67
Energy, Infrastructure & Defence solutions Energy Infrastructure and De Energy , Infrastructure and De May 2013 May 2013 efence efence

Corporate Presentation - May 2013

  • Upload
    justin

  • View
    21

  • Download
    10

Embed Size (px)

DESCRIPTION

jhbhkb

Citation preview

Page 1: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Energy Infrastructure and DeEnergy, Infrastructure and De

May 2013

May 2013

efenceefence

Page 2: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

P j Ll d G

• A global US $ 2.06 billion EPC conglomerate

Punj Lloyd Group

• Providing services in Energy, Infrastructure and Defence s

• Present across Middle East & Africa, Asia Pacific, South A

• International offices in 21 countries

• Rich multicultural manpower from over 37 nationalities

• International clients from top Oil & Gas majors and Gover

• High standards of health safety environment and qualityHigh standards of health, safety, environment and quality

• Equipment assets worth US $ 426 million

• Declared ‘Infrastructure Company of the Year’ at Essar StCNBC TV 18CNBC TV 18

May 2013

sectors

Asia, the Caspian, UK, China and Europe

nment

eel Infrastructure Awards 2010 in association with

Page 3: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Punj Lloyd GroupPunj Lloyd GroupProviding EPC

Energy Infrastruct

Utilities• Water Treatmen• Sewage Treatm

gy

Oil & Gas

• Offshore• Onshore Field Development • Sewage Treatm

• Reservoirs• Centralised Util

Buildings

• Onshore Field Development• Pipelines• Tanks & Terminals

Polymers & Petrochemicals g

• Hospitality & Le• Commercial, InResidential Com

• Healthcare

Polymers & Petrochemicals

• Refineries• Chemicals

Process

• Healthcare• Townships & In

Infrastructure• Subway & Metr

Power

• Chemicals

• Thermal• Nuclear y

• Airports• Highways & Ex• Bridges, Flyove• Tunnels & Cave

S t & T

• Nuclear

Renewables• Solar • Biofuels

May 2013

• Seaports & Ter

Telecom

• Biofuels• Water treatment

C services for :

ture Defence

nt Facilitiesment Facilities

• Land Systems• Aviation

El t iment Facilities

lities

• Electronics

eisuredustrial, Institutional &

mplexes

dustrial Parks

ro Systemsy

xpresswaysers & Interchangeserns

i lminals

Page 4: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Punj Lloyd Group

PL Engine

Punj LloydGroup

Punj Lloyd

p

Energy / Infrastructure / Defence

PUNJ LLOYD

May 2013

PL ENGINEERINGOil & GasPetrochemicals / ChemicalsP N l / Th lPower – Nuclear / ThermalAutomotive / Aerospace

eering

Sembawangd

SembawangEngineers &Constructors

BuildingsInfrastructure

SEMBAWANG E & C

Utilities

Page 5: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Punj Lloyd Overview

Founded in 1988

24 years of professional excellence

Active in hydrocarbon and infrastructure sectors

Revenues (Group) for Year ended March 31, 2013 : US$

Order Backlog (unexecuted as on March 31, 2013 : US$ and orders received after that)

Employees : 20,48p y ,

Safety : Conforming to highest international stan

May 2013

2,059 Million

4,060 Million

80

ndards

Page 6: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Sembawang Overview

Founded in 1982

30 years of professional excellence

Largest EPC contractor in South East Asiag

Classified under highest Unlimited Financial Category in Sin

Present in transportation, infrastructure, buildings, utilities, p

R f Y d d M h 31 2013 US$Revenues for Year ended March 31, 2013 : US$ Order Backlog (unexecuted as on March 31, 2013 : US$ and orders received after that)

Employees : 660Employees : 660

May 2013

Acquired by Punj Lloyd in June 2006

ngapore for Civil, Building and M&E

power, environmental industries

174 Milli174 Million462 Million

Page 7: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

EngineeringEngineering

PL Engineering is a multi-disciplinary Design and Eand is headquartered in India, Gurgaon. PL Engineering :q , g g g

• Is an ISO 9001 company

• Has a strength of over 617 people

• Serves Oil & Gas Petrochemical/ Chemical Power (TServes Oil & Gas, Petrochemical/ Chemical, Power (TAutomotive & Aerospace industry

• Provides services from Concept to Commissioning

• Pre-Bid Engineering g g

• FEED

• Detailed Design & Engineering

• Engineering support during Procurement/ConstruEngineering support during Procurement/Constru- Works as captive for group companies as well

- Has offices in India, ME, UK & SE-Asia

May 2013

ngineering company . It is a subsidiary of Punj Lloyd

Thermal & Nuclear) Infrastructure PolysiliconThermal & Nuclear), Infrastructure, Polysilicon,

uctionuctionas serves global clients

Page 8: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Value DriversValue Drivers

Customer Integration

Experience & Resources

Responsive toResponsive to Market Challenges

SustainableDevelopment

May 2013

Safety

Quality

Multi-Cultural TeamsMulti Cultural Teams

Working Global, Thinking Local

Page 9: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

DifferentiatorsDifferentiators

N 1 i P l W ld idNo.1 in Polymers Worldwide

Diversified Portfolio

Equity ParticipationEquity Participation

Technology Integration

May 2013

Large Fleet of Cons

Total Project Life Cycle Support

Exceeding Customer Expectations

Enviable HSEQ recordsEnviable HSEQ records

In-house Engineering

struction Equipment

Page 10: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Skills and Capabilities

T l D liT l D li

Engineering Procurement

Total DeliverTotal Deliver

Engineering Procurement

Feasibility Study

Master PlanProcurement Services

Master Plan

Technology Packages

Concept Design / FEED

Material Management

Cost Estimates

Detailed Multi-disciplinary Design

Validation

May 2013

C biliC bili

Construction Post Completion

ry Capabilityry Capability

Construction

Project Management

Post Completion

Ongoing technical support

Turnaround supportConstruction Management

Construction Services

Commissioning

Turnaround support

O&M

Technology improvements

Start-up / Training De-bottlenecking

Plant Expansions

Page 11: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Post Completion

Ongoing technical support

Turnaround support

De-bottlenec

Plant Expans

O&M

Technology improvements

Statutory insp

EngineeringProcurement

Life Time

May 2013

Life Time

cking

sions

pection

ConstructionPost Completion

e Supporte Support

Page 12: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Our People

• A team of highly skilled and diversified employees, attend• A rich multicultural team from over 37 nationalities, adapt• A motivated team that can be readily mobilised to any pa• A team that enjoys the challenge of a ‘complex’ project aA team that enjoys the challenge of a complex project a

May 2013

ding to every aspect of the project ting itself to the local customs and traditions of the region

art of the worldnd can think ‘out-of-the box’nd can think out of the box

Page 13: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Manpower – Punj Lloyd Group

Punj Lloyd

Project Management / E ti 16,318Execution 16,318

Project Services 3,179

E i i 1Engineering 1

Management 9

Support Services 973

Total 20,480

May 2013

Sembawang PL Engineering

588 39588 39

26 23

0 4750 475

1 1

45 79

660 617

Page 14: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Human Resource Development

• A committed effort towards maintaining high quality of ma• Executive Development Centre at Banmore providing co

Craftsmen Training Institutes for unskilled labour at Banm• Punj Lloyd is a Founder Supporter of Indian School of BuPunj Lloyd is a Founder Supporter of Indian School of Bu

May 2013

t

anpower, both skilled and unskilledmprehensive, inter-disciplinary training and moreusiness enhancing the nation’s management resourceusiness, enhancing the nation s management resource

Page 15: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

B ti D dliMotor Spirit Quality Upgradation, Haldia Refinery C

Beating Deadlines

Dahej Vijaipur Pipeline 4

South Sumatra to West Java Pipeline, Indonesia 3

OGC Pipeline Oman 3OGC Pipeline, Oman 3

Gas Export Pipeline, Oman 4

LNG Storage & Regasification Facilities, Dabhol ELNG Storage & Regasification Facilities, Dabhol E

Jamnagar - Loni LPG Pipeline 8

Changi Airport Terminal 2 Extension 6

Belgaum - Maharashtra Highway 5

Vadodara - Halol Expressway 4

Balongan - Jakarta Pipeline 2

May 2013

Completion in 18 months

42” x 506 km in 9 months

32” x 26.62 km of lowering in 1 day

32” x 25 5 km of lowering in 1 day32” x 25.5 km of lowering in 1 day

48” x 21 km of lowering in 1 day

Early completionEarly completion

8 months ahead of schedule

6 months ahead of schedule

5 months ahead of schedule

4 months ahead of schedule

2 months ahead of schedule

Page 16: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Major Achievements of the Grou

Constructedterminals

Major Achievements of the Grou

India & YeAll terrain pipeline

specialists,with over 11,000 km,large dia pipelineslarge dia pipelines

Leading contractorin LDPE Plants

South East Asia’s longest and most

advanced underground ad a ced u de g ou dtunnel expressway

World’s largest Wheat

May 2013

World s largest Wheat base Bioethanol

Plant

up

d LNG s in

up

men

Singapore’s LRT / MRT

Changi AirportChangi AirportTerminal Extension

Nuclear > 3 millionengineering manhours

132 years of experience

I l &In polymers & petrochemicals

Page 17: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

ClientsClients

May 2013

Page 18: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

International Offices

UK

Australia

BahrainMalays

MyanmChina

Colombia

Hong Kong

Myanm

Oman

Qatar

SaudiHong Kong

Indonesia

Kazakhstan

Kenya

Saudi

Thaila

Turkm

Y

May 2013

Kenya

LibyaYemen

India

UAE

sia

mar

Singapore

mar

ArabiaArabia

nd

menistan

n

Page 19: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Organisational StructurePUNJ LLOYD

REGIONAL HEAD

MEA & CIS MEA & C

ENERGY INFRASTRU

MEA & CISABU DHABI

MEA & CDUBA

SOUTH ASIA SOUTH ASINDIA

SOUTH EAST ASIASINGAPORE

INDIA

SOUTH EASSINGAPO

SEMBAWANG ENCONSTRUCTOR

SINGAPO

SINGAPORE SINGAPO

May 2013

SINGAPO

D GROUP

DQUARTERS

CIS ENGINEERING

CTURE SPECIALISTS

CISAI

ENGINEERING

POLYMERS & PETROCHEMICALSSIA

DEFENCE

T ASIAORE

NGINEERS & RS PTE LTDORE

UPSTREAM

RENEWABLESORE

ORE

Page 20: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

PLL O d B kl (C lid tPLL Order Backlog (ConsolidateGeographical Segment

South Asia32.2%

Asia Pacific21.8%

Rest of World0.2%

Middle East, Africa & 

CIS45.7%

Description USD MN

South Asia 1,309

Middle East, Africa & CIS 1,857

Asia Pacific 886

Rest of World 8

Total 4,060

May 2013*Unexecuted order value as on March 31, 2013 and order

d)*d)* : Business Segment

Pipeline12% Offshore

10%

Tankage

Power & Others11%

4%

Process24%Infrastructure

39%

Description USD MN

Pipeline 504Pipeline 504

Offshore 385

Tankage 164

Process 981

Infrastructure 1,582

Power & Others 444

Total 4,060

rs received after that

Page 21: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

PLL Revenue (Consolidated) –Geographical Segment

South Asia

Africa0.00%

Rest of World0.28%

41.73%

Middl E t &

Asia Pacific46.01%

Middle East & CIS

11.98%

Description USD MN

South Asia 809

Middl E t Af i & CIS 521Middle East, Africa & CIS 521

Asia Pacific 710

Rest of World 19

Total 2 059

May 2013

Total 2,059

(FY13)Business Segment

Pipeline23.78%

Power & Others11.75%

Offshore5.92%

Tankage8.65%

Process14.99%

Infrastructure34.92%

Description USD MN

Pipeline 575

Offshore 245

Tankage 165

Process 381

Infrastructure 471

Power & Others 222

Total 2,059

Page 22: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

S f t St ti tiSafety Statistics

Particulars 2008 200Particulars

Total Manhours Worked

Fatalities

2008

64,164,570

0

200

68,541,84

Lost Time Injuries

L t W kd

Frequency Rates

3

16

0.05

6

0.0

Lost Workdays

Severity Rate

Recordable Cases

16

0.25

42

6

0.9

3

Frequency Rate =No. of LTI Cas

T t l M hq y

Severity Rate =

Total Manhours w

Mandays Lost due

Total Manhours w

Formula

May 2013

9 2010 2011 20129

46

0

2010

70,289,899

0

2011

73,102,065

0

2012

69,713,135

0

3

5

4

3

49

0.04

3

67

0.04

1

0.01

5

5

0

49

0.70

29

67

0.92

25

10

0.14

17

es

k dx 1,000,000

worked

e to LTI

workedx 1,000,000

Page 23: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Safety Milestones

Safety is Paramount : Man-hours without los• in design• in construction• inside / outside the workplace

13 million Dabhol-Ba12.9 million Haldia12 million Dabhol11 2 million Dahej-Vijai

Achieving Safety Targets through :• safety audits• training

f d / b h ki

11.2 million Dahej-Vijai10 million Sabah Sar10 million YLNG , Yem9 million Kazakhstan

• safety records / benchmarking

Recognition and Awards :• ISO 9001

8 million Fuel Syste7.5 million Dahej7 million OGD III Ab

• OHSAS 18001• ISO 14001

5 million Abu Dhabi4 million Turkey4 million Indonesia 3 million Qatar3 million Qatar2.5 million Georgia

May 2013

st time injury :ngalore

ipuripurawak, Malaysia mennms, NDIA

bu Dhabii

Page 24: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Global Project Delivery Solutio

Oil & Gas Offshore, Onshore & Offshore PTerminals

Process Refineries, Polymers & Petroche

Power Thermal, Nuclear

Utilities Water & Sewage Treatment Fac

Infrastructure Subway & Metro Systems, AirpoInterchanges, Tunnels & Cavern

Hospitality & Leisure CommerciBuildings Hospitality & Leisure, CommerciHealthcare, Townships & Industr

Asset Management Asset Preservation & Maintenan

May 2013

ns for :

ipelines, Onshore Field Development, Tankage and

emicals, Chemicals

cilities, Reservoirs, Centralised Utilities

orts, Highways & Expressways, Bridges, Flyovers & ns, Seaports & Terminals

ial Industrial Institutional & Residential Complexesial, Industrial, Institutional & Residential Complexes, rial Parks

nce

Page 25: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

• Oil & Gas• Oil & Gas• InfrastructureInfrastructure• Defence

May 2013

Page 26: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Oil & GasOil & Gas

• Onshore Field Development & Gas Processing (for more details, clic

• Offshore (for more details, click on the link)

• Onshore & Offshore Pipelines (for more details, click on the link)

• Tanks & Terminals (for more details, click on the link)

• Process (for more details, click on the link)

• Power (for more details, click on the link)

May 2013

ck on the link)

Page 27: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

O h Fi ld D l t & GOnshore Field Development & GEPC of Tie-ins for Abu Dhabi Company for Onshore Oil Op

Shah Gas Gathering – Package 1 for Abu Dhabi Gas Dev

EPC of Spiking Compressor for Abu Dhabi Company for

Huwailah Field Development for Abu Dhabi Company fo

Jarn Yaphour Field Development for Abu Dhabi Nationa

New Water Treatment Plant and Central Processing Fac

Natural Gas Pipeline in Tuas and Jurong Area, Singapore

Total E&P Tambora Field Development Project Phase 2

Peciko Field Development Phase 4 for TotalFinaElf, Indo

KODECO Onshore EPC Services for Poleng Process PlaKODECO Onshore EPC Services for Poleng Process Pla

Petro China EPC Service for Betara Complex Developm

Gas Field Development for Oil India Limited, India

May 2013

BACK

G P iGas Processingperations, Abu Dhabi

velopment Co. Ltd, Abu Dhabi

Onshore Oil Operations, Abu Dhabi

r Onshore Oil Operations, Abu Dhabi

al Oil Company, Abu Dhabi

cilities Upgrade for Occidental Mukhaizna LLC, Oman

e

2, Indonesia

nesia

atformatform

ment, Sumatra

Page 28: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Off h Pi liOffshore Pipelines • B-127 Cluster Pipeline Project In• Laying of new Hout Crude Transmission line Say g• WO-16 Cluster & SB 14 Pipeline Project In• EPC of Offshore Pipeline In• LPG Pipeline from Mahul Refineries to Uran Terminal In• Uran Trombay Jawahardeep Oil Pipeline In• Uran Trombay Jawahardeep Oil Pipeline In• Uran Trombay Gas Pipeline Project India ON• Tambora Field Development, Phase 2 In• Tunu Field Development Phases 4 – 9 In• Panaran Pemping Gas Pipeline In

Offshore Platforms• Upgradation of Platforms Compression Facilities In

• Removal of Well Head Platform In

• Platform Compression Facilities Project Th

• Heera Redevelopment Offshore Platform In

Betara Complex Development Project In• Betara Complex Development Project In

• South Utility Platform (TP 11 S / EPSC 5) In

• Poleng Process Platform, Indonesia In

May 2013

BACK

dia ONGC audi Arabia Al‐Khafji Joint Operations (KJO)j p ( )dia ONGCdia GSPLdia BPCLdia ONGCdia ONGCNGCdonesia TOTALdonesia TOTALdonesia PGN

ndonesia Pertamina

donesia Pertamina

hailand PTT

dia ONGC

donesia Petro Chinadonesia Petro China

donesia TOTAL

donesia Korea Development

Page 29: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Pipelines

A k l d d f th l di i li t t• Acknowledged as one of the leading pipeline contractors

• Successfully commissioned large dia pipelines

• Laid morethan 11,000 km pipeline world over

• Known as ‘All terrain experts’ with experience of laying p

• Owns and maintains 29 spreads of pipeline equipment u

• Owns 18 automatic welding machines. Punj Lloyd introdug j y

• Owns HDD equipment upto 400 mtr

• Owns a flotilla of pipelaying barges capable of laying in p

May 2013

i th lds in the world

ipelines in mountains, deserts, swamps and shallow water

pto 56” dia

uction this technology in Indiagy

pipe in varying depths

Page 30: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Pi li P j tPipeline ProjectsProjects Overseas

• Falcon Jet fuel Pipeline & Bulk Terminal Facilities, Abu Dhabi

• Onshore Gas Pipeline Project, Thailand

• Strategic Gas Transmission Project, Qatar

S b h S k EPC G Pi li M l i• Sabah Sarawak EPC Gas Pipeline, Malaysia

• OGC Pipelines, Oman

• EPIC of Doha Urban Pipeline Relocation, Qatar

• Ethylene and Butane Pipelines, Qatar

• Melita-Tripoli & El Khoms -Tripoli Gas Pipeline, Libya

• EPC for Oil & Gas Export Pipelines, Kazakhstan

• South Sumatra to West Java Gas Pipeline Phase I, Indonesia

H il h Fi ld D l t Ab Dh bi• Huwailah Field Development, Abu Dhabi

• Flowlines and Well Heads Installation, Abu Dhabi

• Gas Export Pipeline, Oman

• BTC & SCP Pipeline, Georgia

• SGP Flowlines, Kazakhstan

• Baku-Tbilisi-Ceyhan Crude Oil Pipeline Project, Turkey

• KAM Pipeline Project, Kazakhstan

May 2013

Projects In India

• EPC of offshore pipeline

• Vijaipur – Kota Pipeline

• Dabhol Bangalore Pipeline

• East West Gas Pipeline

• Dabhol-Panvel Pipeline

• Backwater and Onshore Pipeline, Kerala

D h j U Pi li• Dahej-Uran Pipeline

• Mundra-Delhi Pipeline

• Uran Trombay Pipeline, Mumbai

• Shore Approach Pipeline, AdaniShore Approach Pipeline, Adani

• Dahej-Vijaipur Pipeline

• Mangalore-Bangalore Multi-Product Pipeline

• Jamnagar-Loni LPG Pipeline

• Gas Rehabilitation & Expansion Project

• Kandla-Bhatinda Multi-Product Pipeline

• South Bassein Hazira Trunkline

BACK

Page 31: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Terminals & Docks• EPC Refrigeration storage tanks at Jiangsu, China

• Storage Terminal with 120,000 DWT berth, Singapore

• Oil Tanking Terminal for Oil Tanking(S) Pte Ltd, Sing

• Construction of dry dock and wharves, Singapore

• Construction & Erection of Jetty at Pulau Seraya, Si

• Construction of Container Feeder Berth, Singapore

• Finger Pier extension at Sembawang Shipyard, Sing

• Jetty Extension at Loyang Crescent, Singapore

• Karimun Shipyard Development, Indonesia

• Zouec / DPEC LPG Terminal Project in China• Zouec / DPEC LPG Terminal Project in China

May 2013

e

apore

ngapore

apore

Page 32: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Tanks and Terminals

Crude / Cryogenic LNG & LPG TanksCrude / Cryogenic LNG & LPG Tanks

• In-house design capability

• Only contractor involved in the construction of all 3 terminals in India Dabhol Hazira Dahejterminals in India – Dabhol, Hazira, Dahej

• Only Indian Contractor to have executed LPG/Cryoon EPC basis including mechanical, civil and insula

Fi t I di t t t h t t d LNG• First Indian contractor to have constructed LNG regterminal

May 2013

LNG

ogenic tanks ation work

ifi tigasification

Page 33: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Tanks and TerminalsTanks and Terminals• LPG Import Terminal Project, Oil Petronas Pvt. Ltd

• Bhogat Terminal Project, Cairn Energy India Limitedg j gy

• Offsite & Storage Facilities for Panipat Refinery Indian

• Onshore Gas Development Phase III Abu Dhabi Gas I

• Yemen LNG Project For Utilities & Offsites Yemen LNGYemen LNG Project For Utilities & Offsites Yemen LNG

• Fuel Systems New Doha International Airport, Qatar

• Bulk Liquid Storage & Blending Facility at Meranti He

• Tank Terminal Project at Pulau Busing Tankstore Sin• Tank Terminal Project at Pulau Busing Tankstore – Sin

• LNG Storage (2X148,000M3) Tank Expansion Dahej for

• Jurong Bulk Liquid Product Terminal Horizon Termina

L St (2 160 000 M3) f R i i T i l H• Low Storage (2x160,000 M3) for Receiving Terminal Ha

• LNG Storage (3X160,000M3) and Regasification Termi

• Steel Storage Tanks for Water and Power Project Tech

May 2013

Built in excess of 8.3 millionBACK

n Oil Corporation Ltd.

Industries Ltd.

G Company Ltd., YemenG Company Ltd., Yemen

lios Terminal Corporation Pte. Ltd., Singapore

ngaporengapore

r IHI

als Pte. Ltd. – Singapore

i f Sh llazira for Shell

nal Dabhol for Skanska

hnip

n m3 of storage capacity

Page 34: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

ProcessProcess

May 2013

Page 35: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Refineries• As world leaders in process plants, we offer comp

construction services in turnkey and composite co

• Expertise to execute a diverse and complex rangeTreater, Amine Recovery, Sulphur Recovery, VisbrTreater, Amine Recovery, Sulphur Recovery, Visbrand vacuum Distillation

• Ability to work in live plants within restricted spacehighest standards of health, safety, quality and envhighest standards of health, safety, quality and env

• Completed 17 Refinery Modernisation projects

May 2013

lete range of planning, design, engineering and onstruction projects

e of projects ranging from Sour Water Stripper, Aminereaker, Crude Distillation, Hydrocracker, Hydrogenreaker, Crude Distillation, Hydrocracker, Hydrogen

es and under tight schedules, while maintaining vironmentvironment

Page 36: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Refineries/EPCRefineries/EPC• Process Facilities and Utilities for crude oil storage

Ltd

• Paradip Refinery Project, Indian Oil Corporation

• Cuddalore Refinery Project, Nagarjuna Oil Corporation

• EPC Kerosene Distillation Unit Plant and Constructi

• Yemen LNG Project For Utilities & Offsites Yemen LN

• Fuel Systems New Doha International Airport, Qatar

• Peciko Field Development Phase 4, Indonesia TotalFp

• Motor Spirit Quality Upgradation Project Indian Oil C

• Delayed Coker Unit, Indian Oil Corporation Ltd., India

• Sulphur Block Bharat Oman Refinery Ltd India• Sulphur Block, Bharat Oman Refinery Ltd., India

• Hydrocracker Unit & Hydrogen Generation UnitIndian Oil Corporation Ltd., India

• Sulphur Blocks Six Indian Refineriesp

• 37,000 TPA Grass Root MTBE Plant Indian Oil Corpor

• Hydrocracker Units, Mathura Refinery Indian Oil Corpo

• Constructed Critical Sections CDU/VDU/VBU Indian

May 2013

Constructed Critical Sections CDU/VDU/VBU Indian

• 10.5 MTPA Essar Refinery, Vadinar, Gujarat

Cavern, Mangalore for Indian Strategic Petroleum Reserves

n Limited

on of Main Building & Amenities, Singapore

NG Company Ltd., Yemen

inaelf

orporation Ltd., India

ation

oration

RefineriesRefineries

Page 37: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

P l & P t h i lPolymers & Petrochemicals• World’s leading specialist engineering contractor for low d

• Wealth of experience in polymers with over 70 plants to it• Wealth of experience in polymers with over 70 plants to it

• Involved in all categories ranging from LDPE, linear low d

(HDPE), polypropyline (PP), polyvinyl chloride (PVC) and

• Designed and constructed vinyl chain, oxo alcohols and c

• EPC for 300 KTPA LDPE Plant, Thailand for PTT Polyethylene Co

• Engineering and Project Management of 30,000 MTPY Special

• FEED & EPC for 400 KTPA LDPE Plant, UK for Huntsman

• 400 KTPA LDPE Plant, China for BASF-YPC

• 226,000 TPA LDPE Project, Jubail, Saudi Arabia

• EPC of Polyurethane Plant, Seraya, Jurong Island, Singapore

• EPCM 90,000 TPA chemical plant, China

• EPC Quaternary Ammonium Product, Jurong Island, Singapore

• EPCM for 70,000 MTPY PA Plant, China

May 2013

density Polyethylene (LDPE)

ts creditts credit

density polyethylene (LLDPE) and high density polyethylene

acrylics

caprolactum projects

o.

lty Chemical Plants, Indonesia

Page 38: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

RenewablesRenewables • Punj Lloyd Delta Renewables is capable of developing,

projects.

• The company’s key focus is on Solar Photovoltaics (incl

• The Group is also focused on special projects to develoPolysilicon

Project Experience

• Recently awarded Qatar’s first Polysilicon plant 4000 M

• Commissioned World’s largest wheat based ethanol pla• Commissioned World s largest wheat based ethanol pla

• Solar PV Lighting, India R

• Solar Water Treatment (850 plants), India G

Fi T k S l P P j t G• Five Turnkey Solar Power Projects G

• 5 MW Solar Power Plant - Jawaharlal Nehru National M

May 2013

engineering and executing renewable energy based

luding Polysilicon and Solar Thermal)

p non conventional sources of energy - Bio-fuel and

MPPY capacity from Qatar Technologies

ant in the UKant in the UK

Reliance Industries

Govt. of Bihar

G t f P j bGovt. of Punjab

Mission, Rajasthan

Page 39: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Chemicals

CRISTAL Project, Membrane Chlorine Plant; Expanded T

100 MTPD Sulphuric Acid Project, Saudi Arabia, Basic C

1000 TPD Sulphur Burning Acid Plant, TCH Belgium

Turnkey SAFCO Sulphuric Acid Project, Dammam, Saud

EPC of 45 MTPD Singapore Refining Company, Jurong, S

Agrochemicals Project for Syngenta, UKg j y g ,

May 2013

BACK

Ti02 Yanbu, Saudi Arabia

Chemicals National Company

di Arabia

Singapore

Page 40: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

PowerPower

May 2013

Page 41: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Th lThermal3 x 18 MW Coal Fired Steam Power Plant, P. T. Citra Kus

2 x 30 MW Coal Fired Power Project, Poyry Energy Ltd, j , y y gy ,

2 x 300 MW Power Plant, Haldia Energy Ltd., West Benga

2 x 300 MW Thermal Power Project, Dhariwal Infrastructu

2 x 270 MW Thermal Power Station, GVK Power (Goindw2 x 270 MW Thermal Power Station, GVK Power (Goindw

2 x 250 MW Thermal Power Station, Rajasthan Rajya Vid

4 x 250 MW Jindal Power Plant, Chhattisgarh

6X600 MW Thermal Power Plant SEPCO Champa Cha6X600 MW Thermal Power Plant, SEPCO, Champa, Cha

EPC 3 x 700 MW Power Plant - BOP Components, erectAsh Handling Plants, Malaysia

EPC High Pressure piping system for 250 MW Power Pg p p g yEPC 815 MW CCP - balance of plant including Civil & St

EPC High Pressure piping system for 150 MW Paka Pow

May 2013

suma Perdana at Sangatta, East Kalimantan, Indonesia.

Indonesia

al

ure Pvt. Ltd., Chandrapur, Maharashtra

wal Sahib) Ltd, Tarn Taran, Punjabwal Sahib) Ltd, Tarn Taran, Punjab

dhyut Utpadan Nigam Ltd., Chhabra, Rajasthan

attishgarhattishgarh

tion of Turbine & Generator and Coal and

lant, Singapore, g p

tructural work, Singapore

wer Plant, Malaysia

Page 42: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

NuclearUnderground Civil Work for Nuclear Power Corp. of India

EPC of nuclear equipment and piping for systems for N

Rajasthan Atomic Power for Nuclear Power Corp. of India

Upgrade of Britain’s Submarine Refit Complex at Devon

Nuclear Fuel Reprocessing for Sellafield Facility, UK for

New Fuel Oxide Plant for BNFL, UK

Vitrification Plant for BNFL, UK

May 2013

BACK

uclear Power Corp. of India

a

nport

r BNFL

Page 43: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Buildings & Infrastg• Buildings (for more click on the link)Buildings (for more, click on the link)

• Transportation (for more details, click on the link)

• Utilities (for more details, click on the link)

May 2013

tructure

Page 44: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

BuildingsExecuted a highly diverse range of projects ranging fh t l t hi h d h lthhotels to high end healthcare

Offering integrated design & construction services in

– Hospitality & Leisure including hotels and res– Commercial complexes– Industrial complexesIndustrial complexes– Healthcare– Residential complexes

Building fast-track projects with focus on value engin

May 2013

from luxurious villas and

:

sorts

neering

Page 45: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

BuildingsBuildingsCommercial Complexes• Tinjan International Building, China• German Centre for Industry & Trade, Singapore• Two commercial buildings at Hiranandani Palace Gardens in PaTwo commercial buildings at Hiranandani Palace Gardens in Pa• Integrated residential and retail complex from Tata Realty and I

Hotels & Resorts • Marina Bay Sands Integrated Resort’s, North Podium comprisinand Retail arcade

• Hotels, beach villas, oceanarium and water theme park for Res

Industrial Parks• GE Industrial Park, Beijing Economic Development Zone• Vietnam Singapore Industrial Park, Vietnamg p ,Healthcare Facilities & Hospitals• Institute Complex, Rai Bareli, India• Medical College and Hostel Complex, AIIMS, Raipur, India• Medanta, The Medicity, India

Si N i l E C• Singapore National Eye Centre• Changi General Hospital Substructure Package

Residential Complexes• McNair Towers and the new Changi Prison Complex, Singapore

Th J i h I l d Vill P j t D b i• The Jumeirah Islands Villa Project, Dubai• The Edge on Carnhill in Singapore• Development of Delhi Police Residential Complex, Delhi• Construction of residential and retail complex, (Capitol Heights)

TRIF Real Estate and Dev., Singapore

May 2013

, g p

BACK

anvel SEZ HIRCO Groupanvel, SEZ, HIRCO Group nfrastructure Ltd in Nagpur, India

ng the casino, theatres

sorts World Sentosa, Singapore

e

),

Page 46: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Transportation• Enhancing commuter’s travel experience by projec

◙ Subway and metro systems◙ Airports◙ Highways & Expressways

B id Fl & I h◙ Bridges, Flyovers & Interchanges◙ Tunnels & Caverns◙ Seaports & Terminals

• In Singapore, we have built more than 75% of the

• In India, our owned bituminous road and concrete seen us deliver over 19 highway projects, some falGolden QuadrilateralGolden Quadrilateral

May 2013

cts in :

city’s LRT systems

paving equipment has lling under the prestigious

Page 47: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

TransportationTransportationSubway & Metro Systems

• Construct MTR Corporation’s Shatin to Central Link DiamExpansion of the existing MRT network including New C• Expansion of the existing MRT network including New C

• Design and construction of elevated viaduct including str• Construction of eight stations and viaduct, Bangalore MeAirports• Terminal extension, runways, hangars and control towers

cargo terminals, in-flight catering centres and MRT systeChangi Airport

• The greenfield airport project in Sikkim India• The greenfield airport project in Sikkim, IndiaHighways & Expressways• Construction of Chittorgarh bypass to Udaipur, in the sta• Construction of National Highway No 9, GMR Hyderabad• Upgradation of the Belgaum-Maharashtra Border Highwa• Projects for the Golden Quadrilateral including East Wes• Singapore Kallang-Paya Lebar Expressway • Tunnel Structure Linking East Coast Parkway with Nicoll• Tunnel Structure Linking East Coast Parkway with Nicoll

May 2013

mond Hill Station, Hong KongCircle Line and DownTown Line in SingaporeCircle Line and DownTown Line in Singaporeructural work of four stations for Delhi Metro Rail Corporationetro Rail Corporation

s, to support facilities such as training centres, freights and em for Asia’s major aviation hub, the award winning

ate of Rajasthan from GMR Projects Private Limitedd Vijayawada Expressways Private Limited ay Section of NH-4 in Karnatakast and North South Corridor

l Highwayl Highway

Page 48: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

T t tiTransportationBridges, Flyovers & Interchanges• Construction of 330m causeway to Pulau Brani and a 28y• Construction of interchange at junction of Seletar/Centra• Foundations and Piling, U.P. State Bridge Corp. Ltd

Tunnels & CavernsTunnels & Caverns• Paya Lebar Tunnel, design and construction of 5.1km lon

shafts• Kranji Tunnel, design and construction of 12.6km long by

Seaports & Terminals• Oil Tanking Terminal, construction of Phase II of infrastru

and drainage works, bund walls and extensive ground img , g• Finger pier extension, design and construction of new 69

steel pipe and prefabricated steel jackets and precast de

May 2013

BACK

0m long bridge to Sentosa g gl Expressway/Yio Chu Kang Road

ng by 6.5m internal diameter by 30m deep tunnel and 6

y 3.6m internal diameter tunnel and 10 access Shafts

cture works comprised of tank farm terminal including roads mprovement works p95m service pier using reverse circulation drilling method, ecking systems

Page 49: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Utilities – Municipal EPC project of Utilities in Tripoli, LibyaWater-Sewerage-Storm Water mains & branch lines, Roads

Changi Water Reclamation Plant contracts for Digesters, CivSystem, Liquid Module 2, Civil Work and Scrapers

Ulu Pandan Sewage Treatment Work - covering of existing trservicing & maintenance of the Odour Treatment Facilities &

Kim Chuan Sewerage Treatment Work. West Work Phase 1 gContract 2 - Liquid Train/Liquid Stream

Deep Tunnel Sewerage System, Contract T-05 and Contract

Kim Chuan Refuse Storage and Transfer Station SingaporeKim Chuan Refuse Storage and Transfer Station, Singapore

Ulu Pandan Refuse Incineration Plant, Singapore

Newater Service Reservoirs at Tampines

May 2013

BACK

& other facilities

vil and M&E Work, Sludge Drying

reatment units contract for the & associated ductwork, Singapore

Redevelopment work p

t T-03, Singapore

Page 50: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

TelecomMajor player in telecom infrastructure services, active in the

Turnkey Services for Telecom Tower Companies, High Networks - Optical Fibre, Co-axial Cable and Microwav

Services:

Planning and System EngineeringInstallation and Commissioning of Communication systInstallation and Commissioning of Data Network

May 2013

e telecom industry for over a decade.

Quality Hybrid ve Equipment

tem

Page 51: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Defence

May 2013

Page 52: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Defence• Punj Lloyd has strategically diversified into the De

public-private partnership initiative

• Long term commitment to defence business in Ind

• Punj Lloyd is developing capability and infrastructu

programs

• Establishing itself as a credible original equipmentEstablishing itself as a credible original equipment

technology

• The group’s objective is to indigenously develop g

providing a decisive edge to the Indian Armed For

Punj Lloyd has licenses for:- Guns Rocket and Missile Artillery Systems andGuns, Rocket and Missile Artillery Systems and - Electro optical systems, Fire control systems, C3

armored fighting vehicles- Conversion of civilian aircraft into aircraft for defe

structure and Dynamic Components for Aviation

May 2013

structure and Dynamic Components for Aviation manufacture of aero-structure, airframes and ac

fence sector, under the Government of India’s

dia

ure which can be effectively leveraged for defence

t manufacturer with focus on state of the artt manufacturer with focus on state of the art

enuine force multipliers that will contribute to

rces

related Equipmentrelated Equipment31 systems and power packs associated with

fence application; Precision manufacture of aero and Land System Products; Fabrication andand Land System Products; Fabrication and cessories using composites

Page 53: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Pursuing opportunities in…

Part ofPrime Part of global supply chain

Prime Contractor for

Focus

Land Systems – Artillery, Air Defence SystemPower pack, Maintenance, R

areas Defence Aviation – Modification & MRO of air

D f El t i C4ISR BMS S illDefence Electronics- C4ISR, BMS, Surveilla

May 2013

the Licensed MRO & Offsetthe Manufacturer of

MRO & Upgrades

Offset partner

ms, Small Arms, Armoured Vehicles, Repair & Overhaul, Upgrade

rcraft, Precision manufacturing, Engineering

& Si hti S tance & Sighting Systems

Page 54: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Features of Manufacturing & SyDivision (MSID), Malanpur

• Spread over 65 acres of land• World class Manufacturing facility• Lean and flexible Manufacturing Systems

ERP t• ERP system• Full Fledged Metrology and Metallurgy labs• Compliance to IMS (Integrated Management Systems

• ISO 9001 : 2008 • ISO 14001 : 2004 • OHSAS 18001 : 2007 • AS 9100 (Aerospace)

Capability to handle exotic metals• Capability to handle exotic metals • Skill sets and people capabilities

Strategic Investment in Hi-tech manufacturing Early mover advantage for offset opportunities

May 2013

Early mover advantage for offset opportunities

ystems Integration

s )

Page 55: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Asset ManagementMaintenanceUpgradation of NH 31 from Khagaria to Purnea iUpgradation of NH-31 from Khagaria to Purnea iNational Highways Authority of India

740 MW gas based power plant and LNG storagDabhol Power Corporation, Maharashtra

Toll management for Vadodara - Halol Expressw

Daewoo Automobile Plant Daewoo Motors DelhiDaewoo Automobile Plant, Daewoo Motors, Delhi

Captive Power Plant, Hindustan Aeronautics, Assa

Gas processing and gathering facilities, Oil Indiap g g g ,

May 2013

n Bihar on BOT Annuity basisn Bihar on BOT Annuity basis,

e and regasification terminal,

way Vadodara-Halol Toll Road Ltd., Gujarat

am

a Ltd., Rajasthan, j

Page 56: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Insulation Services

KAEFER Punj Lloyd provides solutions for thermal insulatio

Capabilities include Electrical Heat Tracing, Roofing and Fa

Sound Quality and Safety Practices

Major projects executed Mathura, Vadodara, Reliance and P

Insulation work for LNG Terminals Dabhol, Hazira and Dahe

May 2013

on

acade Systems

Panipat refineries in India

ej

Page 57: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Horizontal Directional Drilling S

PLN Construction, a subsidiary of Punj Lloyd provides HDDDrilling through every kind of soil, the company has execute

The company owns seven rigs of 250 to 400 T capacity

Major crossings:

48” x 1,451 mtr48” x 870 mtr48 x 870 mtr42” x 1,040 mtr30” x 1,585 mtr24” x 1,942 mtr24” x 1 810 mtr24 x 1,810 mtr18” x 1,771 mtr

May 2013

Solutions

D solutions ed total crossings 95,000 mtr till date

Page 58: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

BargesThe Group owns an impressive flotilla of barges for offshorep p gcapabilities

• Kuber, a pipelay barge for laying pipelines upto 60” diainbuilt heave compensation, a helideck, advanced navigp goperating devices, SAT diving systems, providing high e

• Mahesh 1, a pipelay barge with capacity of laying 48” di

M dh d i k b ith it f 650 t• Madhwa, a derrick barge with crane capacity of 650 tonand composite cable installations

• Ganpati, a push pull barge for pipelaying in shore appro

May 2013

pipelaying, greatly enhancing the company’s offshore p p y g, g y g p y

in water depths upto 150 m, outfitted with a stinger withgation systems and international tie ups for remoteg y pend positioning and tracking services.

ia pipelines in water depth upto 65 m

b ilt f i i t ll ti fl ibl i lines, purpose built for riser installations, flexible pipelines

oaches.

Page 59: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Equipment Assets

Large fleet of equipment which can be readily mobilised

Equipment assets valued at USD 426 million

The company owns equipment to cater to every terrain and

– Amphibian : including swamp excavators, dredgebarges, swamp cranes

– Pipeline - 29 spreads of equipment– Road -13 sets of bituminous road equipment

- 3 sets of concrete paving equipment

– Offshore - 4 pipelaying barges

Young equipment fleet – minimum downtime

Single largest equipment lifted : 590 MT

May 2013

every project need:

ers, marsh buggies, flexiyoke work

Page 60: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Equipment Yard & Maintenance

Central India Facilities in Banmore spread oveCentral India Track Repair and Engine Mainten

Indonesia Sungaipurun yard, Indonesia witAccessible by land and water

Middle East &Middle East & Africa

Facilities in Qatar / Abu Dhabi / T

Caspian Base facility in Atyrau is spread storage, repair, maintenance & fa

Inventory maintained on ORACLE based ERP system Equipment managed by Oracle Enterprise Asset M t

May 2013

Management

Facilitieser 20,000 sq mtrnance facility area - 7,000 sq mtrth jetty facilities – 45,000 sq mtr

Tripoli spread over 100,000 sq m

in an area of 80,000 sq m. The facility includes abrication.

Page 61: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

CSR• Regular community improvement activities including loca

awareness and safety meetings medical and dental cheawareness and safety meetings, medical and dental che

• Recruitment opportunities provided to many locals. New

empowered with skills required for future employment

HIV/ AIDS i t l t t ll it l b ll O i• HIV/ AIDS, an integral part at all sites globally. Ongoing w

sites globally

• Corporate Social Responsibility Award – 2011 from Cons

May 2013

al infrastructure development, traffic

ck up campsck-up camps

recruits exhaustively trained and

k h HIV/AIDS tworkshops on HIV/AIDS awareness at

struction Week

Page 62: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

• Promoting education with Dayawanti Punj Model School in Sita

region of north India

Dayawanti Punj Model School, Sitamarhi - Allah

• Affiliated to the Central Board of Secondary Education (CBSE)

equips the students with the intellectual and practical skills nec

career and meet the challenges of a professional life.

Life Enrichment Programme for construction wo• Stems from our belief that 'Each life is precious'. It is a program

welfare of workers with a special focus on wealth HIV/AIDS.

• Creating awareness about HIV/AIDS and other diseases, providtraining, adopting safety practices at work, training in Yoga for h

• Introduced first in 2007 at Medicity, Gurgaon, International Finathe World Bank Group, offered to support the programme.

• With the launch of Phase II of Life Enrichment Programme in 20other sites namely Panipat Haldia and Vadodaraother sites namely, Panipat, Haldia and Vadodara.

May 2013

amarhi, a backward

habad

, the school

cessary to carve a

orkersmme which aims at the holistic

ding medical facilities, first aid health and relaxation

ance Corporation, a member of

008 it was introduced at three

Page 63: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

AwardsAwards• Construction World – One of most admired company of the Yea• D&B Axis Bank Infra Award for best project 2012 - East West G• Construction Week - Engineering Company of the Year 2011• Infrastructure Company of the year 2010 (CNBC/Essar)• Infrastructure Company of the year - 2010 (CNBC/Essar)• Infrastructure Excellence Award’ in association with in the Oil & • Chemtech Award – Outstanding contribution to Engineering – 2• Top Indian company ‘Construction – Infrastructure Developmen

B t I f t t A d NDTV P fit B i L d hi A• Best Infrastructure Award NDTV Profit Business Leadership Aw

ENR Rankings• Ranked no.118 under top Design firms category by ENR.com in• Ranked no. 82 under International contractors category by ENRg y y• Ranked no.127 under Global contractors category by ENR.com• Ranked no. 79 under International contractors category by ENR• Ranked no.109 under Global contractors category by ENR.com• Ranked no.153 under top Design firms category by ENR.com inRanked no.153 under top Design firms category by ENR.com in

Project Exports Promotion Council of India• Maximum Foreign works secured in new areas for Year 2002-03• Maximum Turnover in Overseas construction contracts for year • Maximum Value of Overseas construction and engineering projeg g p j

May 2013

r 2012Gas Pipeline

Gas category for the Dahej-Vijaipur Gas Pipeline – 2009009nt’ Dun & Bradstreet -Rolta Corporate Awards 2008

d O t b 2008ards October 2008

n 2011R.com in 2011 in 2011

R.com in 2012 in 2012

n 2012n 2012

3 / 2003-04 / 2004-052004-2005 / 2006-7

ects contracted for year 2005-2006 / 2007y

Page 64: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

A ards P j Ll dAwards – Punj Lloyd2004 - Safety Award – BTC Pipeline ProjectGreentech Awards:2005 06 Environmental Excellence Gold2005-06 - Environmental Excellence - Gold 2007 - Safety - Gold 2008 - Environment Excellence - Platinum

- Safety Goldy

2009 - Environment Excellence - Gold

2010 - Safety Award - Gold

Awards – Sembawang Engineers & Constructors (SEC)

• 20 x Construction Excellence Awards (BCA, 1987 to 2005)

• 9 x Best Buildable Design Awards (BCA, 1993 to 2005)

• 138 x Safety Performance Gold / Silver / Merit Awards (MO

• British Safety Council 5 Star Award for last five years Engin

Construction Industry Association (ECIA) y ( )

• Safe Working Award (1995)

• National Productivity Award (PSB, 1994)

O E t i A d (EDB 1997)

May 2013

• Overseas Enterprise Award (EDB, 1997)

OM, 1985 to 2005)

neering

Page 65: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Accreditation

OHSAS 18001:2

ISO 14001:2004 Env

ISO 9001:2008 Q

May 2013

2007 Health & Safety

vironmental Management

Quality Management

Page 66: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Policies

May 2013

Page 67: Corporate Presentation - May 2013

Energy, Infrastructure & Defence solutions

Our Pledge

The Safety of PeopleThe Safety of People

The Protection of the Environment

The Assurance of Speed and the Control of y

The Quality of our ServiceThe Quality of our Service

The Success of your Project

May 2013

your cost