Creating Shifts and Shift Times_SPD

Embed Size (px)

Citation preview

  • 8/14/2019 Creating Shifts and Shift Times_SPD

    1/20

    System Process DocumentCreating Shifts and Shift Times

    Department

    Responsibility/Role

    File Name 27761403.docRevision

    Document Generation Date 18/01/2010 09:36:00

    Date Modified 1/18/2010 09:36:00 AM

    Last Changed by

    Status

    Creating Shifts and Shift Times

    Trigger:

    Concept

    The Shifts Times page enables you to enter the start and stop times for each shift. You can also

    create multiple start and stop times, but the start and stop times for a shift cannot overlap.

    If you create a shift without first creating a workday pattern, a default workday pattern of 5

    working days and 2 days off is created. You can later update that workday pattern.

    In this topic, you will create shifts and shift times.

    Required Field(s) Comments

    Output - Result(s) Comments

    Additional Information

    Last changed on: 1/18/2010 09:36:00 AM Page 1

  • 8/14/2019 Creating Shifts and Shift Times_SPD

    2/20

    System Process DocumentCreating Shifts and Shift Times

    Procedure

    Step Action

    1. Begin by navigating to the Workday Calendar page.

    Click the vertical scrollbar.

    Page 2 Last changed on: 1/18/2010 09:36:00 AM

  • 8/14/2019 Creating Shifts and Shift Times_SPD

    3/20

    System Process DocumentCreating Shifts and Shift Times

    Step Action

    2. Click the Manufacturing and Distribution Manager link.

    Last changed on: 1/18/2010 09:36:00 AM Page 3

  • 8/14/2019 Creating Shifts and Shift Times_SPD

    4/20

    System Process DocumentCreating Shifts and Shift Times

    Step Action

    3. Click the vertical scrollbar.

    Step Action

    4. Click the Calendars link.

    Page 4 Last changed on: 1/18/2010 09:36:00 AM

  • 8/14/2019 Creating Shifts and Shift Times_SPD

    5/20

    System Process DocumentCreating Shifts and Shift Times

    Step Action

    5. Use the Workday Calendar page to create a workday calendar, assign workday

    exceptions to a workday calendar or calendar shift.

    Last changed on: 1/18/2010 09:36:00 AM Page 5

  • 8/14/2019 Creating Shifts and Shift Times_SPD

    6/20

    System Process DocumentCreating Shifts and Shift Times

    Step Action

    6. Click in the Name field.

    Step Action

    7. Press [F11].

    Page 6 Last changed on: 1/18/2010 09:36:00 AM

  • 8/14/2019 Creating Shifts and Shift Times_SPD

    7/20

    System Process DocumentCreating Shifts and Shift Times

    Step Action

    8. Enter the desired information into the Name field. Enter "Greg_Cal".

    Last changed on: 1/18/2010 09:36:00 AM Page 7

  • 8/14/2019 Creating Shifts and Shift Times_SPD

    8/20

    System Process DocumentCreating Shifts and Shift Times

    Step Action

    9. Press [Ctrl+F11].

    Step Action

    10. Click the Shifts button.

    orPress [Alt+S].

    Page 8 Last changed on: 1/18/2010 09:36:00 AM

  • 8/14/2019 Creating Shifts and Shift Times_SPD

    9/20

    System Process DocumentCreating Shifts and Shift Times

    Step Action

    11. Use the Shifts page to create shift times for the shift number 1.

    Last changed on: 1/18/2010 09:36:00 AM Page 9

  • 8/14/2019 Creating Shifts and Shift Times_SPD

    10/20

    System Process DocumentCreating Shifts and Shift Times

    Step Action

    12. Click the Times button.

    Step Action

    13. Use the Times page to enter multiple start and stop times. But the start and stoptimes for a shift cannot overlap.

    If you create a shift without first creating a workday pattern, a default workday

    pattern of 5 days on and 2 days off is created. You can then update that workday

    pattern.

    Page 10 Last changed on: 1/18/2010 09:36:00 AM

  • 8/14/2019 Creating Shifts and Shift Times_SPD

    11/20

    System Process DocumentCreating Shifts and Shift Times

    Step Action

    14. Click in the Start field.

    Last changed on: 1/18/2010 09:36:00 AM Page 11

  • 8/14/2019 Creating Shifts and Shift Times_SPD

    12/20

    System Process DocumentCreating Shifts and Shift Times

    Step Action

    15. Enter the desired information into the Start field. Enter "04:00:00".

    Step Action

    16. Click in the Stop field.

    Page 12 Last changed on: 1/18/2010 09:36:00 AM

  • 8/14/2019 Creating Shifts and Shift Times_SPD

    13/20

    System Process DocumentCreating Shifts and Shift Times

    Step Action

    17. Enter the desired information into the Stop field. Enter "12:00:00".

    Last changed on: 1/18/2010 09:36:00 AM Page 13

  • 8/14/2019 Creating Shifts and Shift Times_SPD

    14/20

    System Process DocumentCreating Shifts and Shift Times

    Step Action

    18. Click in the Start field.

    Step Action

    19. Enter the desired information into the Start field. Enter "12:30:00".

    Page 14 Last changed on: 1/18/2010 09:36:00 AM

  • 8/14/2019 Creating Shifts and Shift Times_SPD

    15/20

    System Process DocumentCreating Shifts and Shift Times

    Step Action

    20. Click in the Stop field.

    Last changed on: 1/18/2010 09:36:00 AM Page 15

  • 8/14/2019 Creating Shifts and Shift Times_SPD

    16/20

    System Process DocumentCreating Shifts and Shift Times

    Step Action

    21. Enter the desired information into the Stop field. Enter "20:30:00".

    Step Action

    22. Click in the Start field.

    Page 16 Last changed on: 1/18/2010 09:36:00 AM

  • 8/14/2019 Creating Shifts and Shift Times_SPD

    17/20

    System Process DocumentCreating Shifts and Shift Times

    Step Action

    23. Enter the desired information into the Start field. Enter "21:00:00".

    Last changed on: 1/18/2010 09:36:00 AM Page 17

  • 8/14/2019 Creating Shifts and Shift Times_SPD

    18/20

    System Process DocumentCreating Shifts and Shift Times

    Step Action

    24. Click in the Stop field.

    Step Action

    25. Enter the desired information into the Stop field. Enter "03:45:00".

    Page 18 Last changed on: 1/18/2010 09:36:00 AM

  • 8/14/2019 Creating Shifts and Shift Times_SPD

    19/20

    System Process DocumentCreating Shifts and Shift Times

    Step Action

    26. Click the Save button.

    Last changed on: 1/18/2010 09:36:00 AM Page 19

  • 8/14/2019 Creating Shifts and Shift Times_SPD

    20/20

    System Process DocumentCreating Shifts and Shift Times

    Step Action

    27. You have completed the Creating Shifts and Shift Times procedure.

    End of Procedure.

    Page 20 Last changed on: 1/18/2010 09:36:00 AM