Upload
augusta-freeman
View
215
Download
1
Tags:
Embed Size (px)
Citation preview
Copyright © 2010ZPM Solutions. All rights reserved.
Contractor Management Work Bench
Manage all aspects of your additional Capacity Requirements
Update Work Centre capacity with capacity from PO
Assign Personnel Numbers to Purchase Order and CapacityGenerate Service Entry Sheets from Time Confirmations using Personnel Numbers
Stop waiting on HR for Personnel Numbers
Copyright © 2010ZPM Solutions. All rights reserved.
Balance Labour costs within the correct period
Translate Capacity Requirements to Purchase Orders
Integrate with Site Induction requirements
Integrate with Site Induction requirements
The Contractor Management Workbench ties together the different aspects of Contractor Management, including the Work Centre Capacity, Purchase Order, Time Confirmations, Personnel Numbers, Positions and Service Entry Sheets for the life of the additional Capacity Requirement.
Copyright © 2010ZPM Solutions. All rights reserved.
No need to reassign Operations to other Work Centres
Updates the Capacity in you Work Centre
Forces creation of Service Entry Sheets at the correct time
Visibility for Induction Requirements
Promotes collection of Time Confirmations
Allows for the continuous use of the Scheduling Process