Performance Summary Velocity Wireline Retrievable 3.5” diameter wireline retrievable in 6” hole and larger Jam Mitigation System (JMS) 4” core mitigates two jams Full Closure Slick entry and complete closure Velocity Conventional Industry’s largest core in the slimmest hole Slick start Hidden catcher, disposable shoe and flow-thru piston for the best start to coring Additional Coring Technologies Canamera Wireline Retrievable System Achieves 100% Recovery in the Clearfork Formation, 6 Days & 2 Trips Saved. Challenge: Wireline Core 493’ of Clearfork Formation Canamera’s offset experienced indicated the potential for natural fractures Minimize trips caused by fractured formation Excellent recovery and quality of 3 ½” OD core sample Equipment & Personnel: Deployed a 6 ½” x 3 ½” x 90’ Coring/Drilling BHA 8 ¾” x 3 ½” Impact Resistant Seven Blade 13mm PDC Provision of Coring Technicians with “Wireline Coring and Caney Formation Experience. Canamera Results: 6 Days Saved (vs. 90ft Conventional Core Barrels) 100% Recovery 13.6’/Hr ROP 6 ½” x 3 ½” x 90’ Andrews County, TX – April 2014 [email protected]

Corion Express TX Clearfork Formation - Canamera Coring · Additional Coring Technologies Canamera Wireline Retrievable System Achieves 100% Recovery in the Clearfork Formation, 6

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Corion Express TX Clearfork Formation - Canamera Coring · Additional Coring Technologies Canamera Wireline Retrievable System Achieves 100% Recovery in the Clearfork Formation, 6

Performance Summary

•  Velocity Wireline Retrievable •  3.5” diameter wireline retrievable in 6” hole and larger

•  Jam Mitigation System (JMS) •  4” core mitigates two jams

•  Full Closure •  Slick entry and complete closure

•  Velocity Conventional •  Industry’s largest core in the slimmest hole

•  Slick start •  Hidden catcher, disposable shoe and flow-thru

piston for the best start to coring

Additional Coring Technologies

Canamera Wireline Retrievable System Achieves 100% Recovery in the Clearfork Formation, 6 Days & 2 Trips Saved.

Challenge: •  Wireline Core 493’ of Clearfork Formation •  Canamera’s offset experienced indicated the potential

for natural fractures •  Minimize trips caused by fractured formation •  Excellent recovery and quality of 3 ½” OD core

sample

Equipment & Personnel: •  Deployed a 6 ½” x 3 ½” x 90’ Coring/Drilling BHA •  8 ¾” x 3 ½” Impact Resistant Seven Blade 13mm PDC •  Provision of Coring Technicians with “Wireline Coring and

Caney Formation Experience.

Canamera Results: •  6 Days Saved (vs. 90ft Conventional Core Barrels) •  100% Recovery •  13.6’/Hr ROP

6 ½” x 3 ½” x 90’ Andrews County, TX – April 2014