Creating Process Chains for DSO.doc

Embed Size (px)

Citation preview

  • 7/28/2019 Creating Process Chains for DSO.doc

    1/7

    Creating Process Chains for DSO

    A process chain is a sequence ofprocesses that are scheduled to wait in the background for anevent. Some of these processes trigger a separate event that can, in turn, start other processes.It looks similar to a flow chart. You define the list of Infopackages / DTPs that is needed to loadthe data, say delta or Full load. Then you schedule the Process chain as hourly, daily, monthly,etc, depending on the requirement

    Use: If you want to automatically load and schedule a hierarchy, you can include this as an

    application process in the procedure for a Process Chain

    Note: Before you define process chains, you need to have the Objects ready i.e DSO, Cubes etc

    Steps to Create Process Chains

    Step 1: Go to RSPC transaction. Click on Create. Give Process chain name and Description.

    Step 2: Give the Start process name and description and click on Enter

    Note: Each process chain should start with a Start Process

    Step 3: The next screen will show the Scheduling options.

    There are two options:

    1

    http://help.sap.com/saphelp_nw04s/helpdata/en/7b/d4313b38bea774e10000000a114084/content.htmhttp://help.sap.com/saphelp_nw04s/helpdata/en/7b/d4313b38bea774e10000000a114084/content.htm
  • 7/28/2019 Creating Process Chains for DSO.doc

    2/7

    1. Direct Scheduling:2. Start Using Meta Chain or API

    In my example I have chosen Direct Scheduling as I am processing only one chain i.e DSO. Clickon Change Selections

    In the below screen shot, you can give the scheduling details i.e the Immediate, Date& time etc.

    and click on SAVE

    The Screen shot below indicates that we have started the process.

    2

  • 7/28/2019 Creating Process Chains for DSO.doc

    3/7

    Step 4:

    1. Click on the icon process types as shown in the below figure. You will get a list of options.2. In my example I am scheduling for DSO. To process we need to have InfoPackage,

    DTPs for the corresponding DSO3. Open the tree Load Process and Post Processing, We need to drag and drop

    Execute InfoPackage

    Step 5: Once you drag and drop the Execute infopackage we get the below Popup. We needto keyin the Infopackage name. To do this click on F4 and chose your Infopackage and click onENTER

    3

  • 7/28/2019 Creating Process Chains for DSO.doc

    4/7

    Step 5: Once you drag & drop the InfoPackage, the corresponding DTPs and the correspondingActive Data table are automatically called.

    Step 6: Save + Activate and Execute the Process.

    Step 7: Once the process is completed, we can see the whole chain converted to Green, Whichindicates the process is successfully completed

    Note: Incase of errors in any step, the particular chain will be displayed in red

    4

  • 7/28/2019 Creating Process Chains for DSO.doc

    5/7

    Step 8: We can see if the data is successfully updated by Right-click on the Datastore Data

    Step 9: On selecting Administer Data Target, will lead you to InfoProvider Administration.

    5

  • 7/28/2019 Creating Process Chains for DSO.doc

    6/7

    Step 10: Click on Active Data tab to see the data successfully uploaded.

    6

  • 7/28/2019 Creating Process Chains for DSO.doc

    7/7

    Note:

    1. Similarly the process can be done for Cubes, Master data and Transactional data2. When you create Process chains, by default they are stored in Not Assigned. If you

    want to create your own folders,

    a) Click on the icon Display Components on your toolbar => choose F4 => Create

    b. Give appropriate name for the folder => Enter

    c. SAVE + ACTIVATE

    7