Crashing the Project

Embed Size (px)

DESCRIPTION

Crashing the Project Schedule Single Page Sample Sheet.

Citation preview

CrashCRASHING THE PROJECT

- Calculate the Normal duration & Crash duration of all the activities (use proper logic and physical constraints) - Calculate the Normal cost & Crash cost of all the activities - Calculate the Slope of all the activities (ie., C / D = cost per day) - Follow proper sequence & crashing rules and crash the project activities, plot the least cost curveExample :

WBSTask DescriptionQtyUnitDurationDurationCostSlopeRevisedNormalCrashNormalCrashC/DD1C1Dur.CostDLCode

AConstruction of..A.1 Substructure worksA.1.1 Excavation works500Cum10 dys A.2 Superstructure worksA.2.1 Columns 50Cum8 dys

NOTE:Back to AbstractC = Diff b/w crash cost (CC) and normal cost (NC)D= Diff b/w normal duration (ND) and crash duration (CD)D1= "Reduced by" duration of the concerned activityC1= "Increase in cost" of the concerned activity due to crashingDL= "Balance" duration available for an activity to crash