Upload
david-lee
View
219
Download
1
Tags:
Embed Size (px)
Citation preview
RMS 3.0Contractor Mode
December, 2015
No official date for full switchover from QCS 2.38 to RMS 3.0 contractor mode
State of the RMS Support Contract Expect regular updates once per month
with many new features QCS 2.38 Training Video How Contractor Mode differs from QCS 2.38 Walkthrough of Contractor Mode setup
Agenda
Once RMS Contract resolved expect one video a month
First Video: Installing QCS 2.38 https://youtu.be/LvOwSRCBOSo
RMS Training Videos
No more QCS Site ID – everything based on Contractor ID
Ability to assign permissions Instant updates of information (no more
imports/exports) Ability to work offline and upload later Ability to attach files in many locations
How Contractor Mode Differs
Each contract must be assigned to a Prime contractor by USACE in RMS 3.0
USACE adds first staff member to contractor staff and sets them as administrator
Contractor sets up permissions for each staff member
Staff member logs in and selects prime contractor to access contracts
Contractor Mode Walkthrough
Contractor ModeAssignment of Prime Contractor by Govt.
Contractor ModeLogin, prime contractor selection, contracts
Power point file available at: http://rms.usace.army.mil/datafiles/RMSDec2015Ktr.zip
Conclusion