Page 1: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection
Page 2: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection
Page 3: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection
Page 4: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

2012 -

2016

Planning

Construction Design

Five-Year Capital Facilities PlanFacility Operations and Planning

Greece Central School DistrictBuilding Tomorrow’s Greece Today

Page 5: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

Item Page

1-13

141516171819 2021222324

2526272829

303132333435

36-38

394041424344 4546474849

50

Lakeshore

Brookside Buckman Craig Hill English Village

Executive Summary

Longridge Paddy Hill

Building Inventories Elementary Schools Autumn Lane

Holmes Road

Pinebrook Westridge (Formerly Known as Parkland Elementary) Middle/High Schools

Transportation Annex Transportation Center

Arcadia Middle Arcadia High Athena Middle/High Odyssey Academy (Formerly Known as Apollo Middle School) Olympia Other Buildings

Barnard

Brookside

District Analysis and Prioritization

Estimated Expenses

Lakeshore Longridge Paddy Hill

Westridge (Formerly Known as Parkland Elementary School) Middle/High Schools Arcadia Middle

Pinebrook

Buckman Craig Hill English Village Holmes Road

Elementary Schools Autumn Lane

Alcott Road Facility (Formerly Known as Westridge Elementary School)

Hoover Drive Facility (Formerly Known as Odyssey Academy) Kirk Road Facility (Formerly Known as Kirk Road Elementary School)

Table of Contents

Page 6: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

Item Page

51-5253-54

5556

575859606162

Olympia Other Buildings

Hoover Drive Facility (Formerly Known as Odyssey Academy)

Arcadia High Athena Middle/High

Estimated Expenses Continued

Middle/High Schools

Odyssey Academy (Formerly Known as Apollo Middle School)

Barnard

Table of Contents

Transportation Annex Transportation Center

Kirk Road Facility (Formerly Known as Kirk Road Elementary School)

Alcott Road Facility (Formerly Known as Westridge Elementary School)

Page 7: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

The Greece Central School District is comprised of 16 schools strategically located throughout the Town of Greece as well as number of support buildings. The goal of the District is toprovide facilities in compliance with applicable codes and regulations and to provide schoolsthat have been carefully planned and constructed to foster student learning. This has beenand is being accomplished through a program of well-planned renovation and reconstructionprojects and a proficiently-managed maintenance program.

The most recent Five-Year Capital Facilities Plan (Building Condition Survey) was prepared by Clark Patterson Associates, Design Professionals in 2010 and was based on interviewswith District personnel, a survey of all District facilities, and a review of the followingdocumentation:

Building Condition SurveysAnnual Building Visual Inspection ReportsPrevious Facility EvaluationsPrevious District Long-Range PlansAnnual Fire Inspection Reports

A conceptual scope of work was identified for each project item and cost estimates were prepared. Each item was carefully reviewed and prioritized by District staff. The prioritysystem Type A, B, or C was developed with A being the highest priority. The District iscurrently involved in a three-year reconstruction project with a total project cost of $34.5 million.This project was approved by public referendum in December of 2011. All “A” designated projects will be addressed in this project in construction years 2013, 2014 and 2015 asdesignated.

1. General Condition and Goals Arcadia High School

Arcadia High School is a high school, grades 9 through 12, with approximately 1,109 students. In general, the overall condition of this school is good. The goals for this facility focus on the following:

Priority Items – Type A: Replace windows and blinds - 2013 Install fire-rated classroom doors with ADA hardware - 2013 Replace pool air handling unit - 2013 Clean existing ductwork - 2013 Install new dust collection system in Wood Shop - 2013 Replace air handling unit in Music Suite - 2013 Replace air handling units in Auto Shop – 2013 Replace air handling units rooms 200 through 202 - 2013 Cogeneration plant repairs - 2013

Executive Summary

1

Page 8: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

1. General Condition and Goals - Arcadia High School (continued) Priority Items – Type A (continued):

Reconfigure traffic pattern at main entrance - 2013 Partial flooring upgrades - 2013 Renovate cafeteria ventilation - 2013 Provide air handling unit for first floor team locker room - 2013 Security system upgrade - 2013 Domestic water upgrades (temperature) - 2013 Expand exit and emergency light coverage - 2013 Replace stair tower doors - 2013

Asbestos abatement Provide dugouts for girls’ softball - 2013 Replace standing seam roofs Reseal outdoor all-weather track Install air handling unit at Stage

Priority Items – Type C: Exterior wall/masonry rehabilitation Partial exterior door replacement Replace pavement at south parking lot Reconfigure HVAC system at main office Replace HVAC at Print Shop

2. General Condition and Goals Arcadia Middle School

Arcadia Middle School is a middle school, grades 6 through 8, with approximately 845 students. The overall condition of this building is good.

The goals for this facility focus on the following:

Priority Items – Type A: Provide dust collection systems in two wood shops - 2013 Replace wire glass in impact areas - 2013 Install windows within classroom doors - 2013 Improve parking lot lighting - 2013 Partial flooring upgrades - 2013 Domestic water upgrades (temperature) - 2013 Upgrade fire alarm system for code compliance - 2013 Expand exit and emergency light coverage - 2013 Security system upgrade – 2013 Sinks and casework upgrades - 2013

Priority Items – Type B: Roof replacement

Priority Items – Type C: No items identified

Priority Items-Type B:

2

Page 9: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

3. General Condition and Goals Athena Middle/High School

Athena Middle/High School is a middle and high school, grades 6 through 12, with approximately 839 in the middle school and 1,254 students in the high school. The overall condition of this building is good. High school is contained on the first and second floors with the middle school on the third floor.

The goals for this facility focus on the following:

Priority Items – Type A: Partial roof replacement - 2014 Boys’ and girls’ locker room renovations - 2014 Relocate and reconstruct tennis courts - 2014 Replace main gymnasium air handling unit - 2014 Install fire-rated classroom doors with ADA hardware - 2014 Install dust collection system for Auditorium and Technology wood shops - 2014 Security system upgrade - 2013 Upgrade aisle lighting in auditorium - 2014 Domestic hot water tank replacement - 2014 Cogeneration plant repairs - 2014 Replace east and west gym foyer doors - 2014 Partial exterior door replacement - 2014 Partial flooring upgrades - 2014 Replace folding gym partition - 2014 Refinish hardwood floor in main gym - 2014 Install spark arrestor system for dust collection system in Wood Shop - 2014 Domestic water upgrades (temperature) - 2014 Install corridor night lighting - 2014 Replace air handling unit at Girls' Locker Room - 2014 Install fire alarm and security system in Field House - 2014 Expand exit and emergency light coverage - 2014 Upgrade fire alarm system for code compliance - 2014 Install new air handler for admin and guidance offices - 2014 Casework upgrades – 2014

Priority Items – Type B: Cooling tower replacement Provide dugouts for girls’ softball - 2013 Replace air handling unit at Library and Music Room

Priority Items – Type C: Reseal outdoor all-weather track - 2014 Asbestos abatement

3

Page 10: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

4. General Condition and Goals Autumn Lane Elementary School

The Autumn Lane Elementary School is an elementary school, grades Pre-K through 2, with approximately 409 students. In general, the overall condition of this school is satisfactory.

The goals for this facility focus on the following:

Priority Items – Type A: Install fire-rated classroom doors with ADA hardware – 2013 Install corridor night lighting – 2013 Domestic water upgrades (temperature) – 2013 Expand exit and emergency light coverage - 2013 Security system upgrade – 2013

Priority Items – Type B: Replace air handling unit for gym and cafeteria Replace exhaust fans

Priority Items – Type C: Exterior wall masonry rehabilitation

5. General Condition and Goals Brookside Elementary School

Brookside Elementary School is an elementary school, grades K through 5, with approximately 345 students. The overall condition of this building is satisfactory.

Priority Items – Type A: Install fire-rated classroom doors with ADA hardware - 2014 Replace exhaust fans and upgrade ventilation - 2014 Partial flooring upgrades - 2014 Upgrade fire alarm system for code compliance - 2014 Expand exit and emergency light coverage - 2014 Install corridor night lighting - 2014 Domestic water upgrades (temperature) - 2014 Security system upgrade - 2013

Priority Items – Type B: Upgrade ventilation

Priority Items – Type C: Partial pavement reconstruction

4

Page 11: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

6. General Condition and Goals Buckman Heights Elementary School

Buckman Heights Elementary School is an elementary school, grades 3 through 5, with approximately 337 students. The overall condition of this building is satisfactory.

The goals for this facility focus on the following:

Priority Items - Type A: Exterior walls/masonry rehabilitation – 2015 Install fire-rated classroom doors with ADA hardware – 2015 Install stage handicapped lift – 2015 Partial flooring upgrades – 2015 Security system upgrade - 2013 Domestic water upgrades (temperature) – 2015 Upgrade fire alarm system for code compliance – 2015 Expand exit and emergency light coverage – 2015 Install corridor night lighting – 2015 Upgrade ventilation – 2015

Priority Items – Type B: Replace air handler for gym and cafeteria

Priority Items – Type C: Exterior wall masonry rehabilitation

7. General Condition and Goals Craig Hill Elementary School

Craig Hill Elementary School is an elementary school, grades 3 through 5, with approximately 336 students. The overall condition of this building is satisfactory.

The goals for this facility focus on the following:

Priority Items – Type A: Security system upgrade - 2013 Unit ventilator and casework replacement – 2014 Install fire-rated classroom doors with ADA hardware - 2014 Install stage handicapped lift - 2014 Partial flooring upgrades - 2014 Install corridor night lighting - 2014 Install vestibule doors at main entrance - 2014 Domestic water upgrades (temperature) - 2014

Priority Items – Type B: No items identified

Priority Items – Type C: Exterior wall masonry rehabilitation

5

Page 12: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

8. General Condition and Goals English Village Elementary School

English Village Elementary School is an elementary school, grades Pre-K through 2, with approximately 454 students. The overall condition of this building is satisfactory.

The goals for this facility focus on the following:

Priority Items – Type A: Replace unit ventilators and casework - 2015 Replace light fixtures in classrooms, cafeteria and corridors - 2015 Install fire-rated classroom doors with ADA hardware - 2015 Sink and casework upgrades - 2015 Partial flooring upgrades - 2015 Install corridor night lighting - 2015 Security system upgrade - 2013 Domestic water upgrades (temperature) - 2015 Upgrade fire alarm system for code compliance - 2015 Expand exit and emergency light coverage - 2015

Priority Items – Type B: Replace air handler for gym and cafeteria Asphalt sidewalk replacement

Priority Items - Type C: Partial exterior door replacement

9. General Condition and Goals Holmes Road Elementary School

Holmes Road Elementary School is an elementary school, grades Pre-K through 2, with approximately 409 students. The overall condition of this building is satisfactory.

Priority Items – Type A: Security system upgrade - 2013 Partial roof replacement - 2014 Install fire-rated classroom doors with ADA hardware - 2014 Sink and casework upgrades - 2014 Partial flooring upgrades - 2014 Install corridor night lighting - 2014 Domestic water upgrades (temperature) - 2014 Upgrade fire alarm system for code compliance - 2014 Expand exit and emergency light coverage - 2014 Install handicapped lift at auditorium stage - 2014

Priority Items – Type B: Install new asphalt sidewalk - 2014

Priority Items – Type C Partial exterior door replacement

6

Page 13: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

10. General Condition and Goals Lakeshore Elementary School

Lakeshore Elementary School is an elementary school, grades 3 through 5, with approximately 377 students. The overall condition of this building is satisfactory.

The goals for this facility focus on the following:

Priority Items – Type A: Exterior walls/masonry rehabilitation - 2013 Install fire-rated classroom doors with ADA hardware - 2013 Partial flooring upgrades - 2013 Install corridor night lighting - 2013 Security system upgrade – 2013 Domestic water upgrades (temperature) – 2013 Upgrade fire alarm system for code compliance - 2013

Expand exit and emergency light coverage - 2013 Partial pavement replacement - 2013 Partial exterior door replacement - 2013

Priority Items – Type B: Replace air handling unit for gym and cafeteria Upgrade sewage lift system

Priority Items – Type C Asbestos abatement

11. General Condition and Goals Longridge Elementary School

Longridge Elementary School is an elementary school, grades Pre-K through 5, with approximately 815 students. In general, the overall condition of this school is satisfactory.

The goals for this facility focus on the following:

Priority Items – Type A: Unit ventilator and casework replacement - 2015 Upgrade ventilation for code compliance and classroom relief - 2015 Sink and casework upgrades - 2015 Partial flooring upgrades - 2015 Install corridor night lighting - 2015 Domestic water upgrades (temperature) - 2015 Install fire-rated classroom doors with ADA hardware - 2015 Security system upgrade - 2013 Upgrade fire alarm for code compliance - 2015 Expand exit and emergency lights -2015

7

Page 14: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

11. General Condition and Goals - Longridge Elementary School (continued) Priority Items – Type B:

Improve drainage at west fields

Priority Items – Type C: Exterior walls/masonry rehabilitation - 2015 Replace (2) exterior door systems

12. General Condition and Goals Odyssey Academy (Formerly Apollo Middle School)

Odyssey Academy is a middle school and a high school, grades 6 through 12, with approximately 1,117 students. In general, the overall condition of this school is satisfactory.

The goals for this facility focus on the following: Security system upgrade - 2013 Rear parking lot redesign and reconstruction - 2015 Partial replacement of domestic water lines - 2015 Partial roof replacement (west side) - 2015 Partial flooring upgrades - 2015 Asbestos abatement - 2015 Provide isolation valves for heating piping - 2015 Reseal outdoor all-weather track - 2015 Cogeneration plant repairs - 2015 Install stage handicapped lift - 2015 Provide ventilation and cooling to Library computer lab - 2015 Domestic water upgrades (temperature) - 2015 Upgrade fire alarm system for code compliance - 2015 Expand exit and emergency light coverage - 2015 Rework stage exit doors to swing in direction of egress - 2015 Install fire-rated classroom doors with ADA hardware - 2015

Priority Items – Type B: Exterior walls/masonry rehabilitation Partial window replacement Provide dedicated HVAC system for Cafeteria

Priority Items – Type C: No items identified

8

Page 15: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

13. General Condition and Goals Olympia School

Olympia is a high school and middle school, grades 7 through 12, with approximately 1,251 students. In general, the overall condition of this school is satisfactory.

Priority Items – Type A: Replace windows and blinds - 2015 Replace unit ventilators and casework - 2015 Partial pavement reconstruction at front of school - 2015 Partial sidewalk replacement at front of school - 2015 Install separate air conditioning at radio station - 2015 Install fire-rated classroom doors with ADA hardware - 2015 Reseal outdoor all-weather track - 2015 Cogeneration plant repairs - 2015 Replace folding gym partition - 2015 Partial flooring upgrades - 2015 Domestic water upgrades (temperature) - 2015 Upgrade fire alarm system for code compliance - 2015 Expand exit and emergency light coverage - 2015 Standing seam roof upgrades - 2015 Security system upgrade - 2013

Priority Items – Type B: Asbestos abatement Provide dugouts for girls’ softball - 2015 Provide ventilation for auditorium stage and music equipment storage room Athletic field drainage upgrades

Priority Items – Type C: No items identified

14. General Condition and Goals Paddy Hill Elementary School

Paddy Hill Elementary School is an elementary school, grades K through 5, with approximately 550 students. In general, the overall condition of this school is satisfactory.

The goals for this facility focus on the following:

Priority Items – Type A: Security system upgrade - 2013 Partial exterior door replacement - 2013 Install fire-rated classroom doors with ADA hardware - 2013 Sinks and casework upgrades - 2013 Install fire-rated classroom doors with ADA hardware - 2013 Install ventilation at counselors office and conference room - 2013

9

Page 16: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

14. General Condition and Goals - Paddy Hill Elementary School (continued) Priority Items – Type A (continued):

Domestic water upgrades (temperature) - 2013 Upgrade fire alarm system for code compliance - 2013 Replace original plumbing fixtures - 2013 Expand exit and emergency light coverage - 2013 Replace glass wall at Classroom 4 with rated wall - 2013 Install corridor night lighting - 2013

Priority Items – Type B: Standing seam roof restoration Add raised bases for existing site lighting poles Provide additional cooler/freezer space

Priority Items – Type C: Asbestos abatement

15. General Condition and Goals Pine Brook Elementary School

Pine Brook Elementary School is an elementary school, grades K through 5, with approximately 617 students. The overall condition of this building is excellent.

The goals for this facility focus on the following:

Priority Items – Type A: Sink and casework upgrades - 2013 Domestic water upgrades (temperature) - 2013 Expand exit and emergency lighting - 2013 Security system upgrade - 2013

Priority Items – Type B: Glass vision panel inserts for interior doors Roof replacement Chiller replacement Cooling tower replacement

Priority Items – Type C: No items identified

16. General Condition and Goals - West Ridge Elementary School (Formerly Parkland Elementary School)

West Ridge Elementary School is an elementary school, grades Pre-K through 5, with approximately 507 students. The overall condition of this building is good.

The goals for this facility focus on the following:

Priority Items – Type A: Exterior walls/masonry rehabilitation - 2014 Unit ventilator and casework replacement - 2014

10

Page 17: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

16. General Condition and Goals - West Ridge Elementary School (Formerly Parkland Elementary School) continued Priority Items – Type A (continued):

Install fire-rated classroom doors with ADA hardware – 2014 Sink and casework upgrade - 2014 Replace asphalt sidewalk - 2014 Replace exhaust fans - 2014 Partial flooring upgrades - 2014 Domestic water upgrades (temperature) - 2014 Expand exit and emergency lighting - 2014 Upgrade fire alarm for code compliance - 2014 Security system upgrade - 2013 Exterior wall masonry rehabilitation - 2014

Priority Items – Type B No items identified

Priority Items – Type C No items identified

17. General Condition and Goals Alcott Road Facility (Formerly Westridge Elementary School)

The Alcott Road Facility was closed as a school in June, 2012, as part of the district reorganization plan. Should the facility ever be re-opened as a school in the future, significant upgrades would be required. In general, the overall condition of this school is satisfactory.

The goals for this facility focus on the following: Reconfigure/repair interior sewer lines - 2013 Expand exit and emergency light coverage - 2013 Install corridor night lighting - 2013 Security system upgrade - 2013

18. General Condition and Goals Transportation Annex

This facility houses Transportation, Facilities and Human Resources personnel, Transportation storage as well as district-wide training rooms and Facilities shops.

The goals for this facility focus on the following:

Priority Items – Type A: Replace exterior concrete stairs and landings - 2013 Partial roof replacement - 2013 Expand exit and emergency lighting - 2013 Upgrade fire alarm for code compliance - 2013 Replace electric service weather head entrance - 2013

11

Page 18: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

18. General Condition and Goals - Transportation Annex (continued)

Priority Items – Type B: No items identified

Priority Items – Type C: No items identified

19. General Condition and Goals Transportation Center and Storage Facility

This facility houses Transportation and Facilities personnel, Transportation storage and Facilities shops. It also houses the Bus Maintenance Garage, Central Stores and bus drivers’ training rooms.

The goals for this facility focus on the following:

Priority Items – Type A: Reconstruct pavement at parking lot and access road - 2013 Reconstruct Storage Facility roof, walls, floors and lighting - 2013 Upgrade handicapped parking, entrances and restroom facilities - 2013 Replace security fencing - 2013 Upgrade fire alarm system for code compliance - 2013 Expand exit and emergency lighting - 2013 Security system upgrade - 2013

Priority Items – Type B: Replace HVAC system for offices Replace boiler and pumps Replace exterior domestic water line Replace shop dust collection system Upgrade ventilation at shops

Priority Items – Type C: No items identified

20. Kirk Road Facility (formerly Kirk Road Elementary)

The Kirk Road Facility was closed as a school in June, 2012, as part of the district reorganization plan. Should the facility ever be re-opened as a school in the future, significant upgrades would be required. In general, the overall condition of this school is satisfactory.

The goals for this facility focus on the following:

Priority Items - Type A: Security system upgrade - 2013

12

Page 19: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

21. Barnard Facility

The Barnard Facility was closed as a school in June, 2004. In general, the overall condition of this school is satisfactory.

The goals for this facility focus on the following:

Priority Items - Type A: Security system upgrade - 2013

22. Hoover Drive Facility

The Hoover Drive Facility was closed as a school in June, 2012, as part of the district reorganization plan. Should the facility ever be re-opened as a school in the future, significant upgrades would be required. In general, the overall condition of this school is satisfactory.

The goals for this facility focus on the following:

Priority Items - Type A: Security system upgrade - 2013

13

Page 20: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

(2011-2012 Fiscal Year) 231,477 KWH (Electricity) $27,132

Building Name: Autumn Lane Elementary School

Bed Codes Number: 260501060009

Address: 2089 Maiden Lane, Rochester NY 14626

Use: Prek-2 Current Enrollment 410

Addition #1 2005 12,615

Energy Consumption: 13,770.6 Therm (Gas) $ 8,688

Total Square Footage: 51,357 Rated Capacity: 600

Ownership: Owned

Building Condition Survey Rating: Satisfactory

Building Age:

Building Inventory Form

489 KGAL (Water) $ 1,881

Probable Useful Life of Building: 60 years (current age of original building - 51 yrs)

Estimated Replacement Value: $9,500,000.00

Addition #2 Addition #3 Addition #4

Heating System Source: Natural Gas

Construction Year Square Footage

Original 1961 38,742

14

Page 21: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

(2011-2012 Fiscal Year) 238,337 KWH (Electricity) $27,198

Probable Useful Life of Building: 60 Years (current age of original building - 47 yrs)

Energy Consumption: 12,954.1 THERM (Gas) $ 8,432

329 KGAL (Water) $ 1,270

Estimated Replacement Value: $8,400,000.00

Addition #2 Addition #3 Addition #4

Heating System Source: Natural Gas

Building Age:

Construction Year Square Footage

Original 1965 39,333Addition #1 2005 6,189

Use: 3-5 Current Enrollment: 345

Total Square Footage: 45,522 Rated Capacity: 518

Ownership: Owned

Building Condition Survey Rating: Satisfactory

Building Inventory Form

Building Name: Brookside Elementary

Bed Codes Number: 260501060014

Address: 1144 Long Pond Road, Rochester NY 14626

15

Page 22: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

(2011-2012 Fiscal Year) 233,280 KWH (Electricity) $26,752

Building Name: Buckman Heights Elementary

Bed Codes Number: 260501060013

Address: 550 Buckman Road, Rochester NY 14615

Use: 3-5 Current Enrollment: 334

Addition #1 1993 4,655

Energy Consumption: 10,884.3 THERM (Gas) $ 7,167

Total Square Footage: 48,278 Rated Capacity: 581

Ownership: Owned

Building Condition Survey Rating: Satisfactory

Building Age:

Building Inventory Form

613 KGAL (Water) $ 2,004

Probable Useful Life of Building: 60 Years (current age of original building - 49 yrs)

Estimated Replacement Value: $8,900,000.00

Addition #2 2004 5,987Addition #3 Addition #4

Heating System Source: Natural Gas

Construction Year Square Footage

Original 1963 37,636

16

Page 23: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

(2011-2012 Fiscal Year) 247,680 KWH (Electricity) $30,089

Building Name: Craig Hill Elementary

Bed Codes Number: 260501060003

Address: 320 West Craig Hill Dr., Rochester NY 14626

Use: 3-5 Current Enrollment: 335

Addition #1 2005 10,143

Energy Consumption: 11,452 THERM (Gas) $ 7,530

Total Square Footage: 53,870 Rated Capacity: 623

Ownership: Owned

Building Condition Survey Rating: Satisfactory

Building Age:

Building Inventory Form

1,022 KGAL (Water) $ 3,056

Probable Useful Life of Building: 60 Years (current age of original building - 54 yrs)

Estimated Replacement Value: $9,900,000.00

Addition #2 Addition #3 Addition #4

Heating System Source: Natural Gas

Construction Year Square Footage

Original 1958 43,727

17

Page 24: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

(2011-2012 Fiscal Year) 283,886 KWH (Electricity) $31,145

Addition #2 Addition #3 Addition #4

Heating System Source: Natural Gas

Energy Consumption: 13,422.57 THERM (Gas) $14,196

453 KGAL (Water) $ 1,589

Probable Useful Life of Building: 60 Years (current age of original building - 51 yrs)

Estimated Replacement Value: $9,000,000.00

Building Age:

Construction Year Square Footage

Original 1961 38,328Addition #1 2004 10,633

Use: Prek-2 Current Enrollment: 464

Total Square Footage: 48,961 Rated Capacity: 562

Ownership: Owned

Building Condition Survey Rating: Satisfactory

Building Inventory Form

Building Name: English Village Elementary

Bed Codes Number: 260501060010

Address: 800 Tait Avenue, Rochester NY 14616

18

Page 25: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

(2011-2012 Fiscal Year) 239,920 KWH (Electricity) $27,385

Addition #2 2004 3,014Addition #3 Addition #4

Heating System Source: Natural Gas

Energy Consumption: 14,539.8 THERM (Gas) $ 9,404

575 KGAL (Water) $ 1,907

Probable Useful Life of Building: 60 Years (current age of original building - 45 yrs)

Estimated Replacement Value: $8,900,000.00

Building Age:

Construction Year Square Footage

Original 1967 42,277Addition #1 1993 2,588

Use: Prek-2 Current Enrollment: 420

Total Square Footage: 47,879 Rated Capacity: 537

Ownership: Owned

Building Condition Survey Rating: Satisfactory

Building Inventory Form

Building Name: Holmes Road Elementary

Bed Codes Number: 260501060016

Address: 300 Holmes Road, Rochester NY 14626

19

Page 26: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

(2011-2012 Fiscal Year) 309,040 KWH (Electricity) $36,224

Addition #2 2005 8,681Addition #3 Addition #4

Heating System Source: Natural Gas

Energy Consumption: 13,400.4 THERM (Gas) $ 8,733

573 KGAL (Water) $ 1,897

Probable Useful Life of Building: 60 Years (current age of original building - 49 yrs)

Estimated Replacement Value: $9,500,000.00

Building Age:

Construction Year Square Footage

Original 1963 37,763Addition #1 1993 4,655

Use: 3-5 Current Enrollment: 386

Total Square Footage: 51,099 Rated Capacity: 637

Ownership: Owned

Building Condition Survey Rating: Satisfactory

Building Inventory Form

Building Name: Lakeshore Elementary

Bed Codes Number: 260501060011

Address: 1200 Latta Road, Rochester NY 14612

20

Page 27: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

Building Name: Longridge Elementary

Bed Codes Number: 260501060006

Address: 190 Longridge Avenue, Rochester NY 14616

Use: Prek-5 Current Enrollment: 833

Original 1958 46,461Addition #1 2004 52,688

Energy Consumption: 29,122.7 THERM (Gas) $18,124

Total Square Footage: 99,149 Rated Capacity: 1,145

Ownership: Owned

Building Condition Survey Rating: Satisfactory

Building Age:

Building Inventory Form

(2011-2012 Fiscal Year) 542,172 KWH (Electricity) $63,130

Probable Useful Life of Building: 60 Years (current age of original building - 54 yrs)

Estimated Replacement Value: $18,300,000.00

Addition #2 Addition #3 Addition #4

Heating System Source: Natural Gas

1,994 KGAL (Water) $ 6,572

Construction Year Square Footage

21

Page 28: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

(2011-2012 Fiscal Year) 291,019 KWH (Electricity) $33,707

Building Inventory Form

483 KGAL (Water) $ 1,621

Probable Useful Life of Building: 60 Years (current age of original bulding - 55 yrs)

Estimated Replacement Value: $9,900,000.00

Addition #2 Addition #3 Addition #4

Heating System Source: Natural Gas

Construction Year Square Footage

Original 1957 43,965Addition #1 2005 8,533

Energy Consumption: 16,726.7 THERM (Gas) $10,746

Total Square Footage: 52,498 Rated Capacity: 579

Ownership: Owned

Building Condition Survey Rating: Satisfactory

Building Age:

Building Name: Paddy Hill Elementary

Bed Codes Number: 260501060007

Address: 1801 Latta Road, Rochester NY 14612

Use: K-5 Current Enrollment: 541

22

Page 29: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

(2011-2012 Fiscal Year) 438,000 KWH (Electricity) $53,909

Addition #2 Addition #3 Addition #4

Heating System Source: Natural Gas

Energy Consumption: 15,761.3 THERM (Gas) $ 9,834

717 KGAL (Water) $ 2,401

Probable Useful Life of Building: 60 Years (current age of original building - 19 yrs)

Estimated Replacement Value: $11,400,000.00

Building Age:

Construction Year Square Footage

Original 1993 58,570Addition #1 2004 2,786

Use: K-5 Current Enrollment: 615

Total Square Footage: 61,356 Rated Capacity: 626

Ownership: Owned

Building Condition Survey Rating: Good

Building Inventory Form

Building Name: Pine Brook Elementary

Bed Codes Number: 260501060036

Address: 2300 English Road, Rochester NY 14616

23

Page 30: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

(2011-2012 Fiscal Year) 228,960 KWH (Electricity) $29,548

Building Inventory Form

Building Name: West Ridge Elementary (Formerly Parkland)

Bed Codes Number: 260501060015

Address: 1010 English Road, Rochester NY 14616

Use: Prek-5 Current Enrollment: 494

Total Square Footage: 44,353 Rated Capacity: 538

Ownership: Owned

Building Condition Survey Rating: Satisfactory

Building Age:

Construction Year Square Footage

Original 1966 38,739Addition #1 1993 2,526

Energy Consumption: 11,166.2 THERM (Gas) $ 7,358

394 KGAL (Water) $ 1,423

Probable Useful Life of Building: 60 Years (current age of original building - 46 yrs)

Estimated Replacement Value: $8,200,000.00

Addition #2 2004 3,088Addition #3 Addition #4

Heating System Source: Natural Gas

24

Page 31: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

(2011-2012 Fiscal Year) *2,526,171 KWH (Electricity) $264,105

*combined with Arcadia High

Building Name: Arcadia Middle School

Bed Codes Number: 260501060023

Address: 130 Island Cottage Road, Rochester NY 14612

Use: 6-8 Current Enrollment: 854

Addition #1

Energy Consumption: *113,557.79 THERM (Gas) $ 65,850

Total Square Footage: 175,055 Rated Capacity: 1,230

Ownership: Owned

Building Condition Survey Rating: Good

Building Age:

Building Inventory Form

*6,033 KGAL (Water) $ 14,514

Probable Useful Life of Building: 60 Years (current age of original building - 19 yrs)

Estimated Replacement Value: $35,000,000.00

Addition #2 Addition #3 Addition #4

Heating System Source: Natural Gas

Construction Year Square Footage

Original 1993 175,055

25

Page 32: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

(2011-2012 Fiscal Year) *2,526,171 KWH (Electricity) $264,105

*Combined with Arcadia Middle

Addition #2 Addition #3 Addition #4

Heating System Source: Natural Gas

Energy Consumption: *113,557.79 THERM (Gas) $ 65,850

*6,033 KGAL (Water) $ 14,514

Probable Useful Life of Building: 60 Years (current age of original building - 49 yrs)

Estimated Replacement Value: $56,200,000.00

Building Age:

Construction Year Square Footage

Original 1963 248,219Addition #1 2005 13,202

Use: 9-12 Current Enrollment: 1,400

Total Square Footage: 261,421 Rated Capacity: 1,516

Ownership: Owned

Building Condition Survey Rating: Satisfactory

Building Inventory Form

Building Name: Arcadia High

Bed Codes Number: 260501060010

Address: 120 Island Cottage Road, Rochester NY 14612

26

Page 33: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

(2011-2012 Fiscal Year) 2,440,853 KWH (Electricity) $252,260

Building Name: Athena Middle/High

Bed Codes Number: 260501060019

Address: 800 Long Pond Road, Rochester NY 14612

Use: 6-12 Current Enrollment: 2,142

Addition #1

Energy Consumption: 220,853.18 THERM (Gas) $118,487

Total Square Footage: 412,730 Rated Capacity: 3,007

Ownership: Owned

Building Condition Survey Rating: Satisfactory

Building Age:

Building Inventory Form

7,171 KGAL (Water) $ 15,619

Probable Useful Life of Building: 60 Years (current age of original building - 43 yrs)

Estimated Replacement Value: $88,700,000.00

Addition #2 Addition #3 Addition #4

Construction Year Square Footage

Original 1969 412,730

27

Page 34: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

(2011-2012 Fiscal Year) 802,310 KWH (Electricity) $ 98,327

Addition #2 Addition #3 Addition #4

Heating System Source: Natural Gas

Energy Consumption: 113,557.79 THERM (Gas) $ 67,743

4,049 KGAL (Water) $ 9,745

Probable Useful Life of Building: 60 Years (current age of original building - 51 yrs)

Estimated Replacement Value: $49,700,000.00

Building Age:

Construction Year Square Footage

Original 1961 231,188Addition #1

Use: 6-12 Current Enrollment: 1,144

Total Square Footage: 231,188 Rated Capacity: 1,359

Ownership: Owned

Building Condition Survey Rating: Satisfactory

Building Inventory Form

Building Name: Odyssey Academy (Formerly Apollo Middle)

Bed Codes Number: 260501060022

Address: 750 Maiden Lane, Rochester NY 14615

28

Page 35: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

(2011-2012 Fiscal Year) 2,440,853 KWH (Electricity) $134,473

Building Name: Olympia

Bed Codes Number: 260501060004

Address: 1139 Maiden Lane, Rochester NY 14615

Use: 7-12 Current Enrollment: 1,250

Addition #1 2005 13,893

Energy Consumption: 73,765.34 THERM (Gas) $ 47,722

Total Square Footage: 192,159 Rated Capacity: 1,344

Ownership: Owned

Building Condition Survey Rating: Satisfactory

Building Age:

Building Inventory Form

3,804 KGAL (Water) $ 9,331

Probable Useful Life of Building: 60 Years (current age of original building - 53 yrs)

Estimated Replacement Value: $41,300,000.00

Addition #2 Addition #3 Addition #4

Heating System Source: Natural Gas

Construction Year Square Footage

Original 1959 178,266

29

Page 36: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

(2011-2012 Fiscal Year) 291,960 KWH ( Electricity) $ 36,392

Building Name: Alcott Road Facility (Formerly West Ridge Elementary)

Bed Codes Number: 260501060007

Address: 200 Alcott Road, Rochester NY 14626

Use: 0 Current Enrollment: 0

Addition #1 2005 7,685

Energy Consumption: 13,663.9 THERM (Gas) $ 8,596

Total Square Footage: 53,365 Rated Capacity: 405

Ownership: Owned

Building Condition Survey Rating: Satisfactory

Building Age:

Building Inventory Form

773 KGAL (Water) $ 2,692

Probable Useful Life of Building: 60 Years (current age of original building - 55 yrs)

Estimated Replacement Value: $9,900,000.00

Addition #2 Addition #3 Addition #4

Heating System Source: Natural Gas

Construction Year Square Footage

Original 1957 45,680

30

Page 37: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

(2011-2012 Fiscal Year) 216,957 KWH (Electricity) $ 8,594

Addition #2 Addition #3 Addition #4

Heating System Source: Natural Gas

Energy Consumption: 53,839 THERM (Gas) $ 10,717

478 KGAL (Water) $ 957

Probable Useful Life of Building: 60 years (current age of original building - 85 yrs)

Estimated Replacement Value: $6,800,000.00

Building Age:

Construction Year Square Footage

Original 1927 38,750Addition #1

Use: Offices Current Enrollment: NA

Total Square Footage: 38,750 Rated Capacity:

Ownership: Owned

Building Condition Survey Rating: Satisfactory

Building Inventory Form

Building Name: Barnard

Bed Codes Number: 260501060001

Address: 71 Maiden Lane, Rochester NY 14616

31

Page 38: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

(2011-2012 Fiscal Year) 373,800 KWH (Electricity) $45,187

Building Name: Kirk Road Facility (Formerly Kirk Road Elementary)

Bed Codes Number: 260501060018

Address: 299 Kirk Road, Rochester NY 14612

Use: 0 Current Enrollment: 0

Addition #1 2005 6,929

Energy Consumption: 11,022.6 THERM (Gas) $ 7,162

Total Square Footage: 55,663 Rated Capacity: 300

Ownership: Owned

Building Condition Survey Rating: Satisfactory

Building Age:

Building Inventory Form

279 KGAL (Water) $ 1,142

Probable Useful Life of Building: 60 Years (current age of original building - 44 yrs)

Estimated Replacement Value: $10,300,000.00

Addition #2 Addition #3 Addition #4

Heating System Source: Natural Gas

Construction Year Square Footage

Original 1968 48,734

32

Page 39: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

Addition #5 19 1987 600Addition #6 19 2005 8,782

(2011-2012 Fiscal Year) 496,164 KWH (Electricity) $66,835

Building Inventory Form

1,012 KGAL (Water) $ 2,967

Probable Useful Life of Building: 60 Years (current age of original building - 84 yrs)

Estimated Replacement Value: $24,300,000.00

Addition #2 1952 18,273Addition #3 1956 3,670Addition #4 1962 26,845

Heating System Source: Natural Gas

Construction Year Square Footage

Original 1928 25,649Addition #1 1948 29,134

Energy Consumption: 90,704.55 THERM (Gas) $38,027

Total Square Footage: 112,953 Rated Capacity: 856

Ownership: Owned

Building Condition Survey Rating: Satisfactory

Building Age:

Building Name: Hoover Drive Facility (Formerly Odyssey Academy)

Bed Codes Number: 260501060013

Address: 133 Hoover Drive, Rochester NY 14615

Use: 0 Current Enrollment: 0

33

Page 40: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

(2011-2012 Fiscal Year) 257,280 KWH (Electricity) $13,698

Building Name: Transportation Annex

Bed Codes Number: 260501061023

Address: 1790 Latta Road Building A, Rochester NY 14612

Use: Offices Current Enrollment: NA

Addition #1

Energy Consumption: 27,121 THERM (Gas) $ 5,205

Total Square Footage: 17,601 Rated Capacity:

Ownership: Owned

Building Condition Survey Rating: Satisfactory

Building Age:

Building Inventory Form

214 KGAL (Water) $ 592

Probable Useful Life of Building: 60 Years (current age of original building - 85 yrs)

Estimated Replacement Value: $3,300,000.00

Addition #2 Addition #3 Addition #4

Heating System Source: Natural Gas

Construction Year Square Footage

Original 1927 17,601

34

Page 41: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

(2011-2012 Fiscal Year) 669,600 KWH (Electricity) $31,706

Addition #2 Addition #3 Addition #4

Heating System Source: Natural Gas

Energy Consumption: 53,234 THERM (Gas) $16,417

620 KGAL (Water) $ 960

Probable Useful Life of Building: 60 Years (current age of original building - 49 yrs)

Estimated Replacement Value: $5,400,000.00

Building Age:

Construction Year Square Footage

Original 1963 27,202Addition #1

Use: Offices/maintenance Current Enrollment: NA

Total Square Footage: 27,202 Rated Capacity:

Ownership: Owned

Building Condition Survey Rating: Satisfactory

Building Inventory Form

Building Name: Transportation Center

Bed Codes Number: 260501065024

Address: 1790 Latta Road Building C, Rochester NY 14612

35

Page 42: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

District: Greece Central School DistrictPlease note: Costs=Construction Cost Estimate as of October 2012

2012 SED # Priority Facility Name Costs26-05-01-06-0-031-021 A Apollo Middle $76,900.0026-05-01-06-0-012-037 A Arcadia High $40,800.0026-05-01-06-0-003-009 A Craig Hill $37,900.0026-05-01-06-0-004-030 A Olympia High $130,700.0026-05-01-06-0-004-026 A Olympia High $894,931.0026-05-01-06-0-015-013 A Parkland Elementary $37,700.00

2012 Year Total $1,218,931.00

2013 SED # Priority Facility Name Costs26-05-01-06-7-999-005 A Autumn Lane Elementary $15,800.0026-05-01-06-0-009-014 A Autumn Lane Elementary $109,568.00

26-05-01-06-7-999-005 A Brookside Elementary $13,300.00

26-05-01-06-7-999-005 A Buckman Heights Elementary $14,500.00

26-05-01-06-7-999-005 A Craig Hill Elementary $13,300.00

26-05-01-06-7-999-005 A English Village Elementary $19,900.00

26-05-01-06-7-999-005 A Holmes Road Elementary $8,200.00

26-05-01-06-7-999-005 A Lakeshore Elementary $15,400.0026-05-01-06-0-011-014 A Lakeshore Elementary $324,604.00

26-05-01-06-7-999-005 A Longridge Elementary $28,800.00

26-05-01-06-7-999-005 A Paddy Hill Elementary $17,200.0026-05-01-06-0-007-014 A Paddy Hill Elementary $500,278.00

26-05-01-06-7-999-005 A Pine Brook Elementary $17,400.0026-05-01-06-0-036-007 A Pine Brook Elementary $181,252.00

26-05-01-06-7-999-005 West Ridge Elementary (Formerly Parkland) $19,100.00

26-05-01-06-7-999-005 A Arcadia Middle $30,400.0026-05-01-06-0-012-038 A Arcadia Middle $416,482.00

26-05-01-06-7-999-005 A Arcadia High $37,400.0026-05-01-06-0-012-038 A Arcadia High $3,797,769.0026-05-01-06-0-012-038 B Arcadia High $67,729.00

26-05-01-06-7-999-005 A Athena Middle/High School $87,300.00

26-05-01-06-7-999-005 A Odyssey Academy (Formerly Apollo) $42,600.00

26-05-01-06-7-999-005 A Olympia $47,900.00

26-05-01-06-7-999-005 A Alcott Rd Facility (Formerly West Ridge) $3,000.0026-05-01-06-0-008-013 A Alcott Rd Facility (Formerly West Ridge) $154,776.00

District-Wide Analysis and Prioritization

36

Page 43: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

District: Greece Central School DistrictPlease note: Costs=Construction Cost Estimate as of October 2012

2013 SED # Priority Facility Name Costs26-05-01-06-7-999-005 A Barnard $4,200.00

26-05-01-06-7-999-005 A Kirk Road Facility (Formerly Kirk Road) $3,000.00

26-05-01-06-7-999-005 Hoover Drive Facility (Formerly Odyssey) $4,200.00

26-05-01-06-5-023-012 A Transportation Annex $117,117.00

26-05-01-06-7-999-005 A Transportation Center - Pole Barn $19,900.0026-05-01-06-5-024-013 A Transportation Center - Pole Barn $1,298,013.00

2013 Year Total $7,430,388.00

2014 SED # Priority Facility Name Costs26-05-01-06-0-014-015 A Brookside Elementary $385,382.00

26-05-01-06-0-003-011 A Craig Hill Elementary $761,274.00

26-05-06-01-0-016-010 A Holmes Road Elementary $610,322.00

26-05-01-06-0-015-015 A West Ridge Elementary (Formerly Parkland) $965,737.00

26-05-01-06-0-017-034 A Athena Middle/High $6,532,094.0026-05-01-06-0-017-034 B Athena Middle/High $47,922.00

2014 Year Total $9,302,731.00

2015 SED # Priority Facility Name Costs26-05-01-06-0-013-010 A Buckman Heights $291,802.00

26-05-01-06-0-010-018 A English Village Elementary $998,154.00

26-05-01-06-0-006-013 A Longridge Elementary $1,093,942.00

26-05-01-06-0-031-023 A Odyssey Academy (Formerly Apollo) $3,361,575.00

26-05-01-06-0-004-032 A Olympia $6,200,154.0026-05-01-06-0-004-032 B Olympia $49,440.00

2015 Year Total $11,995,067.00

District-Wide Analysis and Prioritization

37

Page 44: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

District: Greece Central School DistrictPlease note: Costs=Construction Cost Estimate as of October 2012

2016 SED # Priority Facility Name CostsB Autumn Lane Elementary $275,600.00C Autumn Lane Elementary $28,200.00

B Brookside Elementary $20,000.00C Brookside Elementary $100,000.00

. .B Buckman Heights Elementary $223,000.00C Buckman Heights Elementary $40,700.00

.C Craig Hill Elementary $28,200.00

B English Village Elementary $323,000.00C English Village Elementary $35,400.00

B Holmes Road Elementary $110,100.00C Holmes Road Elementary $62,000.00

B Lakeshore Elementary $273,000.00C Lakeshore Elementary $100,000.00

B Longridge Elementary $100,000.00C Longridge Elementary $70,200.00

B Paddy Hill Elementary $145,000.00C Paddy Hill Elementary $100,000.00

B Pine Brook Elementary $1,100,000.00

B Arcadia Middle $1,770,000.00

B Arcadia High $1,140,300.00C Arcadia High $640,800.00

B Athena Middle/High $405,000.00C Athena Middle/High $175,000.00

B Odyssey Academy (Formerly Apollo) $848,000.00

B Olympia $250,000.00

B Transportation Center $555,600.002016 Year Total $8,919,100.00

District-Wide Analysis and Prioritization

38

Page 45: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

School: Autumn Lane Elementary

Alte

ratio

ns

Ma

jor

Sys

tem

En

erg

y

Exc

el I

I

10

/11

Re

con

stru

ctio

n

Re

con

stru

ctio

n

2012 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2013 Priority SED # Item Description Cost

A 26-05-01-06-0-009-014 Install fire-rated doors x $54,496.00

A 26-05-01-06-0-009-014 Corridor night lighting x $18,611.00

A 26-05-01-06-0-009-014 Domestic water upgrades x $20,382.00

A 26-05-01-06-0-009-014 Expand emergency lighting x $15,579.00

A 26-05-01-06-7-999-005 District-wide security upgrades x $15,800.00

Year Total $124,868.00

2014 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2015 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2016 Priority SED # Item Description Cost

B Replace AHU for gym and café x x $223,000.00

B Replace exhaust fans x $52,600.00

C Masonry rehabilitation x $28,200.00

Year Total $303,800.00

District: Greece Central School District

Facility Estimated Expenses

39

Page 46: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

School: Brookside Elementary

Alte

ratio

ns

Ma

jor

Sys

tem

En

erg

y

Exc

el I

I

10

/11

Re

con

stru

ctio

n

Re

con

stru

ctio

n

2012 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2013 Priority SED # Item Description Cost

A 26-05-01-06-7-999-005 District-wide security upgrade x $13,300.00

Year Total $13,300.00

2014 Priority SED # Item Description Cost

A 26-05-01-06-0-014-015 Install fire-rated doors x $90,936.00

A 26-05-01-06-0-014-015 Replace exhaust fans x $167,802.00

A 26-05-01-06-0-014-015 Partial flooring upgrades x $40,509.00

A 26-05-01-06-0-014-015 Upgrade fire alarm - code comp. x $34,058.00

A 26-05-01-06-0-014-015 Expand exit and emerg. lights x $21,309.00

A 26-05-01-06-0-014-015 Install corridor night lighting x $20,255.00

A 26-05-01-06-0-014-015 Domestic water upgrades x $10,513.00

Year Total $385,382.00

2015 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2016 Priority SED # Item Description Cost

C Partial pavement replacement x $100,000.00

B Upgrade ventilation x $20,000.00

Year Total $120,000.00

District: Greece Central School District

Facility Estimated Expenses

40

Page 47: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

School: Buckman Heights Elementary

Alte

ratio

ns

Ma

jor

Sys

tem

En

erg

y

Exc

el I

I

10

/11

Re

con

stru

ctio

n

Re

con

stru

ctio

n

2012 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2013 Priority SED # Item Description Cost

A 26-05-01-06-7-999-005 District-wide security upgrade x $14,500.00

Year Total $14,500.00

2014 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2015 Priority SED # Item Description Cost

A 26-05-01-06-0-013-010 Install fire-rated doors x $101,974.00

A 26-05-01-06-0-013-010 Install handicapped lift x $52,478.00

A 26-05-01-06-0-013-010 Partial flooring upgrades x $41,792.00

A 26-05-01-06-0-013-010 Upgrade fire alarm - code comp. x $43,361.00

A 26-05-01-06-0-013-010 Expand exit and emerg. lights x $20,455.00

A 26-05-01-06-0-013-010 Install corridor night lighting x $20,896.00

A 26-05-01-06-0-013-010 Domestic water upgrades x $10,846.00

Year Total $291,802.00

2016 Priority SED # Item Description Cost

B Replace AHU for gym and café x x $223,000.00

C Masonry rehabilitation x $40,700.00

Year Total $263,700.00

District: Greece Central School District

Facility Estimated Expenses

41

Page 48: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

School: Craig Hill Elementary

Alte

ratio

ns

Ma

jor

Sys

tem

En

erg

y

Exc

el I

I

10

/11

Re

con

stru

ctio

n

Re

con

stru

ctio

n

2012 Priority SED # Item Description Cost

A 26-05-01-06-0-003-009 Construct roof canopy at main ent. x $10,000.00

A 26-05-01-06-0-003-009 Fire breaches at cooking stations x $27,900.00

Year Total $37,900.00

2013 Priority SED # Item Description Cost

A 26-05-01-06-7-999-005 District-wide security upgrade x $13,300.00

Year Total $13,300.00

2014 Priority SED # Item Description Cost

A 26-05-01-06-0-003-011 Replace unit ventilators x $530,335.00

A 26-05-01-06-0-003-011 Install fire rated doors x $86,982.00

A 26-05-01-06-0-003-011 Install stage handicapped lift x $50,866.00

A 26-05-01-06-0-003-011 Install fire-rated doors x $86,982.00

A 26-05-01-06-0-003-011 Insatll stage handicapped lift x $50,866.00

A 26-05-01-06-0-003-011 Partial flooring upgrades x $40,509.00

A 26-05-01-06-0-003-011 Install corridor night lighting x $20,255.00

A 26-05-01-06-0-003-011 Install vestibule doors - main ent. x $21,814.00

A 26-05-01-06-0-003-011 Domestic water upgrades x $10,513.00

Year Total $761,274.00

2015 Priority SED # Item Description Cost

No Work Scheduled .

Year Total $0.00

2016 Priority SED # Item Description Cost

C Masonry rehabilitation x $28,200.00

Year Total $28,200.00

District: Greece Central School District

Facility Estimated Expenses

42

Page 49: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

School: English Village Elementary

Alte

ratio

ns

Ma

jor

Sys

tem

En

erg

y

Exc

el I

I

10

/11

Re

con

stru

ctio

n

Re

con

stru

ctio

n

2012 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2013 Priority SED # Item Description Cost

A 26-05-01-06-7-999-005 District-wide security upgrade x $19,900.00

Year Total $19,900.00

2014 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2015 Priority SED # Item Description Cost

A 26-05-01-06-0-010-018 Replace unit ventilators x $486,213.00

A 26-05-01-06-0-010-018 Replace light fixtures thru out x $257,746.00

A 26-05-01-06-0-010-018 Install fire-rated doors x $110,132.00

A 26-05-01-06-0-010-018 Sinks and casework upgrades x $49,491.00

A 26-05-01-06-0-010-018 Partial flooring upgrades x $41,792.00

A 26-05-01-06-0-010-018 Install corridor night lighting x $20,896.00

A 26-05-01-06-0-010-018 Expand exit and emerg. lights x $17,893.00

A 26-05-01-06-0-010-018 Domestic water upgrades x $10,846.00

A 26-05-01-06-0-010-018 Upgrade fire alarm - code comp. x $3,145.00

Year Total $998,154.00

2016 Priority SED # Item Description Cost

B Replace AHU for gym and café x x $223,000.00

B Remove asbestos floor/wall tile x $192,700.00

B Replace asphalt sidewalk x $100,000.00

C Partial exterior door replacement x $35,400.00

Year Total $358,400.00

District: Greece Central School District

Facility Estimated Expenses

43

Page 50: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

School: Holmes Road Elementary

Alte

ratio

ns

Ma

jor

Sys

tem

En

erg

y

Exc

el I

I

10

/11

Re

con

stru

ctio

n

Re

con

stru

ctio

n

2012 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2013 Priority SED # Item Description Cost

A 26-05-01-06-7-999-005 District-wide security upgrade x $8,200.00

Year Total $8,200.00

2014 Priority SED # Item Description Cost

A 26-05-06-01-0-016-010 Partial roof replacement x $286,587.00

A 26-05-06-01-0-016-010 Install fire-rated doors x $98,843.00

A 26-05-06-01-0-016-010 Sinks and casework upgrades x $84,394.00

A 26-05-06-01-0-016-010 Install stage handicapped lift x $50,866.00

A 26-05-06-01-0-016-010 Partial flooring upgrades x $40,509.00

A 26-05-06-01-0-016-010 Install corridor night lighting x $20,255.00

A 26-05-06-01-0-016-010 Expand exit and emerg. lights x $15,688.00

A 26-05-06-01-0-016-010 Domestic water upgrades x $10,513.00

A 26-05-06-01-0-016-010 Upgrade fire alarm - code comp. x $2,667.00

Year Total $610,322.00

2015 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2016 Priority SED # Item Description Cost

B Install new asphalt sidewalk x $110,100.00

C Partial ext. door replacement x $62,000.00

Year Total $172,100.00

District: Greece Central School District

Facility Estimated Expenses

44

Page 51: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

School: Lakeshore Elementary

Alte

ratio

ns

Ma

jor

Sys

tem

En

erg

y

Exc

el I

I

10

/11

Re

con

stru

ctio

n

Re

con

stru

ctio

n

2012 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2013 Priority SED # Item Description Cost

A 26-05-01-06-0-011-014 Install fire-rated doors x $100,608.00

A 26-05-01-06-0-011-014 Partial flooring upgrades x $34,374.00

A 26-05-01-06-0-011-014 Install corridor night lighting x $18,414.00

A 26-05-01-06-0-011-014 Expand exit and emerg. lights x $43,976.00

A 26-05-01-06-0-011-014 Domestic water upgrades x $16,596.00

A 26-05-01-06-0-011-014 Upgrade fire alarm - code comp. x $7,065.00

A 26-05-01-06-0-011-014 Replace perimeter pavement x $46,856.00

A 26-05-01-06-0-011-014 Masonry rehabilitation x $46,976.00

A 26-05-01-06-0-011-014 Partial exterior door replacement x $9,739.00

A 26-05-01-06-7-999-005 District-wide security upgrade x $15,400.00

Year Total $340,004.00

2014 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2015 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2016 Priority SED # Item Description Cost

B Replace AHU for gym and café x x $223,000.00

C Asbestos abatement x $100,000.00

B Upgrade sewage lift station x $50,000.00

Year Total $373,000.00

District: Greece Central School District

Facility Estimated Expenses

45

Page 52: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

School: Paddy Hill Elementary

Alte

ratio

ns

Ma

jor

Sys

tem

En

erg

y

Exc

el I

I

10

/11

Re

con

stru

ctio

n

Re

con

stru

ctio

n

2012 Priority SED # Item Description CostNo Work Scheduled

Year Total $0.00

2013 Priority SED # Item Description Cost

A 26-05-01-06-0-007-014 Install fire-rated doors x $54,496.00

A 26-05-01-06-0-007-014 Sinks and casework upgrades x $53,307.00

A 26-05-01-06-0-007-014 Install stage handicapped lift x $18,245.00

A 26-05-01-06-0-007-014 Install vent. @ counselor/conf x $39,771.00

A 26-05-01-06-0-007-014 Replace plumbing fixtures Rms 26 & 30 x $70,457.00

A 26-05-01-06-0-007-014 Upgrade fire alarm - code comp. x $50,800.00

A 26-05-01-06-0-007-014 Replace glass wall @ Rm 4 x $18,418.00

A 26-05-01-06-0-007-014 Partial exterior door replace. x $22,915.00

A 26-05-01-06-0-007-014 Install corridor night lighting x $20,028.00

A 26-05-01-06-0-007-014 Expand exit and emerg. lights x $14,550.00

A 26-05-01-06-0-007-014 Domestic water upgrades x $18,925.00

A 26-05-01-06-0-007-014 Replace plumbing fixt. in staff toilet rms. x $61,007.00

A 26-05-01-06-0-007-014 Convert fire alarm panel to FCI x $57,359.00A 26-05-01-06-7-999-005 District-wide security upgrade x $17,200.00

Year Total $517,478.00

2014 Priority SED # Item Description CostNo Work Scheduled

Year Total $0.00

2015 Priority SED # Item Description CostNo Work Scheduled

Year Total $0.00

2016 Priority SED # Item Description Cost

C Asbestos abatement x $100,000.00

B Standing seam roof restoration x $40,000.00

B Add raised bases for existing site lighting poles x $30,000.00B Provide additional cooler/freezer space x $75,000.00

Year Total $245,000.00

District: Greece Central School District

Facility Estimated Expenses

46

Page 53: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

School: Longridge Elementary

Alte

ratio

ns

Ma

jor

Sys

tem

En

erg

y

Exc

el I

I

10

/11

Re

con

stru

ctio

n

Re

con

stru

ctio

n

2012 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2013 Priority SED # Item Description Cost

A 26-05-01-06-7-999-005 District-wide security upgrade x $28,800.00

Year Total $28,800.00

2014 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2015 Priority SED # Item Description Cost

A 26-05-01-06-0-006-013 Replace unit ventilators x $524,336.00

A 26-05-01-06-0-006-013 Upgrade ventilation - code comp. x $151,082.00

A 26-05-01-06-0-006-013 Sinks and casework upgrades x $87,068.00

A 26-05-01-06-0-006-013 Install fire-rated doors x $146,842.00

A 26-05-01-06-0-006-013 Partial flooring upgrades x $41,792.00

A 26-05-01-06-0-006-013 Install corridor night lighting x $20,896.00

A 26-05-01-06-0-006-013 Domestic water upgrades x $10,846.00

A 26-05-01-06-0-006-013 Upgrade fire alarm - code comp. x $73,764.00

A 26-05-01-06-0-006-013 Expand exit and emerg. lights x $37,316.00

Year Total $1,093,942.00

2016 Priority SED # Item Description Cost

B Drainage at west fields x $100,000.00

C Masonry rehabilitation x $58,200.00

C Replace (2) exterior door systems x $12,000.00

Year Total $170,200.00

District: Greece Central School District

Facility Estimated Expenses

47

Page 54: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

School: Pine Brook Elementary

Alte

ratio

ns

Ma

jor

Sys

tem

En

erg

y

Exc

el I

I

10

/11

Re

con

stru

ctio

n

Re

con

stru

ctio

n

2012 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2013 Priority SED # Item Description Cost

A 26-05-01-06-0-036-007 Sinks and casework upgrades x $133,512.00

A 26-05-01-06-0-036-007 Domestic water upgrades x $25,057.00

A 26-05-01-06-0-036-007 Expand exit and emerg. lights x $22,683.00

A 26-05-01-06-7-999-005 District-wide security upgrades x $17,400.00

Year Total $198,652.00

2014 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2015 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2016 Priority SED # Item Description Cost

B Roof replacement x x $1,100,000.00

B Glass vision inserts for interior doors x $30,000.00

B Chiller replacement x x $200,000.00

B Cooling tower replacement x x $55, 000.00

Year Total $1,385,000.00

District: Greece Central School District

Facility Estimated Expenses

48

Page 55: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

School: West Ridge Elementary (Formerly Parkland)

Alte

ratio

ns

Ma

jor

Sys

tem

En

erg

y

Exc

el I

I

10

/11

Re

con

stru

ctio

n

Re

con

stru

ctio

n

2012 Priority SED # Item Description Cost

A 26-05-01-06-0-015-013 Fire breaches at cooking stations x $37,700.00

Year Total $37,700.00

2013 Priority SED # Item Description Cost

A 26-05-01-06-7-999-005 District-wide security upgrades x $19,100.00

Year Total $19,100.00

2014 Priority SED # Item Description Cost

A 26-05-01-06-0-015-015 Replace unit ventilators x $530,335.00

A 26-05-01-06-0-015-015 Install fire-rated doors x $98,843.00

A 26-05-01-06-0-015-015 Sinks and casework upgrades x $84,394.00

A 26-05-01-06-0-015-015 Replace asphalt sidewalk x $67,516.00

A 26-05-01-06-0-015-015 Replace exhaust fans x $54,133.00

A 26-05-01-06-0-015-015 Partial flooring upgrades x $40,509.00

A 26-05-01-06-0-015-015 Masonry rehabilitation x $30,652.00

A 26-05-01-06-0-015-015 Expand exit and emerg. lights x $16,689.00

A 26-05-01-06-0-015-015 Upgrade fire alarm - code comp. x $32,153.00

A 26-05-01-06-0-015-015 Domestic water upgrades x $10,513.00

Year Total $965,737.00

2015 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2016 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

District: Greece Central School District

Facility Estimated Expenses

49

Page 56: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

School: Arcadia Middle

Alte

ratio

ns

Ma

jor

Sys

tem

En

erg

y

Exc

el I

I

10

/11

Re

con

stru

ctio

n

Re

con

stru

ctio

n

2012 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2013 Priority SED # Item Description Cost

A 26-05-01-06-0-012-038 Install new dust collectors x $101,006.00

A 26-05-01-06-0-012-038 Sinks and casework upgrades x $18,399.00

A 26-05-01-06-0-012-038 Install windows in class. doors x $80,339.00

A 26-05-01-06-0-012-038 Replace ext. & parking lot lights x $29,547.00

A 26-05-01-06-0-012-038 Partial flooring upgrades x $34,374.00

A 26-05-01-06-0-012-038 Expand exit and emerg. lights x $26,159.00

A 26-05-01-06-0-012-038 Upgrade fire alarm - code comp. x $1,864.00

A 26-05-01-06-0-012-038 Domestic water upgrades x $18,350.00

A 26-05-01-06-7-999-005 District-wide security upgrades x $30,400.00

A 26-05-01-06-0-012-038 Replace wire glass in impact areas x $106,444.00

Year Total $446,882.00

2014 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2015 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2016 Priority SED # Item Description Cost

B Roof replacement x x $1,770,000.00

Year Total $1,770,000.00

District: Greece Central School District

Facility Estimated Expenses

50

Page 57: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

School: Arcadia High

Alte

ratio

ns

Ma

jor

Sys

tem

En

erg

y

Exc

el I

I

10

/11

Re

con

stru

ctio

n

Re

con

stru

ctio

n

2012 Priority SED # Item Description Cost

A 26-05-01-06-0-012-037 Fire breaches at cooking stations x $40,800.00

Year Total $40,800.00

2013 Priority SED # Item Description Cost

A 26-05-01-06-0-012-038 Replace exterior windows x $1,225,815.00

A 26-05-01-06-0-012-038 Install fire-rated doors/inspect and label frames x $163,490.00

A 26-05-01-06-0-012-038 Replace pool AHU x $359,023.00

A 26-05-01-06-0-012-038 Clean exisitng ductwork; ceiling work included x $13,267.00

A 26-05-01-06-0-012-038 Install new dust coll. in Wood Shop x $171,645.00

A 26-05-01-06-0-012-038 Replace AHU for Music Rm. x $96,764.00

A 26-05-01-06-0-012-038 Replace AHU for Rms. 201, 201A, 202A, 202B x $151,216.00

A 26-05-01-06-0-012-038 Co-Gen plant repairs x $236,623.00

B 26-05-01-06-0-012-038 Provide dugout for softball x $67,729.00

A 26-05-01-06-0-012-038 Reconfigure traffic pattern x $68,381.00

A 26-05-01-06-0-012-038 Partial flooring upgrades x $28,647.00

A 26-05-01-06-0-012-038 Domestic water upgrades x $30,249.00

A 26-05-01-06-0-012-038 Renovate cafeteria ventilation x $323,665.00

A 26-05-01-06-0-012-038 Install AHU First Floor Team Room x $117,452.00

A 26-05-01-06-0-012-038 Provide ventilation in Auto Shop x $165,457.00

A 26-05-01-06-0-012-038 Expand exit and emerg. Lights x $26,438.00

A 26-05-01-06-0-012-038 Stairtower door replacement x $213,276.00

A 26-05-01-06-0-012-038 Install fire-rated doors in Music rooms x $20,961.00

A 26-05-01-06-0-012-038 Window replacement x $385,400.00

A 26-05-01-06-7-999-005 District-wide security upgrades x $37,400.00

Year Total $3,902,898.00

District: Greece Central School District

Facility Estimated Expenses

51

Page 58: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

School: Arcadia High-Continued

Alte

ratio

ns

Ma

jor

Sys

tem

En

erg

y

Exc

el I

I

10

/11

Re

con

stru

ctio

n

Re

con

stru

ctio

n

2014 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2015 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2016 Priority SED # Item Description Cost

B Asbestos abatement x $100,000.00

B Replace standing seam roofs x $460,000.00

B Install AHU for Stage x x $75,000.00

B Re-seal outdoor track x $75,000.00

C Exterior wall masonry rehabilitation x $30,000.00

C Replace pavement for south parking x $275,000.00

C Install separate A/C for Main Office x x $170,000.00

C Partial exterior door replacement x $65,800.00

C Replace HVAC (Print Shop) x x $100,000.00

Year Total $1,350,800.00

Facility Estimated Expenses District: Greece Central School District

52

Page 59: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

School: Athena Middle/High

Alte

ratio

ns

Ma

jor

Sys

tem

En

erg

y

Exc

el I

I

10

/11

Re

con

stru

ctio

n

Re

con

stru

ctio

n

2012 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2013 Priority SED # Item Description Cost

A 26-05-01-06-7-999-005 District-wide secruity upgrades x $87,300.00

Year Total $87,300.00

2014 Priority SED # Item Description Cost

ATH A 26-05-01-06-0-017-034 Partial roof replacement x $1,977,248.00

A 26-05-01-06-0-017-034 Locker room renovations incl. AHUs x $815,242.00

A 26-05-01-06-0-017-034 Relocate/reconstr. tennis courts x $810,179.00

A 26-05-01-06-0-017-034 Replace AHU for Main Gym x $345,150.00

A 26-05-01-06-0-017-034 Re-roof two gyms x $591,701.00

A 26-05-01-06-0-017-034 Install fire-rated doors x $332,112.00

A 26-05-01-06-0-017-034 Install dust collect - APAC x $76,009.00

A 26-05-01-06-0-017-034 Upgrade aisle lighting - APAC x $135,030.00

A 26-05-01-06-0-017-034 Domestic hot water tank upgrades x $111,987.00

A 26-05-01-06-0-017-034 Co-Gen plant repairs x $91,820.00

A 26-05-01-06-0-017-034 Replace E & W gym foyer doors x $80,064.00

A 26-05-01-06-0-017-034 Partial exterior door replacement x $73,752.00

A 26-05-01-06-0-017-034 Partial flooring upgrades x $67,516.00

A 26-05-01-06-0-017-034 Replace folding gym partition x $114,247.00

A 26-05-01-06-0-017-034 Refinish main gym floor x $64,814.00

A 26-05-01-06-0-017-034 Install spark arrestor - dust collector x $18,147.00

A 26-05-01-06-0-017-034 Install fire/security in fieldhouse/concess. x $33,758.00

A 26-05-01-06-0-017-034 Domestic water upgrades x $52,178.00

A 26-05-01-06-0-017-034 Install corridor night lighting x $20,255.00

A 26-05-01-06-0-017-034 Expand emergency light coverage x $85,975.00

A 26-05-01-06-0-017-034 Upgrade fire alarm - code comp. x $24,387.00

B 26-05-01-06-0-017-034 Provide dugouts for softball x $47,922.00

District: Greece Central School District

Facility Estimated Expenses

53

Page 60: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

School: Athena Middle/High (continued)

Alte

ratio

ns

Ma

jor

Sys

tem

En

erg

y

Exc

el I

I

10

/11

Re

con

stru

ctio

n

Re

con

stru

ctio

n

2014 Priority SED # Item Description Cost

ATM A 26-05-01-06-0-017-034 Install fire-rated doors x $197,687.00

A 26-05-01-06-0-017-034 Install new AHU in admin/guidance x $169,509.00

A 26-05-01-06-0-017-034 Install dust collection in wood shops x $133,955.00

A 26-05-01-06-0-017-034 Casework upgrades x $72,757.00

A 26-05-01-06-0-017-034 Install corridor night lighting x $20,255.00

A 26-05-01-06-0-017-034 Upgrade fire alarm - code comp. x $2,286.00

A 26-05-01-06-0-017-034 Expand emergency light coverage x $14,074.00

Year Total $6,580,016.00

2015 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2016 Priority SED # Item Description Cost

B Replace AHU for Library and Music Rm x x $350,000.00

B Replace cooling tower x x $55,000.00

C Re-seal outdoor track x $75,000.00

C Asbestos abatement x $100,000.00

Year Total $580,000.00

District: Greece Central School District

Facility Estimated Expenses

54

Page 61: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

School: Odyssey Academy (Formerly Apollo Middle)

Alte

ratio

ns

Ma

jor

Sys

tem

En

erg

y

Exc

el I

I

10

/11

Re

con

stru

ctio

n

Re

con

stru

ctio

n

2012 Priority SED # Item Description CostA 26-05-01-06-0-031-021 Fire breaches at cooking stations x $76,900.00

Year Total $76,900.00

2013 Priority SED # Item Description CostA 26-05-01-06-7-999-005 District-wide security upgrades x $42,600.00

Year Total $42,600.00

2014 Priority SED # Item Description CostNo Work Scheduled

Year Total $0.00

2015 Priority SED # Item Description Cost

A 26-05-01-06-0-031-023 Mill and pave parking lot x $967,486.00

A 26-05-01-06-0-031-023 Partial replace. domestic water x $801,775.00

A 26-05-01-06-0-031-023 Partial roof repalcement x $485,983.00

A 26-05-01-06-0-031-023 Install fire-rated doors x $244,737.00

A 26-05-01-06-0-031-023 Partial flooring upgrades x $174,134.00

A 26-05-01-06-0-031-023 Asbestos abatement x $139,307.00

A 26-05-01-06-0-031-023 Isolation valves for heat piping x $153,616.00

A 26-05-01-06-0-031-023 Re-seal outdoor track x $118,405.00

A 26-05-01-06-0-031-023 Co-Gen plant repairs x $79,406.00

A 26-05-01-06-0-031-023 Install handicapped stage lift x $60,996.00

A 26-05-01-06-0-031-023 Provide vent.& cooling off Library x $57,741.00

A 26-05-01-06-0-031-023 Expand exit and emerg. lights x $20,254.00

A 26-05-01-06-0-031-023 Domestic water upgrades x $30,107.00

A 26-05-01-06-0-031-023 Upgrade fire alarm - code comp. x $9,041.00A 26-05-01-06-0-031-023 Rework stage doors - code x $18,587.00

Year Total $3,361,575.00

2016 Priority SED # Item Description Cost

B Exterior wall masonry rehabilitation x $75,000.00

B Partial window replacement x x x $528,000.00B Provide dedicated HVAC for cafe x x x $245,000.00

Year Total $848,000.00

District: Greece Central School District

Facility Estimated Expenses

55

Page 62: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

School: Olympia

Alte

ratio

ns

Ma

jor

Sys

tem

En

erg

y

Exc

el I

I

10

/11

Re

con

stru

ctio

n

Re

con

stru

ctio

n

2012 Priority SED # Item Description Cost

A 26-05-01-06-0-004-030 Replace water lines x $46,300.00

A 26-05-01-06-0-004-030 Fire breaches at cooking stations x $84,400.00A 26-05-01-06-0-004-026 Asbestos abatement x $894,931.00

Year Total $1,025,631.00

2013 Priority SED # Item Description CostA 26-05-01-06-7-999-005 District-wide security upgrades x $47,900.00

Year Total $47,900.00

2014 Priority SED # Item Description CostNo Work Scheduled

Year Total $0.00

2015 Priority SED # Item Description Cost

A 26-05-01-06-0-004-032 Replace exterior windows x $2,799,368.00

A 26-05-01-06-0-004-032 Replace unit ventilators x $1,232,919.00

A 26-05-01-06-0-004-032 Replace front pavement x $828,876.00

A 26-05-01-06-0-004-032 Replace front sidewalk x $381,820.00

A 26-05-01-06-0-004-032 Install A/C at WGMC Radio Station x $105,083.00

A 26-05-01-06-0-004-032 Install fire-rated doors x $342,632.00

A 26-05-01-06-0-004-032 Re-seal outdoor track x $118,405.00

A 26-05-01-06-0-004-032 Co-Gen plant repairs x $80,798.00

A 26-05-01-06-0-004-032 Replace folding gym partition x $117,866.00

A 26-05-01-06-0-004-032 Expand exit and emerg. lights x $51,541.00

A 26-05-01-06-0-004-032 Partial flooring upgrades x $41,792.00

A 26-05-01-06-0-004-032 Repair standing seam roof x $34,827.00

A 26-05-01-06-0-004-032 Domestic water upgrades x $53,831.00

A 26-05-01-06-0-004-032 Upgrade fire alarm - code comp. x $10,396.00B 26-05-01-06-0-004-032 Provide dugouts for softball x $49,440.00

Year Total $6,249,594.00

2016 Priority SED # Item Description Cost

B Install ventilation for stage/music area x x $150,000.00B Field drainage x $100,000.00

Year Total $250,000.00

District: Greece Central School District

Facility Estimated Expenses

56

Page 63: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

School: Alcott Road Facility (Formerly Westridge Elementary)

Alte

ratio

ns

Ma

jor

Sys

tem

En

erg

y

Exc

el I

I

10

/11

Re

con

stru

ctio

n

Re

con

stru

ctio

n

2012 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2013 Priority SED # Item Description Cost

A 26-05-01-06-0-008-013 Reconfigure sewer lines x $116,380.00

A 26-05-01-06-0-008-013 Expand exit and emerg. lights x $20,939.00

A 26-05-01-06-0-008-013 Install corridor night lighting x $17,457.00

A 26-05-01-06-7-999-005 Exterior security upgrades x $3,000.00

Year Total $157,776.00

2014 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2015 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2016 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

District: Greece Central School District

Facility Estimated Expenses

57

Page 64: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

Building: Barnard

Alte

ratio

ns

Ma

jor

Sys

tem

En

erg

y

Exc

el I

I

10

/11

Re

con

stru

ctio

n

Re

con

stru

ctio

n

2012 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2013 Priority SED # Item Description Cost

A 26-05-01-06-7-999-005 Exterior security upgrades x $4,200.00

Year Total $4,200.00

2014 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2015 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2016 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

District: Greece Central School District

Facility Estimated Expenses

58

Page 65: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

School: Hoover Drive Facility

Alte

ratio

ns

Ma

jor

Sys

tem

En

erg

y

Exc

el I

I

10

/11

Re

con

stru

ctio

n

Re

con

stru

ctio

n

2012 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2013 Priority SED # Item Description Cost

26-05-01-06-7-999-005 Exterior security upgrades x $4,200.00

Year Total $4,200.00

2014 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2015 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2016 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

District: Greece Central School District

Facility Estimated Expenses

59

Page 66: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

School: Kirk Road Facility

Alte

ratio

ns

Ma

jor

Sys

tem

En

erg

y

Exc

el I

I

10

/11

Re

con

stru

ctio

n

Re

con

stru

ctio

n

2012 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2013 Priority SED # Item Description Cost

A 26-05-01-06-7-999-005 Exterior security upgrades $3,000.00

Year Total $3,000.00

2014 Priority SED # Item Description Cost

No Work ScheduledYear Total $0.00

2015 Priority SED # Item Description CostNo Work Scheduled

Year Total $0.002016 Priority SED # Item Description Cost

No Work ScheduledYear Total $0.00

District: Greece Central School District

Facility Estimated Expenses

60

Page 67: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

Building: Transportation Annex

Alte

ratio

ns

Ma

jor

Sys

tem

En

erg

y

Exc

el I

I

10

/11

Re

con

stru

ctio

n

Re

con

stru

ctio

n

2012 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2013 Priority SED # Item Description Cost

A 26-05-01-06-5-023-012 Replace concrete stairs x $32,734.00

A 26-05-01-06-5-023-012 Partial roof replacement x x $27,667.00

A 26-05-01-06-5-023-012 Expand exit & emerg. lights x $27,537.00

A 26-05-01-06-5-023-012 Upgrade fire alarm - code comp. x $13,138.00

A 26-05-01-06-5-023-012 Replace electric service weather head x $27,667.00

Year Total $128,743.00

2014 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2015 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2016 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

District: Greece Central School District

Facility Estimated Expenses

61

Page 68: Copy of GCSD 5 Year Plan 10.26.12 · Autumn Lane : Holmes Road ... 2014 and 2015 as designated. 1. General Condition and Goals ... Install spark arrestor system for dust collection

Building: Transportation Center

Alte

ratio

ns

Ma

jor

Sys

tem

En

erg

y

Exc

el I

I

10

/11

Re

con

stru

ctio

n

Re

con

stru

ctio

n

2012 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2013 Priority SED # Item Description Cost

A 26-05-01-06-5-024-013 Reconstruct pavement - pkg lot x $799,482.00

A 26-05-01-06-5-024-013 Replace pole barn roof, siding & floor x $302,361.00

A 26-05-01-06-5-024-013 Provide ADA upgrades x $116,967.00

A 26-05-01-06-5-024-013 Replace fencing x $60,803.00

A 26-05-01-06-5-024-013 Upgrade fire alarm for code compliance x $5,686.00

A 26-05-01-06-5-024-013 Expand exit & emerg. lights x $116,967.00

A 26-05-01-06-7-999-005 Exterior security upgrades x $19,900.00

Year Total $1,422,166.00

2014 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2015 Priority SED # Item Description Cost

No Work Scheduled

Year Total $0.00

2016 Priority SED # Item Description Cost

B Replace dust collector in Wood Shop x x $100,000.00

B Upgrade ventilation at shops x x x $100,000.00

B Replace boiler x x x $150,000.00

B Replace water line x $100,000.00

B Replace convectors & unit heaters x x $85,600.00

B Replace heating pump x $20,000.00

Year Total $555,600.00

District: Greece Central School District

Facility Estimated Expenses

62