County Highway 39 Improvement Project (Odean Avenue to CSAH 42) Project Background County Highway 39 provides east-west mobility and connectivity through the northern part of Wright County from Monticello to Highway 101 in Otsego. As with the Twin Cities metropolitan region, Wright County and the surrounding areas have experienced rapid growth. Increased population has resulted in higher traffic volumes throughout the area raising concerns over safety, access and the mobility needs of the corridor. The improvements proposed for Highway 39 are centered on providing safety improvements while increasing the efficiency of the traffic operation. Highway 39 is currently an undivided two-lane roadway with left and right turn lanes at some intersections along the corridor. Side street intersections are stop-controlled through the segment, with the exception of the intersection with Highway 42 which is controlled by a signal. With the increasing traffic and speed, safety has become an increasing concern especially for those living in and around Highway 39. Proposed Improvements The County, in cooperation with the City of Otsego, has developed improvements to increase the efficiency and safety of the Highway 39 corridor. Project Area Urban Section – The corridor will be transformed from a rural, two-lane section to a divided four-lane urban section. The four lanes will provide additional capacity to the corridor and the curb and gutter is intended to aid in traffic calming. In addition, the urban section reduces impact to adjacent properties. Roundabouts at Odean Avenue, Page Avenue and Highway 42 – The roundabouts will provide better traffic flow and traffic calming, while creating more opportunities for side street traffic to enter Highway 39. Multi-Use Trail on South Side – Currently there are no separated pedestrian or cyclist facilities along Highway 39. The project will include a seperated 10-ft wide multi-use trail on the south side of Highway 39. 39 39 39 42 101

County Highway 39 Improvement Project (Odean Avenue to ......101 101 38 85TH ST NE PROJECT LOCATION COMBINED CSAH 39 DETOUR TRAFFIC ODEAN AVE NE NASHUA AVE NE SIPPI RIVER PAGE AVE

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: County Highway 39 Improvement Project (Odean Avenue to ......101 101 38 85TH ST NE PROJECT LOCATION COMBINED CSAH 39 DETOUR TRAFFIC ODEAN AVE NE NASHUA AVE NE SIPPI RIVER PAGE AVE

County Highway 39 Improvement

Project (Odean Avenue to CSAH 42)

Project Background

County Highway 39 provides east-west mobility and connectivity through the northern part of Wright County

from Monticello to Highway 101 in Otsego. As with the Twin Cities metropolitan region, Wright County and

the surrounding areas have experienced rapid growth. Increased population has resulted in higher traffi c

volumes throughout the area raising concerns over safety, access and the mobility needs of the corridor. The

improvements proposed for Highway 39 are centered on providing safety improvements while increasing the

effi ciency of the traffi c operation.

Highway 39 is currently an undivided two-lane roadway with left and right turn lanes at some intersections

along the corridor. Side street intersections are stop-controlled through the segment, with the exception of the

intersection with Highway 42 which is controlled by a signal. With the increasing traffi c and speed, safety has

become an increasing concern especially for those living in and around Highway 39.

Proposed Improvements

The County, in cooperation with the City of Otsego, has developed improvements to increase the effi ciency and

safety of the Highway 39 corridor.

Project Area

Urban Section – The corridor will be transformed from a rural, two-lane section to a divided four-lane urban

section. The four lanes will provide additional capacity to the corridor and the curb and gutter is intended to aid

in traffi c calming. In addition, the urban section reduces impact to adjacent properties.

Roundabouts at Odean Avenue, Page Avenue and Highway 42 – The roundabouts will provide better traffi c

fl ow and traffi c calming, while creating more opportunities for side street traffi c to enter Highway 39.

Multi-Use Trail on South Side – Currently there are no separated pedestrian or cyclist facilities along

Highway 39. The project will include a seperated 10-ft wide multi-use trail on the south side of Highway 39.

39

39

39

42101

Page 2: County Highway 39 Improvement Project (Odean Avenue to ......101 101 38 85TH ST NE PROJECT LOCATION COMBINED CSAH 39 DETOUR TRAFFIC ODEAN AVE NE NASHUA AVE NE SIPPI RIVER PAGE AVE

If you have questions about the project, please contact the Wright County Highway Department at 763-682-7383 or email:

Virgil G. Hawkins, P.E., County Engineer

[email protected]

Chad D. Hausmann, P.E., Assistant County Engineer

[email protected]

Proposed Schedule

The plan is to construct the

improvements in two construction

seasons (Stages 1 and 2).

Stage 2 - 2021

Stage 2, which includes the construction from

Page Avenue to Odean Avenue will begin

Spring, 2021 and be completed Fall, 2021.

39

42

N

ELKRIVER

OTSEGOE

MIS

SIS

SIP

PI R

IVER

85TH ST NEPA

GE

AV

E N

E

PROJECT LOCATION

COMBINED CSAH 39 DETOUR TRAFFIC CSAH 39

WESTBOUND DETOUR TRAFFIC

CSAH 39 EASTBOUND

DETOUR TRAFFIC

70TH ST NE

OD

EA

N A

VE

NE

QU

AM

AV

E NE

101

101

38

85TH ST NE

PROJECT LOCATION

COMBINED CSAH 39 DETOUR TRAFFIC

OD

EA

N A

VE

NE

NA

SH

UA

AV

E N

E

MISSISSIPPI RIVER

PAG

E A

VE

NE

39

N

OTSEGO

Stage 1 - 2020

Beginning Spring, 2020, the contractor will

construct the improvements from Page

Avenue to Quaday Avenue.

Traffi c to the businesses around Highway 42

will be maintained at all times, while through

traffi c will be detoured.

The stage 1 area will be completed by Fall,

2020.