Lampiran 1
Contoh Jurnal – jurnal yang terkait dengan Pengakuan Pendapatan
MEMORIAL VOUCHER
PT. RANTE MUTIARA INSANI NO. VOUCHER :M-ABC0001
MEMORIAL VOUCHER DATE :01.02.12
-
1 AR. PT ABC 10.500.000
AR. PT ABC / PPh 23 500.000
Over Bourden 3.000.000
Coal Hauling 5.000.000
Coal Getting 2.000.000
PPN Out 1.000.000
001/INV/RMI-ABC/I/2012 Periode : January-12
11.000.000 11.000.000
PROPOSED BY CHECKED BY INPUT BY
PT. RANTE MUTIARA INSANI NO. VOUCHER :M-ABC0002
MEMORIAL VOUCHER DATE :01.02.12
-
1 AR. PT ABC 15.750.000
AR. PT ABC / PPh 23 750.000
Rental Unit Komatsu D85 15.000.000
PPN Out 1.500.000
002/INV/RMI-ABC/I/2012 Periode : January-12
16.500.000 16.500.000
PROPOSED BY CHECKED BY INPUT BY
PT. RANTE MUTIARA INSANI NO. VOUCHER :M-ABC0003
MEMORIAL VOUCHER DATE :01.02.12
-
1 AR. PT ABC 21.000.000
AR. PT ABC / PPh 23 1.000.000
Pembuatan Bundwall, Parking Bay 20.000.000
PPN Out 2.000.000
003/INV/RMI-ABC/I/2012 Periode : January-12
22.000.000 22.000.000
PROPOSED BY CHECKED BY INPUT BYAPPROVED BY
APPROVED BY
APPROVED BY
NO. DESCRIPTION ACCOUNT DEBET KREDIT
TOTAL
NO. DESCRIPTION ACCOUNT DEBET KREDIT
TOTAL
NO. DESCRIPTION ACCOUNT DEBET KREDIT
TOTAL
45
BANK VOUCHER
PT. RANTE MUTIARA INSANI NO. VOUCHER : B01-0001
BANK VOUCHER DATE : 15.03.12
-
1 Bank Sendiri Tanjung 49.500.000
AR. PT ABC
001/INV/RMI-ABC/I/2012 11.000.000
002/INV/RMI-ABC/I/2012 16.500.000
003/INV/RMI-ABC/I/2012 22.000.000
49.500.000 49.500.000
NO. DESCRIPTION ACCOUNT DEBET KREDIT
TOTAL
46
Lampiran 2
Format Laporan Laba Rugi PT. RMI
PT. RANTE MUTIARA INSANI
LABA RUGI
Periode 31 Desember 20X1
Nilai
(Bulan Berjalan)
% Nilai
(Kumulatif)
%
Pendapatan
Jasa Pertambangan xxxx xxxx
Pendapatan Proyek xxxx xxxx
Pendapatan Rental xxxx xxxx
Total Pendapatan xxxx xxxx
Biaya Operasional Proyek
Biaya Operasional Proyek
Beban Operasional Langsung xxxx xxxx
Total Biaya Operasional Proyek
Total Biaya Operasional Proyek
xxxx xxxx
Laba / Rugi Operasional xxxx xxxx
Biaya Operasional Umum
Beban Usaha
Biaya Operasional Umum xxxx xxxx
Total Biaya Operasional Umum xxxx xxxx
Laba / Rugi Operasional xxxx xxxx
Pendapatan dan Beban Lain – lain
Pendapatan dan Beban Lain - lain
Pendapatan Bunga xxxx xxxx
Pendapatan Lain – lain
xxxx xxxx
Laba Selisih Kurs xxxx xxxx
Rugi Selisih Kurs (xxxx) (xxxx)
Beban Bunga (xxxx) (xxxx)
Biaya Lain – lain (xxxx) (xxxx)
Total Pendapatan dan Beban Lain - lain xxxx xxxx
Laba Rugi Sebelum Pajak xxxx xxxx
Biaya Pajak
Biaya Pajak
Biaya Pajak (PPH 29) xxxx xxxx
Total Biaya Pajak xxxx xxxx
Laba Rugi Bersih xxxx xxxx
47
Lampiran 3
Contoh Matrik Harga Produksi
TABEL 1 : OB RATES FOR MONTHLY PRODUCTION (US $)
HORIZONTAL DISTANCE (M)
500 1.000 1.500 2.000 2.500 3.000 3.500
VER
TIC
AL
DIS
TAN
CE
(M)
0 1,00 1,10 1,20 1,30 1,40 1,50 1,60
10 1,02 1,12 1,22 1,32 1,42 1,52 1,62
20 1,04 1,14 1,24 1,34 1,44 1,54 1,64
30 1,06 1,16 1,26 1,36 1,46 1,56 1,66
40 1,08 1,18 1,28 1,38 1,48 1,58 1,68
50
1,20 1,30 1,40 1,50 1,60 1,70
60
1,22 1,32 1,42 1,52 1,62 1,72
70
1,34 1,44 1,54 1,64 1,74
80
1,36 1,46 1,56 1,66 1,76
90
1,38 1,48 1,58 1,68 1,78
100
1,40 1,50 1,60 1,70 1,80
rmi
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
2023747
48
Lampiran 4
Paringin, 9 Februari 2012
Nomor : 001/INV/RMI-ABC/II/12
Lampirann : 1. Invoice
2. Kwitansi
3. Faktur Pajak
Perihal : Permintaan Pembayaran
Overburden, Coal Mining dan Coal Hauling to Kelanis
Kepada Yth,
PT. ABC Indonesia
Jalan Patimura, Blok 5, Kav 1-2
Salatiga, Indonesia.
Dengan hormat,
Bersama dengan ini kami sampaikan bahwa pekerjaan untuk bulan Januari 2012
telah selesai kami kerjakan.
Maka dengan ini kami mengajukan permintaan pembayaran sebesar :
Terbilang : Dua puluh dua milyar sembilan ratus lima puluh lima juta dua ratus
delapan puluh empat ribu dua ratus tujuh puluh lima rupiah
Mohon supaya ditransfer ke rekening kami A/C No. 031.009.653.0038 pada Bank
Sendiri Cabang Tanjung A/N PT. Rante Mutiara Insani.
Demikian dari kami, atas perhatian dan persetujuan dari Bapak kami ucapkan
terima kasih.
Hormat kami,
PT. Rante Mutiara Insani
Guno Gumilang
Operation Manager
rmi
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
2023747
CONTOH
49
Lampiran 5
Invoice : 001/INV/RMI-ABC/II/12
PRODUCTION PAYMENT SUMMARY
Period : Januari 2012
No Description Amount IDR
A PARINGIN PIT
1
2
3
Overburden
((300,000 BCM x $ 1,00 ) + ( 200,000 BCM x $ 1,50)) x Rp.
9.500
Coal Mining
1000 TON x $ 1,25 x Rp. 9.500
Coal Hauling
((1000 TON x $0 ,50 ) + ( $ 0,40 x 1000 TON x 5.000 KM)) x
Rp. 9.500
2.850.300.000
11.875.000
19.000.000.500
SUBTOTAL 21.862.175.500
PPN 5% 1.093.108.775
TOTAL 22.955.284.275
Tanjung, 9 Februari 2012
PT. ABC INDONESIA PT. ABC INDONESIA PT. RANTE MUTIARA INSANI
Approved By, Approved By, Approved By,
SURYONO MUSLIH GUNO GUMILANG
General Operation Manager Deputy GM. Strategic Planing Operation Manager
rmi
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
2023747
CONTOH
50
Lampiran 6
KWITANSI
Sudah terima dari : PT. ABC INDONESIA
Banyaknya uang : Dua puluh dua milyar sembilan ratus lima puluh lima juta
dua ratus delapan puluh empat ribu dua ratus tujuh puluh
lima rupiah
Untuk pembayaran : Pekerjaan Overburden, Coal Mining, dan Coal Hauling
bulan Februari 2012.
Rp.
rmi
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
2023747
CONTOH
Tanjung, 9 Februari 2012 PT. Rante Mutiara Insani
Guno Gumilang Operation Manager
22.955.284.275
51
Lampiran 7
Invoice : 001/INV/RMI-ABC/II/12
MINING SUMMARY SHEET
Period : Januari 2012
No Description Quantity
This Month Year to Date
A. PARINGIN PIT
1 Overburden Removal (BCM)
Paringin Mine
Transport Distance (m)
Vertical Distance (m)
30,000
200,000
1,500
45,00
150,000
500,000
2 Coal Mining(Ton)
Transport Distance (m)
Vertical Distance (m)
1,000
3,000
55,00
45,000
3 Coal Hauling(Ton)
Paringin Mine
Transport Distance (km)
1,000
1,000
5,000
3,000
PT. ABC INDONESIA PT. RANTE MUTIARA INSANI
Checked By, Checked By,
MUSLIH GUNO GUMILANG
Deputy GM. Strategic Planing Operation Manager
Date : Date :
rmi
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
2023747
CONTOH
52
Lampiran 8
REKAPITULASI BIAYA PEKERJAAN
MINE INFRASTRUCTURE DEPARTMENT
Uraian Pekerjaan : Capex
Cost Code : 178.20.15
Periode : 26 Januari s/d 25 Februari 2012
Nama Kontraktor : PT. Rante Mutiara Insani
No. Uraian Pekerjaan Volume Satuan
Harga Satuan
(Rp)
Jumlah Biaya
(Rp) Keterangan
1 Haul Road Wara to North Tutupan
Compactor C150 150 jam 100.000 15.000.000
Excavator CAT 330 50 jam 50.000 2.500.000
Sub Total I 17.500.000
2 Haul Road HW Construction
Compactor C150 55 jam 100.000 5.500.000
Dump Truck CWB 340 35 jam 25.000 875.000
Sub Total II 6.375.000
3 Public Road Highwall Relocation
Compactor C150 25 jam 100.000 2.500.000
Backhoe JCB/MF 02 45 jam 35.000 1.575.000
Sub Total III 4.075.000
SUB TOTAL 27.950.000
PPn 5% 1.397.500
TOTAL 29.347.500
Supplied by,
Approved by,
PT. Rante Mutiara Insani
PT. ABC Indonesia
Guno Gumilang
Hendra
Operation Manager
Mine Civilwork Superintendent
CONTOH
53
Lampiran 9
Monthly Equipment Time Sheet
Periode : 01 – 31 Januari 2012
PT. Rante Mutiara Insani
Job Site : PT. ABC Indonesia Equipment No : XE 100 S
Unit Produksi : Kobelco SK 330 Serial No : -
Contract No : 001/ABC/K/MAT/I/2012
Salatiga, 1 Februari 2012
Dibuat Oleh, Disetujui Oleh, Disetujui Oleh,
PT. Rante Mutiara Insani PT. ABC Indonesia PT. ABC Indonesia
Guno Gumilang Putra Atma
Operation Manager Coal Transport Section Head Enginering Manager
CONTOH
54
Lampiran 10
BERITA ACARA PRODUKSI
No: 001/BAP/RMI-ABC/I/12
Period : Januari 2012
Contact No : 001/ABC/K/MAT/I/2012
No Description
Total
WH
Price/WH
(USD)
Ammount
(USD)
1 Excavator Kobelco EX 100 s 50,00 20,00 1,000
Sub Total 1,000
PPN 10% 100
Grand Total 1,100
Salatiga, 1 Februari 2012
PT. ABC INDONESIA PT. RANTE MUTIARA INSANI
Approved By, Prepared By,
SAPTO GUNO GUMILANG
Production Manager Operation Manager
rmi
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
2023747
CONTOH
55
Lampiran 11
CONTOH
56
Lampiran 12
BERITA ACARA JOINT SURVEY
PT. ABC INDONESIA
DENGAN
PT. RANTE MUTIARA INSANI PROGRESS : JANUARI 2012
Pada hari ini, Senin tanggal 1 bulan Februari tahun 2012. Telah dilaksanakan
penandatanganan berita acara joint survey over burden removal dengan penjelasan
sebagai berikut :
- Berdasarkan : Perjanjian jasa penambangan batubara tanggal
1 januari 2008 antara PT. ABC Indonesia
dengan PT. Rante Mutiara Insani
- Progress pekerjaan : Januari 2012
- Pelaksanaan joint survey : 31 Januari 2012
- Volume OB removal : 100,000.00 bcm
- Jarak angkut OB : 1000 m
- Volume coal getting : 10,000 ton
- Jarak angkut batubara : 8.000 km
Terlampir peta progress dan data pendukung lainnya.
Demikian berita acara ini dibuat dengan sesungguhnya untuk dapat dipergunakan
sebagaimana perlunya.
PT. Rante Mutiara Insani PT. ABC Indonesia
Muchlis Abduloh Susilo Husodo
Deputy Operation Manager Prod. Eng. Section Head
Mengetahui,
Sandoro Adi Prakoso
Operation Manager
CONTOH
57
Lampiran 13
Invoice : 001/INV/RMI/ABC/MINING/I/2012
PRODUCTION PAYMENT SUMMARY
Period : Januari 2012
No Job Description Volume Unit Rate Total
Sudirman PIT (Rp) (Rp)
1 Over Burden
100 Ton 100.000 10.000.000
2 Coal Mining
500 Ton 150.000 75.000.000
3 Coal Hauling
Transportation
(100 Ton x 50Km )
100
5000
Ton
Ton/Km
50.000
10.000
5.000.000
50.000.000
SUBTOTAL 140.000.000
PPN 5% 7.000.000
GRAND TOTAL 147.000.000
Tanjung, 9 Februari 2012
PT. ABC INDONESIA PT. ABC INDONESIA PT. RANTE MUTIARA INSANI
Approved By, Approved By, Approved By,
SURYONO MUSLIH GUNO GUMILANG
General Operation Manager Deputy GM. Strategic Planing Operation Manager
rmi
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
2023747
SARAN
58
Lampiran 14
Invoice : 001/INV/RMI/ABC/CONST/I/2012
Working Summary Sheet
Period : Januari 2012
No Job Description Volume Unit Rate Total
Sudirman PIT (Rp) (Rp)
1 Perbaikan jalan
menuju lokasi
tambang Sudirman
PIT
20 Km 100.000 2.000.000
2 Pembuatan Kolam
Penampungan air
5000 M3 50.000 250.000.000
SUBTOTAL 252.000.000
PPN 5% 12.600.000
GRAND TOTAL 264.600.000
Tanjung, 9 Februari 2012
PT. ABC INDONESIA PT. RANTE MUTIARA INSANI
Supplied By, Approved By,
SURYONO GUNO GUMILANG
Mine Civilwork Superintenden Operation Manager
rmi
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
2023747
SARAN
59
Lampiran 15
PRODUCTION SUMMARY
No: 001/BAP/RMI/ABC/RENT/I/2012
Working Period : Januari 2012
Contract Number : -
Invoice Number : 001/INV/RMI/ABC/RENT/I/2012
No Unit Used
Total
WH
Price/WH
(Rp)
Total
(Rp)
1 Excavator Kobelco EX 100 s 50,00 100.000 5.000.000
Sub Total 5.000.000
PPN 10% 500.000
Grand Total 5.500.000
Salatiga, 1 Februari 2012
PT. ABC INDONESIA PT. RANTE MUTIARA INSANI
Approved By, Prepared By,
SAPTO GUNO GUMILANG
Production Manager Operation Manager
rmi
PT RANTE MUTIARA INSANI
General Contractor & Supplier
Jl. Belimbing D III/13 Komperta Murung Pudak
Tanjung – Tabalong 71571, Kalimantan Selatan,
Indonesia
Phone +62 526 2021301, 2023744 Fax: +62 526
2023747
SARAN
60
Lampiran 16
61
Lampiran 17
DAFTAR RIWAYAT HIDUP
Nama Lengkap : Mahatma Hendranata Saputra
Jenis Kelamin : Laki-laki
Tempat/Tanggal Lahir : Boyolali, 19 Januari 1990
Agama : Kristen
Alamat Domisili : Jalan Perintis Kemerdekaan, Bangunharjo,
RT 07 RW II, Bangunharjo, Pulisen,
Boyolali
Status : Belum Kawin
Telp. : 085643747539
Email : [email protected]
Nama Orang Tua
Nama Ayah : Hendratmoko
Nama Ibu : Sri Rahayuningsih
INFORMASI PENDIDIKAN
Pendidikan Nama Institusi Kota Tahun Lulus Jurusan
SD SD Pulisen Boyolali 2002
SMP SMP Negeri 1 Boyolali 2005
SMA SMA Negeri 1 Boyolali 2008 IPS
S1 Universitas Kristen
Satya Wacana
Salatiga 2012 Akuntansi
PENGALAMAN PRIBADI
Pengalaman Keterangan Tahun
Sertifikasi 1. Brevet Pajak A & B Fakultas
Ekonomika dan Bisnis UKSW.
2012
62
Pengalaman Organisasi 1. Divisi Eksternal Himpunan
Mahasiswa Program Studi Kelompok
Studi Akuntansi – Senat Mahasiswa
Fakultas Ekonomika dan Bisnis
2. Divisi Internal Himpunan Mahasiswa
Program Studi Kelompok Studi
Akuntansi – Senat Mahasiswa
Fakultas Ekonomika dan Bisnis.
2009
2010
Pengalaman Kerja 1. Asisten Dosen Aplikasi Spreadsheet
Fakultas Ekonomika dan Bisnis
UKSW
2. Asisten Dosen Aplikasi Spreadsheet
dan Pengantar Akuntansi Fakultas
Ekonomika dan Bisnis UKSW
2011
2012
Kepanitiaan 1. Panitia Accounting Fair “Globalisasi
Akuntansi dan Penguatan Usaha
Kecil Menengah di Indonesia”
2. Panitia Seminar Nasional “Kode Etik
Profesi Akuntan Publik”
3. Sekretaris National Seminar on
Accounting “Peran Akuntansi Dalam
Pemberantasan Korupsi”
4. Ketua National Seminar on
Accounting “ Penyusunan Laporan
Keuangan Berbasis SAK 2010”
5. Ketua National Seminar on
Accounting “ Penyusunan Laporan
Keuangan Berbasis SAK ETAP”
6. Panitia Makrab Ekonomi, “Economic
Goes To The World”.
2009
2009
2010
2011
2011
2011
63
Seminar dan Pelatihan 1. Golden 2008 ( Program Pengenalan
Fakultas )
2. Talk Show Fakultas Ekonomika dan
Bisnis
3. Latihan Kepemimpinan Pra Dasar
Mahasiswa
4. Seminar Kerohanian “Keluargaku,
Penting nggak sih?”
5. Accounting Weekend Fellowship
2008 ( Pengenalan Program Studi dan
Keakraban Mahasiswa Program
Studi)
6. Kegiatan Pelestarian Budaya Melalui
“NOANCEP”
7. Kuliah Umum “Asuransi Sebagai
Pilihan Investasi”
8. Kegiatan Basic Leadership Training
“Prepare Future Leaders In Creative
and Innovative”
9. Seminar Nasional Kewirausahaan
“Great Man Have a Great Mind”
10. Sosialisasi Undang – Undang No. 21
Tahun 2011 Tentang Otoritas Jasa
Keuangan
2008
2008
2008
2009
2009
2010
2010
2010
2011
2012
Keterampilan
Penunjang
1. Konser Kursus Ke – 13 Fakultas Seni
Pertunjukan UKSW
2. Konser Kursus Fakultas Seni
Pertunjukan UKSW “Brighten Your
Day With Music”
2010
2012