "Hongkong International Terminals gains elastic capacity using a data-iPetering, M. E. H. (2009). Effect of block width and storage yard layout on marine container terminal performaStahlbock, R. and Vo, S. (2008) Operations research at container terminals: a literature update. OR Spectrum, 30,1-52.Steenken, D., Vo, S. and Stahlbock, R. (2004) Container terminal operation and operations research - aclassification and literature review. OR Spectrum, 26, 3-49.Vis, I. F. A. and de Koster, R. (2003). Transshipment of containers at a container terminal: an overview. EuropeanJournal of Operational Research, 147, 1-16.
5/21/2018 Container Shipping Course Module
49/49
AcknowledgmentAcknowledgmentEditor : Mazen I. Hussein, Industrial and Manufacturing Engineering Department, University of W isconsin-Milwaukee.
Grateful acknowledgment is herewith made for the cooperation and permission tous the materials and photos from the following personnel/websites/institutes:
Alex Klein / www.renaissanceronin.wordpress.com
American President Lines Ltd / www.apl.com
Burlington Northern Santa Fe Railway / www.bnsf.com
Center for Disease Control and Prevention / www.cdc.gov
containershipping.nl / www.containershipping.nl
Danny Cornelissen-Maritime Photographer/ www.portpictures.nl
FRANCETRUCK / [email protected]
Great Lakes St. Lawrence Seaway System / www.greatlakes-seaway.com
Hamburger Hafen und Logistik AG / www.hhla.de
Hapag-Lloyd / www.hapag-lloyd.com
KOCKS / www.kockskrane.de
Mediterranean Shipping Company MSC / www.mscgva.ch
merriam-webster / www.visualdictionaryonline.com
Port of Brisbane Pty Ltd / www.portbris.com.au
Port of Long Beach/ www.polb.com/default.asp Robert West Milwaukee School of Engineering / [email protected]
Swedish Timars group / www.timars.se
VDL Containersystemen / www.vdlcontainersystemen.com
Webmaster / www.infovisual.info
Wikimedia
Wikipedia
Union Pacific / www.up.com
93
94
The End!