Aims for final Phase

Overall Target – Reduce Paper by 20% Currently at 13% Celebrate achievements to date! Our last chance to make impact! Take advantage of new IT equipment rollout Fresh awareness campaign A survey at end of project?

Page 3: County Hall Waste Prevention Project Final Phase Oct 2008 – Dec 2008

Current Picture

Average per month

2 pallets/100 boxes/500 reams/250,000 sheets!

Page 4: County Hall Waste Prevention Project Final Phase Oct 2008 – Dec 2008

1. Celebrate Results achieved so far Show graph showing improvement WP Noticeboard in concourse Large visual display showing target

reached/how far to go? Another paper display? Make it relevant! Email all staff – everyone is making a

difference

Page 5: County Hall Waste Prevention Project Final Phase Oct 2008 – Dec 2008

2. New IT Equipment

Emails from IT, make people aware Rollout of MFD’s Huge potential to reduce paper usage Default double-sided Scan to email Launch awareness campaign around it

Page 6: County Hall Waste Prevention Project Final Phase Oct 2008 – Dec 2008

3. PP Awareness Campaign

Paper Prevention – It’s the business! Launch Paper Prevention Week Email quiz incorporating tips each day Visual & info display in concourse/canteen Signage review at equipment locations Champions trained up, min 1 per section Ensure all staff avail of training

Page 7: County Hall Waste Prevention Project Final Phase Oct 2008 – Dec 2008

New Ideas for Awareness Campaign “Dummy” guide to using the

photocopier/printer avail on intranet.

(Is IT doing this?) A few points from Dummy Guide to be put on

a small poster with paper prevention message and placed on/near each photocopier/printer.

Countdown to intro to new fab equipment that will do everything you wish for!!

Page 8: County Hall Waste Prevention Project Final Phase Oct 2008 – Dec 2008

New ideas (cont’d)

Ensure new printers configured so don’t print a test page on start up (as some photocopiers/printers currently do).

  Clear instructions readily available (near the printer

& on the intranet) to change settings to single sided printing where needed.

  Inform staff beforehand via email outlining benefits

(new & improved, reliability, speed, scanning features etc.) and changes (default duplex being main one)

Page 9: County Hall Waste Prevention Project Final Phase Oct 2008 – Dec 2008

Short auto promo on new equip when switch on pc

Page 10: County Hall Waste Prevention Project Final Phase Oct 2008 – Dec 2008

Previous ideas – Bigger Push! Stamp out ‘bits of paper’ on peoples desk for

phone messages, all should be emailed Scrap paper obviously not being used can we

reinforce this message? Tackle amount of Junk mail/several copies of

the same brochure/leaflet etc that are received on a daily basis in all sections of the Council.

Induction Training – more hands on?

Page 11: County Hall Waste Prevention Project Final Phase Oct 2008 – Dec 2008

Communicating the message

Staff Emails Staff Newsletter Intranet Back of payslips? Signs/posters Catchy visual display/info board WP Notice Board (concourse wall)

Page 12: County Hall Waste Prevention Project Final Phase Oct 2008 – Dec 2008

Communicating the Message (cont’d) WP Team/Champions in each section Short auto promo on new equip when turn

on pc

Page 13: County Hall Waste Prevention Project Final Phase Oct 2008 – Dec 2008

Visual Display

Page 14: County Hall Waste Prevention Project Final Phase Oct 2008 – Dec 2008

Target Reached – how far to go? 20% at top of scale We are here

Page 15: County Hall Waste Prevention Project Final Phase Oct 2008 – Dec 2008

Paper Prevention Week

Follow up Wall/Tower showing reduction?