Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
MIT Lincoln LaboratoryFPAW-2008 - 1Robinson10/09/2008
Corridor Integrated Weather System (CIWS)
1 Situational awareness2 Interfacility coordination3 Reduced workload4 Proactive Reroutes5 Routes open longer6 Improved Arr/Dep Transition
Area (ATA/DTA) management7 Reduced MIT restrictions8 Improved Ground Stop Program
management
9 Directing pathfinders10 Close route proactively11 FAA facility staffing assistance12 Directing traffic through weather gaps13 More SWAP departures14 Improved safety15 Improved Ground Delay
Programs (GDP) management
0
2
4
6
8
10
12
14
16
18
ZMP ZOB ZDC ZAU ZNY ZBW
CIW
S U
sage
per
Sto
rm D
ay
TMU
Areas
CIWS in TMU& Areas
TMU
CIWS inTMU only
Observed RAPT Benefits
It’s Not Just What’s in the Tool,But Who Gets to Use It
0 – 2 Hour Echo TopsForecast
0 – 2 Hour Winter PrecipitationForecast
Storm Growth & DecayTrends
Storm Motion &Extrapolated Position
Echo Tops Tags
Real-Time ForecastAccuracy Scores
MIT Lincoln LaboratoryFPAW-2008 - 2Robinson10/09/2008
Framework for Integrated Weather-ATM Decision Making
4-D Weather ForecastTactical: 0-2 hrs
Strategic: 2-8 hrs
Forecasts of Precipitation, Echo Topsplus Turbulence, Shear, Growth, etc.
Includes Forecast Uncertainty
Air Traffic Management Decision Making and ExecutionDevelop and decide on air traffic management planExecute planReal-time evaluation and decision review
UserDemand
Capacity Impact Forecasts(Terminal and Enroute)
Weather Avoidance Fields
Route Impacts
Flow Impacts / Sector Capacity Loss
Pilot ModelPilot deviation likelihood as
a function of weather
Precipitation
Echo Tops
TRANSLATION
Wx – ATM IntegrationEffective Response
Strategies
RouteAvailabilityPlanningTool
MIT Lincoln LaboratoryFPAW-2008 - 3Robinson10/09/2008
NY Route Availability Planning Tool (RAPT)
Deviation sensitivity
CIWS forecasts
Weather Avoidance Field (WAF)
Blockage calculation
* NASA-funded foundational research at MIT-LL
Blocking WAF contour
Passable widthRoute box
%VIL > VIP Level 3
(flig
ht a
ltitu
de–e
chot
op)
Convective weather avoidance model*
Probability of Deviation
• Estimated 2007 RAPT Delay Savings: 2,300 hours, $7.5 M- Early 2008 field study results show increased benefits
• Lessons learned from real-time field use assessment:
1. Don’t expect to get it right the first time – best todesign WX-ATM DST with this in mind
2. Close collaboration with operational user communityis critical (in case of RAPT – includes FAA and airlines)
3. Aggressive training program crucial to DST acceptanceand success
Weather Input Weather Translation Airspace and WX-Blockage Models
MIT Lincoln LaboratoryFPAW-2008 - 4Robinson10/09/2008
Building a Scalable Network of WX-ATM Response Strategies
“Building block” approach to expandresponse strategy capabilities ina specific ATM decision-makingarena (e.g., departure management)
15m
in A
ircra
ft Th
roug
hput
A08
Issued
End
Traffic over-delivery
Fair WeatherActualTNFRA ModelMAX*TNFRA
Route A
vailability
Extending framework for integratedWX-ATM decision-making from tacticalto strategic wx-impact mitigationPlanning (e.g., AFP management)
CoSPA 0 – 8 HourForecast
AFP Capacity ImpactModel
AFP Throughput AssessmentAnd Response Strategy