CRENSHAW/LAX TRANSIT CORRIDOR PROJECT FEIS/FEIR
Executive SummaryCONSIDERATION OF ALTERNATIVES
Page ES-16
miles.MOS-Centurywouldextendfrom
theMetroExpositionLinetotheAviation/
CenturyStation,atadistanceof7.4miles,
andwouldincludeDesignOption6.
MOS-Centurywouldalsorequireabus
feederconnectiontotheMetroGreen
Lineatthesouthernend.Ifconstructed,
eitherMOSwouldbeconsistentwith
theestablishedfinancialplanforthe
Crenshaw/LAXTransitCorridorProject.
Asstatedpreviously,thePartially-
CoveredLAXTrenchOptionhasbeen
incorporatedintotheprojectdefinition
asaninterimsolutiontothefullycovered
condition.ThePartially-CoveredTrench
configurationwouldallowaconcrete
capover1,000feetofthebelowgrade
trackwithtwo500-footcoveredsections.
Twootherdesignoptionsthatmaybe
incorporatedintotheprojectdefinition
(basedonpotentialforcostsavingsand
reductioninenvironmentalimpactsin
onecase,andbaseduponBoardaction
intheother).Theseoptionswillfurther
beexploredthroughthepreliminary
engineeringphaseandduringthe
procurementofdesignbuildcontracts.
Alternate Southwest Portal at Crenshaw/
King Station Option.Thisoptioninvolves
analternateportalatthesouthwest
corneroftheCrenshawBoulevard/Martin
LutherKingJr.Boulevardintersection.
Duringthepreliminaryengineering
phaseoftheproject,Metrodetermined
thataprovidingconnectioninfrontof
theBroadwaybuilding(Walmart)could
provideincreasedaccesstotheregional
mall.Inaddition,potentialcostsavings
andfewerdisplacementscouldbe
achievedthroughlesspropertyacquisition
(Theportalwouldbelocatedwithinthe
existinglandscapedsidewalkadjacentto
theBroadwaybuildingandwouldprovide
verticalcirculationtotheunderground
Crenshaw/KingStation).Theportal
couldalsobelocatedinthebasementof
theBroadwaybuildingtoprovideadirect
connectiontotheBaldwinHillsCrenshaw
Plaza.Thisalternateportalisnotincluded
withinthecurrentprojectfinancial
planandwouldonlybeimplemented
ifthelandwereprivatelyfundedorif
easementstoprivately-ownedlandare
granted.Thisstationislocatedatthemost
heavilydevelopedareaoftheentireline
withamajorshoppingcenternearthe
site.Whilethisdesignoptionisnotyet
incorporatedintotheprojectdefinition,
negotiationswiththemallownersmay
yieldsavingswhichallowittobeadopted
aspartoftheprojectdefinition.
Below-Grade Crenshaw/Vernon Optional
Station. SincetheadoptionoftheLPA,
theMetroBoard,atitsMay2011meeting,
directedthebelow-gradeCrenshaw/
VernonStationtobeconsideredasan
optionwithintheprocurementofdesign-
buildcontracts.Whilethisactiondidnot
incorporatetheoptionalstationintothe
projectdefinition,itplacedanemphasis
oncarryingthedesignforwardforthe
design-buildprocurementprocess.Itmay
beimplementedifbidsfortheproject
What is the Harbor Subdivision? The Harbor Subdivision is a freight rail corridor, approximately 26 miles in length, that traverses southwest Los Angeles County from Vernon to Wilmington. In the early 1990s, Metro purchased the portion of the corridor between Redondo Junction and Watson Yard, along with several other rail rights-of-way, to further the development of the region’s rapid transit system. Metro has initiated an Alternatives Analysis Study (AA) for the Harbor Subdivision Transit Corridor. The study will examine potential transit service along the Metro-owned Harbor Subdivision.
Below-grade trench alignment along Aviation Boulevard, adjacent to LAX south runways.
CRENSHAW/LAX TRANSIT CORRIDOR PROJECT FEIS/FEIR
Executive SummaryPROJECT ALIGNMENT
Page ES-17
includingthisdesignoptionfallwithinthe
projectfundingamount.
Project Alignment
Thesouthernterminusofthealignment
wouldbeginattheexistingMetroGreen
LineAviationStationwhichisinanaerial
configuration,andtransitionnortherly
toabelow-gradetrenchconfiguration,
southof111thStreet,asitpassesadjacent
totheLAXsouthrunways.Thebaseline
configurationoftheprojectnearLAX
Runway25Land25Rendsisacut-
and-covertrenchthatiscoveredwitha
reinforcedconcreteroof.Thisisbased
oncommentsreceivedfromtheFederal
AviationAdministration(FAA)andLos
AngelesWorldAirports(LAWA)onthe
DEIS/DEIR.Thereisalsoaninterim
optionforadepressedpartially-covered
trench.Afterclearingthesouthrunways
northof104thStreet,thealignmentwould
transitiontoanaerialconfigurationacross
CenturyBoulevard.
AtCenturyBoulevard,theLRT
alignmentwouldbelocatedonanew
bridgeconstructedwestof,andadjacent
to,theexistingrailroadbridge.The
alignmentwouldtransitiontoanat-grade
configurationnorthoftheWallyPark
structureandoperateat-gradeacross
ArborVitaeStreetandwouldtransition
toanaerialstructureacrossManchester
Avenue.Thealignmentwouldtransition
backtogradelevelforat-gradecrossings
atIsisandHindryAvenues.TheLRT
alignmentwouldtransitiontoanaerial
configurationacrossLaCienegaBoulevard
andtheI-405andwouldreturntograde
beforeOakStreet.
Thealignmentwouldcontinueatgrade
totheeastwithat-gradecrossingsat
OakStreet,CedarStreet,IvyStreet,
andEucalyptusAvenue.Thealignment
woulddescendtoabelow-gradetrench
configurationunderLaBreaAvenuewith
anopencutstationtotheeastofLaBrea
Avenue.Thealignmentwouldtransition
backtogradeeastofLaBreaAvenue
untilVictoriaAvenue.At-gradecrossings
wouldoccuratCentinelaAvenue,West
BoulevardandBrynhurstAvenueandan
at-gradestationwouldbelocatedtothe
westofWestBoulevard.
WestofVictoriaAvenue,thealignment
wouldtransitiontoabelow-grade
tunnelandcontinuealongtheHarbor
SubdivisionuntilCrenshawBoulevard
whereitwouldcontinuenorthunder
CrenshawBoulevarduntilnorthof59th
Placewhereitwouldtransitiontograde
levelinthroughaportalinthemiddle
oftheCrenshawBoulevardmedian.
Thealignmentisrequiredtobebelow
gradeunderthissegmentofCrenshaw
Boulevardbecausethestreetright-of-
waywidthis100feet,whichwouldbe
insufficienttoaccommodateanat-grade
Aerial structure across Manchester Avenue.
Existing view of the Aviation Boulevard/Manchester Avenue intersection.
Rendering of aerial structure over I-405.
Existing view of Florence Avenue crossing at I-405.
CRENSHAW/LAX TRANSIT CORRIDOR PROJECT FEIS/FEIR
Executive SummaryPROJECT ALIGNMENT
Page ES-18
ofCrenshawBoulevard.Thealignment
wouldbebelowgradefortheremainder
ofthealignmenteithertotheterminus
associatedwithanMOSatKingorat
ExpositionBoulevard(theterminusfor
theLPA),withtheincorporationofDesign
Option6.Thebelow-gradealignment
couldbebuiltaseitheraboredorcutand
covertunnel.Thechoiceoftunneling
methodologywillbebasedonananalysis
ofthelengthanddepthofthetunnel
section.Below-gradestationswould
belocatedinthemedianofCrenshaw
BoulevardatKingandExposition
Boulevardswithportalentrances
onpropertiesadjacenttoCrenshaw
Boulevard.
LRTwithoutreducingroadwaylane
capacity.
Thealignmentwouldtravelatgradein
anewmedianofCrenshawBoulevard
southof59thStreetto48thStreet.The
frontageroadsalongCrenshawBoulevard
wouldbeeliminatedwherethealignment
isoperatingatgrade.Therewouldbe
anat-gradestationinthemedianof
CrenshawBoulevard,southofSlauson
Avenue.Thealignmentwouldtransition
toabelow-gradeconfigurationnorthof
48thStreetthroughaportalinthemedian
What is an Overhead Contact System? A distinctive feature of LRT is that the vehicles draw power from overhead wires, known as the overhead contact system (OCS). This allows LRT systems to be integrated with other at-grade transportation modes, such as automobiles and pedestrians.
Cross-sectional view of Crenshaw Boulevard between 54th and 57th Streets
Cross-sectional view of the Harbor Subdivision near Edward Vincent Jr. Park.
CRENSHAW/LAX TRANSIT CORRIDOR PROJECT FEIS/FEIR
Executive SummaryPROJECT ALIGNMENT
Page ES-19
MOS-Centurywouldfollowthesame
alignmentdescribedabove,butbeginning
attheCrenshaw/ExpositionStationwith
theincorporationofDesignOption6and
terminatingattheCenturyStation.
Stations and Station Parking.TheLPA
wouldincludesixstationsforpassenger
accessandthreepark-and-ridefacilities.
Thelocationandsizeofthepark-and-ride
facilitieswasrefinedduringtheadvanced
conceptualengineeringprocess.Together,
thesefacilitieswouldsatisfythetransit
corridor’sparkingdemands.
Fortransitpassengers’convenience
andtocontrolcapital,operating,and
maintenancecosts,theproposedstations,
includingsignage,maps,fixtures,
furnishings,lighting,andcommunication
Vertical Profile of the LPA Alignment.
LRVs would be equivalent to those Metro operates on the existing Metro Blue, Green and Gold Lines. Each vehicle would be equipped for independent two-way operation, with a driver’s cab at each end and would have equal performance in either direction.
equipment,wouldhaveaconsistent
designsimilartotheexistingMetroLRT
stations.LRTStationtypeswouldbe
eitherat-grade,aerial,orbelowgrade,and
CRENSHAW/LAX TRANSIT CORRIDOR PROJECT FEIS/FEIR
Executive SummarySUPPORTING FACILITIES
Page ES-20
arecomprisedof270feetlongplatforms
thataccommodateLRTtrainswithupto
threecars.Theprojectincludestwoat-
gradestations,oneundergroundstation,
onetrenchstation,andoneaboveground
(aerial)station.
• Aviation/Century(aerial)
• Florence/LaBrea(atgrade)
• Florence/West(atgrade)
• Crenshaw/Slauson(atgrade)
• Crenshaw/King(underground)
• Crenshaw/Exposition(underground
withDesignOption6)
Allplatformswouldbefullyaccessible
andcomplywiththeAmericanswith
DisabilitiesAct(ADA).Outdoorplatforms
wouldbewell-lightedandinclude
amenities,suchascanopiesthatcover
aminimum30percentoftheplatform
area,seating,bikelockers,bikeracks,
trashreceptacles,andartwork.TheLRT
stationswouldalsoincludesignage,safety,
andsecurityequipmentwhichwould
providereal-timeinformation.
Supporting LRT Facilities.TheLPA
constructionwouldincludeinstalling
trackwork,anoverheadcontactsystem
(OCS)distributingelectricitytolightrail
vehicles(LRVs),tractionpowersubstations
(TPSS)locatedaboutonemileapart,
signalingandcommunicationsystems,
andavehiclemaintenanceandoperations
facilitywhichwouldoperate24hoursa
day,sevendaysaweek.
Systems:TheLRTfixedguidewaywould
consistofcontinuouslyweldedrails.The
railswouldbeembeddedinaconcrete
slaborinstalledoncrosstiesandballasts.
TheLRTOCSwouldconsistofsteel
polesinstalledalongtheoperatingright-
of-waytosupporttheelectricalpower
line.Thepoleswouldbeapproximately
25-feettallandwouldbeinstalledat90
to170feetintervals.Thepoleswould
generallybelocatedinthecenterofthe
right-of-way,betweenthetwotracks,
whereverpossible.Insomelocations,
thepoleswouldbelocatedonboth
sidesoftheLRTtracks.Theoverhead
electricalpowerlinesaresuspended
abovetheLRTtracks.Electricityfor
LRToperationswouldbesuppliedtothe
OCSfromtractionpowersubstations
(TPSS),locatedalongtheproposedLRT
alignment.Theseelectricalsubstations
wouldbeenclosedstructureslocatednear
theLRTalignment.Developmentofthe
substations,insomecases,wouldrequire
anaccessroadwayformaintenance
vehicles.Electricalsubstationswouldbe
requiredforapproximatelyeachmileof
singleordouble-track.Communications
andsignaling(C&S)buildingshouse
traincontrolandcommunications
forLRToperationsinacentralfacility
ateachstation.Eachfacilityisan
enclosurelocatedwithinthestation
sitearea,typicallyadjacenttoastation
platform.PositioningofaC&Sbuilding
mustbedonetoprovideclearances
formaintenanceandservicing,andto
maintainsightlinesforLRToperations.
Page ES-21
Century Looking East, Gateway to LAX
Aviation and Century, Looking East
Aviation/Century StationThe Aviation/Century Station will serve as a new major gateway between Metro’s regional transit system and LAX. The station will be aerial and designed to accom-modate a future connection to the LAX People Mover. A bus transfer plaza will be provided on the west of the station to provide multimodal access to the system.
CRENSHAW/LAX TRANSIT CORRIDOR PROJECT FEIS/FEIR
Executive SummaryAVIATION/CENTURY STATION
Rendering of the aerial station at Century/Aviation Boulevards.
The above figure shows the location of the Aviation/Century Station located at the aerial crossing over Century Boulevard at Aviation Boulevard.
Existing view of Century Boulevard at Aviation Boulevard.