  • 5/27/2018 Cost Center Wise Rpt

    1/15

    Cost Centers:

    Actual / Plan / Variance

    S_ALR_87013611

    January 2010

    SSAAPP

    OOppttiimmiizzaattiioonn

    Developed by theUFA Learning &

    Developments Team

  • 5/27/2018 Cost Center Wise Rpt

    2/15

    This Quick Reference Guide is designed to get you started in using the indicatedtransactions and is not meant to take place of a full instructional user manual orclassroom training.

    Record of Change

    Date

    MM/DD/YYYY

    Reason For Change Version Name Sign off

    01/26/2010 Draft Draft Richard Crabbe

    01/27/2010 For Distribution 1.0 Richard Crabbe Dean Baber

    Table of ContentsINTRODUCTION................................................................................................. 3

    TRIGGER................................................................................................................. 3T-CODE .................................................................................................................. 3

    COST CENTERS REPORTING.............................................................................. 4ACTUAL/PLAN/VARIANCES_ALR_87013611............................................................ 4EXPORTING A REPORT TO EXCEL ................................................................................. 11FORMATTING THE SPREADSHEET ................................................................................. 15

    Cost Centers: Actual / Plan / Variance S_ALR_87013611 2 of 15

  • 5/27/2018 Cost Center Wise Rpt

    3/15

    Introduction

    Trigger

    This report will allow a manager to investigate cost variances between what wasplanned and the actual costs.

    T-Code

    S_ALR_87013611

    Cost Centers: Actual / Plan / Variance S_ALR_87013611 3 of 15

  • 5/27/2018 Cost Center Wise Rpt

    4/15

    Cost Centers Reporting

    Actual / Plan / Variance S_ALR_87013611

    Step 1: Enter Transaction Code S_ALR_87013611 Click or press Enter

    The following screen is displayed:

    Cost Centers: Actual / Plan / Variance S_ALR_87013611 4 of 15

  • 5/27/2018 Cost Center Wise Rpt

    5/15

    Selection Values

    Step 2: Complete the following fields Click to view a list of options

    Controlling Area - Enter 1000 1000 = UFA CO Controlling Area

    Fiscal Year -

    From Period -

    To Period -

    Enter the year and period which you would like to

    review; the period review can be for just thecurrent period or a cumulative range

    Plan Version - Enter 0 (zero)

    Actual Version - Leave Blank

    Selection Groups

    Step 3: Enter your sites number or use the drop down menu to select your costcenter number (Or value(s) field)

    Click to view a list of options

    Cost Centers: Actual / Plan / Variance S_ALR_87013611 5 of 15

  • 5/27/2018 Cost Center Wise Rpt

    6/15

    Step 4: Click Execute or press F8The following screen is displayed

    In this menu you can use theside scroll bar to view variouexpense lines for your costcenter.

    Once budgets have beenentered in SAP you will see avariances from plan to actuacosts in this menu as well.

    One of the benefits of using

    this particular T-code is thatyou will have the ability to ddown by line for review;

    The drill down will go to linedetail similar to using T-Code(KSB1)

    Cost Centers: Actual / Plan / Variance S_ALR_87013611 6 of 15

  • 5/27/2018 Cost Center Wise Rpt

    7/15

    Step 5: Select the GL line which you would like to perform further review.Step 6: Double click on the line

    The following menu is displayed:

    In the select report menu there arevarious options which can be performed.

    Generally you will select the default lineCost Centers: Actual Line Itemswhich is the most detailed.

    Step 7: Select the report you wish to viewStep 8: Click

    Cost Centers: Actual / Plan / Variance S_ALR_87013611 7 of 15

  • 5/27/2018 Cost Center Wise Rpt

    8/15

    The following screen is displayed:

    Detailed totals of the cost lines for the GL which you have selected

    Step 9: Click back arrow to return to first expense menuThe following screen is displayed:

    Cost Centers: Actual / Plan / Variance S_ALR_87013611 8 of 15

  • 5/27/2018 Cost Center Wise Rpt

    9/15

    Step 10: Scroll to the line Over / under absorption

    Step 11: Double Click on the line Over / under absorption

    The following menu is displayed:

    In the select report menu there arevarious options which can be performed.

    Generally you will select the default lineCost Centers: Actual Line Itemswhich is the most detailed.

    Cost Centers: Actual / Plan / Variance S_ALR_87013611 9 of 15

  • 5/27/2018 Cost Center Wise Rpt

    10/15

    The following screen is displayed:

    Cost Centers: Actual / Plan / Variance S_ALR_87013611 10 of 15

  • 5/27/2018 Cost Center Wise Rpt

    11/15

    Exporting a report to Excel

    An Excel Spread sheet is a very effective method to review and drill down through theinformation.

    Alternatively Press:Step 1: Click List in the SAP main menu barStep 2: Select ExportStep 3: Select Spreadsheet

    The following screen is displayed:

    Step 4: Click

    Cost Centers: Actual / Plan / Variance S_ALR_87013611 11 of 15

  • 5/27/2018 Cost Center Wise Rpt

    12/15

    The following screen is displayed:

    Step 5:

    Select Table (Unless you would prefer to use a pivot table)

    Step 6: ClickThe following screen is displayed:

    Step 7: Click

    Cost Centers: Actual / Plan / Variance S_ALR_87013611 12 of 15

  • 5/27/2018 Cost Center Wise Rpt

    13/15

    The following screen is displayed:

    Step 8: Click FileStep 9: Select Save Copy As

    Cost Centers: Actual / Plan / Variance S_ALR_87013611 13 of 15

  • 5/27/2018 Cost Center Wise Rpt

    14/15

    The following screen is displayed:

    Step 10: Browse to the location where you wish to save the fileStep 11: Apply a meaningful file nameStep 12: Click Save

    Cost Centers: Actual / Plan / Variance S_ALR_87013611 14 of 15

  • 5/27/2018 Cost Center Wise Rpt

    15/15

    Formatting the Spreadsheet

    Upon saving your report to a folder location of your choice the SAP menu will bedisplayed and you can just simply exit out or leave up. Once you have opened yoursaved file you may want to do some initial page set up and formatting to make thisreport review a little more efficient other than just scrolling line by line.

    Suggested formatting:

    Changing header text color so as the text is more visible. (Color fill function fromtool bar)

    Insert an additional row above header text. (Right click on top line and insert row) Changing column R to currency text with a dollars sign and as well brackets which

    show negative values

    Step 1: Highlight column with financial text leave entire columnhighlighted

    Step 2: Right click and select propertiesStep 3: Select tab labeled number and select currency to format

    decimal places, dollar sign and as well negative numberformatting

    Inserting filtersAllows you to filter through the report by cost element name or various header textcolumns

    Step 1: Highlight the top row containing the header textStep 2: In the menu bar for excel select Data > Filter > Auto Filter.

    Place a freeze pane function in the spread sheet, this is handy as wellStep 1: Move your cursor to the row under the header column and column where

    you would like the freeze pane to startStep 2: In the menu bar for excel select Window > Freeze Panes. If the format you

    have selected does not work follow the previous steps and select Unfreezepanes and reset.