Contractor Logo
Contractor name
CLIENT
PROJECT MANAGER
Project titleProject titleProject titleProject title
DOCUMENT DOCUMENT DOCUMENT DOCUMENT DESCRIPTION:DESCRIPTION:DESCRIPTION:DESCRIPTION:
SLEEPER DESIGN SLEEPER DESIGN SLEEPER DESIGN SLEEPER DESIGN INSIDE TANK FARM INSIDE TANK FARM INSIDE TANK FARM INSIDE TANK FARM
1 Revised as marked xxx xxx xxx xxx
0 Issued for construction xxx xxx xxx xxx
B Revised as marked. xxx xxx xxx xxx
A Issued for Client’s Approval. xxx xxx xxx xxx
Rev.Rev.Rev.Rev. DateDateDateDate Revision DescriptionRevision DescriptionRevision DescriptionRevision Description PreparedPreparedPreparedPrepared CheckedCheckedCheckedChecked ReviewedReviewedReviewedReviewed ApprovedApprovedApprovedApproved
DOCUMENT NUMBERDOCUMENT NUMBERDOCUMENT NUMBERDOCUMENT NUMBER
Type Discp Job SJ Seq Format PAGES
A4A4A4A4 1111 OF 44444444
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 2 of 44
Record of Revisions
Rev Date Revision Description
A Issued for Client’s Approval.
B Revised by changing embedded beam to anchor lugs for sleepers.
0 Issued for Construction.
1 Client’s comments incorporated and revised as marked.
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 3 of 44
TABLE OF CONTENTS
Sr.
No. Description
Page No.
1. Introduction 4
2. Scope 4
3. Design considerations 4
4. Design of Steel beam and column. 8
5. Design of foundation 32
6. Annexure
Annexure 1- TANK FARM-6 SLEEPER LOADING DATA 40
Annexure 2- TANK FARM-7 SLEEPER LOADING DATA 41
Annexure 3- Beam flange bending check.
42
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 4 of 44
1. Introduction:
This document is produced to cover the design calculations of sleepers.
2. Scope:
This document presents design calculations of sleepers inside tank farm.
3. Design considerations:
a) Seismic load: Seismic load on the sleeper as per Design basis.
Seismic load combination and load factor.
While using UBC force for BS8110 combination shall be divided by 1.4 hence
Ve= 0.1/1.4 W = 0.0714 W.
BS code and Client’s design criteria is silent on load combination of thermal (friction force on
Pipe rack and sleepers so reference is made to shell DEP refer next page.
Thermal effects shall be taken along with Seismic and wind loads.
Entire Pipe loading and thermal effects are considered as Imposed load (live load) and factor
of 1.6 is applied in operational condition. So load combination in operation condition is,
= (1.4) x Dead load + (1.6) x Pipe vertical load + (1.6) x Pipe lateral load.
= (1.4) x Dead load + (1.6) x Pipe vertical load + (0.15 x1.6) x vertical load*.
= (1.4) x Dead load + (1.6) x Pipe vertical load + (0.24) x vertical load*…...a
Seismic load combination.
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 5 of 44
= (1.2) x Dead load + (1.2) x Pipe vertical load + (1.2) x Pipe lateral load + (1.2) x Seismic load.
= (1.2) x Dead load + (1.2) x Pipe vertical load + (1.2 x 0.15) x Pipe vertical load* + (1.2 x 0.0714) x Pipe vertical
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 6 of 44
Load*.
= (1.2) x Dead load + (1.2) x Pipe vertical load + (0.18) x Pipe vertical load* + (0.0857) x Pipe vertical load*.
= (1.2) x Dead load + (1.2) x Pipe vertical load + (0.18 + 0.0857) x Pipe vertical load*.
= (1.2) x Dead load + (1.2) x Pipe vertical load + (0.266) x Pipe vertical load*…………………..a
Comparing combination a and b, the operating load combination with load factor 1.6 found
more stringent so design of components are done with uniform factor of 1.6.
Although the thermal forces are not to be transferred to foundation, the foundation stability
and soil pressures are checked for forces with factor of 1.0. In this case, load component of
friction (0.15) is higher that the seismic (0.0714) so conservatively foundation are checked for
friction force of (0.15) vertical load to account for lower seismic force.
b) Wind load:
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 7 of 44
Refer BS 6399 Part -2,
Wind load on pipe sleeper having width more than 4m and pipes of 32” maximum,
Wind Load on 4 pipes = 1.2 x 4 x (32 x 0.0254) x 0.971 = 3.8 kN/m
Pipe operating weight is as follows,
Seismic load for pipes more than 4 Nos. is = 7.26 x 5 x 0.0714 = 2.6 < 3.8 kN/m is less severe than
seismic load so seismic load is governing load case over wind and wind load is neglected.
Also 1.4 DL + 1.6 LL + 1.6 LL (lateral); for superstructure design,
Is severe than 1.2 DL + 1.2 LL + 1.2 LL (lateral) + 1.2 Seismic; for superstructure design, as 1.2 x
0.0714 =0.086 W < (1.6 -1.2). For local anchors, seismic lateral force the load factor of LL (lateral)
(1.6-1.2=0.4) over 0.0714 x 1.2 seismic is governing. So stringent combination of 1.6 factor for
component design is followed for simplicity in calculations.
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 8 of 44
4. Design of Steel beam and column.
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 9 of 44
Notes: (refer table on next page)
1. Stool height varies from 100mm to 250mm as the pipes are provided at slope of 1:1000.
2. For each sleeper located 6m apart the level difference is 6mm, towards manifold.
3. Stools are shown indicative and height is worked out based on piping information i.e. drawing
number ---------and ---------------. The stools will be provided by piping group.
4. The total height for working out moment at foundation base level is = depth of foundation
below ground + height of steel beam top above FGL + stool height + half of pipe diameter.
5. Maximum size of pipe is considered for working out the moment in each sleeper in the above
expression.
6. Orientation of sleeper in table is 1 when the sleeper is along North-South and 0 when it is
Along East-West.
7. Two groups are identified in sleeper for further design, up-to lateral load of 31kN and 32kN to
63 kN.
8. Sleeper SL-053 is located on middle of culvert so only superstructure design is applicable.
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 10 of 44
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 11 of 44
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 12 of 44
SL-0
53 R
ES
TIN
G O
N P
IPE
CU
LV
ER
T- F
OU
ND
AT
ION
IS D
ES
IGN
ED
WIT
H P
IPE
CU
LV
ER
T
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 13 of 44
Beam stress check: (detailed calculation done for SL-117A and all other sleeper tabulated in table).
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 14 of 44
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 15 of 44
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 16 of 44
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 17 of 44
Factored forces on beam for anchor bolt design:
SL-117A Anchor design:
Resultant shear force = √1002+11.8 - 78.68 x µ (where µ co-eff of friction between steel
and concrete (ACI 318 Design guide).
=53.48 kN (to be used for anchor bar design)
Vertical force P= 78.68kN and moment M =18.8 kN-m (for base plate and anchor pullout
design), (minimum vertical load and max. moment is more stringent combination so adopted)
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 18 of 44
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 19 of 44
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 20 of 44
Tensile force on Anchor P= 74.9 kN = 16.83 kips.
Shear force on Anchor S= 53.48 kN = 12.02 kips.
Supplimentry reinforcement for tension:
Ast = Pu/0.9 x Fy = 74.9 x 1000 / (0.9 x 460 ) = 180mm2 .
Top 4-Nos T12 bars having area of 452mm2
Supplimentry reinforcement for shear:
Ast = Su/0.9 x Fy = 53.48 x 1000 / (0.9 x 460 ) = 129 mm2 .
Top 4-Nos T8 bars having area of 200mm2
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 21 of 44
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 22 of 44
All other sleeper anchor design. (SL-0116)
Maximum moment and corresponding axial load is considered.
Shear force is considered maximum of both tank farms.
Resultant shear force = √54.462+27.72 - 92.35 x µ (where µ co-eff of friction between steel
and concrete. =5.69 kN (to be used for anchor bar design).
Vertical force P= 72.62kN and moment M =10.23 kN-m (for base plate and anchor pullout
design), (minimum vertical load and max. moment is more stringent combination so adopted).
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 23 of 44
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 24 of 44
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 25 of 44
Supplimentry reinforcement for tension:
Ast = Pu/0.9 x Fy = 32.44 x 1000 / (0.9 x 460 ) = 78.4mm2 .
Top 4-Nos T12 bars having area of 452mm2
Supplimentry reinforcement for shear:
Ast = Su/0.9 x Fy = 5.7 x 1000 / (0.9 x 460 ) = 13.8 mm2 .
Top 4-Nos T8 bars having area of 200mm2
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 26 of 44
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 27 of 44
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 28 of 44
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 29 of 44
Beam Flange and web check for local bending/Bucking load:
Maximum load from page No of 37 of this document is 139kN/m and stiffners are provided at
750mm c/c. Weight of 8m long pipe filled with product of density is worked out on next page
and beam is checked for the same.
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 30 of 44
With load factor of 1.6, shear force is 132.8 kN.
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 31 of 44
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 32 of 44
5. Design of foundation
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 33 of 44
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 34 of 44
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 35 of 44
Moment due to eccentricity = Fy x e = 37.5 x 0.5 = 18.75 kNm (for SL019B)
1
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 36 of 44
Note-2
Note-1
1
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 37 of 44
Note-2
1
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 38 of 44
Notes:1) Note-1: sleeper shifted on pipe culvert, Note 2: Sleeper deleted.
Note-1
1
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 39 of 44
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 40 of 44
Annexure 1- TANK FARM-6 SLEEPER LOADING DATA
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 41 of 44
Annexure 2- TANK FARM-7 SLEEPER LOADING DATA
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 42 of 44
Annexure 3- Beam flange bending check.
C/c distances of biggest pipes (32”) are 1000mm for TF6 and TF7 respectively as shown.
Shoe support as per PDMS snapshot.
Beam size 203 x 133 x 25.
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 43 of 44
Client Logo
SLEEPER DESIGN
INSIDE TANK FARM
Contractor Logo
Contractor NameContractor NameContractor NameContractor Name
Job No: Doc. Revision : Date:
1
XX-X-XXXX-XX-XXXX-1Rev xx-Tank-farm Sleeper design.doc Page 44 of 44
Notes:
1. As the pipe is very stiff it is not possible that it will bend with respect to beam flange and bear on the
corner of flange. Due to any other reason it bears then it will get self adjusted by a small deflection.
2. Beam is considered as rigidly held between support point (anchor bolts) but which is not a real case It
will follow a small rotation (twisting) along with stool bottom surface to bring in one level.