WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 1
Contents Page
1 BACKGROUND 3
1.0 PROJECT CONTEXT 3 1.1 KEY ACTION AREAS 4 1.2 NEW GALLERIES AND COMMUNITY SPACES 5 1.3 FUNCTIONAL AREAS 7 1.4 CONSTRUCTION COSTS 8 1.5 FUNDING 9
2 OPTIONS ANALYSIS 11
3 FEASIBILITY ANALYSIS 12
3.0 SCOPE OF ANALYSIS 12 3.1 MARKET APPETITE 13 3.2 VISITOR LEVELS 14 3.3 ENVIRONMENTAL FINANCIAL AND SOCIAL SUSTAINABILITY STRATEGIES 17 3.4 FINANCIAL IMPLICATIONS 19
4 CONCEPT PLANS 23
5 STAGED IMPLEMENTATION PLAN AND COSTS 33
6 CONCLUSIONS AND NEXT STEPS 38
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 3
1 Background
1.0 Project Context
In 2009, the Western Australian Museum, Geraldton underwent a regional
site review which identified a range of issues and priorities for actions. The
Museum was identified by the Mid West Development Commission as a
flagship project and vehicle for the interpretation of the new stories about
the local community and Mid West region. In particular, the Commission
saw considerable potential in enhancing the story of HMAS Sydney II and
further value in creating new types of gallery spaces.
The review led to a recommendation a new Site Masterplan be prepared
to ensure strategic opportunities were seized and positive outcomes
secured for Geraldton and the Mid West. Key aspects identified were:-
Improving connection to existing and future development in and
around the Batavia Coast Marina and providing additional flexible
space to interpret regional stories of state, national and
international significance and deliver educational programmes.
That the Museum was seen as being well-placed to become the
international centre for the interpretation of the story of HMAS
Sydney (II) and HSK Kormoran: arguably, the most significant
Australian Naval event of World War II, and one of Australia’s most
commemorated maritime events.
There was potential to develop a significant site to mark, not only
the Sydney/Kormoran story, but also to reflect important
contemporary developments in the region (e.g. Oakajee Port, the
potential for the Square Kilometre Array) and to further enhance
Aboriginal involvement and ownership of the site.
In 2011, Hames Sharley was commissioned by the Western Australian
Museum to produce a Site Masterplan to inform and guide the long term,
staged development of the WA Museum, Geraldton, ensuring its
integration into the physical environment, the regional development
context and the cultural offer to the people of, and visitors to, the Mid West.
This masterplan project is supported by the Mid West Development
Commission through its Regional Development Scheme.
Through the masterplan process, the Museum was invited to consider
what was required for meaningful and successful activation of the Batavia
Coast Marina as an emerging destination in the wider city network of visitor
sites and culturally important spaces. Although part of this remit is outside
the Museum 'footprint', it has been considered strategically, and in
consultation with key stakeholders, in order to present to the Mid West
Development Commission and the City of Geraldton an overall picture of
how the Marina could develop, with the Museum playing a central role in
that regeneration.
Through consultation with stakeholders, the Site Masterplan process
identified that the Museum played a key role in meeting community needs
and the outcomes of the masterplan reflect:-
The role of the Museum in providing informative interpretation on
issues and activities for a wide cross section of Mid West residents
and visitors.
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 4
The pivotal role the Museum plays both in terms of location and
activities in the activation of the marina precinct and adjoining
tourist and historical areas.
The implementation of the Site Masterplan has significant benefits in terms
of regional development. These are further outlined in Section 3.0.
The Site Masterplan includes recommendations for the physical and
cultural development of the site and is informed by a needs and options
appraisal, feasibility analysis, concept plans and staged costings. The
master plan will be used to develop business cases and grant and
sponsorship proposals for the development of the Museum.
Delivery of the masterplan has been in two stages with stage one
consisting of an approved two volume report (August 2011) that provided
the context of the masterplanning including the outcomes of the
stakeholder consultation, site analysis and key outcomes sought in the final
masterplan. This second stage - volume three - reports on the
development of the master plan, based on stage one.
1.1 Key Action Areas
The initial report identified 10 Actions for the external public areas of the
site and building design and 5 Actions for the internal layout and
configuration of space within the main museum building. The issues inside
and outside the museum are numerous but the following key actions are
considered priorities in terms of building outcomes. They have formed the
basis of the options and design concepts followed through to the final
masterplanning stage. Opportunities were also identified for partnerships
with industry and government in relation to the establishment and
maintenance of future exhibits.
The external and internal action areas have been summarised into the 11
Key Actions opposite.
A1 Expand the Museum to include emerging contemporary
stories (Square Kilometre Array, HMAS Sydney II) and
interactive spaces for education and lifelong learning
A2 Resolve the function of the separate wedge building,
including future uses, or alternative building options and
design configurations for the adjacent space
A3 Identify a location for adequate on site storage (eastern
end of the site) to enable the Museum to divest itself of the
old Museum Display Building on Marine Terrace
A4 Improve the security and appearance of the
service/loading area (facing Foreshore Drive)
A5 Implement a clear sense of destination, identity and arrival
at the street corner of Foreshore Drive and Museum Place
A6 Have a clear and purposeful Museum main entrance and
reception space including changes to the public realm and
resolution of micro climate issues
A7 Create a signage and lighting strategy to assist visitor way
finding and enhance the museum’s presence and identity
A8 Implement measures that will reduce the Museum’s
operating costs, principally energy consumption, and
consider renewable energy options and screening of the
principal north façade to reduce glare and heat load from
the direct western sun
A9 Activate the position of the Museum on the marina
frontage through exploring options to attract commercial
uses such as a café, retail or functions
A10 Review the grounds landscaping and design a more
engaging and dynamic exterior
A11 Resolve future use of the Community Gallery and
circulation through other parts of the Museum including
the rigid layout of the Mid West Gallery
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 5
1.2 New Galleries and Community Spaces
The proposed Geraldton Museum redevelopment will breathe new life into
the Batavia Marina precinct as part of the revitalised Geraldton foreshore.
Enhancing the connectedness of the Museum and its site with both city and
community has been a core principle during the masterplan exercise. The
concept design therefore aims to integrate themes of history, innovation,
environment, community engagement and education.
The Museum precinct will include a series of inspiring new exhibition and
public spaces that form a natural transition between the existing building
and the surrounding marina, with onward links to the city centre and other
visitor attractions. Softening the boundaries between the current building
and its surrounds, a significant extension is proposed towards Foreshore
Drive that will engage the street and invite visitors to view the sights and
sounds of the Museum from a new public square.
This gateway space provides the foreground setting for the new gallery
and foyer building which features an attractive curved light wall to greet
visitors on arrival. The building will house a number of feature galleries,
relocated shop, reception area and flexible event spaces. Other external
spaces include an enclosed forecourt to a new cafe and a sheltered
Museum garden, providing intimate locations for external exhibitions as
well as opportunities for markets and temporary events.
The outcome of the masterplanning phase is a preferred layout of interior
and exterior spaces which, if fully developed, will provide the Museum with
the following new facilities.
Museum Spaces
Immersion Gallery:
This gallery will enable hi tech visual digital experiences, in particular using
materials from the HMAS Sydney II / Kormoran search expeditions,
Square Kilometre Array (SKA), large-format multimedia presentations and
other audiovisual productions developed for key Mid West stories.
Candidates include the Abrolhos Islands and the wreck of the Batavia. The
Immersion Gallery will bring stories to life, in particular to those places and
spaces that are inaccessible to the public. This gallery will take advantage
of Geraldton’s NBN capabilities and host live feeds to events elsewhere in
the state, around Australia or throughout the world.
Investigate, Discover, Explore (IDE) Gallery:
This gallery will provide interactivity, learning, exploration and discovery
through hands-on experiences, live demonstrations, presentations and
exhibits. It will focus on inter-generational, life-long learning while also
being capable of accommodating particular audience needs such as new
national education curriculum outcomes for students or activities for
people with disabilities.
SKA Gallery:
Should Australia be announced as the site of the SKA, the world’s largest
radio astronomy project will be based at the Murchison Radio Observatory
(MRO) but will be publicly inaccessible due to its radio quiet requirements.
The SKA gallery will showcase the Yamaji interpretation of the region’s
skies and interpret the project’s science within a safe publicly available
display area.
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 6
Foyer and Community Gallery:
This space has an outlook towards Foreshore Drive and a new public
space (Museum Square). Shaped in an arc, it is a spine along which
decisions can be made by the visitor as to the experiences they will have. It
is an internal piazza space that will, when combined with the external
Museum Square, create an open flexible space that can accommodate
community exhibitions, performances, events and functions.
Reception and Shop:
The reception, cloaking and shop area will be located at the repositioned
front entrance to enhance the Museum’s location on the corner of Museum
Place and Foreshore Drive. It will create a visible gallery of activity and
inviting spaces to help locate the Museum and attract visitors to enter.
Toilets and Service Kitchen:
Additional public toilets and a small service kitchen will be required near
the reception / foyer area to service IDE, community gallery and public
gatherings.
Storage Area:
A small workshop / crate storage area will meet facility requirements for
visiting exhibitions such as those from national cultural institutions.
Museum Garden:
Connected to the foyer and IDE Gallery, the Museum Garden will be an
intimate enclosed area which maintains visual interaction between outside
and inside spaces. The garden will provide another form of gathering area
and enable outdoor exhibits or programs that are sheltered from the
environmental conditions.
Veranda Landscape Area:
A landscaped veranda along the new southern facade will provide shelter
from the extreme wind and sun conditions and facilitate greater activation
of Museum Square. It will provide comfortable public seating and access to
free Wi-Fi for use by nearby residents and business tenants as well as
Museum visitors,
Cafe with Commercial Function Area
New Cafe:
Demolition and redevelopment of the current wedge building is proposed
to provide an integrated shell building suitable for fit out and operation as a
cafe. Retention of the curved southern wall of the wedge building is
proposed as an enclosure for the cafe’s al fresco space. The cafe will
provide an important amenity for visitors to the Museum and wider Batavia
Marina.
Function Area:
An upper level is proposed above the cafe to provide a function area which
could be related to the cafe operation. It would be suitable for hire by
external parties with a small bar area, operable wall and some storage
(existing WCs on ground level would be used). Its ocean outlook lends to a
unique location for special occasions including larger Museum events.
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 7
Public Spaces and External Structures
Sun Shades:
New sun shading, as originally proposed for the Museum, is
recommended for the north facing glazed facade of the main building. This
will provide significant improvements to interior conditions, reducing the
impact of sunlight and heat on the Museum’s principal gallery and displays.
Museum Square:
Transformation of the existing Museum Place into a shared public space
would achieve greater activation potential and opportunities between the
Museum, the adjacent hotel / apartment complex and wider marina. A
pivotal civic square would be created that enables onward connectivity into
the second stage development of Batavia Coast Marina, the Bill Sewell Site
Masterplan and improved pedestrian access from the marina to the HMAS
Sydney II Memorial on Mt Scott. The concept envisages access through the
square would be allowed for some public parking and vehicular access
would be maintained to adjacent properties, albeit within a highly traffic
calmed environment suitable for safe pedestrian activities and flows.
1.3 Functional Areas
The existing museum building is currently 1,985sqm. The masterplan
proposes the addition of 1,005sqm of new museum space (excluding
storage areas, verandas, cafe and function area) which is arranged into the
following functional areas.
New Construction Ground Floor
Description Area Sqm
Gallery spaces
Immersion Gallery 100
Investigate, Discover, Explore (IDE) Gallery 170
SKA Gallery 20
Foyer and Community Gallery 600
Other Interior spaces
Reception and Shop 65
Toilets and service kitchen 50
Cafe with commercial kitchen 195
Cafe exterior area 375
Other Exterior spaces
Storage area (outbuilding) 80
Museum garden area 245
Veranda landscape area 350
Museum Square 3,000
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 8
New Construction Upper Floor
Description Area Sqm
Function space including bar, operable wall to divide the
room in two, storage area and a small reheat kitchen
265
Stairs and lift 25
New Construction – External Structures
Description Area Sqm
Sun Shades 225 *
* refer to Options Report on Louvres by Cox Architects (2010)
1.4 Construction Costs
The detailed costs to construct the proposed development are included in
Section 5 of this report and are summarised below.
Description Cost to Construct Comments
New Museum Spaces
including Garden+
Storage Area +Fit out
costs
$12,306,064 Excludes escalation and GST
(refer to Schedule One of
Master Plan Budget No.4)
Cafe (cold shell cost) $1,504,749 Excludes escalation and GST
(refer to Schedule Two of
Master Plan Budget No.4)
Function Area (cold
shell cost)
$2,789,119 Excludes escalation and GST
(refer to Schedule Three of
Master Plan Budget No.4)
Museum Square
(public space)
$3,648,624 Excludes escalation and GST
(refer to Schedule Four of
Master Plan Budget No.4)
Total $20,248,556 Excludes escalation and GST
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 9
1.5 Funding
Opportunities have been identified through consultation with stakeholders
for funding including but not limited to Royalty for Regions, CSIRO and
Federal Government. With the nature of the development, funding can be
sought in a variety of ways to cover both capital for construction costs and
fit out and ongoing operational costs.
The amount of funding will determine the extent of implementation of the
masterplan through the three potential options of:
Do Nothing – no funding available
The development of the Museum without Museum Square –
limited funding
The full site masterplan – full funding
Some of the principal funding bodies and sources are set out below, with a
note of applicable areas of support.
State Government:
Funding for increased operation costs and some consolidated revenue
funding may be available to support the application that will access
Royalties for Regions funding through the Mid West Investment Plan
(MWIP).
Mid West Investment Plan:
Support for the Museum as a flagship project, currently estimated as a $15
million project. This cost is for the Museum redevelopment only and does
not include other marina activation projects that have been identified i.e.
Museum Square.
Commonwealth Government:
Regional Development Australia funds may be available for elements
pursued in partnership with City of Greater Geraldton. This program is only
available to local governments and not for profit organisations with an
annual income of at least $1.5 million dollars.
The Regional Development Australia Fund (RDAF) is a national program to
support Australia’s regions and enhance their wellbeing and economic
development. The program is administered by the Department of Regional
Australia, Regional Development and Local Government. It is designed to
ensure that new investments build on strengths and reflect the
characteristics, opportunities and challenges of our diverse regions.
Preference will be given to applications which demonstrate partnership
funding on a dollar for dollar basis for grant requests of $5 million or less.
For grant requests over $5 million, $2 for every $1 of RDAF funding is the
criteria (Nov 2011 RDAF Guidelines).
Commercial /Private Donors:
An opportunity could exist for contributions from commercial organisations
or philanthropists. This could relate directly to the HMAS Sydney II and
Kormoran exhibition, the SKA gallery, Community gallery, IDE gallery or
Immersion gallery. Benefits including naming rights, sponsor recognition,
etc could be considered.
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 10
Australian and German Governments:
Due to the national and international interest in HMAS Sydney II and
Kormoran, there may be potential sources of funding from various
departments and programs.
Local Shires:
There may be potential synergies with Shark Bay and Carnarvon e.g. to
create display and trail links between the Museum and other visitor
destinations. The Shires of Northampton and Exmouth are further
possibilities.
Veterans groups and potential private donations:
Veterans groups and private donors could be approached to contribute to
the HMAS Sydney II and Kormoran exhibit. Recognition of donors could be
provided by way of a plaque or digital display.
SKA:
The Australian Government and international SKA members could be
approached for funding for capital and ongoing operational funding of the
SKA exhibit, given both the unique nature of the facility and also the role the
exhibit would play in keeping visitors away from the SKA site.
WA Department of Commerce:
Potential for funding may be available for the SKA gallery content and fit
out.
CSIRO – ASKAP project only:
CSIRO could be approached for funding that may exist for capital and
ongoing operational funding of the ASKAP exhibit, given both the unique
nature of the facility and also the role the exhibit would play in keeping
visitors away from the ASKAP site.
City of Greater Geraldton:
The potential redevelopment of Museum Place into Museum Square is
seen as a future project that would potentially be funded by the City of
Greater Geraldton. The masterplan for the Museum promotes the concept
of a small civic square in this location as a focal point for visitors, residents
and employees of the area, supporting the overall development of the
museum and the wider marina precinct. This could become an important
meeting and event space with a range of elements such as seating
shade, planting, removable bollards for traffic management for events,
parking, signage etc. A separate design exercise would be required to
advise more thoroughly on costs, feasibility and implementation.
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 11
2 Options Analysis
In the development of the Site Masterplan options, the following activities
were undertaken:
Inclusion of issues identified in the context analysis in Volume One
and Volume Two. This included City of Greater Geraldton planning
schemes and policies, the overall development capacity of the site
and its urban setting within the marina
Assessment of existing and planned development in the precinct
including City of Greater Geraldton and private initiatives.
Identification of functional areas identified in the needs analysis and
their relationship to each other and the surrounding precinct and
streetscape. This included considering the relationship between
functional areas within the Museum as well as the relationship of
the public entrance, shop and community gallery to the external
environment.
Consideration of synergies and conflicts with adjacent actual and
proposed developments to maximise opportunities to add value.
Consultation was undertaken with adjoining developers and the
City that resulted in the concept of the cafe and function area being
included in the masterplan. These facilities have the benefit of
enhancing the existing and future facilities in the precinct and also
attract visitors to the precinct due to improved amenities.
Assessment of stakeholder/market preference for proposed
options in terms of facilities, content and programs through the
stakeholder consultation process
The above activities resulted in the development of a number of options
with the Project Manager for review by the Project Board and Western
Australian Museum management, which arrived at the preferred
masterplan option presented in this report.
The preferred option is considered a robust and engaging proposal in
response to the shortcomings, constraints and opportunities of the
Museum in its current and emerging context. However, only the
development of the whole masterplan concept, including enhancement of
surrounding public realm, will deliver the full potential and benefits that this
flagship site can offer the local community and wider city region.
If approvals and funding cannot be secured for the complete site
regeneration, then a partial upgrade of the Museum may have to be
considered with more limited resources and outcomes for the WA
Museum, City of Greater Geraldton and the Mid West.
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 12
3 Feasibility Analysis
3.0 Scope of Analysis
The feasibility analysis has been undertaken to show the market appetite
and likely financial benefits, based on existing percentage levels of
conversions from regional population and tourism visitor numbers,
together with the environmental and social impacts.
Whilst it would be anticipated that the additional galleries and full activation
of the masterplan would increase the conversions levels, it is difficult to
predict those levels within the scope of the masterplan. Any major new
development and new galleries offering a different experience will
undoubtedly create a spike in regional visitors. It is also expected that the
SKA and enhanced HMAS Sydney II and Kormoran will attract additional
tourist visitors.
More detailed analysis of visitor numbers would take place in the
development of any business case for funding.
From a regional context the proposed Site Masterplan improvements also
meet the desired outcomes for investment in regions through:
Improving services to regional communities through the provision
of topical and technologically advanced interpretive displays to
inform and educate the community. In addition the proposed cafe,
function centre and museum square adds capacity to the regional
community and facilities for visitors;
Retaining benefits in regional communities through ensuring the
interpretation of key historical, industrial and infrastructure events
and activities are a key focus to attract visitors;
Attaining sustainability through the inclusion of sustainable
concepts in the design and construction process as well as building
in energy and water efficient services;
Expanding opportunity through the provision of facilities with a
broad based community benefit as well as economic activity
through the lease of the cafe and function area; and
Growing prosperity through creation of a new economic activity in
the marina area and increased employment.
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 13
3.1 Market Appetite
The stakeholder consultation process identified a number of key initiatives
that would increase attraction of the Museum to visitors.
The key elements of additional gallery space the masterplan provides for
are:
An effective community exhibition space to support the local
community by way of exhibitions and displays. There had
previously been an area dedicated to this however this had been
replaced with the HMAS Sydney II Gallery. There was strong
support for the reinstatement of community gallery space in the
consultation process. The way in which this space has been
integrated in the master plan provides for a more flexible and
visible area that relates effectively to other spaces within the
Museum.
A Square Kilometre Array (SKA) gallery to provide an
interpretation of the new radio astronomy project. This inclusion
will provide the basis of informing the public of the radio
astronomy activities at the MRO facility. The MRO will not be
publicly accessible due to its radio quiet requirements. The
Museum provides an excellent public venue for displaying the
activities and providing informative exhibitions and events such as
public lectures or video links to scientists working at the MRO.
An Immersion Gallery will provide the opportunity to provide a
visual digital experience with regards to displays and exhibitions.
There is an increasing interest by the public in exhibitions of this
nature.
An Investigate, Discover, Explore (IDE) gallery to provide
interactive displays.
The masterplan also includes additional experiences expected by visitors
to Museums, as follows:
Provision of a shell for a cafe to be built on the current wedge
building location, leased to an operator to fit out. Discussions with
the developer of the apartment hotel in the marina indicate an
interest in taking on the lease for such a development. Creating a
cafe as part of the Museum masterplan will provide an amenity for
Museum visitors and will also attract people to the precinct.
Provision of a function area above the café, built as a shell leased to
the cafe operator or other party. It would be serviced by the cafe.
There was strong demand in the consultation process for a quality
function area of the size proposed. Its location with views over the
marina would make it an attractive option for special events and
meetings. It could also be used for larger Museum events and
presentations.
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 14
3.2 Visitor Levels
Increased levels of visitors to the Museum precinct in excess of the
historical levels outlined in the interim report are projected due to:
Increased numbers of cruise ships visiting Geraldton and the
relocation of the public jetty at the termination of Museum Place
between the hotel complex and the Museum. This will provide a
higher visibility for the Museum to cruise ship passengers and,
combined with the hotel and museum public amenities, will
provide for greater capture of this market segment.
Increased population growth in the region
Increased tourism to the area
Further development of the marina precinct
The uniqueness and attractiveness of improved galleries will have
greater appeal to a wide range of the local population including
school groups.
The uniqueness and attractiveness of exhibitions such as the
HMAS Sydney II, SKA and shipwreck galleries will attract visitors
with a historical and scientific background who are visiting Western
Australia.
The May 2011 Mid West Investment Plan 2011-2021 developed by the Mid
West Development Commission highlights the following key strategies and
growth aspects for the region.
The Western Australian Planning Commission in 2004 had forecast the
population in the Mid West region to grow to 55,000 by 2015. However this
was almost reached within 5 years.
The estimated population in the Mid West Region in 2009 was 54,984 and
for City of Greater Geraldton (CGG) it was 38,777. The CGG therefore had
70.5 % of the regional population and this percentage has been used to
identify potential growth in that area.
Projected growth based on planned and possible major projects and
outcomes from prospective industry development would result in
increases to the population as outlined in the following table.
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 15
Source 2009
Region
2009
CGG
2016
Region
2016
CGG
2021
Region
2021
CGG
2026
Regional
2026
CGG
2031
Regional
2031
CGG
Australian Bureau of
Statistics
54,984 38,777 63,014 44,424 70,510 49,709 79,103 55,767 88,628 62,482
Western Australian
Planning Commission
N/A N/A 55,400 N/A 57,000 N/A 57,800 N/A 58,100 N/A
Economic Forecast N/A N/A 63,990 45,112 72,960 51,436 81,305 57,320 90,431 63,753
Economic Forecast with
Multiplier
N/A N/A 70,089 49,412 79,824 56,275 89,988 63,448 99,681 70,275
These growth projections provide significant opportunity for increased
visitation to the Museum by Mid West residents and visitors from
interstate, intrastate and overseas.
In addition to the growth in population the MWDC Investment Plan also
identified that there is increasing tourism growth from domestic and
international tourists. In 2007 and 2009 there were 440,500 visitors per
year to the Mid West region of which 211,440 (48%) were tourists. Tourism
numbers are expected to increase by approximately 3.2% per annum in
Western Australia and the 2009 numbers in the table below have been
extrapolated at this rate.
Approximately 20 cruise ships a year visit Geraldton bringing
approximately 25,000 visitors per annum. It is anticipated these numbers
will increase. Discussions are being undertaken that should result in the
landing jetty for cruise passengers being moved to a location in front of the
Museum. This will increase the exposure and visitors to the Museum.
In 2007/08, 7.6% of intrastate, interstate and international visitors to the
region visited the Museum. In 2008/09 27.7% of local (CGG) residents
visited the Museum.
Museum surveys indicate that 33% of local visitors to the Museum are
repeat visitors but that it may be as high as 78%. There is not enough data
to ascertain if the return visit is in the same year and accordingly it has
been assumed that it was in a previous year for the projections in the table
on the following page.
The table on p.16 below outlines the known historical information and
projects potential visitors to the Museum based on existing patronage
levels as a percentage of visitors and regional residents.
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 16
Actual
2008
Actual
2009 Actual
2010 Actual
2011 Estimated
2016
Estimated
2021
Estimated
2026
Estimated
2031
Australian Bureau of Statistics Projections
(CGG residents)
38,070 38,777 40,537 43,005 44,424 49,709 55,767 62,482
Number of Visitors to the region 440,500 440,500 454,600 469,100 549,000 642,500 752,000 880,300
Number of Museum visitors 44,041 42,650 47,114 40,372 53,579 62,599 72,559 84,210
Percentage of Museum visitors of total
visitors from outside of the Region
7.6% 7.2% 7.9% 6.8% 7.6% 7.6% 7.6% 7.6%
Number of Museum visitors from outside
of the Region
33,471 31,716 35,913 31,898 41,724 48,830 57,152 66,903
Number of local visitors as a percentage
of local population of CGG
27.7% 28.1% 27.6% 19.7% 27.7% 27.7% 27.7% 27.7%
Number of Local visitors 10,570 10,934 11,201 8,474 12,305 13,769 15,447 17,307
Total actual and projected visitors 44,041 42,650 47,114 40.372 53,579 62,599 72,559 84,210
Notes:
1. Population for 2010 and 2011 are estimates
2. Museum statistics not fully complete for split of visitors in 2009,
2010 and 2011 and estimates made.
3. Projections for 2016 to 2031 for split of visitors have been made on
the known 2008 breakdown.
4. 2010 and 2011 visitors to the region are based on estimates
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 17
3.3 Environmental Financial and Social Sustainability Strategies
Strategies that contribute to the environmental, financial and social
sustainability of the site masterplan are outlined below.
These strategies reflect opportunities for the Museum in delivering major
social, cultural and economic outcomes for the City, the Region and State.
Strategy Environmental Financial Social Sustainability
Integrate the Batavia Coast Marina
via the Museum’s location with
significant markers in the CBD -
Foreshore Drive and BCM Stage 2;
Geraldton Foreshore and CBD; Bill
Sewell Complex; and HMAS Sydney
II Memorial at Mt Scott.
Batavia Coast Marina to become a
destination that attracts general
activation through spaces such as
the cafe and function areas,
improved Marina frontage and
public jetty, and Museum Square.
Museum extension designs to
complement relevant existing and
proposed developments in the City
to create a sense of place and
belonging for the community.
Spaces such as the public foyer and
community gallery to encourage
higher Museum visitation and
participation through creation of civic
spaces.
Create economic opportunities
through a café and function space
that enhance the visitor experience
in the Marina area.
Increase visitor numbers to the
Museum with increased revenue
potential resulting through
commercial leasing, donations,
retail, venue hire and functions.
Create economic opportunities for
the community via Museum Square
through activities such as markets,
performances and events.
Create a community amenity in the
Marina that is a destination in its
own right, and enables the
Museum’s own potential to develop
in its delivery of services to the
community.
Offer Museum experiences inside
and outside of the Marina precinct
that support the City’s Creative
Social City Plan
Expand gallery areas and increase
exhibitions in response to emerging
contemporary stories of national and
international significance
Use design guidelines that support
the environment in terms of
architectural design, materials and
sustainable energy and water
usage.
Increase visitor numbers to the
Museum with increased revenue
potential resulting through
commercial leasing, donations,
retail, venue hire and functions.
Create exhibition material that can
be used via technology, trails or
other exhibits to elsewhere in the
state e.g. the HMAS Sydney II /
Kormoran story in Geraldton, Shark
Bay and Carnarvon, and the SKA in
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 18
Strategy Environmental Financial Social Sustainability
Create flexible spaces to enable
development of other Mid West
content as opportunities arise.
Geraldton and Shire of Murchison.
Develop NBN content delivery
mechanisms to increase audiences
Encourage multiple narratives and
community content creation using
the Community foyer and gallery
Provide interactive education
services and lifelong learning
opportunities
Understand the world we live in
through historical and contemporary
stories from our region.
Enable both formal and informal
sharing of knowledge and
encourage curiosity, enquiry and
creativity.
Identify opportunities for
sponsorship
Use partnerships and collaborations
with agencies and industries in the
region to create content and
opportunities in the IDE Gallery
Improve community and visitor
knowledge and understanding of
stories of a local, national and
international significance.
Offer Museum experiences inside
and outside of the Marina precinct
that support the City’s Creative
Social City Plan and that allow
people to meaningfully relate to their
history, heritage, culture and
environment.
Implement renewable energy
systems and interpret science and
technology used by the renewable
energy sector in the region
Incorporate within exhibitions
examples of how sustainable
initiatives have been utilised in the
Museum design, construction and
operation
Minimize operating and
maintenance costs through
sustainable design
Potential revenue dependent on
amount of energy expended vs
energy created
Sustainable design, water and
energy use that can be practicably
demonstrated and interpreted to the
community.
Become an active participant in a
sustainable Mid West.
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 19
3.4 Financial Implications
To assess the financial impact of the proposed development on the
Museum’s recurrent budget, the income or operating cost of the proposed
new areas has been estimated based on a full year’s operation and related
to the new construction aspects only.
The increasing population and visitor numbers will in themselves drive
additional income. However, the additional and improved facilities will
ensure that the ratio of visitor numbers are maintained and enhanced.
The additional facilities will also enable a greater number of special events
and community activities to occur. These could be in the function area or
the Museum foyer and community gallery.
The cafe and function area could be leased to a third party or potentially the
Museum could lease the cafe area to an operator and maintain control of
the function area and rent it out to other parties as required.
Existing income streams for the Museum come from the following:
Donations
Guided Tours
Education
Public Programs
Shop
The estimated increase in income from these sources by 2016 and 2021 is
shown over page and is based on an estimated average spend of a
planned 46,000 visitors in the 2012/13 budget, projected for the estimated
future visitor numbers.
As a result of the proposed development the following additional income
streams would also be available:
Community gallery foyer area for functions (it is proposed that this
should be able to be secured as a separate area if required)
Cafe lease
Function area lease or individual rentals
The predicted financial implications for the Museum of growth in visitor
numbers and developing new facilities are set out in the following table
(note all values are in 2012 $).
Recurrent operating costs would be impacted by the increased size of the
facility and would include maintenance to the structure of the cafe and
function centre.
There is currently 1,985sqm of existing museum building. The planned
development will add the following built areas:
Museum – 1,005sqm (excluding storage areas, verandas etc)
Cafe – 195sqm
Function area – 290sqm
The estimated impact of the new facilities on operational costs is also
included in the table on p.21 (explanation of the income and cost basis is
shown in the notes below the table).
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 20
INCOME SOURCE Impact Description 2013 2016 2021 2026 2031
Donations Increase in visitors $60,000 $70,000 $81,700 $95,100 $110,300
Guided Tours Increase in visitors $5,000 $5,800 $6,800 $8,000 $9,300
Education Increase in visitors $4,700 $5,500 $6,400 $7,300 $8,400
Public Programs Increase in visitors $11,000 $12,800 $15,000 $17,400 $20,200
Shop Increase in visitors $155,000 $181,000 $210,900 $244,700 $283,800
Rental income – foyer and
community gallery
Note 1
The foyer/community gallery could be secured
from the rest of the museum and rented out for
functions and events.
N/A $39,000 $39,000 $39,000 $39,000
Lease income – Cafe.
Note 2
Lease income as a result of the leasing of the cafe
to an operator
N/A $26,500 $26,500 $26,500 $26,500
Lease income – function area.
Note 3.
Lease income as a result of the leasing of the
function area to an operator
N/A $6,000 $6,000 $6,000 $6,000
Total Income $235,700 $346,600 $392,300 $444,000 $503,500
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 21
ADDITIONAL EXPENDITURE
Staffing. Note 4 Staffing levels N/A $150,000 $150,000 $150,000 $150,000
Annual maintenance of additional
Museum area. Note 5
Maintenance on newly constructed areas N/A $72,000 $72,000 $72,000 $72,000
Annual maintenance of cafe and
function area. Base building only.
Note 6
Maintenance on newly constructed areas N/A $14,000 $14,000 $14,000 $14,000
Cleaning. Note 7 Cleaning on newly constructed areas N/A $26,000 $26,000 $26,000 $26,000
Utilities. Note 8 Power usage for newly constructed areas and
exhibits.
Water usage for additional toilets and facilities
Gas usage for additional facilities
N/A $66,000 $66,000 $66,000 $66,000
Security. Note 9 Security contract N/A $0 $0 $0 $0
Misc. Note 10 Various costs of operating the facility N/A $15,000 $15,000 $15,000 $15,000
Total Additional Expenditure N/A $343,000 $343,000 $343,000 $343,000
Note 1 - Lease based on cold shell and operator fitting out the cafe. The
lease income has been estimated based on discussions with local agents
and property consultants. Investigations with local property advisors have
indicated that a cold shell lease of $200 per sq m plus outgoings could be
applied to the cafe area as an initial lease. The initial rate would be subject
to future agreed reviews.
Note 2 - It is anticipated the function area and the cafe would be leased to
the same party as the cafe or alternatively control could remain in house
and outsource bookings and management. If the latter was chosen there
would be additional costs to fit out the facility. The basis of income shown is
to lease the facility to an operator and is a result of investigations with local
property advisors who have indicated that $100 per sq m plus outgoings
may be an acceptable lease level.
If the facility was rented out it could be anticipated that say initially 2
bookings per week at $600 could result in an income (before costs) of
$60,000 per annum.
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 22
Note 3 - An allowance of 6 events per year at a rental of $1000 per event
has been made.
Note 4 – From discussions with Museum management the increased
gallery space and types of activity will result in an estimated two new full
time positions and conversion of part time positions into full time roles. The
financial impact of this is estimated at $300,000. It should be noted that
increased patronage of the Museum through population growth and
tourism would have resulted in at least 50% of this costs being incurred.
Accordingly the lower amount has been included as reflecting the
proposed development costs.
Note 5 – An average allowance of 0.9% ($72,000) per annum of capital cost
should be allowed for maintenance over additional construction for the life
of the facility as a life cycle cost. This is consistent with what would be
reasonably expended to maintain the asset in an effective manner. This
would be low in the first years and vary each year as the facility was
maintained and various elements replaced or refurbished. Financial
implications shown are an average cost per annum. Note that the current
maintenance costs for the existing facility are budgeted at $88,000 for
1,985sqm.
Note 6 – Museum would be responsible for maintaining base building. Cost
would be recoverable in the lease rental set so should be neutral. Lessee
to be responsible for all cleaning and maintenance of plant and equipment
and furniture.
Note 7 – Cleaning costs increased as a percentage of existing for new
areas of construction. No costs allowed for cafe and function area as a
Lessee cost.
Note 8 – Inclusion of energy saving design principles and solar power has
the opportunity to reduce these costs. Power costs for cafe and function
centre to be lessees cost.
It is anticipated the water usage impact will be minimal with reduced
garden areas and use of water saving initiatives in the design. Water costs
for cafe and function centre to be lessees cost.
Gas usage increase would be minimal with cafe and function areas’
lessees covering the cost of those areas
Cost increase has been estimated based on current sqm costs.
Note 9 – It is not envisaged there would be any significant increase in the
security contract
Note 10 - Based on allocating sqm rate for existing to new areas.
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 23
4 Concept Plans
The following plans, elevations, sections and perspective sketches
illustrate the Site Master Plan vision. The following pages also contain
Design Principles with images of feature buildings and public realm that
provide examples of potential design outcomes.
The concept plans reflect the area schedule outlined in Section 1.3 which is
repeated opposite. In the development of the concept drawings,
consultation was undertaken with Museum Management in respect of the
areas required and the relationships between each area from an
operational aspect. Area schedules were prepared and agreed to clearly
outline the additional facilities and areas required.
New Construction Ground Floor
Description Area Sqm
Gallery spaces
Immersion Gallery 100
Investigate, Discover, Explore (IDE) Gallery 170
SKA Gallery 20
Foyer and Community Gallery 600
Other Interior spaces
Reception and Shop 65
Toilets and service kitchen 50
Cafe with commercial kitchen 195
Cafe exterior area 375
Other Exterior spaces
Storage area 80
Museum garden area 245
Veranda landscape area 350
Museum Square 3,000
New Construction Upper Floor
Description Area Sqm
Function space including bar, operable wall to
divide the room in two and a small reheat kitchen
265
Stairs and lift 25
Continuity of characterThe character of the museum will be enhanced by the extensions which respect and reference some of the dis nc ve forms of the exis ng building, par cularly curvatures and scale.
A recognisable landmarkThe museum is a landmark element within the Geraldton townscape. It is visible from many vantage points. The extension will signifi cantly enhance the landmark quality of the museum and ensure that the building acts as a marker within the urban landscape. The museum building will become a well linked part of the story of Geraldton and central to local storytelling.
‘The arc’ The proposed extension provides the museum with a refreshing new main entrance, Community gallery, Immersion gallery and Interac ve-Discovery-Educa on (IDE) space. The sweeping arc of the western side of the new gallery provides a dis nc ve, illuminated and welcoming face to the street. The curved ‘light catcher’ wall is an inters al element between the museum interior and the outside and an a rac ve enclosure for a new public square to Museum Place. When lit up at night, it will rise up as a 2 storey light box, par ally transparent, par ally translucent and alive with informa on about what is happening within the building. It could include a veranda element providing a sheltered outdoor space fron ng the square.
Orientation and way findingAt various loca ons visible from both within and outside the building, a series of marker sculptures or installa ons will act as beacons to a ract and help orient the visitor. These will be complementary to the dis nc ve design of new buildings and will be public art opportuni es adding to the richness of the stories told by the museum.
The confi gura on of the expanded museum provides clear orienta on for visitors to begin their journey through the various galleries. The visitor can easily access the core of the museum or peripheral a rac ons, with a number of vistas becoming available through the building along four points of the compass. There will be a northerly vista through the building out over the marina providing access out to the cafe and alfresco. A view east will draw visitors out into the sheltered museum garden.
DESIGN ELEMENTSWA Museum - Geraldton
howeler + yoon architecture‘light dri ’ interac ve RFID ligh ng installa on, philadephia, U.S.A 2010images: howeler + yoon architecture
Geraldton Museum, WA
Olson Kundig Architects - Lightcatcher at Whatcom Museum , Bellingham, WA
The famous viking ship of Reykjavik Also known as: Sólfar - Sun Voyagerin Reykjavík, Iceland, by Jón Gunnar Árnason.Image: Marjolein
Adrien Fainsilber, Nanterre & Liliane Grunig - Tribel,F. Tribel, ParisMuseum für Moderne Kunst, StraßburgImage: Bega
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 24
Marina frontageThe northern eleva on of the museum facing the marina will be completed with the addi on of louvred sun shading to protect the facade. The marina frontage of the museum will a ract increased ac vity with proposed public sea ng along the veranda. The new cafe will open up onto the boardwalk while s ll off ering a sheltered si ng area away from sun and wind. Above the cafe, a second storey func on venue will have excellent views out over the water. A proposed public je y at the end of Museum Place will enable large passenger boats to berth and visit the museum and precinct. A small visitor centre can be included into the cafe facility to inform people as they arrive at the precinct by boat.
Museum SquareSheltered from the wind and north-westerly sun, the square will reinvent Museum Place as a space for people to gather. This space can host markets, displays and performance and will be developed as a joint project with the City of Greater Geraldton. The backdrop of ‘the arc’ will en ce people into the square and the museum both during the day and evening.
Foyer and community galleryThe foyer has the poten al to fulfi l a number of key roles for the future museum. It principally acts as a circula on and ‘break out’ space providing fl ow between galleries and smaller rooms. It is also the direct link to the garden and new public square. Within the foyer, there is room for the recep on, cloaks and shop, temporary display (as a community gallery), gathering of large groups (such as school children) and a star ng point for tours. There is also scope to host func ons and events connected to the galleries that could spill into the cafe, the garden or out to the marina. A kitchene e is provided between the new foyer gallery and the IDE gallery to facilitate this.
Cafe and function area A single storey cafe will be located near the exis ng wedge. This will be an integrated element of the overall museum, providing a well connected amenity with good capacity, exposure and dual aspect out over Museum Place and the marina (including any new public je y). A small recep on/visitor area can be included for visi ng cruise passengers. It is important that the cafe can be accessed from the promenade, the public street and internally from both the main gallery and the museum foyer. The cafe will be suitable as a hired venue and will have adjustable screened par oning to enable it to be opened out to either external or internal spaces, subject to weather condi ons. Retaining the curved wall of the wedge building will provide a dis nc ve enclosure for the external sea ng area for the cafe.
Museum gardenThe museum garden provides tranquil respite from the open built environment, with scope for outdoor display or ac vity space that is sunny yet sheltered from the wind. The garden will have a vista back into the new foyer and IDE gallery, maintaining visual interac on between outside and inside spaces.
DESIGN ELEMENTSWA Museum - Geraldton
lahznimmo architects - Armory Wharf Café, Sydney,Image: Bre Boardman
Arkhefi eld and Total Project Group Architects in assoc - The Cairns Cruise Terminal Image: Sco Burrows
Hames Sharley Architects - Mandurah War Memorial, WA
Lumascape Ligh ng
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 25
MaterialsUse environmentally accredited materials with low embodied energy and low VOC.Use recycled and locally sourced materials.
WaterAim for Museum to be water balanced and include ini a ves such as: Rainwater collec on and recycling for non potable uses. Waterless vacuum technology toilets.
StormwaterImprove stormwater management around site through, for example: Direct runoff in impervious external spaces into below surface fi ltra on tanks, prior to discharge to
the public drain. Passive deten on and treatment of surface runoff within so landscaped areas using pervious natural
materials and ‘sedgebeds’ prior to recharge to the local groundwater aquifer. Sub soil irriga on using captured rainwater (from roofs).
EnergyPassive solar design for extension verandahs, north facing shaded closing to IDE.External adjustable shading elements to control heat and light gain, reduce energy consump on.High performance insula on and independent thermosta cally controlled environment to new (community) gallery.Photovoltaic energy fed back to grid – designed as integral part of the building. Solar powered controls and climate/daylight monitoring (BMS and weather sta on).‘Green switching’ of lights and power-mo on sensor or occupier controlled, limi ng stand- by power usage.
WasteSeparate glass, plas cs and aluminium at source and dispose through recycling centre.
Transport Provide bicycle storage and end of trip facili es for staff and bicycle racks for visitors. Support pedestrian and public transport links to other a rac ons in Geraldton.
EducationDisplay and interpret PV energy produc on and rainwater collec on and reuse.
SUSTAINABLE INITIATIVESWA Museum - Geraldton
Building-integrated photovoltaic installa ons Image: Bethany, REI
Building-integrated photovoltaic installa ons , EuropeImage: Kuraray Europe GmbH, Division TROSIFOL
Wellington waterfront, New ZealandImage: Ian Stanger
Building-integrated photovoltaic installa ons Image: Atlan s Energy Systems
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 26
Ground Level
SITE MASTERPLANWA Museum - Geraldton
N.T.S
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 27
Upper Level
SITE MASTERPLANWA Museum - Geraldton
N.T.S
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 28
FLOOR SPACEWA Museum - Geraldton
Ground LevelWA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 29
N.T.SN.T.S
FLOOR SPACEWA Museum - Geraldton
Upper LevelWA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 30
N.T.S
PERSPECTIVESWA Museum - Geraldton
Axonometric view from South
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 31
PERSPECTIVESWA Museum - Geraldton
Axonometric view from North-west
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 32
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 33
5 Staged Implementation Plan and Costs
The preferred implementation plan is to undertake the development as
outlined in the masterplan as this achieves the outcomes sought and
provides a Museum facility that meets future service delivery objectives of
the Western Australian Museum. An indicative programme including
estimated design and construction timing is outlined on the following page.
An option for staging the build could be to complete the additions to the
Museum galleries as a first stage and the inclusion of the cafe and function
area at a later stage.
The cafe could be also developed without the function area. However, there
would be cost implications of building a ground floor shell and then an
upper floor at a later stage. Therefore, a commitment to demolition of the
existing wedge building and its replacement with a two level building
housing a cafe and function suite would be the more practical scenario. In
addition, from a leasing perspective, the consultation phase identified that
there is an interest in an outside party being involved with both the cafe and
the function centre. It would be recommended that discussions commence
with regards to a potential lessee as soon as possible to enable this to be
pre-committed prior to a construction contract being let.
As outlined in Section 1.4, the estimated project cost excluding escalation
and GST is $20,248,556. The total professional fees are estimated at
approximately $2.2M including Museum Square. However, the figure is
$1.82M for the Museum, cafe and function area without the new square.
The estimated architectural fees as a component of total professional fees
are approximately $0.52M. Fee calculations for each component of the
masterplan are shown in the table on page 35. If the extension to the
Museum and cafe and function area were developed as one package, with
the new square on Museum Place redeveloped as a separate phase, the
estimated architectural fees would look as follows:
Stage Estimated Architectural Fees
for Museum, Cafe and
Function Area
Estimated (Landscape)
Architectural Fees for
Museum Square
Design Brief $37,207 $14,862
Schematic Design $55,810 $22,293
Design Development $74,414 $29,723
Contract documentation $111,620 $44,585
Contract Administration $81,855 $32,696
Defects Period $11,162 $4,459
Total (excl. escalation, GST
and disbursements)
$372,068 $148,617
Note: Estimated Architectural Fees based on the BMW Standard Panel Pre determined fee
scale for Complex Projects and on the Net Perth based Estimated Total Cost (ETC).
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 37
Indicative Staging:
In terms of indicative staging, the table below outlines a phased
construction of the Site Masterplan according to the overall project costs
(design fees plus construction costs), projected over 4-5 years.
Stage: Design/Approvals Phase Phase 1 Phase 2 Phase 3 Completed Site Development
Description: Master planning
Approvals, Detailed
Design,
Documentation
Main extension to
Museum including
Garden, Storage Area
and external works
Demolition of Wedge
Building and development
of new Cafe and Function
Area (cold shell cost)
Redevelopment of
Museum Place,
modifications to services,
build new Museum Sq
Museum, Cafe, Function
Area and Museum
Square
Timeframe: 2012 2013-2014 2014 2015 2012-2015
Costs to construct:
at Geraldton Prices
(excl. escalation and GST)
n/a $8,004,912 $3,168,468 $2,692,339 Total $13,865,719
Budget Allowances:
(incl. fit out costs and all
professional fees)
- $4,301,152 $1,125,401 $956,285 Total $6,382,838
Indicative Project Costs
by QS Schedule:
excl. escalation and GST
- $12, 306,064 $4,293,868 $3,648,624 Total $20,248,556
excl. escalation and GST
Adjusted Professional
fees by Phase:
(excl. escalation and GST)
$1,538,149
(approx. 70% of total
professional fees)
$219,736
(nominal 10% of total
professional fees)
$219,736
(nominal 10% of total
professional fees)
$219,736
(nominal 10% of total
professional fees)
Total Prof. Fees $2, 197,358
Adjusted Project Costs by
Phase:
excl. escalation and GST
$1,538,149
$11,148,955 $4,070,019 $3,491,433 Total $20,248,556
excl. escalation and GST
WA MUSEUM GERALDTON SITE MASTERPLAN - Final Report 38
6 Conclusions and Next Steps
The Site Masterplan for the WA Museum, Geraldton was tasked with
addressing not just the Museum but the wider site and its context, including
outdoor spaces, buildings and public and staff facilities. In accordance with
the project brief, the masterplan has sought to provide direction for:-
The development of the site as a significant cultural and
educational institution and visitor attraction, ensuring connections
to existing and future developments in and around the Batavia
Coast Marina, the City of Geraldton and the wider Mid West region;
Improved interpretation and access to unique historical and
contemporary heritage and stories, including those of HMAS
Sydney, HSK Kormoran and the Square Kilometre Array.
Delivering flexible spaces within the Museum site that allow for
museum and community-led programming, ensuring a constantly
refreshed offer; and
Extending visitor services that support and add value to core
experiences, meeting increasing demands of visitors for an
engaging, interactive experience using World-Class collections
combined with the best of contemporary design and interpretation;
Through a discrete consultation exercise, thorough site analysis and
options planning, a carefully worked out sequence of new spaces has been
conceived for the site that has regard to the Museum’s overall vision and
strategic objectives, current operations, income potential and ongoing
facility costs. The outcome of the masterplanning phase is a preferred
concept for a number of key interior and exterior areas which, if fully
developed, will provide the Museum with dynamic new gallery and
reception spaces, attractive public venues and integrated commercial
facilities that will help meet current challenges and grasp present and
future opportunities. In doing so, there are clear synergies with wider
strategies, regional programs and community initiatives across Batavia
Marina, City of Greater Geraldton and the Mid West region.
The masterplan is illustrated by way of a number of plans, images and
perspectives to convey the design concept and underlying principles. It is
also supported by a feasibility assessment to demonstrate the financial
benefits and report on market potential for expanding the Museum’s
facilities in light of population and visitor projections for the area. An
indication of fees and estimate of project costs related to staged
development of the site is also provided to help inform subsequent
business case development and applications for principal funding.
With the support of key partners, implementation of the new masterplan
concept for the revitalisation of the WA Museum in Geraldton can be
delivered along with wider benefits for the marina precinct, city and region.