Prime Consultant Parsons Transportation Group Inc. 101 West Ohio Street, Suite 2121 Indianapolis, IN 46204 Authorized Negotiator / Dave Ayala Direct / 317.616.1006 Email / [email protected] September 22, 2020 Trust Through Performance Our construction professionals have provided quality, reliable construction inspection services for the Crawfordsville District over 7 On-Call Contracts. INDOT knows we will deliver! Local Capacity Advantage Parsons lasting exclusive partnership with DBE CECon and Hanson provides the District with guaranteed local capacity. Optimizing assignments by experience level and location result is added value and better service. Proven Project Supervisors Our long relationship with the Crawfordsville District is directly attributed to the talent of our staff, especially our Project Supervisors. INDOT knows them and trusts them to perform from Pre-Construction Conference to Final Construction Record. Why Parsons Through seven on-call contract selections, Parsons has earned the trust of the Crawfordsville District through The 5 Keys to Success of our Proven Approach: Dependability: INDOT knows when given an assignment, we will be there and perform. Quality: Our job is quality control. We take that serious to deliver projects that will endure. Flexibility: We are always open to adapt and adjust our staffing plan that adds the most value to INDOT. Availability: Our deep roster of construction professionals have immediate capacity to take on any assignment. Logistics: Our staff live throughout the District providing cost saving advantages to assign staff projects close to where they live. CRAWFORDSVILLE DISTRICT ON CALL CONSTRUCTION INSPECTION SERVICES / RFP 2009, ITEM 2 Dependability Parsons’ 5 Keys to Success Quality Flexibility Availability Logistics 1 2 3 4 5 Sincerely, Dave Ayala, PE, PTOE Vice President, Parsons Bob Fisher, PE Project Manager

CRAWFORDSVILLE DISTRICT - pscs.indot.in.gov

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CRAWFORDSVILLE DISTRICT - pscs.indot.in.gov

Prime Consultant

Parsons Transportation Group Inc.101 West Ohio Street, Suite 2121Indianapolis, IN 46204

Authorized Negotiator / Dave AyalaDirect / 317.616.1006 Email / [email protected]

September 22, 2020

Trust Through Performance

Our construction professionals have provided quality, reliable construction inspection services for the Crawfordsville District over 7 On-Call Contracts. INDOT knows we will deliver!

Local Capacity Advantage

Parsons lasting exclusive partnership with DBE CECon and Hanson provides the District with guaranteed local capacity. Optimizing assignments by experience level and location result is added value and better service.

Proven Project Supervisors

Our long relationship with the Crawfordsville District is directly attributed to the talent of our staff, especially our Project Supervisors. INDOT knows them and trusts them to perform from Pre-Construction Conference to Final Construction Record.

Why Parsons

Through seven on-call contract selections, Parsons has earned the trust of the Crawfordsville District through The 5 Keys to Success of our Proven Approach:

Dependability: INDOT knows when given an assignment, we will be there and perform.Quality: Our job is quality control. We take that serious to deliver projects that will endure.Flexibility: We are always open to adapt and adjust our staffing plan that adds the most value to INDOT. Availability: Our deep roster of construction professionals have immediate capacity to take on any assignment.Logistics: Our staff live throughout the District providing cost saving advantages to assign staff projects close to where they live.

CRAWFORDSVILLE DISTRICTON CALL CONSTRUCTION INSPECTION SERVICES / RFP 2009, ITEM 2

Dependability

Parsons’5 Keys to Success

Quality

Flexibility

Availability

Logistics

1

2

3

4

5

Sincerely,

Dave Ayala, PE, PTOEVice President, Parsons

Bob Fisher, PEProject Manager

Page 2: CRAWFORDSVILLE DISTRICT - pscs.indot.in.gov

INDOT CRAWFORDSVILLE DISTRICT

LegendP Parsons Transportation GroupH HansonC CECon

CONSTRUCTION DIRECTORDave Holtz, PE

PROJECT MANAGERBob Fisher, PE (P)

Bob Fisher, PE (P)Jacob Cunningham (P)Holliston Huhn, PE (P)

Kent Eaton (P)Jim Bauer (P)Andrew Piotrowski (H)Will Begley (H)

Scott Cotter (P)Rex Cronk (P)Lynn Fox (C)

Eric Fisher (P)Kurtis Plohr (P)Brad Vannoy (P)Zach Riley (P)

Chris Allen (P)Charles Rairdon (P)Jacob Lauteri (P)Gray Sasseville (C)Tim Edwards (C)

Chase Moore (C)Madison Gould (C)Thomas Padgett (H)Ryan Hickman (H)Randy Kertzman (H)

Dan Bridge, PEKirk Frederick, PE

Jay Ritter, PEErik Seef, PE

Brad Thompson, PE Don Thornton, PE

PROJECT ENGINEERS AND SUPERVISORS

INSPECTORS

CRAWFORDSVILLE DISTRICT AREA ENGINEERS

INDOT

DBEGOAL

We are proud that CECon will again be our trusted exclusive DBE partner. Their exclusive commitment to our team means real capacity that is not watered down by playing the field. We greatly appreciate their loyalty and dedicate 15% to them, tripling the 5% goal.

Parsons and our teammates are committed to the mission of the Indiana Transportation Team. Working together, INDOT, contractors, and consultants will keep Indiana the leader in building and maintaining a superior transportation system that is vital to the prosperity of our state.

Our Team is prequalified in

Construction Inspection13.1

CATEGORY

Parsons, CECon, and Hanson continue our exclusive teaming agreement to supply the INDOT Crawfordsville District with ample local capacity.

We commit the named staff shown in our organizational chart to provide On-Call Construction Inspection Services on any given assignment as directed by the Crawfordsville District. All members of this team will perform the duties described in the Scope of Services for Category 13.1 Construction Inspection.

THE PARSONS TEAM

DBE

70% Parsons Transportation Group, Inc. 15% Hanson15% CECon

EXCLUSIVE ESTABLISHED PARTNERSHIP +

RFP#: 2009 / Item #2 / Letter of Interest / Page 2

Page 3: CRAWFORDSVILLE DISTRICT - pscs.indot.in.gov

GREE

NCAS

TLE

TERR

E HA

UTE

COLF

AXLE

BANO

NW

. LEB

ANON

CLIN

TON

AVON

LOCAL PRESENCE

BUDGET-FRIENDLY OVERHEAD

EXPERIENCE LEVELS

16 of our 24 proposed staff live within the Crawfordsville District. We take pride in delivering projects near where we live. The added value and better service provided by our local presence is unmatched.

Parsons strives to control overhead costs. Lower Overhead translates to more hours in the field providing Construction Inspection Services and not to servicing unreasonably high overhead costs.

Matching the right level of experience to the assignment, combined with our district-wide coverage, provides INDOT with flexible staffing opportunities to add maximum value.

UNPARALLELED DISTRICT-WIDE COVERAGE

LIZT

ONBR

OWNS

BURG

INDI

ANAP

OLIS

Bob Fisher, PE PE/PM

Jacob Lauteri Engineer Intern/Inspector

Kent Eaton Project Supervisor

Rex Cronk Project Supervisor

Thomas Padgett Inspector

Ryan Hickman Inspector

Lynn Fox Project Supervisor

Scott Cotter Project Supervisor

Holliston Huhn, PE Project Engineer

Gray Sasseville Inspector

Jacob Cunningham Inspector

Kurthis Plohr Graduate Engineer/Inspector

Brad Vannoy Graduate Engineer/Inspector

Eric Fisher Inspector

Zach Riley Inspector

Andrew Piotrowski Project Supervisor

Will Begley Project Supervisor

Randy Kertzman Inspector

Madison Gould Graduate Engineer/Inspector

Tim Edwards Inspector

65

70

65

74

65

41

52

41

36

59

40

421231COLFAX

LIZTON

GREENCASTLE

BROWNSBURG

WEST LEBANON

TERRE HAUTE

VEEDERSBURG

LAFAYETTE

LEBANON

CLINTON

DANVILLEAVON

INDOT Crawfordsville District Office

Cities/Towns where staff are based out of

LAFA

YETT

E

DANV

ILLE

VEED

ERSB

URG

Chris Allen Graduate Engineer/Inspector

Jim Bauer Project Supervisor

Chase Moore Inspector

GREE

NWOO

D

Charles Rairdon Inspector

RFP#: 2009 / Item #2 / Letter of Interest / Page 3

Page 4: CRAWFORDSVILLE DISTRICT - pscs.indot.in.gov

STAFFING SOLUTIONS THAT ADD VALUE

Our local presence provides logistical advantages to the District. The result is direct cost savings that equate to more hours in the field inspecting work. As always, we will work with the District to optimize not only logistics, but also experience levels to staff given assignments with the right people at the right compensation levels. This provides more value and stretches the on-call capacity dollars further.

Flexibility and ResourcesEven through the challenging times of 2020, INDOT has remained focused and committed to constructing and maintaining a world class transportation system. Parsons is a committed partner to INDOT at all levels. We understand the need for construction inspection staff continues to increase and are ideally positioned in the Crawfordsville District to provide that staffing assistance.

As always, our Project Manager Bob Fisher will work with Crawfordsville Construction to best fit our staff to meet their needs and create the best value. As the table here, the district map, and our org chart show, we offer a full roster of experienced, local, and available staff to help the district deliver. professionals that live across the District.

CAPACITY AVAILABLE NOW

RFP#: 2009 / Item #2 / Letter of Interest / Page 4

NameYears Exp.

Project Engineer/Supervisor Inspector

Graduate Engineer

Certified Tech

Qualified Tech

Site Manager Starting Availability

Bob Fisher, PE 30 ● ● ● ● ● December 2020

Kent Eaton 27 ● ● ● ● ● December 2020

Jake Cunningham 28 ● ● ● ● ● December 2022

Scott Cotter 21 ● ● ● ● ● December 2021

Rex Cronk 1 42 ● ● ● ● ● May 2020

Eric Fisher 10 ● ● ● ● December 2020

Charles Rairdon 27 ● ● ● ● December 2020

Thomas Padgett 23 ● ● ● ● December 2022

Ryan Hickman 9 ● ● ● ● December 2020

Gray Sasseville 8 ● ● ● ● December 2022

Tim Edwards 29 ● ● ● ● December 2020

Madison Gould 1 ● ● ● ● ● December 2020

Holliston Huhn, PE 12 ● ● ● ● ● April 2021

Jacob Lauteri 2 1 ● ● ● ● June 2021

Brad Vannoy, PE 11 ● ● ● ● April 2021

Kurtis Plohr, PE 6 ● ● ● ● April 2021

Lynn Fox 28 ● ● ● ● ● June 2021

Jim Bauer 26 ● ● ● ● ● December 2022

Chris Allen 2 ● ● ● ● December 2020

Chase Moore 1 ● ● ● ● December 2020

Andrew Piotrowski 6 ● ● ● ● ● April 2021

Will Begley 4 ● ● ● ● ● April 2021

Randy Kertzman 27 ● ● ● ● April 2021

Zach Riley 2 ● ● ● ● April 2021

● – In-Process 1Commits to return from retirement if workload/assignments demand. 2Currently committed to join Parsons upon graduation.

Page 5: CRAWFORDSVILLE DISTRICT - pscs.indot.in.gov

Demonstrated LeadershipBob Fisher will serve as our Project Manger (PM) for this project. He is a proven PM/PE with a strong reputation as a top provider of construction inspection services. He is 100% committed to managing this on-call contract and ensuring your satisfaction with the performance of our duties. Bob is also available for assignment in the field as needed by INDOT.

Relevant Project Experience: Project Engineer. RS-40108 SR 32 Lebanon and B-41004 Thin Deck Overlays. Lebanon, IN

Bob assumed the role of Project Engineer for these concurrent jobs after an INDOT staffing adjustment. Parsons was already providing the inspection staff. B-41004 has completed already and RS-40108 will complete within the next two weeks.

Project Engineer. RS-41981. I-74 and US 421 Pavement Patching Project. Fountain, Vermillion, and Clinton Counties, IN.

This fast-paced, late season job is repairing pavement on I-74 and US 421 damaged by harsh winter weather. Bob and two inspectors are providing complete project administration and construction inspection.

Project Manager/Engineer. I-65 ATL Design-Build Construction Inspection Services, Tippecanoe County, IN. Bob led this $88 million design-build contract to add new third travel lanes, completely replace mainline pavement, and mainline bridge widening and deck replacements.

30 YEARS OF EXPERIENCEEDUCATIONBS, Civil Engineering, Purdue University

REGISTRATIONProfessional Engineer, IN

CERTIFICATIONS ▪ INDOT Project Engineer/Supervisor ▪ INDOT Qualified Technician ▪ INDOT Site Manager ▪ OSHA 10-hour Safety Training ▪ INDOT Certified Utility Coordinator ▪ Past INDOT Utility Coordination Instructor

ROBERT (BOB) FISHER, PE Project Manager/Engineer

Denotes project assignment through an on-call contract.

Our assignments consistently come in on time and under budget.

* Projected

Continued Cost Savings

We have shown in past proposals how we consistently underrun assignments which provides capacity for other assignments. This is true even on the smaller $500,000 On-Call Contract RFP 190403 that Parsons was selected for back in the Spring of 2019.

RFP Job Orig. Fee Used Fee Underrun

190403b

B-36694 $130,071 $90,000* $40,071*

RS-41981 $326,938 $224,282 $102,656

RS-41006 $99,638 2020 Assignments funded by above

underruns.B-41004 $35,500

PROACTIVE MANAGEMENT ADDS VALUE +Bob continues to employ the processes he has honed to manage the Construction Services we provide to INDOT:

▪ Continually monitoring budget ▪ Communicating with project staff to clearly understand

contractor schedules ▪ Working with INDOT to properly staff projects to most

effectively utilize budget ▪ Keeping Area Engineers apprised of budget and

schedule status ▪ Accurately closing out assignments, allowing INDOT to close

Purchase Orders to use excess capacity for other assignments ▪ Providing accurate and timely invoicing

Bob has successfully managed seven on-call contracts for the Crawfordsville District.

RFP#: 2009 / Item #2 / Letter of Interest / Page 5

Page 6: CRAWFORDSVILLE DISTRICT - pscs.indot.in.gov

KEY STAFF: LEADERSHIP THAT DELIVERS SUCCESS

Kent has been a Project Supervisor with Parsons for four years and has 27 total years of experience. He has successfully delivered multiple projects for the INDOT Crawfordsville District through Parsons' seven on-call contracts.

Scott Cotter has more than 21 years of construction experience working for INDOT and on the contracting side of the business. He has 20+ years of military service in the Army with multiple deployments to the Middle East. Scott is still active in the Army Reserves helping prepare troops for deployment around the world.

CERTIFICATIONS

▪ INDOT Certified Technician ▪ INDOT Qualified Technician ▪ INDOT Site Manager ▪ OSHA 10hr Safety Training

EDUCATION

▪ BS, Technology. American Military University

▪ MBA, Grantham University

CERTIFICATIONS

▪ INDOT Certified Technician ▪ INDOT Qualified Technician ▪ INDOT Site Manager

KENT EATONProject Supervisor

SCOTT COTTERProject Supervisor

Key Projects/Role

RS-41006. US 40 Resurface from Brazil to Reelsville. Clay and Putnam Counties. INDOT requested to have Kent assist on this late season resurfacing contract. The project is patching and resurfacing approx. 5 miles of US 40 from the East side of Brazil to near Reelsville. Kent is working on this job while concurrently completing the Final Construction Record for B-36694. This dual responsibility is a direct cost saving to INDOT.

B-36694 SR 46 Bridge Replacement and Overlay, Clay County. – The District requested to have Kent take over this project from the original Project Supervisor. He seamlessly took over in July 2019 with an Inspector from another firm working under him. This project is replacing a bridge on SR 46 over Killion Ditch east of SR 59 and overlaying another bridge on SR 46 to the west of SR 59.

R-30907 SR 75 Pavement Replacement and Utility Relocation, Advance, IN. – Kent led field inspection activities for this project through end of June 2019. During his time on this job, he shared his experience and knowledge of construction with younger inspection staff. Knowing this is how Kent approaches his job, gave INDOT the confidence to reassign Kent to B-36694 and still be assured the SR 75 project in Advance would continue to successful completion.

Key Projects/Role

B-39578 I-65 Bridge Removals and Overlays, Clinton and Tippecanoe Counties, IN. – Scott is the Project Supervisor for this $8 million project at three different locations. Near the SR 28 exit in Clinton County, NB and SB I-65 bridges over an abandoned rail line are being completely removed, filled in, and new mainline pavement placed. To the south of SR 28 bridges over Little Potato Creek are being overlaid with special Latex Modified Concrete that gains strength rapidly to reopen to traffic sooner. Lastly, bridges over Lauramie Creek in Tippecanoe County are receiving more extensive rehabilitation, including new approach slabs, conversion to semi integral end bents, removal of existing overlay, hydrodemo and deck patching, new latex modified overlay, and polymeric overlay. To accommodate traffic and phased construction, a temporary prefabricated bridge and roadway are being constructed in the median.

INDOT Greenfield District, ID/IQ Contracts. – Scott was a Project Manager for INDOT overseeing the ID/IQ contracts in Greenfield District. These contracts serve as a bridge between Maintenance and Construction. The contractors perform bridge and roadway work that is beyond the capacity of normal INDOT Maintenance forces and prolongs the service life of the assets until construction contracts are developed, bid, and executed for more robust rehabilitation or replacement is performed.

Denotes project assignment through an on-call contract.RFP#: 2009 / Item #2 / Letter of Interest / Page 6

Page 7: CRAWFORDSVILLE DISTRICT - pscs.indot.in.gov

KEY STAFF: LEADERSHIP THAT DELIVERS SUCCESS

Jake has 28 years of construction experience in Indiana. Since joining Parsons in 2014, he has worked on several projects in the Crawfordsville District.

Jim joined Parsons upon retiring from the INDOT Crawfordsville District after 26 years of service. Over his career, Jim has successfully delivered a wide variety of construction contracts throughout the District.

EDUCATIONAS, Civil Engineering Technology

CERTIFICATIONS

▪ INDOT Certified Technician ▪ INDOT Qualified Technician ▪ INDOT Site Manager ▪ OSHA 30hr Safety Training

CERTIFICATIONS

▪ INDOT Certified Technician ▪ INDOT Qualified Technician ▪ INDOT Site Manager

JACOB (JAKE) CUNNINGHAMProject Supervisor

JIM BAUERProject Supervisor

Key Projects/Role

B-39578 I-65 Bridge Removals and Overlays, Clinton and Tippecanoe Counties, IN. – Jake is the assistant PE/S for this project on I-65 to overlay bridges over Little Potato Creek, remove bridges over abandone railroad near SR 28 and rehabilitate bridges over Lauramie Creek.

RS-41981. I-74 and US 421 Pavement Patching Project. Fountain, Vermillion, and Clinton Counties, IN. – Jake is leading field inspection work on this fast-paced, late season job for repair of pavement on I-74 and US 421. The bulk of the work involves full-depth concrete patching that requires the inspection staff to perform multiple tests on subgrade treatment and concrete every day. Jake's attention to detail and commitment help ensure quality results.

B-37785 SR 55 Small Structures Replacements, Benton County, IN. – Jake is the Project Supervisor for the replacement of two existing small structures with new concrete box culverts on SR 55 north of Oxford, IN. To add value, Parsons utilized an inspector to provide most of the on-site duties during construction. This allowed Jake to help on other assignments while still administering this job. The work was completed on September 20, 2019 and SR 55 was reopened.

Key Projects/Role

RS-40109 SR 63 Resurface. Vermillion County, IN. – Jim is the project supervisor over this project for the patching and resurface of nearly 6 miles of SR 63 between Cayuga and SR 32. The project has reached substantial completion early and Jim is working on the Final Construction Record for early submittal to District Review.

R-40376 Small Structure Pipe Lining on US 41, SR 32, and SR 63 in Montgomery and Warren Counties., IN. – Jim was the Project Supervisor over this bundled project. Work included trenchless pipe installation, thermoplastic liner placement, application of centrifugally cast concrete, and cured-in-place liners to rehabilitate existing pipe culverts.

RS-41656 Institution and Park Road Maintenance at Shades State Park, IN. – Concurrent with R-40376, Jim served as the Project Supervisor over this job at Shades State Park in west central Indiana. Work included patching, milling and overlay of 0.8 miles of CR 800 S from SR 234 to the park entrance, Patching, milling and overlay of Main Park, Campground, and Pond Roads within the park.

Parsons was selected to provide Construction Inspection services on the I-65 Added Travel Lanes project from Lebanon to SR 47. Jake and Jim are commited to this project for construction years 2021 and 2022. However, if the District's needs change, Parsons remains flexible to meet any request from INDOT for staffing adjustments.

+

Denotes project assignment through an on-call contract.RFP#: 2009 / Item #2 / Letter of Interest / Page 7

Page 8: CRAWFORDSVILLE DISTRICT - pscs.indot.in.gov

INSPECTORS: QUALIFIED AND EXPERIENCED

Key Projects/Role

RS-41006 US 40 Resurface from Brazil to Reelsville, Clay and Putnam Counties, IN – Inspector for the patching and resurfacing of approximately 5 miles of US 40 east of Brazil.

RS-40108 SR 32 Resurface and Bridge Deck Overlay in Lebanon, IN. – Inspector for the patching and resurface of through Lebanon and overlay of bridge over I-65.

Key Projects/Role

B-41004. Thin Bridge Deck Overlays on SR 39, SR 32, and SR 267 in Boone and Hendricks Counties. IN. – Inspector for this project to rehabilitate and place polymeric overlays on six bridges. Worked closely with the contractor to complete this project early with zero quality issues.

R-37115 I-65 ATL CEI, Tippecanoe County, IN. – Inspector for 8.1 miles of added travel lanes along I-65 and 14 bridges.

Key Projects/Role

B-39578 I-65 Bridge Removals and Overlays, Clinton and Tippecanoe Counties, IN. – Gray is an Inspector for bridge removals and deck overlays on I-65.

RS-41981 I-74 and US 421 Pavement Patching Project. Fountain, Vermillion, and Clinton Counties, IN. – Gray is an Inspector on this fast-paced, late season job for repair of pavement on I-74 and US 421.

Key Projects/Role

RS-39327 US 40 Resurface, Bridge Deck Overlay, and Traffic Signal. Plainfield, IN. – Inspector on this project to improve US 40 through Plainfield.

B-37785 SR 55 Small Structures Replacements, Benton County, IN.– Inspector for replacement of two small structures with concrete box culverts on SR 55 north of Oxford, IN.

Key Projects/Role

RS-39327 US 40 Resurface, Bridge Deck Overlay, and Traffic Signal. Plainfield, IN. – Inspector on this project to improve US 40 through Plainfield.

RS-38655 I-74, Boone/Hendricks/Montgomery County, IN. – Inspector for 13.1 miles of interstate HMA overlay with eight bridge deck overlays.

Key Projects/Role

RS-39259 US 40 Resurface from SR 75 to US 231 in Putnam County. IN. – Inspector for the patching and resurface of this section of US 40 and reconstruction of intersection at US 231.

RS-41978 I-70 Pavement Patch and Rehab. Clay and Vigo Counties, IN. – Inspector on this project to patch and rehab over 16 miles of pavement on I-70 near Terre Haute.

CHRIS ALLENGraduate Engineer/Inspector

THOMAS PADGETTInspector

GRAY SASSEVILLEInspector

CHARLES RAIRDONInspector

RYAN HICKMANInspector

TIM EDWARDSInspector

CERTIFICATIONS

▪ Graduate Engineer ▪ INDOT Qualified Technician ▪ INDOT Site Manager

CERTIFICATIONS

▪ INDOT Certified Technician ▪ INDOT Qualified Technician ▪ INDOT Site Manager ▪ OSHA 30hr Safety Training

CERTIFICATIONS

▪ INDOT Certified Technician ▪ INDOT Qualified Technician ▪ INDOT Site Manager

CERTIFICATIONS

▪ INDOT Certified Technician ▪ INDOT Qualified Technician ▪ INDOT Site Manager

CERTIFICATIONS

▪ INDOT Certified Technician ▪ INDOT Qualified Technician ▪ INDOT Site Manager ▪ OSHA 30hr Safety Training

CERTIFICATIONS

▪ INDOT Certified Technician ▪ INDOT Qualified Technician ▪ INDOT Site Manager

Denotes project assignment through an on-call contract.RFP#: 2009 / Item #2 / Letter of Interest / Page 8

Page 9: CRAWFORDSVILLE DISTRICT - pscs.indot.in.gov

PROVEN CONSTRUCTION INSPECTION EXPERIENCE

Description

▪ 12 miles of full-depth concrete patching on I-74 from MM 4 to MM 16.

▪ Nearly 300 tons of HMA patching on US 421 in Frankfort, IN.

Assignment Highlights

▪ Construction started in mid-August 2019 with INDOT oversight.

▪ Parsons assumed control of the project after Labor Day.

▪ Fast-paced, high production rate job completed in November 2019.

Description

▪ RS-40108 Patching and Resurface of SR 32 through Lebanon and thin deck overlay of SR 32 bridge over I-65.

▪ B-41004 Bridge Thin Deck Overlays of 6 bridges in Lebanon area.

Assignment Highlights

▪ Parsons eliminated field office that was far from the jobs. Saved that cost and unnecessary travel costs.

▪ Worked closely with contractors on both jobs to resolve issues, manage changes, and control costs.

Description

▪ Removal of NB and SB I-65 bridges over an abandoned rail line just north of SR 28.

▪ Overlay of NB and SB I-65 over Little Potato Creek using Latex Modified Concrete-VE.

▪ Rehabilitation work on I-65 bridges over Lauramie Creek, including new approach slabs, conversion to semi integral end bents, removal of existing overlay, hydrodemo and deck patching, new latex modified overlay, and polymeric overlay.

Assignment Highlights

▪ Close coordination with contractor due to complex maintenance of traffic on I-65.

▪ Worked with INDOT, designer, and contractor to implement use of movable barrier for overlay work at Little Potato Creek to increase safety for work force and traveling public.

▪ Worked through change to add piling for temporary bridge in median at Lauramie Creek. Drove the complex shop drawing review process and cost analysis to move the project forward.

Fountain, Vermillion, and Clinton Counties, IN On-Call Contract: RFP 190403bConstruction Amount: $8,381,348Key Staff: Bob Fisher, Jake Cunningham, Gray Sasseville

Lebanon, IN areaOn-Call Contract: RFP 190903e/190403bConstruction Amount: $2,250,00/$ 1,000,000Key Staff: Bob Fisher, Thomas Padgett, Eric Fisher

Clinton and Tippecanoe Counties, IN On-Call Contract: RFPs 171104c, 180901dConstruction Amount: $8,047,228Key Staff: Scott Cotter, Jake Cunningham, Gray Sasseville, Charles Rairdon, Brad Vannoy

RS-41981. I-74 and US 421 Pavement Patching Project

RS-40108 SR 32 Resurface/B-41004 SR 39, SR 32, SR 267 Bridge Thin Deck Overlays

B-39578 I-65 Bridge Removals and Overlays

COMPLETED ASSIGNMENT JUST OVER $100,000 UNDER BUDGET.

+

RFP#: 2009 / Item #2 / Letter of Interest / Page 9

Page 10: CRAWFORDSVILLE DISTRICT - pscs.indot.in.gov

PROVEN CONSTRUCTION INSPECTION EXPERIENCE

Description

▪ This project was the replacement of two existing small structures with new concrete box culverts on SR 55 north of Oxford, IN.

▪ Built under closure, the contractor was required to replace one structure at a time in order to maintain access to property between the structures. They elected to compress the schedule and do one after the other and not utilize the allowable 40 days of closure for each box. The work completed on September 20, 2019 and SR 55 was reopened.

Assignment Highlights

▪ Parsons eliminated the field office, providing direct contract savings.

▪ Parsons utilized an Inspector to provide the daily on-site observation, documentation, and materials testing to save costs. Project Supervisor Jake Cunningham was able to help on other projects while still administering this contract.

Assignment Highlights

▪ RS-39327. US 40 through Plainfield. Providing two Inspectors to INDOT PES Al Naderi, now through the end of November 2020.

▪ RS-40108. SR 32 through Lebanon. Project will complete by end of September. FCR turn in by end of October 2020.

▪ RS-39259. US 40 from US 231 to SR 75 and on US 231 South Approach to US 40. Currently providing two inspectors to INDOT PES Jeff Stanley. Anticipate completion by end of October 2020.

▪ RS-40109. SR 63 from SR 234 to SR 32. Project has substantially completed. Final Acceptance anticipated by end of September. PES Jim Bauer working on Final Construction record.

▪ B-41004. SR 39, 32, 267 Thin Deck Overlays in Hendricks County. Project completed very early due to good cooperation between Parsons staff and contractor. Final Construction record will be submitted early before due date in mid-October 2020.

▪ RS-41006. US 40 Resurface from Brazil to Reelsville. Parsons PES Kent Eaton performing double duty inspecting this late season project while finishing FCR for B-36694 with help of 1 Parsons Inspector. Completion anticipated end of October and FCR submittal be end of November 2020.

▪ B-40873. US-150 Boardwalk Trail. Terre Haute, IN. INDOT asked us to provide an Inspector to work for PE Ben Leege using capacity provided by underrun assignments on our oldest active On-Call RFP 171104c. This assignment was originally was to start in June. Due to utility relocation delays and Cost Reduction Incentive redesign, the start has delayed until now, late September. We are still answering the call and providing CECon Inspector Lynn Fox.

Description

▪ This project is replacing a bridge on SR 46 over Killion Ditch east of SR 59 and overlaying another bridge on SR 46 to the west of SR 59.

Assignment Highlights

▪ Kent Eaton replaced INDOT Project Supervisor on July 1, 2019.

▪ Inspector from another consultant working under Kent's supervision.

▪ Kent closed the field office at end of August to move to R-41006 on US 40 east of Brazil. He will help deliver that late season resurface job while finishing the Final Construction Record for the bridge job on time. This results in direct savings to INDOT.

Benton County, IN On-Call Contract: RFP 141004eConstruction Amount: $378,700Key Staff: Jake Cunningham, Charles Rairdon

Clay County, IN On-Call Contract: RFP 180901d, 190403bConstruction Amount: $4,810,983Key Staff: Kent Eaton

B-37785 SR 55 Small Structures Replacements

Current On-Call Assignments

B-36694 SR 46 Bridge Replacement and Overlay

RFP#: 2009 / Item #2 / Letter of Interest / Page 10

Page 11: CRAWFORDSVILLE DISTRICT - pscs.indot.in.gov

Project UnderstandingOn-call construction inspection contracts continue to be INDOT's preference for supplementing their in-house staff to fully staff and successfully deliver projects. Parsons proven approach has been developed from our strong understanding of INDOT's use and expectations for On-Call Construction Inspection services.

Since March of this year, our world has experience unprecedented challenges with the COVID-19 pandemic. Indiana has responded well on all fronts to protect its citizens and keep our economy on track. INDOT's mission was deemed essential from the onset, which shows the commitment Indiana has to continuing the construction, upkeep and operation of a world-class transportation system.

We believe that what we do is vitally important as we are the quality control for the construction of Indiana's transportation system. Our experience and attention to even the smallest detail help deliver successful quality projects that will last. We apply a firm but fair approach with the contractors we are charged with overseeing to ensure their conformance with the contract documents.

INDOT On-Call UnderstandingThrough our successful delivery of six on-call contracts with the Crawfordsville District, we have developed a full understanding of the needs for Construction Inspection Services and the expectations for delivering them. Our high standard of service is what makes us valuable to the District. We approach every assignment in the same way and have earned your trust as a top provider.

PARSONS’ PROVEN APPROACH +

DELIVERING COST-EFFECTIVE SERVICESParsons continues its commitment to providing high quality and cost effective construction inspection services. Our low overhead and budget management result in direct cost savings that returns capacity to the District. This capacity has been used for late season projects, adding us to ongoing jobs that need more staff, and even to prepare Final Construction Records on contracts we may not have even worked on.

RFP 190903E. $1 MILLION ON-CALL

Contract Fee Used Fee Savings

RS-39327 $240,850 $230,000 $10,850

RS-40108 $129,260 $125,000 $4,260

RS-39259 $278,350 $110,000 $168,350

RS-40109 $245,850 $175,000 $70,850

B-41004 $130,100 $ 125,000 $ 5,100

Cost Savings on the Way

TEAM IN ACTION: BEST PRACTICESSafety is a core value of Parsons and its teaming partners. OWN ZERO is a culture-based

approach to reduce exposure and to employ safety-driven behaviors and beliefs. Our Indiana construction inspection services team has not had any lost time accidents while working on any INDOT assignments.

PROJECT APPROACH AND UNDERSTANDING

Notes:

RS-40108 supplemented by $35.5k to the fee shown through capacity remaining on RFP 190403b.

Projected used fee and savings are based on current staffing levels and anticipated completion dates. Changes could occur on these assignments that will impact final savings.

RFP#: 2009 / Item #2 / Letter of Interest / Page 11

Page 12: CRAWFORDSVILLE DISTRICT - pscs.indot.in.gov

1 DEPENDABILITY

The Crawfordsville District knows from experience that Parsons will answer the call on every assignment and be there every day to deliver our services. Our commitment and dedication is proven by our record of delivering quality jobs on time and under budget.

2 QUALITY

Our services directly impact the quality of the projects we work on and we take that seriously. There is not much we have not seen with our teams experience. We understand the importance of adherance to the plans and specifications and how to work cooperatively with the contract to deliver a quality job.

Dependability

Parsons’5 Keys to Success

Quality

Flexibility

Availability

Logistics

1

2

3

4

5

ADAPTING TO DELIVER

In the Spring of 2020, the Parsons team was supplying inspection staff on RS-40108 and B-41004 for an INDOT PE/S who resigned mid-June. The Area Engineer asked Bob Fisher to assume the role of PE/S on both. Bob took over the administrative duties and Inspectors Eric Fisher and Thomas Padgett tag-teamed the inspection of work on both jobs. This team effort and willingness to adapt made the transition seamless and have delivered quality projects for INDOT.

Parsons' proven approach to delivering on-call construction inspection services has been developed and honed through five contracts with the Crawfordsville District. RFPs 131004b, 141004e, 171104c, 180901d, 190403b, 190903e, and 200407e.

Our 5 Part Approach is proven to deliver highly cost-effective, quality construction inspection services.

+

3 FLEXIBILITY

Highway construction is a dynamic business. Countless factors can require changes to the best laid plans. Parsons is ultimately flexible to adapt and respond as the District needs to deliver successful projects at the best value possible.

4 AVAILABILITY

As shown in the table on Page 4, we have a variety of staff with availability at the end of this construction season. We also continue to look for and hire quality construction professionals that can provide the District with additional staffing options.

5 LOGISTICS

The required map on Page 3 shows how our staff has unmatched district-wide coverage. We feel this has been a difference maker for us by being able to staff projects anywhere in the District. This gives you more options and creates true costs savings on travel and provides better service being close to our jobs.

RFP#: 2009 / Item #2 / Letter of Interest / Page 12