Contractor Management Work Bench

Page 2: Copyright © 2010ZPM Solutions. All rights reserved. Contractor Management Work Bench

Manage all aspects of your additional Capacity Requirements

Update Work Centre capacity with capacity from PO

Assign Personnel Numbers to Purchase Order and CapacityGenerate Service Entry Sheets from Time Confirmations using Personnel Numbers

Stop waiting on HR for Personnel Numbers

Copyright © 2010ZPM Solutions. All rights reserved.

Balance Labour costs within the correct period

Translate Capacity Requirements to Purchase Orders

Integrate with Site Induction requirements

Integrate with Site Induction requirements

The Contractor Management Workbench ties together the different aspects of Contractor Management, including the Work Centre Capacity, Purchase Order, Time Confirmations, Personnel Numbers, Positions and Service Entry Sheets for the life of the additional Capacity Requirement.

Page 3: Copyright © 2010ZPM Solutions. All rights reserved. Contractor Management Work Bench

Copyright © 2010ZPM Solutions. All rights reserved.

Page 4: Copyright © 2010ZPM Solutions. All rights reserved. Contractor Management Work Bench

No need to reassign Operations to other Work Centres

Updates the Capacity in you Work Centre

Forces creation of Service Entry Sheets at the correct time

Visibility for Induction Requirements

Promotes collection of Time Confirmations

Allows for the continuous use of the Scheduling Process