Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
1
COYOTE® GLC (Ground Level Closure)Complete Assembly Installation
AUGUST 2010
Be sure to read and completely understand this procedure before applying product. Be sure to select the proper PREFORMED product before application.
NOMENCLATURE 1.Dome(1) 2.SmallPartsBag(1) 3.OrganizerandEndPlate withPlatform(1)
TOOLS REQUIRED•CanWrench•SideCutters•Snips•Pliers
•CableTies•SledgeHammer•FiberOpticOpeningTools•ScrewDriver
•Mallet•Shovel
4.CollarAssembly(1)5.EndPlateGasket(1)6.Base(1)
COYOTE GLC Base with Flat Cover Kits
Catalog No.GLC Brochure
ReferenceCode
Description
COYGLC-C1-000 C1 COYOTE GLC Base with Flat Cover
COYOTE GLC Dome Assembly with Platform Kits
COYGLC-F1-000 C2 with F1
COYOTE GLC Dome Assembly with Universal Organizer (Buffer and Ribbon). Includes:(1)Platform,(1)UniversalOrganizerwithEndplate,(1)Dome,(1)DomeCollar,(1)SmallPartsBag,(1)TransitionTubeKit,(1)Gasket,and(4)Grommets-(2)8003663,(1)8003664and(1)8003665
COYGLC-F2-000 C2 with F2
COYOTE GLC Dome Assembly with Buffer Tube Organizer for Increased Tray & Storage Capacity (Buffer Tube Only).Includes:(1)Platform,(1)BufferTubeOrganizerforIncreasedTray&StorageCapacitywithEndplate,(1)Dome,(1)DomeCollar,(1)SmallPartsBag,(1)Gasket,and(4)Grommets-(2)8003663,(1)8003664and(1)8003665
COYGLC-F3-000 C2 with F3
COYOTE GLC Dome Assembly with Cross-Connect Organizer EMPTY (Buffer and Ribbon). Includes:(1)Platform,(1)Cross-ConnectOrganizerwithEndplate,(1)Dome,(1)DomeCollar,(1)SmallPartsBag,(1)TransitionTubeKit,(1)Gasket,and(4)Grommets-(2)8003663,(1)8003664and(1)8003665
COYGLC-F4-000 C2 with F4
COYOTE GLC Dome Assembly with OptiTap™ Organizer EMPTY (Buffer and Ribbon).Includes:(1)Base,(1)Platform,(1)OptiTapOrganizerwithEndplate,(1)Dome,(1)DomeCollar,(1)SmallPartsBag,(1)TransitionTubeKit,(1)Gasket,and(4)Grommets-(2)8003663,(1)8003664and(1)8003665
2©2010PreformedLineProductsCompany.Allrightsreserved.
COYOTE GLC Accessory Kits
Catalog No.
GLC BrochureReference
Code
Description Catalog No.GLC OrderReference
CodeDescription
80809005 A1 GLC Dome 80808613 A11Express Fiber Storage Ring for LITE-GRIP® Splice Tray
80809006 A2 GLC Dome Collar 80808817 A12Parking Lot for Cross-Connect Organizer – holds 6 connectors
80809775 A3 GLC Dome Gasket 80808152 A13 CORNING OptiTap™ Adapter
80809793 A4GLC Dome Collar Lock Assembly
80807972 A14 *OptiTap™ Installation Tool
80809781 A5 GLC Flat Cover Kit 80809766 A15 Shield Connector
80809788 A642” Base Retention Stake with Anchor Plate
ContactPLP fordetails
A16 COYOTE® PLC Splitter
80809791 A7 Base Retention Stake Driver CapContactPLP fordetails
A17 Adapter Modules
LGSBS8-5 A8LITE-GRIP® Splice Blocks for Single Fusion (Yellow) – 5 splice blocks
ContactPLP fordetails
A18 Pigtail Cable Assemblies
LGSBR3-5 A9LITE-GRIP® Splice Blocks for Mass Fusion/Ribbon (Purple) – 5 splice blocks
ContactPLP fordetails
A19 Optical Drop Cable Assembly
800013213 A10 COYOTE® Cross-Connect Tray 80809843 A20Ground Lead Kit (Includes 4 Ground Leads)
COYOTE GLC Spacer Kits
COYGLC-S1-000 S1 Standard Spacer. Includes:(2)StandardSpacerHalves,(4)SpacerStuds,&Fasteners
COYGLC-S2-000 S2Grounding Spacer. Includes:(1)GroundingSpacerHalf,(1)StandardSpacerHalf,(1)RemovableAccessPlate,(1)GroundingPlate,(1)RemovableBussBar,(4)GroundLeads,(1)Screw-OnTerminalHead,(4)SpacerStuds,andFasteners
COYGLC-S3-000 S3Dual Grounding Spacer. Includes:(2)GroundingSpacerHalves,(2)RemovableAccessPlates,(2)GroundingPlates,(2)RemovableBussBars,(8)GroundLeads,(2)Screw-OnTerminalHeads,(4)SpacerStuds,andFasteners
COYOTE GLC Full Assembly Kits
COYGLC-F1B-000 C3 with F1
COYOTE GLC with Universal Organizer (Buffer and Ribbon).Includes:(1)Base,(1)Platform,(1)UniversalOrganizerwithEndplate,(1)Dome,(1)DomeCollar,(1)SmallPartsBag,(1)TransitionTubeKit,(1)Gasket,and(4)Grommets-(2)8003663,(1)8003664and(1)8003665
COYGLC-F2B-000 C3 with F2
COYOTE GLC with Buffer Tube Organizer for Increased Tray & Storage Capacity (Buffer Tube Only). Includes:(1)Base,(1)Platform,(1)BufferTubeOrganizerforIncreasedTray&StorageCapacitywithEndplate,(1)Dome,(1)DomeCollar,(1)SmallPartsBag,(1)Gasket,and(4)Grommets-(2)8003663,(1)8003664and(1)8003665
COYGLC-F3B-000 C3 with F3
COYOTE GLC with Cross-Connect Organizer EMPTY (Buffer and Ribbon). Includes:(1)Base,(1)Platform,(1)Cross-ConnectOrganizerwithEndplate,(1)Dome,(1)DomeCollar,(1)SmallPartsBag,(1)TransitionTubeKit,(1)Gasket,and(4)Grommets-(2)8003663,(1)8003664and(1)8003665
COYGLC-F4B-000 C3 with F4
COYOTE GLC with OptiTap™ Organizer EMPTY (Buffer and Ribbon). Includes: (1)Platform,(1)OptiTapOrganizerwithEndplate,(1)Dome,(1)DomeCollar,(1)SmallPartsBag,(1)TransitionTubeKit,(8)Pigtails,(1)Gasket,and(4)Grommets-(2)8003663,(1)8003664and(1)8003665
*OptiTap™isatrademarkofCorningCableSystems
3
COYOTE Grommet Chart
PLP Catalog NumberGLC Order Reference
CodeCable Range Inches (mm) Description Splitting Location
8003691 G1 .40” - .60” (10.7 – 15.2 mm) 1-Hole Grommet
8003663 G2 .42” - .60” (10.7 – 15.2 mm) 2-Hole Grommet
8003990 G3.50” - .60” (12.7 – 15.2 mm).125” - .25” (3.2 – 6.4 mm)
& Flat Drop4-Hole Grommet
8003664 G4 .30” - .43” (7.6 – 10.9 mm) 4-Hole Grommet
8003665 G5.125” - .25” (3.2 – 6.4 mm)
& Flat Drop6-Hole Grommet
8003676 G6.42” - .60” (10.7 – 15.2 mm).125” - .25” (3.2 – 6.4 mm)
& Flat Drop7-Hole Grommet
8003677 G7.125” - .25” (3.2 – 6.4 mm)
& Flat Drop8-Hole Grommet
8003989 G8 Flat Drop Cable Only 4-Hole Grommet
8003796 G9 Flat Drop Cable Only 12-Hole Grommet
4
Step #1 SelectplacementfortheGLCanddiga26”Lx26”Wholetothedepthofapproximately13”ortopropertrenchdepth.Useyourstandardcompanypracticetolinethebottomofholeandtrenchwithpeapebblesorgravel.
Hole Preparation
Grounding Installation
Step #2 Ifgroundingisrequired,installgroundrodinonecornerofthehole.
Step #3 Usingthe3/8”sideofacanwrench,screwontheterminalhead(provided)toa24”longpieceofsolidorjacketed#6coppergroundwire.
NOTE:Usesidecutterstoremovebreakawayofterminalheadifdesired.
Mallet
GroundRod
Step #4Bendthegroundwiretotheapproximatedimensionsbelowandattachittothegroundingrodperyourstandardcompanypractice.
Staking
Step #5 Secureanchorplatetostakeatthe5throundholefromthetopofthestake.
Step #6 Placestakesatthefollowinglocationswithinthehole.
5
Step #7Installdrivercaponendofstake.
Step #8Useasledgehammertodrivestakesintogrounduntiltheanchorplatesofthestakesareabout1”fromtheground.
Base Preparation and Securing Base
Step #9 Installcableties(notprovided)inbottomslotsofbase.
Additionalcabletieslotsprovidedbutarenotrequiredtobeused.
CableTies
Step #10Slidecablethroughthebottomofbase.
Step #11Positionbaseinholesothattheanchorplatesofthestakesarepositionedwithintheoutsidechannelofbase.
Step #12Makesurethegroundwireentersthebaseinthecorneropeningandisflushagainsttheinsidewallofthebase.
GroundWire
6
Cable and Endplate Preparation
Step #13 Makesurethecableisenteringthebaseinopposingcornersandroutecableinbaseasshown.
Step #14 Drivestakesuntilthebaseiscapturedbytheanchorplatesofthestakesandremovedrivercapfromstakes.
Step #15 Securecablewithcableties.
Step #16 Tapecablelegstogetherapproximatelyevery1-1/2ft.Stoptapingabout60”(152cm)fromtheendofthecableloop.
Step #17 Removeplatformfromendplate.
Step #18 Disassembletheplatformhalvesbyremovingboltsandlockwashers
Platform Half “A”
Platform Half “B”
7
Step #19 OPTIONAL STEP AttachthePlatformHalf“B”totheendplateinthepositionshownbelowtouseasastabilizerwhileworkingontheendplate.
Platform Half “B”
Step #20 Determinewhichcableportswillbeusedandmarktherespectivebreakouttabsofendplate.
NOTE: Useports1and4forexpresscableapplicationsintheUniversalandCross-ConnectOrganizers.Useports2and3forexpresscableapplicationsintheOptiTapandBufferTubewithIncreasedStorageOrganizers.
Step #21 Removetheendplatecapsfromtheselectedcableportsandbreakoutthetabs.
PLP Tip: Scoring edges of tabs with knife makes them break out easier.
Step #23 Ifusingcutcable,insertcablethroughgrommet.Ifyourapplicationrequiresexpresscable,see Step 24 for grommet slitting procedure.
Step #22 Measurecabletodeterminediameterandholelocationtouseingrommet.
Step #24 Grommet Slitting–Ifslittingisrequired,laygrommetonastableflatsurface.Positionutilityknifewiththecuttingedgeagainstthetopsurfaceandcutthroughgrommet. Consult grommet chart on page 3 for slitting locations of all grommets.
PLP Tip: Use a pen to sketch slitting lines on top surface of grommet prior to cutting.
1
2 3
4
8
Step #25 Cablepreparationforloosetubeorribboncables.
Configuration Sheath Opening
CutCable 95”(2.4m)
Step #26a Determinefibercutlocationandmeasuresheathopeningforloosetubeorribboncables.
PLP Tip: Leaveabout 3” (8 cm) of strength member totrim later.
Sheath Opening forCut Location B
Sheath Opening forCut Location A
Step #26b Measuresheathopeningforexpressedfiber(buffertubewindowcut)applications
Sheath Opening forCut Location
Expressed Fiber
Windowcutlocationsforbuffertube(s)
PLP Tip: Leaveabout 3” (8 cm) of strength member totrim later.
Step #27Forribbonfeedercables,leave4”(10cm)ofthecentraltubefromthesheathopeningwhenremovingthecentraltube.
IMPORTANT NOTE:FortheOptiTapOrganizerleaveonly1”(2.5cm)ofthecentraltubefromthesheathopeningwhenremovingthecentraltube.
4” (10 cm)
CentralTube
PLP Tip:Leave about 3”(8 cm) of strengthmember totrim later.
9
Cable Preparation for Armored Cables
Step #28 Splitsheathandarmor1”fromthesheathopeningandinsertshieldconnector.
Step #29 Installthestudoftheshieldconnectorthroughtheslotofthestrengthmemberbracketandsecurewithnut.Trimcablestrengthmember(s)to1.5”(4cm).Securecablestrengthmember(s)undercapandtightennut.
Step #30 Securecablesheathwithhoseclamp.
Cable Preparation for Dielectric(Non-Armored) Cables
Step #31 Trimcablestrengthmember(s)to1.25”(3cm).Securecablestrengthmember(s)undercapandtightennut.
Grommet Installation into End Plate
Step #32 Securecablesheathwithhoseclamp.
Step #33 Pushcableingrommetandpositiongrommetinendplateslot.
IMPORTANT NOTE:If using the 4-hole flat drop grommet for the OptiTap Organizer, make sure the slits in the grommet are facing outward so futuredrops can be added without disconnecting drops that have already been installed.
10
Step #34 Pullcableoutofgrommetandpositioncablestrengthmemberbracketontogroundingstud.Securebrackettostudwithexternaltoothlockwasherandhexnut.
Step #35 Confirmcablecapsurfacesarelubricated.Addsiliconelubricantprovidedifneeded.
Step #36 Installcablecapandsecurewithhexbolts.
Step #38 Whenusingcableports2and3,usea4”(10cm)pieceoftransitiontubetoroutefiberontotransitiontray.Securetransitiontubetotransitioncompartmentwithtiewraps.
Step #37 Whenusingcableports1and4,routeandsecurecentraltubeofunitubecablestotransitioncompartmentwithtiewraps.
Ribbon Applications for Universal,Cross-Connect, & OptiTap Organizers
SURFACES TO BE LUBRICATED
NOTE: TIGHTEN ALL UNUSED CABLE CAPS
NOTE: Tighten bolts by hand evenly until cable cap is fully seated (DO NOTUSE POWERTOOLS TOTIGHTEN BOLTS).
Reminder:Useports1and4forexpresscableapplicationsintheUniversalandCross-ConnectOrganizers.Useports2and3forexpresscableapplicationsintheOptiTapOrganizer.
1
2 3
4
11
Step #39 Routefiberwithintransitiontray.
Step #40 Insertfiberstoberoutedtosplicetraysintotransporttubesandsecuretotransitioncompartment.
Buffer Tube/Loose Tube Applications for Universal, Cross-Connect, &
OptiTap Organizers
Skip to Step #42 for Ribbon Applications
Universal Organizer
PLP TIP: Placeapieceoftransitiontubingoverretainerstudtopreventdamagetobuffertubes.
Step #41a Routeandstorebuffertubesinstoragebrackets.
OUTGOING FIBER
INCOMING FIBER
PLP Tip: For ease of handling, group the transition tubes in multiples of six.
NOTE:Useports1and4forexpresscableapplicationsintheUniversalandCross-ConnectOrganizers.Useports2and3forexpresscableapplicationsintheOptiTapandBufferTubeIncreasedTrayOrganizers.
INCOMING BUFFER TUBE
OUTGOING BUFFER TUBE
1
2 3
4
12
Cross-Connect & OptiTap Organizers
Step #41b Installbuffertubebracketsintransitiontrayandsecurewithkepsnuts.
Step #41c Routeandstorebuffertubesinstoragebrackets.
INCOMING BUFFER TUBE
OUTGOING BUFFER TUBE
Step #41f Toinstallretainerclip,positionthebottomslotoftheretainerclipontothebottomofthebracket.Tiltretainerclipforwarduntilthetopofthebracketsnapsintothetopslotoftheretainerclip.
Step #41d Routeandstorebuffertubesinstoragebrackets.Ifroutinginsidestoragebrackets,see Step #41e.
INCOMING BUFFER TUBE
OUTGOING BUFFER TUBE
PLP TIP: Placeapieceoftransitiontubingoverretainerstudtopreventdamagetobuffertubes.
Buffer Tube Increased Tray & Storage Organizer
13
Step #42 Routetransporttubesand/orbuffertubestosplicetraysandsecure.
Step #43 MeasureandmarkpigtailsforCross-ConnectorOptiTapOrganizer.
Step #44 Routeincomingandoutgoingfibersorpigtailsandspliceperstandardcompanypractice.
Step #45 Securesplicetray(s)withstrap.
NOTE:TheBufferTubeOrganizerwithIncreasedTrayCapacityusesastraptosecurethesplicetrays.
Step #46 Installadapterplate(s)androutepigtailstoadaptersasshownbelow.
Cross-Connect Organizer:Allpigtailsat21”(53cm)fromconnectoredge
OptiTap Organizer:4pigtailsat8”(20cm)fromconnectoredge
AND4pigtailsat9”(23cm)fromconnectoredge
Removethepigtailjacketand*KEVLAR®yarnbeyondthismark.
OUTGOING FIBERINCOMING FIBER
Routing Pigtails in Cross-ConnectOrganizer
*KEVLAR®isaregisteredtrademarkofDuPont.
14
Step #47 OPTIONAL STEP Secureparkinglotmountingplatetostuds. Attachconnectorparkinglot(s)toplateand storeconnector(s)inparkinglot(s)when serviceisnotrequired.
Routing Pigtails and Connecting Drop Assemblies in OptiTap Organizer
Step #48 Removeshroudfromorganizer.
Step #49 Installhardenedconnector(s)intoadapterplate.
Step #50 Routepigtailstohardenadapter(s)asshownbelow.Usethe8”longpigtailstoconnecttotheinneradaptersandthe9”longpigtailstoconnecttotheouteradapters.
Step #51 Re-Installshroudtoorganizer.
15
Step #52 Installdropcableassemblyintohardenadapterbyaligningconnectorarrowwithadapternotchandinsertconnector.Rotatethreadedsleeveuntilfullyinstalled.
Step #53 Uselabelonshroudtoidentifyconnections.
Step #54 OPTIONAL STEP RemovePlatformHalf“B”fromendplateif usedtostabilizetheendplatewhile workingontheorganizer.
Platform Installation
Step #56 Assembleplatformtoendplatewithnutsandlockwashers.Makesurethearrowontheplatformislinedupwiththeairvalveoftheendplate.
Dome Preparation & Installation
Step #55 InsertsquarenutsinPlatformHalf“B”andre-assembletheplatformhalvesaroundcableswithboltsandlockwashers.
Step #57 Lubricateallinnerandoutersurfacesaroundgasketwithsiliconelubricanttoeaseassemblyandclosurere-entry.
AdapterNotch
ConnectorArrow
Platform Half “A”
Platform Half “B”
16
Step #58 Slideendplategasketontoendplateandpressintogroove.
Step #59 Re-tighten all cable cap bolts (Step #36) to assure that the cable caps are fully seated.
Step #60 Positiondomeoverendplate.
Step #61 Installdomecollarandsecurewithlatch.
Step #62 OPTIONAL STEP Securethedomecollarlockassemblyto thelatchofcollartopreventtampering.
17
Step #63 Secureplatformtobasewithboltsandlockwashers.
Step #64 Backfilltheholeandtrenchperyourstandardcompanypractice,unlessaspacerisrequired(See Spacer Installation).
Step #65 Placespacerhalvesaroundcablesandsecuretogetherwithselftappingscrewsandlockwashers.
Spacer Installation (If Required)
Step #67 Attachgroundleadstostudsofendplateinwhichbondconnectionshavebeenmadetoinsidetheclosure.
Skip to Step #73 if Installing a Standard Spacer
Step #66 Securespacertobasewithspacerstuds.
Step #68 Attachoppositeendsofgroundleadstotheinsidestudsofthegroundingplate.
18
Step #69 Installremovablebussbartoouterstudsofthegroundingplate.
Step #70 Installgroundingplate(s)togroundingspacerhalforhalveswithboltsandlockwashers.
Step #71 Connectterminalhead(s)ofgroundwire(s)tothemiddleouterstud(s)ofgroundingplate(s).
Step #73 Secureplatformtospacerwithboltsandlockwashers.
Step #72 Installremovableaccessplate(s)togroundingspacerhalforhalveswithboltsandlockwashers.
Step #74 Backfilltheholeandtrenchperyourstandardcompanypractice.
19
20SP3091
SAFETY CONSIDERATIONS
Thisapplicationprocedureisnotintendedtosupersedeanycompanyconstructionorsafetystandards.Thisprocedure isofferedonlytoillustratesafeapplicationfortheindividual.FAILURE TO FOLLOW THESE PROCEDURES MAY RESULT IN PERSONAL INjURY OR DEATH.
Do not modify this product under any circumstances.
Thisproductisintendedforusebytrainedtechniciansonly.This product should not be used by anyone who is not familiar with, and not trained to use it.
Whenworkingintheareaofenergizedlines,extracareshouldbetakentopreventaccidentalelectricalcontact.
Forproperperformanceandpersonalsafety,besuretoselectthepropersizePREFORMED™productbeforeapplication.
PREFORMEDproductsareprecisiondevices.Toinsureproperperformance,theyshouldbestoredincartonsunder coverandhandledcarefully.
P.O.Box91129,Cleveland,Ohio44101•440.461.5200•www.preformed.com•e-mail:[email protected]