COZYEON Residence Main facilities gallery. Corridor of each floor

Embed Size (px)

DESCRIPTION

The elevator and fire extinguishing system in the corridor

Citation preview

COZYEON Residence Main facilities gallery Corridor of each floor The elevator and fire extinguishing system in the corridor Stairs entrance of building inside Stairs of building Postbox of each room at the 1/F front door Transformer room Water tank, fire pump, water supply pump, septic tank manage room Emergency light at the stairs of each floor The veranda on 9/F Automatic meter reading electricity for every room and each floor Automatic meter reading water for every room and each floor Automatic meter reading Gas for every room and each floor Fire alarm system in each floor Fire extinguisher set up in each floors corridor and inside every room The standpipe system in each floor The visitor interphone set up in every room Digital door lock in every room Direct phone call between 1/F and 13/F for emergency Canopy style open area in top roof 2/F Community Room 1/F Toilet (for disable) 1/F Lobby 1/F MDF ROOM 1/F Elevator entrance 1/F Information desk (management office) Fire, communications, broadcasting, smoke exhaustion control system 1/F The entrance 1/F Video phone for visitor and residence & entrance controls card key systems 1/F Auto-door at the entrance 1/F Car park entrance