40
DCM International Corporate Brochure

Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

DCM International

Corporate Brochure

Page 2: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Content

Services 3 – 5 Current Projects 6 – 7 Corporate Offices 8 – 16 Oil & Gas 17 – 21 Aviation 22 Logistics 23 – 26 Laundry 27 Manufacturing 28 – 30 Broadcasting 31 – 32 Hospitality 33 – 35 Management Services 36 Client References 37 Reference 38 Client List 39 Contact Info 40

Page 3: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Services

Page 3 of 40

This diagram illustrates how the services provided by DCM International span the complete project life cycle:

v

Client Needs and DCM Services

Client Needs

Identify Business

Requirement

Agree Business

Case

Establish Feasibility

Instruction to Proceed

Award Contracts

Occupation Satisfy Business

Needs

Pre Design Phase (Project Definition)

Implement Project

Design & Construction Phase (Project Implementation)

Handover Phase (Completion) Development Consultancy

Concept Design

Feasibility Study

Design Management

Project Management

Migration & Aftercare

Client Needs

Project Inception

Briefing Design and Cost

Management

Value Engineering

Procurement Site Management

Handover Activates

Project Aftercare

Page 4: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Services

Page 4 of 40

DCM International has been serving clients for more than 30 years. From our original base in the United Kingdom, we now have offices in Europe and the Middle East. Throughout this time we have maintained our original objective of offering our clients a complete property development service. We provide high quality design combined with top International development and project management services.

Client satisfaction is the cornerstone of DCM International. Our main focus when managing projects; is to provide the best property solution; be it project management; development management; design services or a complete design and build service. DCM International will provide professional and impartial advice to our clients during each stage of the development process in whatever capacity we are appointed.

The following are some of the benefits that our clients receive by utilising the services of DCM International:

Excellent business investment

Development that works and meets their needs and requirements.

Total management of the development

Built-in flexibility for future changes.

Significant savings in construction achieved by:

Accurate briefing and informative decision making

Minimising over-design

Spending in areas of key importance and saving in others

Fair and ethical procurement management

Close review of the lifecycle costs

Page 5: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Services

Design &Construction Management Consultant

Page 5 of 40

Project Management By drawing on our extensive design and construction experience DCM International will effectively manage your project at all stages. We continually monitor and control the development budget in order to achieve maximum value for our client. DCM International’s proactive approach to programming will effectively inform and guide all participants involved in the project from feasibility through concept to final completion. We utilize a strict, but fair management style, which works well with both consultants and contractors and facilitates an efficient working environment.

Design DCM International’s appreciation of what makes a completed development successful gives our team of talented architects, designers and project managers the ability to combine the leading edge in current design with a comprehension of what is of practical and financial importance to the development. Our extensive “hands on” experience of the practicalities of construction allows DCM to design savings into the scheme at an early stage, thereby producing a positive impact on reducing construction costs, to the long-term benefit of the project.

Development Management After initial investigations, DCM International will progress suitable development opportunities that makes sound business sense. We formulate the scheme to maximize the development return and achieve the optimum business solution. Using expert knowledge of the development market, DCM International will assist our clients in securing business partners and arranging finance where required.

Design & Build DCM’s clients benefit from the expertise of our internationally recognised design team coupled with the financial security afforded at an early stage in the development from Design & Build. Our senior management control the design process to ensure compliance with the development master plan and budget parameters. This allows our clients to benefit from a unique combination of high quality original design and management control, which produces a finished development that works commercially and delivers the best possible value for money to our clients.

Page 6: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Current Projects

Page 6 of 40

National Trading & Development NTDE City

Location: Dubai - UAE

NTDE City is a multi-faceted project, which will provides grade “A” office buildings, labour accommodation and state of the art automated logistics facilities including cold store and climate-controlled zones. This project when completed will house NTDE’s complete UAE operations and will undoubtedly elevate them to a higher level of service for their clients.

Page 7: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Current Projects

Page 7 of 40

Schenker LLC

Regional HQ & Distribution Centre Location: Dubai – UAE

DCM International designed and project managed both the Regional Headquarters and the Central Distribution Centre for DB Schenker; the German logistics multinational, one of the top three logistics companies in the world. The Headquarters is a G+3 building constructed of precast concrete with a total built-up area of 4,100 m2. The Central Distribution Centre is a steel frame building with a built-up area of 36,000m2 serviced by 36 loading docks. The warehouse building is fitted with roof mounted solar power generation, which will produce 95% of DB Schenker’s power requirements.

Page 8: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Current Projects

Page 8 of 40

Trilogi Mega Distribution Centre

Location: Dubai - UAE

The Trilogi Mega Distribution Centre was designed and project managed by DCM International. The project consists of two principal buildings; a 20m to eaves air-conditioned logistics facility with a total BUA of 40,000m2 and a G+1 administration office facility of 2,500m2. The Distribution Centre will house Nike, Under Armour, Columbia, Timberland etc. within a full serviced and automated seven level multi-tier racking system. This project was constructed on time within 10 months and under budget.

Page 9: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Corporate Offices

Design &Construction Management Consultant

Page 9 of 40

EMERSON Fisher Valves – Regional Head Office Location: Dubai – UAE

The Emerson Fisher building is a 14,000m2 facility consisting of a 4,500m2

ground plus two, administration office and a 9,500m2 ground plus mezzanine workshop facility. The workshop contains eleven overhead cranes, three jib cranes and a compressed air distribution network. There are also paint booths; shot blast zones and a pressure test facility. This project is the expansion for Emerson's Regional Head Office building, which was designed and project managed by DCM in 2010. Together the three projects designed and project managed by DCM for Emerson equate to 15,000m2

of grade “A” high quality office, 13,000m2

of logistics facility and 15,000m2 of workshops. This campus

in JAFZA is considered one of the best facilities within Emerson’ worldwide portfolio.

Page 10: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Corporate Offices

Design &Construction Management Consultant

Page 10 of 40

Emerson Climatic Technologies – Regional Head Office

Location: Dubai – UAE Emerson Climate Technologies building is a 14,500m2

logistics facility located within the JAFZA South zone. The building consists of a ground and mezzanine office facility of 3,000m2

and a distribution facility of 11,500m2. This facility is designed to accommodate Emerson’s Climate Technologies Regional Logistics requirements for the coming ten years. This project is the third undertaken by DCM for Emerson. On all three projects, DCM has designed and project managed the entire facility.

Page 11: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Corporate Offices

Page 11 of 40

Emerson Regional Head Office Location: Dubai – UAE An American Corporation with a yearly turnover in excess of US$25 Billion, Emerson is a global manufacturing and technology company offering a wide range of products and services in the areas of network power, process management, industrial automation and climate technologies. Recognized widely for their engineering capabilities and management excellence, Emerson selected DCM to design and project manages their new Regional Headquarters.

DCM Role: - DCM provided a complete turnkey service for Emerson. This included the design and full project management and site supervision for their 8,000m2 fully fitted out office facility. This building is now the Regional Head Office for Emerson, where they manage Middle East, African and Far East operations.

Page 12: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Corporate Offices

Page 12 of 40

Weatherford

Training & Technology Centre

Location: Abu-Dhabi - UAE

Weatherford is one of the worlds’ largest oil-field services companies and is listed on the NYSE. They operate in more than 100 countries and employ more than 50,000 people worldwide. DCM coordinated with Weatherford’s global training management team to establish the design for this very high specification training & technology center. The project encompasses a 130-seat auditorium, which features the largest back projection system installed within the Middle East. The project also includes a real-time operations center, rig simulator, videoconference, electronics laboratory, numerous lecture theaters and training facilities. The building is equipped with a fully functional restaurant and is setup to facilitate Weatherford’s Regional Data Center.

DCM ROLE: provided full design and project management services for both the base building and fitting out packages including the procurement of all Audio Visual and FF&E items.

Page 13: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Corporate Offices

Page 13 of 40

Weatherford Manufacturing Offices

Location: Abu-Dhabi - UAE Weatherford’s manufacturing office HQ is adjacent to their main manufacturing facility and is constructed over three stories equating to approximately 4,500m2 of fully fitted out high spec office facility.

DCM’s ROLE: on this project DCM provided full services, including design and project management of both the base building and fitting out packages including the procurement of all FF&E items.

Page 14: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Corporate Offices

Page 14 of 40

Johnson & Johnson

Regional Head Office

Location: Dubai - UAE

Johnson & Johnson (J&J) employs in excess of 114,000 staff worldwide in the field of research development, manufacture and sale of products in the health care field. J&J’s Regional Head Office is situated in a 2B+G+3F building within Dubai Healthcare City, UAE.

DCM ROLE: Represented J&J and project managed the construction of the base building then provided full design and project management services for their office fitting out and procurement management of all FF&E items.

Page 15: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Corporate Offices

Page 15 of 40

Tetra Pak

Corporate - Regional Head Office

Location: - Dubai - UAE Operating in more than 170 markets with over 20,000 employees Tetra Pak is truly a world leader in food processing and packaging.

DCM ROLE: DCM structured a development deal to

undertake the Tetra Pak Regional Head Office, whereby

Tetra Pak would only sign a long lease for their building

and pay an annual rent calculated on the actual

development cost of the project. DCM also designed and

project managed the base building and fitting out package

for the project. Upon project completion we established

and agreed with both parties the final rental costs to be

paid by Tetra Pak. These negotiations resulted in Tetra

Pak obtaining a building, which facilitated their entire

future office requirement at less than ½ the annual rental

cost they were previously paying.

Page 16: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Corporate Offices

Page 16 of 40

Infosys Technologies Office Facility Location: Bangalore - India The project includes offices, an auditorium with seating for six thousand, T.V. studios, restaurants, accommodation and extensive landscaping works all on a nineteen acres site. DCM ROLE: to provide the master plan & concept Architectural designs for Infosys Technologies expansion plans in Bangalore.

PepsiCo Regional Head Offices

Location: Dubai – UAE DCM Designed and project managed the fitting out and migration of PepsiCo to their Regional Headquarters in Dubai.

Page 17: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Corporate Offices

Page 17 of 40

Wrigley Regional Head Office

Location: Dubai - UAE

Wrigley is a recognized leader in confectionary goods with a wide range of products including gum, mints, hard and chewy candies and chocolate. The company has operations in more than 40 countries and distributes its world-famous brands in more than 180 countries, generating global revenues of $30 billion annually.

DCM ROLE: Wrigley appointed DCM to project manage their MENA Regional Head Office building.

Dubai Internet City Office Development

Location: Dubai – UAE Dubai Internet City (DIC) is an information technology park created by the Government of Dubai as a free economic zone and a strategic base for companies targeting Regional emerging markets.

DCM ROLE: DCM’s CEO, Mr Andrew Fullerton, project managed this development personally. The project consisted of 40,000m² of speculative office space split over four buildings, the complete infrastructure for an advanced data centre, which currently facilitates the entire DIC. The project also contains significant external infrastructure including both a salt water and sweet water lake, with elaborate hard and soft landscaping, incorporating numerous water features within a land area of more than 300,000m².

Page 18: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Oil & Gas

Page 18 of 40

Weatherford Manufacturing Facility

Location: Abu Dhabi - UAE

The Abu Dhabi manufacturing facility is the largest plant owned and operated by Weatherford. The project, in summary, consists of a 38,000m2 air-conditioned manufacturing facility and includes pressure test zones, shot blast, paint booths, carbide shops, pipe reclamations and pipe storage. The facility is served by 22 overhead cranes and 25 jib cranes. A buss bar power system and compressed airlines run throughout the plant and provides versatile power and air connection to all areas of the plant. DCM ROLE: DCM designed and project managed every aspect of this project for Weatherford. We are pleased to report that the plant after its first year of operation is now surpassing Weatherford’s internal production forecasts and is the top producing plant within their worldwide portfolio.

Page 19: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Oil & Gas

Page 19 of 40

Weatherford City Iraq Operations Base

Location: Basra - Iraq

The North Ramallah base, known, as “Weatherford City” is located in Basra, in the South of Iraq. This base is one of the largest operations undertaken by Weatherford. The facility can accommodate 1,250 personnel within 2/3* grade accommodation and provide full onsite catering, laundry, medical centre, power generation, desalination, grey water treatment and diesel storage. In addition to the accommodation aspect of the base there will also be three operational workshops totalling 27,000m2. These include; machine shop, pipe reclamation, pressure test zone, shot blast and paint booths to facilitate all Weatherford’s product-lines.

DCM Role: from our offices in Dubai and Iraq, DCM designed and project managed every aspect of this project for Weatherford.

Weatherford:

Page 20: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Oil & Gas

Design &Construction Management Consultant

Page 20 of 40

Pipe Reclamation

Location: Abu Dhabi – UAE and Iraq

The pipe reclamation operation is located within Weatherford’s facility in Abu Dhabi and southern Iraq. These facilities include an automated pipe reclamation facility complete with EMI testing and internal and external pipe coating station.

DCM Role: designed and project managed the building component of this facility, with Weatherford undertaking the mechanical automation in-house.

Simulator & Real time Operation Centre

Location: Abu Dhabi - UAE

The simulator facility is located within Weatherford’s Training & Technology Centre; it is designed to provide real-time simulation of the drilling process and is a vital part of Weatherford’s on-going progress and development of both their in-house and client’s staff. Real-time operations are a key value added service offered by Weatherford. It allows senior Weatherford staff the ability to monitor and optimize the drilling operation for all rigs from a centralized control centre located in Abu Dhabi. This facility has derived significant benefits to both Weatherford and their clients alike. DCM Role: designed and project managed the building component of this facility.

Page 21: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Oil & Gas

Page 21 of 40

Weatherford Laboratories Location: Abu Dhabi - UAE

The facility is a cutting edge geochemical laboratory to facilitate all facets of rock and fluid analysis for the purpose of evaluating hydrocarbon resources. This facility is considered the best facility in Weatherford’s portfolio of laboratories. DCM Role: DCM designed and project managed every aspect of this project for Weatherford.

Page 22: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Oil & Gas

Page 22 of 40

Weatherford Pressure Test Facility Location: Abu Dhabi - UAE

These facilities can accommodate the testing of multiple components up to pressures of 30,000 psi. DCM Role: DCM designed and project managed Weatherford’s pressure test facility within their complex in Abu Dhabi.

Page 23: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Aviation - Operations

Page 23 of 40

Zodiac Aerospace Location: Dubai - UAE

Zodiac Aerospace is a World leader in ‘aerospace equipment and systems. Zodiac Aerospace Services Middle East (ZME) project was the construction of a new office & workshop facility, located on two adjacent plots within Dubai World Central. The project is approximately 6,000m2 of hot rolled steel frame and reinforced concrete construction. The functional requirements of Zodiac’s operations dictated ‘multi height’ workshop space. This requirement allowed DCM’s architects the opportunity to develop a design concept based on an aerospace theme, which you see in the attached visualization. DCM Role: DCM designed and project managed every aspects of the project for Zodiac.

Page 24: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Logistics

Page 24 of 40

Integrated National Logistics (INL)

Location: Dubai - UAE INL is a joint venture between Integrated Logistics, a publicly traded company from Malaysia, and National Trading & Development Establishment (NTDE) from the UAE. The Joint venture was established to provide third party logistics services throughout the Middle East. Their flagship facility is a 70,000m2 state of the art logistics facility, consisting of 45,000 fully automated cold store pallet positions and 35,000 pallets of conventional air-conditioned storage. The introduction of a fully automated storage system is a first for an independent company in the region. DCM has designed and project managed the complete facility. Now that the project has been successfully completed and the facility is operational the way goods are stored in Dubai will be totally transformed. Logistics, will now be brought to a new level within the region

Page 25: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Logistics

Page 25 of 40

National Trading & Development Establishment Logistics Facility

Location: Dubai -UAE

NTDE is one of the Gulf’s leading distribution and logistics providers for international consumer brands in the

Region. Their list of brands includes Cadbury Chocolate, Davidoff, Haagen-Dazs, Pokka juices, Vitamin-C drink

and Al Rabies juices.

DCM Role: DCM Project managed the construction of their high-bay warehouse located at the centre of their Regional Headquarters complex in Dubai.

Page 26: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Logistics

Page 26 of 40

Emerson Climatic Technologies – Regional Logistics Hub

Location: Dubai – UAE This building is part of Emerson’s Dubai Campus, all of which was designed and project managed by DCM. It is the 11,500m2 central distribution facility designed to accommodate Emerson’s Climate Technologies Regional Logistics requirements for the coming ten years.

Page 27: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Logistics

Page 27 of 40

Edgen Murray

Logistics Facility

Location: Dubai - UAE

Edgen Murray is a truly global company with operations in every

continent; they specialize in the supply and distribution of high

performance steel products.

DCM Role: DCM designed and project managed the expansion of

their regional distribution facility located within Jebel Ali Free Zone.

Page 28: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Laundry

Page 28 of 40

Champion Cleaners Head Office & Dry cleaning Location: Dubai – UAE Champion Cleaners, development, a leading dry cleaning company in Dubai, is a fully automated laundry facility located within Dubai Investment Park with a capacity to process twenty thousand garments per day. DCM designed and project managed the complete facility.

Page 29: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Manufacturing

Page 29 of 40

Emerson Manufacturing Facility

Location: Dubai- UAE

Emerson’s workshop and manufacturing facility is located in Jebel Ali Free Zone and facilitates several Emerson divisions within one location.

DCM Role: DCM designed and project managed every aspect of this project for Emerson.

Page 30: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Manufacturing

Page 30 of 40

Emerson Manufacturing Facility – Fisher Valves

Location: Dubai- UAE

Emerson’s manufacturing facility for their Fisher Valves division is located within their JAFZA complex and includes 11 overhead cranes, paint booths, pressure test zones and grit blast facilities and is located in Jebel Ali Free Zone.

DCM Role: DCM designed and project managed every aspect of this project.

Page 31: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Manufacturing

Page 31 of 40

Wärtsilä Manufacturing Facility

Location: Dubai - UAE

Wärtsilä is a global leader in complete lifecycle power solutions for the marine and energy

markets. Wärtsilä's net sales totalled EUR 4.6 billion employing 17,500 staff. The company

has operations in 160 locations in 70 countries around the world.

DCM Role: DCM designed and project managed their office and

workshop facility located within Dubai Investment Park. The

workshop incorporates seven overhead cranes ranging in size from

20 to 30 tonnes.

Page 32: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Broadcasting

Page 32 of 40

MBC Head Office relocation

Location: Dubai - UAE MBC (Middle-East Broadcasting Company) is the largest TV and radio broadcaster in the Middle East. DCM’s CEO project managed numerous developments for MBC over a four-year period. The management of the relocation of the companies’ head office from London to Dubai Media City was the largest project undertaken by MBC. This project included the construction of one main production studio several smaller studios for TV and Radio, sound booths, control rooms and high quality office facility of approximately 8,000m2 to accommodate the owner and senior management.

MBC Big Brother

Location: Manama - Bahrain

DCM’s CEO project managed the “Big Brother House” project for MBC. This project was developed in conjunction with Endermol the world’s largest independent production company and the owner of the Big Brother franchise. The project consisted of a large film set constructed in the shape of a conventional villa, however permitting secret filming from every area of the facility. The project also contained control rooms sound booths and a large

production studio, to house an audience of over 100 guests.

Page 33: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Broadcasting

Page 33 of 40

Al-Arabia News - Studio Location: Dubai – UAE

Al-Arabia news studio was the first open news set in the Middle East and has set the standard for news sets ever since. DCM project managed this development for MBC the parent company of Al-Arabia.

Al Aan TV Head Office & Studio

Location: Dubai - UAE

Al Aan' is a pan-Arab infotainment satellite television station based in Dubai Media City, United Arab Emirates. It focuses on news content and entertainment programs and targets Arab families with a slight tilt towards young female audience in the Arab world. DCM designed and project managed their facility within Media City, which included their main news set, control room, transmission room and offices for their senior staff.

Dubai TV Satellite Studio

Location: Dubai - UAE

DCM designed this production Studio for Dubai TV. This project consisted of; two studios of 1,000m2 and 500m2, control room, sound booths and other support functions.

Page 34: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Hospitality

Design &Construction Management Consultant

Page 34 of 40

Forte Hotel Group

Hotel Projects Location: United Kingdom (various locations)

Roll out programme of three star hotels for the Forte Group DCM was appointed to produce a concept design for Post House Hotels to be applied throughout the UK. We worked with various local architects during the design process and supervised on site installation. Our brief was to produce a consistent corporate image that was attractive, practical and commercially viable. During the subsequent rollout programme, capital expenditure was monitored and reduced through economies of scale. Only minor local adjustments were needed to the design of this very profitable and successful concept.

Page 35: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Hospitality

Design &Construction Management Consultant

Page 35 of 40

Le Jeddah Meridien

Hotel Development

Location: Jeddah – Kingdom of Saudi Arabia Privately funded three hundred bedrooms five star hotel with extensive banqueting and wedding function facilities after construction of the building shell, DCM International was appointed as sole consultants and project managers.

DCM Role: We undertook extensive revisions of the design proposals, which produced benefits in cost, time and quality of work. DCM International helped negotiate the contracts, advised our client on appointments, controlled and supervised the work on site.

This project was successfully completed at 40% less capital expenditure then comparable developments in the region.

Page 36: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Management Services

Page 36 of 40

Management Services DCM International was appointed by Mr Salim Al Moosa to undertake an extensive management review of his construction company’s (Pioneer) performance on the City Bank project (pictured below). Pioneer was the main contractor for this 16-story prestigious office development providing more than 70,000M² of office space for a construction cost of $45,000,000. During this assignment DCM International reported directly to Mr Al Moosa the President of the Company. We advised and implemented significant efficiency improvements and established the principle elements behind their large contractual claim for additional costs and an extension of time.

DCM International was appointed by a top international design consultancy practice to review and upgrade their internal quality systems and operating procedures. The deliverables from this assignment was a complete revision to their existing quality system and several workshop-training seminars to implement the new management and quality systems throughout the organisation.

Page 37: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Client References

Page 37 of 40

Page 38: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Reference

Page 38 of 40

Page 39: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Client List

Page 39 of 40

British Energy

Canon UK

Dubai Internet City

Dubai TV

Edgen Murray

Emerson

Forte Hotels

General Electric

Holiday in Crowne Plaza

Integrated National Logistics

Infosys

Johnson & Johnson

J Walter Thompson

Le Meridien

Milton Bradley

Majid Al Futtaim

MBC

Maritime & Mercantile Int.

National Trading

NCP

Petroleos de Venezuela

Shell Exploration

Sun life Properties

Tetra Pak

Tower Media

University of Hertfordshire

Wärtsilä

Weatherford

Wrigley

-Nuclear Power Station Refurbishment

-Corporate HQS - Europe

-Commercial Development

-Various broadcast project - Dubai

-Logistics Facility - Dubai

-Regional HQ - Dubai

-New Build & Refurbishment’s

-Water treatment factory- Dubai

-New Build & Refurbishment’s

-3PL facility - Dubai

-Head Office Development

-Regional HQ (Dubai)

-UK Headquarters

-Hotel Project - KSA

-Corporate HQ (UK)

-Mixed Use Commercial

-Broadcast Facility

-Corporate HQ -Dubai

-Logistics Facilities - Dubai

-Development Projects - Dubai

-Head Office - UK

-Support Facilities

-Development Projects

-Regional Head Office - Dubai

-Broadcast Facility

-Educational Facilities - UK

-Manufacturing & Regional Office - UAE

-HQ (UAE) Manufacturing & Operations base

-Regional office - Dubai

Page 40: Corporate Brochure - DCM Internationaldcminternational.com/DCM-Corporate-Brochure.pdf · 2018-12-16 · Corporate Brochure Design & Construction Management Services Page 4 of 40 DCM

Corporate Brochure Design & Construction Management

Contact Info

Page 40 of 40

Design & Construction

Management Consultants

Dubai – United Arab Emirates

Media City – Concord Tower

23rd Floor - Office 23-06

Tel: +971 4 455 1080

Fax: +971 4 455 1081

Mob: +971 50 454 0733

Email: [email protected]

www.dcminternational.com

Andrew Fullerton – CEO