50
AXIS BSC SWAP SITE SURVEY REPO SITE NAME : Royal Tower River CITY : JAKARTA AREA : NORTH JAKARTA SITE TYPE : BUILDING ADDRESS Acknowledged by: Name : Disra Agifral Name ID : WX44837 ID Position : Survey & Design Position Engineer Signature : Signature Date : Date : Jl. Pluit Karang Pluit, Kec. Penjari

Copy of BSC Survey Royal Tower

Embed Size (px)

DESCRIPTION

x

Citation preview

Page 1: Copy of BSC Survey Royal Tower

AXIS BSC SWAPSITE SURVEY REPORT

SITE NAME : Royal Tower Riverside Apartemen

CITY : JAKARTA

AREA : NORTH JAKARTA

SITE TYPE : BUILDING

ADDRESS

Acknowledged by:

Name : Disra Agifral Name : Teguh P. LaksonoID : WX44837 ID :Position : Survey & Design Position : Site Survey PIC

EngineerSignature : Signature :

Date : Date :

: Jl. Pluit Karang Barat, no 50, Kel. Pluit, Kec. Penjaringan, North Jakarta

Page 2: Copy of BSC Survey Royal Tower
Page 3: Copy of BSC Survey Royal Tower

1. INDEXSite Name Royal Tower Riverside Apartemen City Jakarta

Area North Jakarta Site Type Building

0 . COVER

1 . INDEX

2 . GENERAL INFORMATION

3 . ENVIRONMENT INSPECTION FORM

4 . BSC SURVEY DATA

5 . DATACOM SURVEY DATA

6 . POWER SUPPLY

7 . SMR WORKS & REMARKS

8 . PHYSICAL NETWORK DIAGRAM

9 . PROPOSED FLOOR PLAN

10 . PHOTO REPORT

Site View

Page 4: Copy of BSC Survey Royal Tower

2. GENERAL INFORMATION

Project Name Axis BSC Swap ProjectSite Name Royal Tower Riverside Apartemen Jakarta Area PluitStreet Address Jl. Pluit Karang Barat no. 50, kel.Pluit, kec. Penjaringan - Jakarta UtaraSite Type Building Owner Ericsson Date of Survey 8-Jul-11List of Surveyor:

No. Name Company E-mail Cell Phone1 Disra Agifral Huawei +62878800011072 Hariyadi Widagdo Huawei +628119108707

List of Customer PIC:No. Name Company E-mail Cell Phone1 Teguh P. Laksono Axis +6283828000522 Immanuel Suranta Axis

List of Proposed Equipments:

No. Equipment Type

1 BSC6900 Cabinet 2 600x800x2200 2(2500) 2(63A x 2, 100A x 2)

2 RNC6900 Cabinet 1 600x800x2200 2500 63A x 2, 100A x 22 CX600-X3 Cabinet 1 600x800x2200 1200 63A x 2

3 OSN 1800 (Module) 450

4 NE40E-X3 Cabinet 2200 63A x 2

[email protected]@huawei.com

[email protected]

CabinetQuantity

Dimension(W x D x H) mm

Power(Watt)

MCB x Pcs(AC / DC)

Insert to CX600 Cabinet

1Cab+1 Module

Page 5: Copy of BSC Survey Royal Tower

5 S9303 700 32A x 2

6789

2 modules will be inserted to NE40 Cabinet

Page 6: Copy of BSC Survey Royal Tower

3. ENVIRONMENT INSPECTION FORMSite Name Royal Tower Riverside Apartemen City Jakarta

Area Jakarta Site Type Building

BSC6900

Inspection Items Status RemarkEquipment Room

There is an available equipment room for this project

The existing room is ready in space

The existing room is ready in decoration

The existing room is ready in air conditioner

The existing room is ready in cable tray Require New Tray

Power System

The main AC power (for rectifier & UPS) is available

The main AC breaker(for rectifier & UPS) is enough

The branch AC power (for equipment) is available

The branch AC breaker(for equipment) is enough

The rectifier is available and enough in capacity

The rectifier fuse is available and enough in capacity

The DCPDB/PDF is available and enough in capacity Require New DCPDB

The DCPDB MCB is available and enough in capacity Require New MCBs

The grounding bus bar is available

Transmission & Signal

The ODF/OTB is available and enough in capacity

The DDF/DSX is available and enough in capacity

The MDF is available and enough in capacity

The LAN/IP is available and enough ports

The CLOCK is available and enough ports

Remarks

█Yes □No □N/A

█Yes □No □N/A

□Yes █No □N/ANeed to move

computer desks to get space

█Yes □No □N/A Pak Teguh wants to propose 1 AC

□Yes █No □N/A

█Yes □No □N/A

█Yes □No □N/A

█Yes □No □N/A

█Yes □No □N/A

█Yes □No □N/A

□Yes □No █N/A

□Yes █No □N/A

□Yes █No □N/A

█Yes □No □N/A

█Yes □No □N/A

□Yes □No █N/A

□Yes □No █N/A

□Yes □No █N/A

□Yes □No █N/A

Note: “N/A” means “not involved”.

Page 7: Copy of BSC Survey Royal Tower
Page 8: Copy of BSC Survey Royal Tower

4. BSC SURVEY DATASite Name Royal Tower Riverside Apartemen City Jakarta

Area North Jakarta Site Type Building

BSC6900

- Cabinet: * Cabinet Quantity: __5__Units * Floor Height (mm): __400__mm * Cabling mode (Up/Down): __Down__ * Cable Tray Height: __300__mm

- Power Cables: * -48V (m) : __20__Lines x __15__m (Total: __180__m) * GND (m) : __20__Lines x __15__m (Total: __180__m) * PGND (m) : __150__m

- Optical Fibre Cables: (A) Switch S6502 --------6_m-------- NE40-4 (LC)-----------------------------(LC)

(B) NE40-4 --------__15__m-------- ODF (LC)--------------------------- (LC) (C) ODF --------__15__m-------- OSN 1800 (LC) --------------------------- (LC)

- FE Cables: * BSC 6900 --------__15__m-------- CX600-X3 * BSC 6900 --------__15__m-------- Switch S6502

- Alarm Cables: * Signal Cable Length : __8__m * Power Cable Length : __14__m

Page 9: Copy of BSC Survey Royal Tower
Page 10: Copy of BSC Survey Royal Tower

6.1. AC POWER SUPPLY

Site Name Royal Tower Riverside ApartemenCity Jakarta

Area Pluit Site Type Building

AIR CONDITIONING UNIT Aircon 1 Aircon 2 Aircon 3 Aircon 4

Brand Liebert Hiros Liebert Hiros

Type Hiros Hiros

Cooling Capacity PK 5 5(AC is not working properly)

Phase 1 / 3 Phase

Circuit Breaker Input Capacity Ampere

R Current Load Ampere

S Current Load Ampere

T Current Load Ampere

R-N Voltage Volt

S-N Voltage Volt

T-N Voltage Volt

Shelter Dimension

Length 11 meter

Width 5 meter

Lamp Installed inside shelter 40 watt x 6 pc(s)

Existing Aircon Calculation

Aircon Volume Unit BTU Conversion (BTUH)

Room Size 55 m2 18535

People 0 Prsn(s) 0

Lighting 240 Watt 1020

Equipment 18198.00 Watt 62109.77

TOTAL BTU Needed 81664.77

Aircon Installed 2 Pcs

Cooling Capacity / unit 45000 BTUH

Total Cooling Capacity 90000 BTUH

45000 BTUH

Total BTU Needed 89831 BTUH

Result Not OK

New Equipment Aircon Calculation

Aircon Volume Unit BTU Conversion (BTUH)Room Size 55 m2 18535

People 0 Prsn(s) 0

Lighting 240 Watt 1020

Equipment 30248.00 Watt 103236.42

TOTAL BTU Needed 122791.42

Aircon Installed 2 Pcs

Cooling Capacity / unit 45000 BTUH

Total Cooling Capacity 90000 BTUH

45000 BTUH

Total BTU Needed 135071 BTUH

Result Not OK

Note

Total Cooling Capacity (n+1 redundancy)

Total Cooling Capacity (n+1 redundancy)

Page 11: Copy of BSC Survey Royal Tower

6

Page 12: Copy of BSC Survey Royal Tower

6.1. AC POWER SUPPLY

Site Name Royal Tower Riverside ApartemenCity Jakarta

Area Pluit Site Type Building

AIR CONDITIONING UNIT Aircon 1 Aircon 2 Aircon 3 Aircon 4

Brand Daikin

Type

Cooling Capacity PK 2.5

Phase 1 / 3 Phase

Circuit Breaker Input Capacity Ampere

R Current Load Ampere

S Current Load Ampere

T Current Load Ampere

R-N Voltage Volt

S-N Voltage Volt

T-N Voltage Volt

Shelter Dimension

Length 6.8 meter

Width 5 meter

Lamp Installed inside shelter 40 watt x 4 pc(s)

Aircon Calculation

Aircon Volume Unit BTU Conversion (BTUH)

Room Size 34 m2 11458

People 0 Prsn(s) 0

Lighting 160 Watt 680

Batt Heat Dissipation 12000.00 Watt 40956.00

TOTAL BTU Needed 53094.00

Aircon Installed 3 Pcs

Cooling Capacity / unit 22500 BTUH

Total Cooling Capacity 67500 BTUH

45000 BTUH

Total BTU Needed 66368 BTUH

Result Not OK

Total Cooling Capacity (n+1 redundancy)

Page 13: Copy of BSC Survey Royal Tower

6

Page 14: Copy of BSC Survey Royal Tower

6.1. AC POWER SUPPLYSite Name Royal Tower Riverside Apartemen City Jakarta

Area North Jakarta Site Type Building

KWH UNIT KWH 1 KWH 2 KWH 3

Phase 1 / 3 Phase 3

Circuit Breaker Capacity Ampere 100

kVA Capacity kVA 66

R Current Load Ampere 19.9

S Current Load Ampere 22.5

T Current Load Ampere 25.4

GENSET UNIT GENSET 1 GENSET 2 GENSET 3

Brand -

Model -

kVA Capacity kVA -

ACPDB UNIT ACPDB 1 ACPDB 2 ACPDB 3

Phase 1 / 3 Phase 3

Circuit Breaker Input Capacity Ampere 100

R Current Load Ampere -

S Current Load Ampere -

T Current Load Ampere -

Existing 14916 VA

Battery Charging 29038 VA

AC power Availability 66000 VAPower Usage 44 %

Remain kVA 23762 VA

Result OK

New Equipment Power Calculation

Existing 14916 VA

Battery Charging 29038 VA

New Proposed Equipment 11568 VA

0.00 VA

Total AC Power Requirement 55522 VAAC power Availability 66000 VAPower Usage 84 %

Remain kVA VA

Result Not Ok

*Power Calculation:

Aircon ( if any changes from previous Cooling capacity or running sequence)

Exceed 80% cap

Page 15: Copy of BSC Survey Royal Tower

6.2. DC POWER SUPPLYSite Name:Gondrong Royal Tower Riverside Apartemen City Jakarta

Area North Jakarta Site Type Building

Rectifier UNIT PS 1 PS 2 PS 3

Brand Eltek

Model Flatpack 2

Current Load Ampere 137

Total Rectifier Module Slots Slot 16

Capacity per Rectifier Module Ampere 37.5

Qty of Rectifier Module Installed Pcs 12

Current Max Output Ampere 450

Rectifier Efficiency % 96%

Qty of Idle Rectifier Module Slots Slot 4

Total Circuit Breaker Slots Slot 135

Qty of Circuit Breaker Installed Pcs 115

Qty of Occupied Circuit Breaker Pcs 78

Qty of Idle Circuit Breaker Pcs 37

Qty of Idle Circuit Breaker Slots Slot 20

Battery UNIT Battery 1 Battery 2 Battery 3

Brand Fiamm

Model 2GM 1000

Ah per Bank Ah 1000

Qty of Banks Banks 2

Total Ah 2000

Remarks

Existing DC Power Calculation

Existing Power Consumption 7398 Watt

Battery Charging 10800 WattTotal DC Power Consumption 337.00 A

DC Power Avalibility 450 A

Rectifier Usage 74.89 %

Remaining Power 113 A

Result OK

New Upgrade DC Power Calculation

Existing Power Consumption 7398 Watt

Battery Charging 10800 WattTotal power of Proposed Equipment 12050 Watt- BSC6900 7500- NE40E-3 2200- S9303 700- CX600-X3 1200- OSN1800 450- BTS3900 0Total DC Power Consumption 560.15 A

DC Power Avalibility 450 A

Rectifier Usage 124.48 %

Remaining Power 0 A

Result Not Ok

Page 16: Copy of BSC Survey Royal Tower

7. SMR WORKS & REMARKSSite Name Royal Tower Riverside ApartemenCity Jakarta

Area North Jakarta Site Type Building

Supporting Facilities Requirement:- New MCB, Cable Tray Breakers are as follows: 4 x 100A & 4 x 63A (For 2 BSC 6900), 2 x 50A (For CX600-X3), 2 x 10A (For OSN 1800), 4 x 16A (For 2 S6502), 4 x 32A (For NE40-4), proposal new rectifier.

- New Cable Tray, Width 35 cm, Length 2 m, with Accessories

- Other required Materials for Installation, pease refer to the Material List

- Need discuss with Technical Team about which equipmen can install first coz space limitted, only can install 5 cabinet in this site.

Page 17: Copy of BSC Survey Royal Tower

8. PHYSICAL NETWORK CONNECTIONSite Name Royal Tower Riverside Apartemen City Jakarta

Area P Site Type Building

Lan cable

RNC Name

HW OSN1800

HW MGW

HW SGSN

IuCS interface GE Port::Port1-?Port2-?

HW cs-router

IuPS GE Port:Port3-?Port4-?

HW ps-router

HW NodeB

IuB interface Port:Port0-?Port1-?

HW CX600

Customer OM network

OM link FE Port:Port5-?Port6-?Port7-?Port8-?

DCPDB Rectifier2*63A + 2*100A

HW Lanswitch

HW NE-40

MM optical cable

power cable

None

ODF

Page 18: Copy of BSC Survey Royal Tower
Page 19: Copy of BSC Survey Royal Tower

9. PROPOSED FLOOR PLANSite Name Royal Tower Riverside Apartemen City Jakarta

Area North Jakarta Site Type Building

GEM&

APZ21233C

ET4-1&

APG40

BSCJK04

RNCJK02

RXTJK01

GEM&

APZ21233C

ET4-1&

APG40

BSCJK05

MPBN

MPBN

BatteryBank 1

BatteryBank 2

BatteryBank 2

AC

Rectifier(InstalledModules:12 of 16)

AC

AC

Upper Tray

PDF

DDFBSCJK04

DDF

DDFBSCJK05

ODF

DDFBSCJK04

DXX

ODFRNCJK02

ProposedCX600-X3

&OSN1800

ProposedBSC6900

ProposedBSC6900

ProposedNE40-E

&S6502

AC

AC

ProposedLowerCableTray

Lower Tray

GND

ACPDB

ComputerDesks

ExpansionRoof.

Height:235 cm

ExpansionRoof.

Height:210 cm

Page 20: Copy of BSC Survey Royal Tower
Page 21: Copy of BSC Survey Royal Tower

10.1. ENVIRONMENT PHOTOSSite Name Royal Tower Riverside Apartemen City Jakarta

Area North Jakarta Site Type Building

1 . Situation Around Room (Left) 2 . Situation Around Room (Right)

3 . Inside Room 4 . Inside Room (Right View from Entrance)

5 . Inside Room (Left View from Entrance) 6 . Battery Room

Page 22: Copy of BSC Survey Royal Tower

10.3. AC POWER PHOTOSSite Name Royal Tower Riverside Apartemen City Jakarta

Area North Jakarta Site Type Building

1 . KWH 2 . ACPDB

3 . Circuit Breaker in KWH 4 . R Current Load = 19.9 A

5 . S Current Load = 22.5 A 6 . T Current Load = 25.3 A

Page 23: Copy of BSC Survey Royal Tower

10.4. DC POWER PHOTOSSite Name Royal Tower Riverside Apartemen City Jakarta

Area North Jakarta Site Type Building

1 . Rectifier: Eltek Type: Flatpack 2 2 . Battery: 3 Banks x 1000 Ah

3 . Current Load: 137A 4 . PDF (Front View)

5 . Proposed MCB Position

Page 24: Copy of BSC Survey Royal Tower

10.6. EQUIPMENT PHOTOSSite Name Royal Tower Riverside Apartemen City Jakarta

Area North Jakarta Site Type Building

1 . Prop. Cabinets: BSC6900, CX600-X3, NE40-4 2 . Proposed Cable Tray

3 . Proposed Cable Duct for Power Cables

Page 25: Copy of BSC Survey Royal Tower

10.5. EXISTING EQUIPMENT PHOTOSSite Name Royal Tower Riverside Apartemen City Jakarta

Area North Jakarta Site Type Building

1 . Existing ODF TRM 2 . Existing ODF

3 . Existing Huawei Switch (S6502) 4 .Existing RNC Ericsson

Page 26: Copy of BSC Survey Royal Tower